Loading...
HomeMy WebLinkAboutRES-24-7434 (ROAD REPAIR AND ACCOUNTABILITY ACT) Page 1 of 2 RES-24-7434 CITY OF HERMOSA BEACH RESOLUTION NO. RES-24-7434 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2024–25 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017) was passed by the Legislature and Signed into law by the Governor in April, 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of the City of Hermosa Beach are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City of Hermosa Beach must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and WHEREAS, the City of Hermosa Beach, will receive an estimated $504,579 in RMRA funding in Fiscal Year 2024–25 from SB 1; and WHEREAS, this is the eighth year in which the City of Hermosa Beach is receiving SB 1 funding and will enable the City of Hermosa Beach County to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City of Hermosa Beach has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list; and WHEREAS, the City of Hermosa Beach used a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the communities priorities for transportation investment. The projects placed on the SB 1 list for Fiscal Year 2024–25 involves the rehabilitation of a street with a Pavement Condition Index (PCI) ranging from 34 to 69; and DocuSign Envelope ID: 9B8ED61F-B860-4126-B6BB-420B2116B30D Page 2 of 2 RES-24-7434 WHEREAS, the funding from SB 1 will help the City of Hermosa Beach maintain and rehabilitate various streets and sidewalks throughout the City of Hermosa Beach this year and similar projects in the future; and WHEREAS, the 2023 California Statewide Local Streets and Roads Needs Assessment found that the City of Hermosa Beach’s streets and roads are in good condition and this revenue will help us maintain and improve the overall quality of our road system; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive co-benefits statewide. Without revenue from SB 1, the City of Hermosa Beach would have to delay projects throughout the community. NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA, DOES HEREBY RESOLVE AS FOLLOWS: 1. The foregoing recitals are true and correct. 2. The list in “Attachment 2” of newly proposed projects will be funded in-part or solely with Fiscal Year 2024–25 Road Maintenance and Rehabilitation Account revenues. 3. The list in “Attachment 2” of previously proposed and adopted projects may also utilize Fiscal Year 2024–25 Road Maintenance and Rehabilitation Account revenues in their delivery. With the relisting of these projects in the adopted fiscal year resolution, the City of Hermosa Beach is reaffirming to the public and the State our intent to fund these projects with Road Maintenance and Rehabilitation Account revenues. PASSED, APPROVED, and ADOPTED on this 11th day of June, 2024. Mayor Justin Massey PRESIDENT of the City Council and MAYOR of the City of Hermosa Beach, CA ATTEST: APPROVED AS TO FORM: ________________________________ ________________________________ Myra Maravilla, Patrick Donegan, City Clerk City Attorney DocuSign Envelope ID: 9B8ED61F-B860-4126-B6BB-420B2116B30D State of California ) County of Los Angeles ) ss ) City of Hermosa Beach June 18, 2024 Certification of Council Action RESOLUTION NO. RES-24-7434 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA ADOPTING A LIST OF PROJECTS FOR FISCAL YEAR 2024–25 FUNDED BY SB 1: THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 I, Myra Maravilla, City Clerk of the City of Hermosa Beach do hereby certify that the above and foregoing Resolution No. RES-24-7434 was duly approved and adopted by the City Council of said City at its regular meeting thereof held on the 11th day of June 2024 and passed by the following vote: AYES: MAYOR MASSEY, MAYOR PRO TEMPORE FRANCOIS, COUNCILMEMBERS SAEMANN, DETOY and JACKSON NOES: NONE ABSTAIN: NONE ABSENT: NONE ________________________________ Myra Maravilla, City Clerk DocuSign Envelope ID: 9B8ED61F-B860-4126-B6BB-420B2116B30D Agency Contact: Lucho Rodriguez (310) 318-0210 LoCode:5155 lrodriguez@hermosabeach.gov Pre- Construction Construction Min. Max. Sidewalk Grinding This project will provide grinding and repairs to sidewalk to address trip hazards and improve safety. Various sidewalk locations based on highest priority. 7/1/2024 7/1/2025 10 20 CIP 105 Annual Street Improvements This project proposes pavement rehabilitation of streets at various locations. The project will also address limited quantities of deteriorated concrete sidewalk, curb and gutter, curb ramps and drainage deficiencies. Locations TBD 5/31/2024 12/31/2024 10 20 CIP 112 City Sidewalk Improvements This project will provide grinding, replacement, and other improvements to sidewalks throughout the City to maintain and improve safety. 24th Street from Palm Drive to Manhattan Ave and various locations TBD 5/31/2024 7/31/2024 10 20 CIP 143 PCH Mobility Improvement Project This project is to improve accessibility, mobility and safety along the Pacific Coast Highway corridor. Pacific Coast Highway within City limits 7/21/2025 10/30/2028 15 30 CIP 193 Pedestrian Crossing Safety Improvements This project will implement pedestrian safety and accessibility improvements at several uncontrolled locations throughout the City. Improvements may include installation of median closures, modifications to parking to enhance sight lines, enhanced pavement markings and signage, curb extensions, accessible ramp improvements, and other safety measures as deemed appropriate. Including but not limited to: Hermosa Avenue at 2nd, 4th, 6th, 19th, 24th, and 25th Streets Pier Avenue at Manhattan Avenue, Loma Drive, and Cypress Avenue 245 Valley Drive Herondo Street at Monterey Boulevard 1/1/2025 10/30/2026 10 20 STATE OF CALIFORNIA • CALIFORNIA TRANSPORTATION COMMISSION Senate Bill (SB) 1 Proposed Project List Form Local Streets and Roads Program Agency Name:FY Hermosa Beach 24/25 NEWLY PROPOSED PROJECTS PREVIOUSLY PROPOSED AND ADOPTED PROJECTS Summary of Proposed Project List Project No. Project Title Project Description Project Location Estimated Completion Date (mm/dd/yyyy) Estimated Useful Life (# of yrs) DocuSign Envelope ID: 9B8ED61F-B860-4126-B6BB-420B2116B30D