HomeMy WebLinkAbout2013-07-16 PC AGENDA1
AGENDA
PLANNING COMMISSION MEETING
CITY OF HERMOSA BEACH
CITY HALL COUNCIL CHAMBERS
1315 VALLEY DRIVE
HERMOSA BEACH, CA 90254
July 16, 2013
7:00 P.M.
Peter Hoffman, Chairman
Kent Allen, Vice Chairman
Michael Flaherty
Sam Perrotti
Ron Pizer
Note: No Smoking Is Allowed in the City Hall Council Chambers
THE PUBLIC COMMENT IS LIMITED TO THREE MINUTES PER SPEAKER
Planning Commission agendas and staff reports are available for review
on the City’s web site at www.hermosabch.org.
Wireless access is available in the City Council Chambers for mobile devices:
Network ID: City Council and Password: chb13
Written materials distributed to the Planning Commission within 72 hours
of the Planning Commission meeting are available for public inspection immediately
upon distribution in the Community Development Department during normal business hours
from Monday through Thursday, 7:00 a.m. - 6:00 p.m. and on the City’s website.
Final determinations of the Planning Commission may be appealed to the City Council within
10 days of the next regular City Council meeting date. If the 10th day falls on a Friday
or City holiday, the appeal deadline is extended to the next City business day.
Appeals shall be in written form and filed with the City Clerk's office, accompanied by
an appeal fee. The City Clerk will set the appeal for public hearing before
the City of Hermosa Beach City Council at the earliest date possible.
If you challenge any City of Hermosa Beach decision in court, you may be limited
to raising only those issues you or someone else raised at the public hearing
described on this agenda, or in a written correspondence delivered to the
Planning Commission at, or prior to, the public hearing.
To comply with the Americans with Disabilities Act (ADA) of 1990, Assistive Listening Devices
will be available for check out at the meeting. If you need special assistance to participate
in this meeting, please call or submit your request in writing to the Community Development
Department at (310) 318-0242 at least 48 hours (two working days) prior to the meeting time
to inform us of your needs and to determine if/how accommodation is feasible.
2
1. Pledge of Allegiance
2. Roll Call
3. Oral / Written Communications
Anyone wishing to address the Commission regarding a matter not related to a public
hearing on the agenda may do so at this time.
Section 1
Consent Calendar
4. Approval of the June 18, 2013 Action Minutes
5. Resolution(s) for Consideration - None
THE RECOMMENDATIONS NOTED BELOW ARE FROM THE PLANNING STAFF AND ARE RECOMMENDATIONS
ONLY. THE FINAL DECISION ON EACH ITEM RESTS WITH THE PLANNING COMMISSION. PLEASE DO NOT
ASSUME THAT THE STAFF RECOMMENDATION WILL BE THE ACTION OF THE PLANNING COMMISSION.
Section II
Public Hearing
6. CON 13-2 / PDP 13-3 -- Conditional Use Permit, Precise Development Plan and Tentative
Parcel Map No. 72198 for a 2-unit condominium on east lot at 920 17th Street (continued
from the May 22, 2013 meeting).
Staff Recommended Action: To adopt the resolution approving subject Conditional Use
Permit, Precise Development Plan, and Tentative Parcel Map subject to conditions.
7. CON 13-3 / PDP 13-4 -- Conditional Use Permit, Precise Development Plan and Tentative
Parcel Map No. 72199 for a 2-unit condominium on west lot at 920 17th Street (continued
from the May 22, 2013 meeting).
Staff Recommended Action: To adopt the resolution approving subject Conditional Use
Permit, Precise Development Plan, and Tentative Parcel Map subject to conditions.
8. CUP 13-4 -- Conditional Use Permit Amendment proposing to change an existing restaurant
with on-sale beer and wine and hours of operation from 11 a.m. to 11:00 p.m. daily, to allow
an earlier opening to accommodate breakfast dining, open air dining, and an amended floor
plan, at 425 Pier Avenue (currently Buona Vita Pizzeria).
Staff Recommended Action: To adopt the resolution approving subject Conditional Use
Permit amendment subject to conditions.
Section III
9. Staff Items
a. Review of Fiscal Year 2013-2014 Capital Improvement Program (CIP) for
conformance with the City’s General Plan.
3
b. Report on City Council actions.
c. Report on comprehensive planning processes.
d. Tentative future Planning Commission agenda.
e. Community Development Department activity reports of May, 2013.
10. Commissioner Items
11. Adjournment
1 Planning Commission Action Minutes
June 18, 2013
ACTION MINUTES OF THE PLANNING COMMISSION MEETING
OF THE CITY OF HERMOSA BEACH HELD ON
JUNE 18, 2013, 7:00 P.M.,
AT THE CITY HALL COUNCIL CHAMBERS
All public testimony and the deliberations of the Planning Commission can be viewed
on the City’s web site at www.hermosabch.org, On-Demand Video of City Meetings
The meeting was called to order at 7:02 P.M. by Chairman Pizer.
1. Pledge of Allegiance
2. Roll Call
Present: Commissioner Allen, Flaherty, Hoffman, Perrotti, Chairman Pizer
Absent: None
Also Present: Ken Robertson, Community Development Director
Michael Jenkins, City Attorney
Pamela Townsend, Senior Planner
Eva Choi, Assistant Planner
Aaron Gudelj, Planning Technician
3. Oral / Written Communications
Anyone wishing to address the Commission regarding a matter not related to a public
hearing on the agenda may do so at this time.
Section I
CONSENT CALENDAR
4. Approval of the May 22, 2013 action minutes
ACTION: To approve the above minutes as presented.
MOTION by Commissioner Perrotti, seconded by Commissioner Flaherty. The motion
carried by a unanimous vote.
5. Resolution(s) for Consideration - None
Section II
Public Hearing
6. CUP 12-11 / PDP 12-11 -- Conditional Use Permit and Precise Development Plan
Amendments to convert an existing auto body, painting and general repair use (Mike’s
Foreign Car Service) to auto repair and sales for a maximum of two vehicles use (Lexology
Auto Care); substantially replace 4,816+ sq. ft. of buildings with 9,203+ sq. ft. of buildings
(6,000+ sq. ft. auto repair and 3,203 sq. ft. accessory office/storage) surface parking and
2 Planning Commission Action Minutes
June 18, 2013
landscaping; and amend hours of operation and other conditions for consistency with the
revised use and site plan, in the C-3 zone at 1086 Aviation Boulevard and 1111 Prospect
Avenue; and adoption of an Environmental Negative Declaration (continued from the April
16 and May 22, 2013 meetings).
Staff Recommended Action: To adopt the resolution approving the Conditional Use Permit
and Precise Development Plan amendments subject to the conditions, and adopting a
Negative Declaration.
ACTION: To adopt the resolution approving subject Conditional Use Permit and Precise
Development Plan amendments as presented, and adopting a Negative Declaration.
MOTION by Commissioner Perrotti, seconded by Commissioner Allen. The motion carried
by the following vote:
AYES: Comms. Allen, Flaherty, Hoffman, Perrotti, Chmn. Pizer
NOES: None
ABSTAIN: None
ABSENT: None
7. PDP 13-1 / CUP 13-1 / PARK 13-1 -- (1) Precise Development Plan to allow a 29,544+
square foot hotel with 30 rooms and common areas on an undeveloped 11,516+ square
foot lot at 1429 Hermosa Avenue; (2) Conditional Use Permit to allow on-sale general
alcohol (mini-bars) in guest rooms and in common areas for hotel guests; (3) Parking Plan
to allow a valet program including less than required parking and parking in tandem; and
adoption of environmental Mitigated Negative Declaration and Mitigation Monitoring Plan
(continued from the May 22, 2013 meeting).
Staff Recommended Action: To adopt the resolution approving Precise Development Plan,
Parking Plan, and Conditional Use Permit subject to conditions and adopting an environmental
Mitigated Negative Declaration and Mitigation Monitoring Plan.
ACTION: To adopt the resolution approving subject Precise Development Plan,
Conditional Use Permit and Parking Plan with modifications to conditions to limit alcohol to
mini-bars only, require one in-lieu parking space fee due to loss of one on-street space,
prohibit location of bicycle facilities in 5’ setback at rear of lot, modifying findings
accordingly and renumbering conditions, and adopting an environmental Mitigated Negative
Declaration and Mitigation Monitoring Plan.
INITIAL MOTION by Commissioner Perrotti, seconded by Commissioner Flaherty and
AMENDED MOTION by Commissioner Flaherty, seconded by Commissioner Hoffman to
additionally limit on-sale alcohol to mini-bars only. The motion carried by the following vote:
AYES: Comms. Flaherty, Hoffman, Perrotti, Chmn. Pizer
NOES: Comm. Allen
ABSTAIN: None
ABSENT: None
8. PARK 13-3 -- Parking Plan to classify a proposed ice-cream and baked goods (cookies and
cakes) retail business (“Baby g’s Cookies and Ice Cream”) as a ‘snack shop’ for the
purpose of calculating parking requirements, at 243 Pacific Coast Highway (previously
Brothers Laundry & Cleaners).
Staff Recommended Action: To adopt the resolution approving a Parking Plan finding that
3 Planning Commission Action Minutes
June 18, 2013
the use is a snack shop and less than required parking is merited due to the parking
demand characteristics of the proposed use.
ACTION: To adopt the resolution approving subject Parking Plan at 243 Pacific Coast
Highway as presented.
MOTION by Commissioner Perrotti, seconded by Commissioner Hoffman. The motion
carried by the following vote:
AYES: Comms. Allen, Flaherty, Hoffman, Perrotti, Chmn. Pizer
NOES: None
ABSTAIN: None
ABSENT: None
9. CON 13-6 / PDP 13-7 -- Conditional Use Permit, Precise Development Plan and Vesting
Tentative Parcel Map No. 72210 for a 2-unit condominium at 1500 Hermosa Avenue.
Staff Recommended Action: To adopt the resolution approving the Conditional Use Permit,
Precise Development Plan, and Vesting Tentative Parcel Map subject to conditions.
ACTION: To adopt the resolution approving subject Conditional Use Permit, Precise
Development Plan and Vesting Tentative Parcel Map No. 72210 for a 2-unit condominium
at 1500 Hermosa Avenue as presented.
MOTION by Commissioner Hoffman, seconded by Commissioner Perrotti. The motion
carried by the following vote:
AYES: Comms. Allen, Flaherty, Hoffman, Perrotti, Chmn. Pizer
NOES: None
ABSTAIN: None
ABSENT: None
10. CON 13-7 / PDP 13-8 -- Conditional Use Permit, Precise Development Plan and Vesting
Tentative Parcel Map No. 72277 for a 2-unit condominium at 633 5th Street.
Staff Recommended Action: To adopt the resolution approving the Conditional Use Permit,
Precise Development Plan, and Vesting Tentative Parcel Map subject to conditions.
ACTION: To adopt the resolution approving subject Conditional Use Permit, Precise
Development Plan and Vesting Tentative Parcel Map No. 72277 for a 2-unit condominium
at 633 5th Street.
MOTION by Commissioner Hoffman, seconded by Commissioner Perrotti. The motion
carried by the following vote:
AYES: Comms. Allen, Flaherty, Hoffman, Perrotti, Chmn. Pizer
NOES: None
ABSTAIN: None
ABSENT: None
11. CON 13-8 / PDP 13-9 -- Conditional Use Permit, Precise Development Plan and Vesting
Tentative Parcel Map No. 72237 for a 2-unit condominium at 332 Ocean View Avenue.
Staff Recommended Action: To adopt the resolution approving the Conditional Use Permit,
4 Planning Commission Action Minutes
June 18, 2013
Precise Development Plan, and Vesting Tentative Parcel Map subject to conditions.
ACTION: To adopt the resolution approving subject Conditional Use Permit, Precise
Development Plan and Vesting Tentative Parcel Map No. 72237 for a 2-unit condominium
at 332 Ocean View Avenue.
MOTION by Commissioner Hoffman, seconded by Commissioner Allen. The motion
carried by the following vote:
AYES: Comms. Allen, Flaherty, Hoffman, Perrotti, Chmn. Pizer
NOES: None
ABSTAIN: None
ABSENT: None
Section III
Hearing
12. S-21 #7 – Slope determination to determine if the property is a convex sloping lot for
purposes of calculating building height at 2906 Tennyson Place.
Staff Recommended Action: To direct staff as deemed appropriate.
ACTION: To determine, by minute order, that the subject property is a convex sloping
lot and can use alternative method to calculate height.
MOTION by Commissioner Allen, seconded by Commissioner Perrotti. The motion carried
by the following vote:
AYES: Comms. Allen, Flaherty, Perrotti, Chmn. Pizer
NOES: Comm. Hoffman
ABSTAIN: None
ABSENT: None
Section IV
13. Staff Items
a. Request to initiate a sign code amendment to consider special provisions for
automobile sales lots.
ACTION: The Planning Commission consensus was to not initiate a sign code
amendment to consider special provisions for automobile sales lots.
b. Memorandum regarding rotation of the Planning Commission Chairmanship.
c. Report on City Council actions.
d. Report on comprehensive planning processes.
e. Tentative future Planning Commission agenda.
5 Planning Commission Action Minutes
June 18, 2013
f. Community Development Department activity reports of April, 2013.
14. Commissioner Items
15. Adjournment
The meeting was formally adjourned at 10:55 P.M.
CERTIFICATION
I hereby certify the foregoing Minutes are a true and complete record of the action taken by
the Planning Commission of Hermosa Beach at the regularly scheduled meeting of June 18,
2013.
Ron Pizer, Chairman Ken Robertson, Secretary
Date
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
, 914
J M FLOORES SUB LOT 21
PROPOSED 2- UNIT CONDOMINIUM EAST LOT
SOARING
DEVELOPMENT, INC
525 S SAN GABRIEL BLVD
SAN GABRIEL,CA 91776
PHONE: 626-307-7788
M.S. Consulting / Engineering Inc.
12540 Destino Street, Cerritos, CA 90703
(562) 397-4868
DESIGNER
RENDERING IS FOR ARTIST'S CONCEPT ONLY
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
PROPOSED 2- UNIT CONDOMINIUM EAST & WEST LOT DRIVEWAY DIAGRAM
10'-0"26'-0"5'-0"9'-0"140'-0"40'-0"40'-0"20'-0"20'-0"17'-0"10'-9"10'-9"9'-0"4'-0"4'-0"17TH ST.FRONT
SETBACK
REAR
SETBACK
PL 80'PL 80'PL 140'
PL 140'
LAWN
GUEST PARKING
9X20UNIT B
LAWN
LAWN
FILL (E)
CURBCUT
REMOVED
PARKING
NEW
PARKING
NEW CURBCUT
PER CITY STANDARD
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.TRASHFAUELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.FAU ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FOYER
TRASH
OFFICE
FAMILY
ROOM
LAUNDRY
ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.FAU ELEVATOR UP
BATHROOM
BEDROOM
16'X10'
FOYER
TRASH
OFFICE
GUEST PARKING
9X20
LAWN
LAWN
LAWN
DRIVEWAY
GARAGE
20'X21'
W.H.TRASHFAU
MAX. SLOPE
20%
MAX. SLOPE
10%
3' H
RETAINING WALL
SIDESETBACKF.F 160
F.F 158
F.F 160.5 FLOW2%MAX. SLOPE
10%RETAINING WALL
UNIT A
F.F 162.5
F.F 160.5F.F 163
F.F 161
RETAINING WALL
FLOW
2%VERTICAL CURVEF.F 157.5
UNIT BUNIT A
F.G. 160.5
(163)
F.G. 161.25
(161)
F.G. 163.5
(165)
F.G. 162.5
(167)F.G. 163.5
(168)
F.G. 169.25
(168.75)
F.G. 162.5
(165)
F.G. 162.25
(164.25)
F.G. 160
(162.50)F.G. 167.5
(167.5)
F.G. 159.5
(158)
F.G. 160
(160.5)
F.G. 157.5
(161.75)
F.G. 157.00
(160.75)
F.G. 159.5
(162.5)
F.G. 169.25 F.G. 168.33 F.G. 165.5 F.G. 161.25 F.G. 159
F.G. 158.75
F.G. 160.65F.G. 160.5
(168.5)
(170.25)
F.G. 156.75
F.G. 157.25
F.G. 157.25
F.G. 165
F.G. 166
DRIVEWAY
DRIVEWAY
NEW RETAINING WALL CENTERED
ON ADJACENT
PROPERTY PERMITTED
BY ADJACENT OWNERON THE CONDITION THAT
THE EXISTING SOUTHERN
TREES REMAIN
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL SIDESETBACKNEW RETAINING WALL
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
10'-0"28'-0"5'-0"5'-0"140'-0"40'-0"40'-0"20'-0"20'-0"17TH ST.FRONT
SETBACK
REAR
SETBACK
4'-0"SIDESETBACKPL 80'PL 80'PL 140'
PL 140'2'-6"1'-6"
1/4:12
1/4:12
BALCONY
1/4:12
1/4:12
1/4:12
1/4:12
1/4:12
1/4:12
UNIT A UNIT B
BALCONY
C
P
1
:
2
0
0
M
A
X
A
C
T
U
A
L
1
9
3
C
P
3
:
1
9
8
.
5
M
A
X
A
C
T
U
A
L
1
9
3
C
P
2
:
1
9
9
.
5
M
A
X
A
C
T
U
A
L
1
9
3
.
3
C
P
6
:
1
9
9
M
A
X
C
P
4
:
1
9
5
.
8
M
A
X
C
P
5
:
1
9
8
M
A
X
C
P
3
:
1
9
2
M
A
X
A
C
T
U
A
L
1
9
1
C
P
1
:
1
9
7
M
A
X
A
C
T
U
A
L
1
9
1
C
P
2
:
1
9
6
M
A
X
A
C
T
U
A
L
1
9
1
.
3
C
P
4
:
1
9
1
.
3
M
A
X
A
C
T
U
A
L
1
9
1
C
P
5
:
1
9
3
M
A
X
A
C
T
U
A
L
1
9
1
.
3
C
P
6
:
1
9
6
M
A
X
A
C
T
U
A
L
1
9
1
PL 140'
COOL ROOF
TYP.
COOL ROOF
TYP.
A
C
T
U
A
L
1
9
3
A
C
T
U
A
L
1
9
3
A
C
T
U
A
L
1
9
3
.
3BALCONY NEW RETAINING WALL CENTERED
ON ADJACENT
PROPERTY PERMITTED
BY ADJACENT OWNER
ON THE CONDITION THATTHE EXISTING SOUTHERN
TREES REMAIN
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
NOT PART OF PROJECT
10'-0"26'-0"5'-0"9'-0"140'-0"40'-0"40'-0"1ST FLOOR PLAN
SCALE : 3/16"=1'-0"
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.
UNIT A UNIT B
49'-6"27'-0"49'-6"
13'-7"6'-9"21'-3"
6'-2"8'-11"21'-3"13'-9"6'-0"6'-8"27'-0"GUEST PARKING
9X20
TRASH
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
FAUELEVATOR
UP
BATHROOM
BEDROOM
16'X10'10'-9"13'-2"8"8'-0"
5'-0"49'-6"
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.
2'-10"
10'-10"7'-1"20'-11"
6'-2"8'-11"21'-3"10'-2"10'-3"6'-8"21'-0"FAU ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
13'-2"
8'-0"
FOYER4'-0"2'-11"6'-0"TRASH
F.F 162.5
F.F 160.5
F.F 163
F.F 161
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
NOT PART OF PROJECT
MASTER BEDROOM
BEDROOM
DECK
10'-0"26'-0"5'-0"9'-0"140'-0"40'-0"40'-0"2ND FLOOR PLAN
SCALE : 3/16"=1'-0"
UNIT A UNIT B
49'-6"27'-0"49'-6"10'-7"6'-0"6'-8"MASTER
BATHROOM
HER CLOSET
HALLWAY
15'-8"18'-9"15'-1"4'-0"19'-6"13'-2"6'-2"15'-0"15'-1"
ELEVATOR
FOYER
DN
UP
26'-4"DEN
MASTER BEDROOM
BEDROOM
12'-5"6'-8"MASTER
BATHROOM
W.I.C
HALLWAY
CLOSET
6'-0"17'-6"13'-2"6'-2"12'-9"17'-5"
ELEVATOR3'-6"RETREAT
21'-1"5'-8"11'-9"
F.F 173
F.G 170
CLOSET
HIS CLOSET 3'-6"3'-1"4'-0"DECK
DECK
11'-1"7'-11"UP
F.F 173
F.F 171
F.F 173
F.F 171
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
NOT PART OF PROJECT
28'-0"5'-0"5'-0"140'-0"40'-0"40'-0"3RD FLOOR PLAN
REF
LIVING ROOM
DININGROOM
KITCHEN
STORAGE
5'X5'
SCALE : 3/16"=1'-0"
UNIT A UNIT B
49'-6"31'-0"47'-6"
10'-0"
20'-6"10'-0"
SLIDING
GLASS
DOOR
ELEVATORDN
5'-10"13'-2"6'-8"8"F.P
REF
LIVING ROOMDININGROOM
KITCHEN
STORAGE
SLIDING
GLASS
DOOR
ELEVATOR DN
F.P19'-8"4'-0"10'-0"
5'-0"
20'-6"17'-0"7'-0"7'-0"11'-8"21'-6"9'-0"6'-8"24'-4"20'-6"7'-8"19'-4"7'-4"23'-8"GLASS
DOOR
GLASS
DOOR
GLASS
DOOR
GLASS
DOOR
F.F 183
F.F 181
F.F 183
F.F 181
TILETILETILETILEDECK
DECK DECK DECK
5'-4"
BBQ
WET
BAR
5'-0"
10'-0"
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
NOT PART OF PROJECT
170.25 @ SIDEWALK
F.F 162.5
UNIT A,B WEST ELEVATIONS
SCALE : 3/16"=1'-0"
@GARAGE DOOR
F.F 173
10'-6"F.F 183
10'-0"R 193
10'-0"F.F 161
F.F 171
F.F 181
F.F 191
10'-0"10'-0"10'-0"5'-0"
10'-0"PLPLSIDING
1'-6"
W.I.RAILING
EXISTING GRADE
STUCCO
BEIGE COLOR
DECORATIVE
CP: 1
9
5.
8
M
A
X
ACTU
A
L
1
9
3
CP: 1
9
2
M
A
X
ACTU
A
L
1
9
1
CP: 1
9
1.
3
M
A
X
ACTU
A
L
1
9
1
CP: 1
98.
5
M
A
X
ACT
U
AL
1
93
BRICK VENEER
1'-6"
W.I.RAILING
STUCCO
BEIGE COLOR
DECORATIVE
HARDIE SIDING
F.F 160.5
STREET
30' MAX HEIGHT LIMIT
F
R
O
M
E
X
I
S
T
I
N
G
G
R
A
D
E
NEW RETAINING WALL BEYOND
E.G. 165
E.G. 163
NEW GRA
D
E
F.F 163
NEW 3' HIGH RETAINING WALL
2% NEW GRADE
F.G. 169.25
E.G. 168.75
VERTICALCURVE
NEW GRADE
2% (1:50) Max
NEW GRADE BEYOND
10% (1:10) Max
WOOD FACIA
WOOD FACIA
20% (1:5)
M
a
x
E.G. 171
UNIT A,B EAST ELEVATIONS
SCALE : 3/16"=1'-0"
F.F 163
F.F 173
10'-0"F.F 183
10'-0"F.F 193
10'-0"PL10'-0"
5'-0"PLF.F 160.5
F.F 171
F.F 181
F.F 191
10'-6"10'-0"10'-0"W.I.RAILING
EXISTING GRADE
DECORATIVE
CP1: 196 M
A
X
ACTUAL 1
9
1
.
3
CP1:
1
9
7
M
A
X
ACTU
A
L
1
9
1
CP: 19
9
M
A
X
ACTU
A
L
1
9
3
CP: 2
0
0
M
A
X
ACT
U
AL 1
9
3
HARDIE SIDING
STUCCO
BEIGE COLOR
HARDIE SIDING
W.I.RAILING
DECORATIVE
HARDIE SIDING
E.G. 165
E.G. 168
E.G. 167
STREET
F.F. 161
F.F. 162.5
30' MAX HEIGHT LIMIT FROM EXISTING GRADE
VERTICAL
CURVENEW GRADE BEYOND
2% (1:50) Max
NEW GR
A
D
E
B
E
Y
O
N
D
20% (1:5
)
M
a
x
2% NEW GRADE
2% NEW GRADE
STUCCO
BEIGE COLOR
F.G. 163.5
F.G. 163.5
F.G. 162.5
F.G 164.5NEW 3' HIGH RETAINING WALL
DRIVEWAY
BEYOND
WOOD FACIA
WOOD FACIA
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
UNIT A NORTH ELEVATIONS
SCALE : 3/16"=1'-0"
SIDING
F.F 163
F.F 173
10'-0"F.F 183
10'-0"F.F 193
10'-0"PL4'-0"
1'-6"
W.I.RAILING
STUCCO
BEIGE
DECORATIVE
CP: 200
M
AX
ACT
U
AL 193
CP: 19
8.
5
M
A
X
ACTU
A
L
1
9
3
PL5'-0"
BRICK VENEER
CONC.
STEPS E.G. @
PL. (170.25)
E.G. @
PL. (171)
F.G. 164.5
UNIT B NORTH ELEVATIONS
SCALE : 3/16"=1'-0"
STUCCO
BEIGE
F.F 161
F.F 171
F.F 181
F.F 191
10'-0"10'-0"10'-0"PL4'-0"
1'-6"
W.I.RAILING
BRICK VENEER
ROLL UP
GARAGE DOOR
DECORATIVE
CP: 1
9
7
M
A
X
ACT
U
AL
1
9
1
CP: 1
9
2
M
A
X
ACT
U
AL
1
91
PL5'-0"
F.G.
162.5
UNIT A SOUTH ELEVATIONS
SCALE : 3/16"=1'-0"
F.F 162.5
F.F 173
F.F 183
10'-0"F.F 193
10'-0"4'-0"PL1'-6"
W.I.RAILING
STUCCO
BEIGE
ROLL UP
GARAGE DOOR
CP: 195.
8
M
A
X
ACT
U
AL
193
CP: 1
9
9
M
A
X
ACTU
AL 19
3
5'-0"PLBRICK VENEER E.G. (168)
F.G.
163.5
UNIT B SOUTH ELEVATIONS
SCALE : 3/16"=1'-0"
STUCCO
BEIGE
F.F 161
F.F 171
F.F 181
F.F 191
10'-0"10'-0"10'-0"4'-0"PL1'-6"
W.I.RAILINGDECORATIVECP: 191.3 MAX
ACTUAL 191CP: 1
9
6
M
A
X
ACTU
A
L
1
9
1
5'-0"PLEXISTING GRADE
F.G.
163.5
E.G. (165.49)
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
SECTION A
SCALE : 3/16"=1'-0"
SECTION B
SCALE : 3/16"=1'-0"
F.F 162.5@GARAGE DOOR
F.F 173
10'-6"F.F 183
10'-0"F.F 193
10'-0"F.F 161
F.F 171
F.F 181
F.F 191
10'-0"10'-0"10'-0"F.F 163
F.F 173
10'-0"F.F 183
10'-0"F.F 193
10'-0"GARAGEFAMILY
ROOMBEDROOM
GARAGE FAMILY ROOM OFFICE
BEDROOM BEDROOMBATHROOM
DINING LIVING BALCONY
BALCONY
BEDROOM BEDROOMBATHROOM
KITCHEN LIVING
LAUNDRYFAMILY ROOM
BATHROOMHALLWAY BALCONYCLOSET
BATHROOM
BATHROOM
DINING LIVINGBATHROOM
F.F 160.5 @GARAGE DOOR
EXISTING GRADE
EXISTING GRADE
EXISTING GRADE
F.F 163
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
LAWN
GUEST PARKING
9X20
4AGA@5GAL
1AUS@15GAL
6PHR@5GAL
LAWN
LAWN
LAWN
TURFBLOCKTURFBLOCK
CATCH BASIN
DRAIN TANK
SYETEM
283 SF 188 SF
189 SF
925 SF
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.TRASHFAUELEVATOR
UP
BATHROOM
BEDROOM
16'X10'10'-9"FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.FAU ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FOYER
TRASH
OFFICE
81 SF
3PHR@5GAL
5EUR@5GAL
5GAL@5GAL
NEW RETAINING WALL CENTEREDON ADJACENT
PROPERTY PERMITTED
BY ADJACENT OWNER
ON THE CONDITION THAT
THE EXISTING SOUTHERN
TREES REMAIN
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
CONCRETE
DRIVEWAY
1414 SF
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
LINE TABLE
LINE LENGTH
L1 140.15'
BEARING
6
(
L2 40.00'1
(
L3 140.15'1
:
L4 40.00'6
:
L5
L6
L7
L8
ZONING: R2
AREA TABLE
LOT BEFORE(SQ.FT)AFTER(SQ.FT)
21 5'606.0
22 5'606.0
11212.0
140.15'6
(
40.00'1
(
140.15'1
:
40.00'6
:
L1:L2:L4:L3:L5:
L7:L8:L6:DRIVEWAY
LAWN
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.TRASHSTORAGE
ABOVE HEAD
200 CF
FAUELEVATOR
UP
BATHROOM
BEDROOM
16'X10'10'-9"FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.FAU ELEVATOR
BATHROOM
BEDROOM
16'X10'
FOYER
STORAGE
ABOVE HEAD
200 CF
TRASH
OFFICE
GUEST PARKING
9X20
......... Prop. Catch Basin
...... Prop. Sheet Flow
...... Sump Pump
UNIT A UNIT B
F.F 162.5
F.F 160.5
F.F 163
F.F 161
F.G. 160.5
(163)
F.G. 161.25
(161)
F.G. 163.5
(165)
F.G. 162.5
(167)F.G. 163.5
(168)
F.G. 169.25
(168.75)
F.G. 162.5
(165)
F.G. 162.25
(164.25)
F.G. 160
(162.50)F.G. 167.5
(167.5)
F.G. 159.5
(158)
F.G. 160
(160.5)
F.G. 157.5
(161.75)
F.G. 157.00
(160.75)
F.G. 159.5
(162.5)
F.G. 169.25 F.G. 168.33 F.G. 165.5 F.G. 161.25 F.G. 159
F.G. 158.75
F.G. 160.65F.G. 160.5
(168.5)
(170.25)
F.G. 156.75
F.G. 157.25
F.G. 157.25
F.G. 165
F.G. 166
NEW RETAINING WALL CENTERED
ON ADJACENT
PROPERTY PERMITTED
BY ADJACENT OWNER
ON THE CONDITION THAT
THE EXISTING SOUTHERN
TREES REMAIN
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
BRAHEA ARMATA (BLUE HESPER PALM)
14
Attachment 2 Location Map
Subject Site (East Lot) X
15
Attachment 3 Zoning Map
Subject Site
(East Lot)
16
Attachment 4 Legal Poster (East Lot)
Poster for
east lot
18
Attachment 5 Site Pictures (East Lot)
Main residence built in 1915
Rear yard, looking southeast Rear yard, looking southwest
Properties to the east
R-1 zoned properties to
the west & southwest
R-2B zoned properties,
north side of 17th Street
1
View from rear deck at 909 16th Street,
directly south of project.
Looking north from rear deck at 909
16th Street. Heavy vegetation provides
privacy and screening from noise.
Supplemental
Information
9 & 10
2
Views to west from bedroom window
at 909 16th Street.
Views to north from bedroom window
at 909 16th Street.
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
, 914
J M FLOORES SUB LOT 21
PROPOSED 2- UNIT CONDOMINIUM WEST LOT
SOARING
DEVELOPMENT, INC
525 S SAN GABRIEL BLVD
SAN GABRIEL,CA 91776
PHONE: 626-307-7788
M.S. Consulting / Engineering Inc.
12540 Destino Street, Cerritos, CA 90703
(562) 397-4868
DESIGNER
RENDERING IS FOR ARTIST'S CONCEPT ONLY
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
PROPOSED 2- UNIT CONDOMINIUM EAST & WEST LOT DRIVEWAY DIAGRAM
10'-0"26'-0"5'-0"9'-0"140'-0"40'-0"40'-0"20'-0"20'-0"17'-0"10'-9"10'-9"9'-0"4'-0"4'-0"17TH ST.FRONT
SETBACK
REAR
SETBACK
PL 80'PL 80'PL 140'
PL 140'
LAWN
GUEST PARKING
9X20UNIT B
LAWN
LAWN
FILL (E)
CURBCUT
REMOVED
PARKING
NEW
PARKING
NEW CURBCUT
PER CITY STANDARD
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.TRASHFAUELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.FAU ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FOYER
TRASH
OFFICE
DRIVEWAYFAMILY
ROOM
LAUNDRY
ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.FAU ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FOYER
TRASH
OFFICE
GUEST PARKING
9X20
LAWN
LAWN
LAWN
DRIVEWAY
GARAGE
20'X21'
W.H.TRASHFAU
MAX. SLOPE
20%
MAX. SLOPE
10%
3' H
RETAINING WALL
SIDESETBACKF.F 160
F.F 158
F.F 160.5 FLOW2%MAX. SLOPE
10%RETAINING WALL
UNIT A
F.F 162.5
F.F 160.5F.F 163
F.F 161
RETAINING WALLSIDESETBACK
F.F 157.5VERTICAL CURVEFLOW
2%VERTICAL CURVEUNIT BUNIT A
F.G. 160.5
(163)
F.G. 161.25
(161)
F.G. 163.5
(165)
F.G. 162.5
(167)F.G. 163.5
(168)
F.G. 169.25
(168.75)
F.G. 162.5
(165)
F.G. 162.25
(164.25)
F.G. 160
(162.50)F.G. 167.5
(167.5)
F.G. 159.5
(158)
F.G. 160
(160.5)
F.G. 157.5
(161.75)
F.G. 157.00
(160.75)
F.G. 159.5
(162.5)
F.G. 169.25 F.G. 168.33 F.G. 165.5 F.G. 161.25 F.G. 159
F.G. 158.75
F.G. 160.65F.G. 160.5
(168.5)
(170.25)
F.G. 156.75
F.G. 157.25
F.G. 157.25
F.G. 165
F.G. 166
DRIVEWAY
NEW RETAINING WALL CENTERED
ON ADJACENT
PROPERTY PERMITTED
BY ADJACENT OWNER
ON THE CONDITION THAT
THE EXISTING SOUTHERN
TREES REMAIN
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
10'-0"28'-0"5'-0"9'-0"140'-0"40'-0"1'-6"4'-0"2'-6"(160)
FRONT
SETBACK
REAR
SETBACKPL 40'PL 40'PL 140'
1/4:12
1/4:12
BALCONY
1/4:12
1/4:12
1/4:12
1/4:12
1/4:12
1/4:12
UNIT A
UNIT B
BALCONY
PL 140'
COOL ROOF
TYP.
COOL ROOF
TYP.SIDESETBACKC
P
1
:
1
9
8
M
A
X
A
C
T
U
A
L
1
8
9
.
5
C
P
3
:
1
9
5
M
A
X
A
C
T
U
A
L
1
8
9
.
5
C
P
2
:
1
9
8
M
A
X
A
C
T
U
A
L
1
8
9
.
8
C
P
6
:
1
9
0
M
A
X
A
C
T
U
A
L
1
8
9
.
5
C
P
5
:
1
9
1
M
A
X
A
C
T
U
A
L
1
8
9
.
8
C
P
4
:
1
9
2
.
5
M
A
X
A
C
T
U
A
L
1
8
9
.
5
C
P
3
:
1
8
7
.
5
M
A
X
A
C
T
U
A
L
1
8
7
C
P
2
:
1
9
0
M
A
X
A
C
T
U
A
L
1
8
7
.
3
C
P
1
:
1
9
0
.
5
M
A
X
A
C
T
U
A
L
1
8
7
C
P
4
:
1
9
1
M
A
X
A
C
T
U
A
L
1
8
7
C
P
5
:
1
9
0
M
A
X
A
C
T
U
A
L
1
8
7
.
3
C
P
6
:
1
8
9
M
A
X
A
C
T
U
A
L
1
8
7BALCONYBALCONYNEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
NOT PART OF PROJECT
40'-0"40'-0"1ST FLOOR PLAN
SCALE : 3/16"=1'-0"
13'-7"6'-9"21'-3"
6'-2"8'-11"21'-3"13'-9"6'-0"6'-8"27'-0"10'-9"13'-2"8"8'-0"
2'-10"
10'-10"6'-9"21'-3"
6'-2"8'-11"21'-3"10'-2"10'-3"6'-8"21'-0"13'-2"
8'-0"2'-11"6'-0"10'-0"26'-0"5'-0"
140'-0"
49'-6"49'-6"5'-0"49'-6"
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.
UNIT A UNIT B
GUEST PARKING
9X20
TRASHFAU
ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.FAU ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FOYER
TRASH
F.F 160 F.F 157.5
27'-0"9'-0"4'-0"F.F 158
F.F 160.5
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
NOT PART OF PROJECT
40'-0"40'-0"2ND FLOOR PLAN
SCALE : 3/16"=1'-0"10'-7"6'-0"6'-8"15'-8"18'-9"15'-1"4'-0"19'-6"13'-2"6'-2"15'-0"15'-1"12'-5"6'-8"6'-0"17'-6"13'-2"6'-2"12'-9"17'-5"3'-6"21'-1"5'-8"11'-9"3'-6"3'-1"4'-0"7'-11"10'-0"26'-0"5'-0"
140'-0"
49'-6"49'-6"
11'-1"
MASTER BEDROOM
BEDROOM
DECK
UNIT A UNIT B
MASTER
BATHROOM
HER CLOSET
HALLWAY
ELEVATOR
FOYER
DN
DEN
MASTER BEDROOM
BEDROOM
MASTER
BATHROOM
W.I.C
HALLWAY
CLOSET ELEVATOR
RETREAT
F.F 170.5F.G 168
CLOSET
HIS CLOSET
DECK
DECK
UP UP
F.F 170.5
F.F 168
F.F 168
F.F 170.5
26'-4"27'-0"9'-0"Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
NOT PART OF PROJECT
28'-0"5'-0"
140'-0"40'-0"40'-0"3RD FLOOR PLAN
SCALE : 3/16"=1'-0"
47'-6"47'-6"
10'-0"
20'-6"
10'-0"
5'-10"13'-2"6'-8"8"15'-8"4'-0"12'-0"
5'-0"
20'-6"17'-0"7'-0"7'-0"11'-8"21'-6"9'-0"6'-8"20'-4"20'-6"7'-8"19'-4"7'-4"19'-8"REF
LIVING ROOM
DININGROOM
DECK
KITCHEN
STORAGE
5'X5'
UNIT A UNIT B
ELEVATOR
F.P
REF
LIVING ROOMDININGROOM
KITCHEN
STORAGE
ELEVATOR
F.P
SLIDING
GLASS
DOOR
GLASS
DOOR
GLASS
DOOR
SLIDING
GLASS
DOOR
GLASS
DOOR
GLASS
DOOR
DN
DN
F.F 179.5
F.F 177
F.F 177F.F 179.5
27'-0"9'-0"4'-0"TILEDECK
TILEDECK
TILEDECK
TILEBBQ
WET
BAR
5'-4"
5'-0"
10'-0"
39'-7"
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
NOT PART OF PROJECT
UNIT A,B WEST ELEVATIONS
SCALE : 3/16"=1'-0"
5'-0"
10'-0"
1'-6"
1'-6"10'-6"9'-0"10'-0"10'-0"9'-0"10'-0"DRIVEWAY
BEYOND
163.80 @ SIDEWALK PLPLSIDING
S.S.RAILING
W/ CABLE
EXISTING GRADE
STUCCO
BEIGE COLOR
DECORATIVE
STUCCO
BEIGE COLOR
BRICK VENEER
DECORATIVE
HARDIE SIDING
F.F 160@GARAGE DOOR
F.F 170.5
F.F 179.5
F.F 189.5CP1: 195MAXACTUAL 189.5CP1: 190
MAX
ACTUAL 189.5
F.F 158
F.F 168
F.F 177
F.F 187CP1: 187.5 MAXACTUAL 187CP1: 189 MAX
ACTUAL 187F.F 160.5
F.F 157.5
STREET
S.S.RAILING
W/ CABLE
30' MAX HEIGHT LIMI
T
F
R
O
M
E
X
I
S
T
I
N
G
G
R
A
D
E
PL2% NEW GRADE
2% NEW GRADE
2% NEW GRADESLOPES UPBEYONDE.G. 162.5
E.G. 160.75
E.G. 164.25
NEW 3' HIGH RETAINING WALL
WOOD FACIA
WOOD FACIA
WOOD
NEW G
R
A
D
E
B
E
Y
O
N
D
20% (1:5
)
M
a
x
VERTICALCURVE
NEW GRADE BEYOND
2% (1:50) Max
S.S.RAILING
W/ CABLE
DECORATIVE
S.S.RAILING
W/ CABLE
DECORATIVE
UNIT A,B EAST ELEVATIONS
SCALE : 3/16"=1'-0"
10'-0"
5'-0"10'-6"9'-0"10'-0"10'-0"9'-0"10'-0"PLPLS.S.RAILING
W/ CABLE
EXISTING GRADE
STUCCO
BEIGE COLOR
DECORATIVE
HARDIE SIDING
STUCCO
BEIGE COLOR
HARDIE SIDING
S.S.RAILING
W/ CABLE
DECORATIVE HARDIE SIDING
F.F 157.5
F.F 168
F.F 177
F.F 187
CP1: 191
MAX
ACTUAL 187CP1: 1
9
0
.
5
M
A
X
ACTU
A
L
1
8
7
F.F 160.5
F.F 170.5
F.F 179.5
F.F 189.5
CP1: 192.5
MAX
ACTUAL 189.5CP1: 198
MAX
ACTUAL 189.5
F.F 160
168.5 @ SIDEWALK
E.G. 162.5
E.G. 161.75
STREET
30' MAX HEIGHT LIMIT
F
R
O
M
E
X
I
S
T
I
N
G
G
R
A
D
E
F.F. 158
NEW RETAINING WALL BEYOND
NEW GRADE
10% (1:10) Max NEW GRADE
20% (1:5) M
a
x
NEW GRADE
10% (1:10) Max
2%NEW GRADE
NEW 3' HIGH RETAINING WALL
ENTRY
BRIDGE
VERTICALCURVE
VERTICAL
CURVE
E.G. 167.5
E.G. 160.5
WOOD FACIA
WOOD FACIA
HARDIE SIDING
NEW GRADE
2% (1:50) Max
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
UNIT A NORTH ELEVATIONS
SCALE : 3/16"=1'-0"
9'-0"
1'-6"
4'-0"10'-0"9'-0"10'-0"SIDING
PLW.I.RAILING
STUCCO
BEIGE
DECORATIVE
PLBRICK VENEER
F.F 160.5
F.F 170.5
F.F 179.5
F.F 189.5CP1: 198 MAX
ACTUAL 189.5CP1: 195 MAX
ACTUAL 189.5EXISTING GRADE
E.G. @
(P.L. 169)
E.G. @
P.L. 165
2% NEW GRADE
CONC.
STEPS
WALKWAY
DRIVEWAY
F.G.
162.25
E.G. (163.80)
UNIT B NORTH ELEVATIONS
SCALE : 3/16"=1'-0"
9'-0"
1'-6"
4'-0"10'-0"9'-0"10'-0"STUCCO
BEIGEPL S.S.RAILING
W/ CABLE
BRICK VENEER
ROLL UP
GARAGE DOOR
DECORATIVE
PLF.F 158
F.F 168
F.F 177
F.F 187CP1: 190.5 MAX
ACTUAL 187CP1: 187.5 MAX
ACTUAL 1872% NEW GRADE
F.G. 159
UNIT A SOUTH ELEVATIONS
SCALE : 3/16"=1'-0"
9'-0"
1'-6"
4'-0"10'-0"9'-0"10'-0"PLW.I.RAILING
STUCCO
BEIGE
ROLL UP
GARAGE DOORPL
BRICK VENEER
F.F 160
F.F 170
F.F 179
F.F 189CP1: 190 MAX
ACTUAL 189.5CP1: 192.5 MAX
ACTUAL 189F.G. 161.5
2% NEW GRADE
UNIT B SOUTH ELEVATIONS
SCALE : 3/16"=1'-0"
9'-0"
1'-6"
4'-0"10'-0"9'-0"10'-0"STUCCO
BEIGE PLPLS.S.RAILING
W/ CABLE
DECORATIVE
F.F 158
F.F 168
F.F 177
F.F 187
CP1: 189
MAX
ACTUAL 187CP1: 191 MAX
ACTUAL 187
EXISTING GRADE
E.G. @
P.L. 161
E.G. @
P.L. 159 2% NEW GRADE
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
SECTION A
SCALE : 3/16"=1'-0"
SECTION B
SCALE : 3/16"=1'-0"10'-0"9'-0"10'-0"10'-6"9'-0"10'-0"10'-0"9'-0"10'-0"GARAGEFAMILY
ROOMBEDROOM
GARAGE FAMILY ROOM OFFICE
BEDROOM BEDROOMBATHROOM
DINING LIVING BALCONY
BALCONY
BEDROOM BEDROOMBATHROOM
KITCHEN LIVING
LAUNDRYFAMILY ROOM
BATHROOMHALLWAY BALCONYCLOSET
BATHROOM
BATHROOM
DINING LIVINGBATHROOM
F.F 160.5
F.F 170.5
F.F 179.5
F.F 189.5
F.F 160@GARAGE DOOR
F.F 170.5
F.F 179.5
F.F 189.5
F.F 158
F.F 168
F.F 177
F.F 187
F.F 157.5 @GARAGE DOOR
EXISTING GRADE
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
LAWN
GUEST PARKING
9X20
4AGA@5GAL
1AUS@15GAL
6PHR@5GAL
LAWN
LAWN
LAWN
TURFBLOCKTURFBLOCK
CATCH BASIN
D RAIN TANK
SYETEM
283 SF 188 SF
189 SF
925 SF
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.TRASHFAUELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.FAU ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FOYER
TRASH
OFFICE
81 SF
3PHR@5GAL
5EUR@5GAL
5GAL@5GAL
EXISTING
GRASS
NEW RETAINING WALL CENTEREDON ADJACENT
PROPERTY PERMITTED
BY ADJACENT OWNER
ON THE CONDITION THAT
THE EXISTING SOUTHERN
TREES REMAIN
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"STORAGE
ABOVE HEAD
200 CF MIN
14'-10" x 3'-0"
x 4'-6"
Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN Scale:
Sheet Title:
Date Issued:
Date Drawn:
Checked By:
Drawn By:
Drawing Status:
Sheet No:Revisions:Sym. Description By DateAS SHOWN
LINE TABLE
LINE LENGTH
L1 140.15'
BEARING
6
(
L2 40.00'1
(
L3 140.15'1
:
L4 40.00'6
:
L5
L6
L7
L8
ZONING: R2
AREA TABLE
LOT BEFORE(SQ.FT)AFTER(SQ.FT)
21 5'606.0
22 5'606.0
11212.0
140.15'6
(
40.00'1
(
140.15'1
:
40.00'6
:
L1:L2:L4:L3:L5:
L7:L8:L6:LAWN
DRIVEWAY
UNIT A UNIT B
FAMILY
ROOM
LAUNDRY
ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'10'-9"FAMILY
ROOM
LAUNDRY
GARAGE
20'X21'
W.H.FAU ELEVATOR
UP
BATHROOM
BEDROOM
16'X10'
FOYER
STORAGE
ABOVE HEAD
200 CF
TRASH
OFFICE
26'-0"
GUEST PARKING
9X20
......... Prop. Catch Basin
...... Prop. Sheet Flow
...... Sump Pump
F.F 160
F.F 158
F.F 160.5
F.F 157.5GARAGE
20'X21'
W.H.TRASH
STORAGE
ABOVE HEAD
200 CF
FAU
F.G. 160.5
(163)
F.G. 161.25
(161)
F.G. 163.5
(165)
F.G. 162.5
(167)F.G. 163.5
(168)
F.G. 169.25
(168.75)
F.G. 162.5
(165)
F.G. 162.25
(164.25)
F.G. 160
(162.50)F.G. 167.5
(167.5)
F.G. 159.5
(158)
F.G. 160
(160.5)
F.G. 157.5
(161.75)
F.G. 157.00
(160.75)
F.G. 159.5
(162.5)
F.G. 169.25 F.G. 168.33 F.G. 165.5 F.G. 161.25
F.G. 158.75
F.G. 160.65F.G. 160.5
(168.5)
(170.25)
F.G. 156.75
F.G. 157.25
F.G. 157.25
F.G. 165
F.G. 166
F.G. 159
NEW RETAINING WALL CENTERED
ON ADJACENT
PROPERTY PERMITTED
BY ADJACENT OWNER
ON THE CONDITION THAT
THE EXISTING SOUTHERN
TREES REMAIN
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
NEW RETAINING WALL
BRAHEA ARMATA (BLUE HESPER PALM)
14
Attachment 2 Location Map
Subject Site (West Lot) X
15
Attachment 3 Zoning Map
Subject Site
(West Lot)
17
Attachment 4 Legal Poster (West Lot)
Poster for
west lot
18
Attachment 5 Site Pictures (West Lot)
Main residence built in 1915 Detached garage and storage shed
Rear yard, looking southeast Rear yard, looking southwest
Properties to the east
Subject Site R-1 zoned properties to
the west and southwest
R-2B zoned properties,
north side of 17th Street
R-1 zoned properties, fronting
Raymond Ave, west of subject site
1
View from rear deck at 909 16th Street,
directly south of project.
Looking north from rear deck at 909
16th Street. Heavy vegetation provides
privacy and screening from noise.
Supplemental
Information
9 & 10
2
Views to west from bedroom window
at 909 16th Street.
Views to north from bedroom window
at 909 16th Street.
HOWARD MECHANICAL
ENGINEERING
Plans Prepared by:REVISIONS94&56
*#96*140'%#
ÄÄ
425 PIER AVE
HERMOSA BEACH, CA 90254 DATEJob InfoOwner:NEW RESTAURANTProject Address:425 Pier Ave.,Hermosa Beach, CAGroup Occupancy:A2Type of Const:VBLegal Description:Lot 25, Hiss' Addition to Hermosa Beach, M.B. 4-19Assessor Parcel:4183-018-004Existing Area:1209 Sq. FtExisting parking:3 existing on siteSeatingExisting:49Occupancy LoadAreaLoadKitchen 1:200 298 1.49 (2)Storage 1:300 84 .28 (1)Dining 1:15 827 46Total Load 49Scope of Work:Demo roof over open dining area; full facade remodel.All work shall comply with 2010 CBC, 2010 CPC, 2010 CMC, 2010 CBC 2005California Engergy CodeSheet IndexGeneralArchitecturalSheet DescriptionG0.00 TITLE SHEETG0.02 SITE SURVEYA1.01 SITE PLANA2.01 EXISTING & PROPOSED INTERIOR PLANA2.02 PROPOSED INTERIOR EAST ELEVATIONA2.03 PROPOSED INTERIOR WEST ELEVATIONA3.01 PROPOSED EXTERIOR FRONT ELEVATION29 JUN 2013 -Vicinity MapTENANT IMPROVEMENT FOR425 PIER AVE, HERMOSA BEACH, CA 90254SHEETDRAWING TITLESCALEG0.00TITLE SHEET03 JUL 2013 A
SHEETDRAWING TITLESCALEHOWARD MECHANICAL
ENGINEERING
Plans Prepared by:REVISIONS94&56
*#96*140'%#
ÄÄA1.01425 PIER AVE
HERMOSA BEACH, CA 90254 30 JUN 2013 -BUONA VITATRATTORIADIMAGGIOARTEXISTING PLAN1/4" = 1'-0"(E) ROOF OVERHANGSTO PROPERTY LINE(E) FACADE(E) PARAPET(E) ROOF OVERHANGSTO PROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINEPROPERTY LINERESTAURANTPROPOSED PLAN1/4" = 1'-0"(N) DEMO ROOF TOCREATE OPEN AIRDINING AREA.AREA IS OPEN TO THESKY.(E) FACADE(E) PARAPET(N) DEMO ROOF OVERDOOR WAY(E) PLANTER(E) PLANTER(E) DOOR TOTRATTORIARESTAURANT(E) DOOR TORESTAURANTSITE PLAN
HOWARD MECHANICAL
ENGINEERING
Plans Prepared by:REVISIONS94&56
*#96*140'%#
ÄÄ
425 PIER AVE
HERMOSA BEACH, CA 90254 30 JUN 2013 -SHEETDRAWING TITLESCALEA2.01INTERIOR PLAN(E) BAR(E) MALE(E) FEMALE(E) PASS THROUGH(E) STORAGE(E) BUONA VITA TRATTORIA1209 SF(E) KITCHEN(E) DINING AREA(E) RAMP UP(E) DOOR(E) MALE(E) FEMALE(E) PASSTHROUGH(N) STORAGE(E) KITCHEN(E) DINING AREA(N) BAR(N) ACCORDIANDOORS(N) ACCORDIANDOORS(N) 3' HIGHWROUGHT IRONFENCE(N) OPEN AIR DINING AREAFP(N) PLASTEREDUPPER WALL EXISTING FLOOR PLAN1/4" = 1'-0" PROPOSED FLOOR PLAN1/4" = 1'-0"23'-10"7'-10 1/4"5'-0"5'-0"5'-6 1/8"12'-2 1/8"20'-6 3/4"14'-5"23'-2 1/2"17'-10"8'-9 1/2"20'-5"3'-0"14'-6"3'-0"(E) HYDRO-MECHANICALGREASE INTERCEPTOR20 GPM UNDER3- COMPARTMENT SINKREAR EGRESS DOOR READILYOPERABLE BY CRASH BARSEGRESS DOOR SHALL BEREADILY OPERABLE WITHOUTTHE USE OF A KEY ORSPECIAL KNOWLEDGE OREFFORT02 JUL 2013 A(N) HIGH DEFINITIONFLAT PANELTELEVISION
HOWARD MECHANICAL
ENGINEERING
Plans Prepared by:REVISIONS94&56
*#96*140'%#
ÄÄ54'-10"12'-0"8'-8"44'-3"425 PIER AVE
HERMOSA BEACH, CA 90254 30 JUN 2013 -SHEETDRAWING TITLESCALEA2.02(E) PARAPET FROM ADJACENTPROPERTYEAST ELEVATION VIEW FROM CENTER OF RESTAURANT1/4" = 1'-0"(E) PLANTER(N) 3' HIGH WROUGHT IRONFENCE(E) PARAPET THIS PROPERTYEAST ELEV15'-3"17'-7"9'-0"03 JUL 2013 A
HOWARD MECHANICAL
ENGINEERING
Plans Prepared by:REVISIONS94&56
*#96*140'%#
ÄÄ12'-0"54'-10"425 PIER AVE
HERMOSA BEACH, CA 90254 30 JUN 2013SHEETDRAWING TITLESCALEA2.03(E) PARAPET FROM ADJACENTPROPERTYWEST ELEVATION VIEW FROM CENTER OF RESTAURANT(E) PLANTER(N) 3' HIGH WROUGHT IRONFENCE(E) PARAPET THIS PROPERTY44'-3"8'-8"WEST ELEV-15'-3"9'-0"(N) HIGH DEFINITION FLATSCREEN TELEVISION03 JUL 2013A
HOWARD MECHANICAL
ENGINEERING
Plans Prepared by:REVISIONS94&56
*#96*140'%#
ÄÄ17'-3"17'-3"
9'-6"5'-0"12'-2"
13'-11 1/2"
425 PIER AVE
HERMOSA BEACH, CA 90254 30 JUN 2013 -SHEETDRAWING TITLESCALEA3.01(E) PARAPET FROM ADJACENTPROPERTY(E) PLANTER(N) 3' HIGH WROUGHT IRONFENCE(E) PARAPET THIS PROPERTYFRONT ELEVEXISTING ELEVATION1/4" = 1'-0"PROPOSED ELEVATION1/4" = 1'-0"
CIP NO.PROJECT NAME
General
Fund
State Gas
Tax Fund
Tyco
Fund
Park/Rec
Facility Tax
Fund
CDBG
Funds
Prop A
Fund
Proposition
C Fund
Measure R
Fund
Grants
Fund
Sewer
Fund
TOTAL CIP
FUNDING FY
13-14
001 115 122 125 140 145 146 147 150 160
STREET AND HIGHWAY IMPROVEMENTS
13-127 Street Improvements -- Various Locations 150,000 470,000 100,000 720,000
12-143 PCH/Aviation Beautification Project 150,000 1 32,000 275,000 503,000 124,006 5 1,084,006
12-160 PCH Traffic Improvements 162,000 100,000 6 262,000
SUBTOTAL 300,000 502,000 0 0 0 275,000 503,000 262,000 224,006 0 2,066,006
13-308 Stormwater Improvements 40,000 40,000
13-401 Sewer Improvements -- Various Locations 400,000 400,000
SUBTOTAL 0 0 0 0 0 0 0 0 0 440,000 440,000
PARKS IMPROVEMENTS
13-538 Citywide Park Master Plan 65,000 65,000
SUBTOTAL 0 0 0 65,000 0 0 0 0 0 0 65,000
PUBLIC BUILDINGS AND GROUNDS IMPROVEMENTS
11-602 Clark Field Energy Efficient Electrical Upgrades 1,000 2 30,000 31,000
13-606 Fire Station Renovation and Upgrades 33,000 33,000
13-613 City Yard Roof 30,000 30,000
13-619 Police Facilities Improvements 70,000 70,000
13-631 14th Street Beach Restroom Rehabilitation 25,000 25,000
13-649 Community Center General Improvements 90,000 90,000
13-655 City Facilities ADA Transition Plan and Improvements 67,715 67,715
13-656 Citywide Energy Conservation Upgrades 50,000 25,000 55,000 7 130,000
13-659 Municipal Pier Structural Repairs – Phase II 195,000 195,000
13-663 Parking Structure Repairs 69,592 3 69,592
13-664 City Facility Condition Assessment & Asbestos Report 55,739 4 55,739
SUBTOTAL 309,331 0 220,000 145,000 67,715 0 0 0 55,000 0 797,046
FUND TOTALS 609,331 502,000 220,000 210,000 67,715 275,000 503,000 262,000 279,006 440,000 3,368,052
1 Chevron Funds, Coke Drum Project, $150,0002Committed Funds - Clark Building $1,0003Committed Funds - Parking Facility, $9,592
4 SCE Rule 20A Funds, $124,006
5 CDBG Exchange Funds, $55,739
6 LACMTA STP-L Exchange Funds, $100,000
7 Solar Grant TBD, $55,000
City of Hermosa Beach
DEPARTMENT OF PUBLIC WORKS
CAPITAL IMPROVEMENT PROGRAM
FY 2013-14
SEWER/STORM DRAIN IMPROVEMENTS
2
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-2014
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: STREET AND HIGHWAY IMPROVEMENTS 001-8127-4201
115-8127-4201
147-8127-4201
PROJECT NO./TITLE: CIP 13-127 Street Improvements - Various Locations
PROJECT DESCRIPTION:
This project proposes pavement
rehabilitation of streets at various locations.
The selection of streets is prioritized based
on their respective Pavement Condition
Index (PCI, a numerical index ranging from
0 for failed pavement to 100 indicating
pavement in perfect condition) established
by the City’s Pavement Management
Program Report. Candidates for this Fiscal
Year’s Street Improvement Program are a
continuation of past year’s PCI based list of
streets as established in the Pavement
Management Report. The project will also
address limited quantities of deteriorated
concrete sidewalk, curb and gutter, curb
ramps and drainage deficiencies. It will also
include the City’s Slurry Seal Program.
JUSTIFICATION:
To repair and/or maintain the City’s street
infrastructure identified by the City’s
Pavement Management Program Report in
accordance with the City’s annual Street
Improvement Program.
STATUS:
Design to begin FY 12-13 and construction
scheduled for FY 13-14. Specific streets to
be determined.
COST TO COMPLETE PROJECT REMAINING PRIOR YEARS FUNDS
Construction $574,180
Construction Support $35,000
Engineering $35,000
Associate Engineer $75,820
CURRENT REQUEST
001 General Fund $150,000
115 State Gas Tax Fund $470,000
147 Measure R Fund $100,000
PROJECT TOTAL: $720,000 TOTAL FY 13-14 CIP FUNDING: 720,000
3
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
001 General Fund
8127 Street Improvements/Various Locations
8127-4200 Contract Services
8127-4201 Contract Serv/Private 273,316 313,894 0 313,894 150,000
Total Contract Services 273,316 313,894 0 313,894 150,000
Total Street Improvements/Various Locations 273,316 313,894 0 313,894 150,000
115 State Gas Tax Fund
8127 Citywide St Impr/Various Locations
8127-4100 Personal Services
8127-4102 Regular Salaries 0 0 0 0 44,656
8127-4180 Retirement 0 0 0 0 3,681
8127-4188 Employee Benefits 0 0 0 0 7,797
8127-4189 Medicare Benefits 0 0 0 0 731
Total Personal Services 0 0 0 0 56,865
8127-4200 Contract Services
8127-4201 Contract Serv/Private 321,691 515,486 0 515,486 413,135
Total Contract Services 321,691 515,486 0 515,486 413,135
Total Citywide St Impr/Various Locations 321,691 515,486 0 515,486 470,000
147 Measure R Fund
8127 Citywide St Impr/Various Locations
8127-4100 Personal Services
8127-4102 Regular Salaries 0 0 0 0 14,885
8127-4180 Retirement 0 0 0 0 1,227
8127-4188 Employee Benefits 0 0 0 0 2,599
8127-4189 Medicare Benefits 0 0 0 0 244
Total Personal Services 0 0 0 0 18,955
8127-4200 Contract Services
8127-4201 Contract Serv/Private 99,254 200,000 0 200,000 81,045
Total Contract Services 99,254 200,000 0 200,000 81,045
Total Citywide St Impr/Various Locations 99,254 200,000 0 200,000 100,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
4
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Street and Highway Improvements 115- 8143-4201
145-8143-4201
146- 8143-4201
Chevron Coke Drum Project
SCE Rule 20A
PROJECT NO./TITLE: CIP 12-143 PCH-AVIATION BEAUTIFICATION PROJECT
PROJECT DESCRIPTION:
The purpose of this project is to improve the
aesthetics along both the Aviation Boulevard
and Pacific Coast Highway corridors.
Improvements will include gateway signs,
landscaping medians, street and pedestrian
lighting, colored art panels, bus shelters, street
furnishings, and other related streetscape
improvements to help create an identity of
Hermosa Beach, to help create a pedestrian-
friendly environment, and that enhances
conditions for local business
This project to be programmed/budgeted as
follows:
Phase I
Conceptual Plan
Completed in FY 12-13
Phase II
Engineering Plans and Specifications
FY12-14
Phase III
Construction
FY14-15
The project will also be coordinated with the
operational mobility improvements proposed by
the PCH Traffic Improvements Project which
will also include preliminary engineering for the
intersection of PCH & Aviation - funded through
the South Bay Measure R Program.
STATUS:
Conceptual Design has begun in FY12-13.
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Conceptual Design $160,000
Engineering Design $200,000
Construction TBD
CURRENT REQUEST
115 State Gas Tax Fund
145 Proposition A Fund
$32,000
$275,000
146 Proposition C Fund ($375,000 from
Potential Competitive Grant Funding)
Chevron Coke Drum Project
SCE Rule 20A
$503,000
$150,000
$124,006
PROJECT TOTAL: $1,084,006 TOTAL FY 13-14 CIP FUNDING: $1,084,006
5
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
001 General Fund
8143 PCH-Aviation Beautification Project
8143-4200 Contract Services
8143-4201 Contract Serv/Private 0 0 0 0 150,000
Total Contract Services 0 0 0 0 150,000
Total PCH-Aviation Beautification Project 0 0 0 0 150,000
115 State Gas Tax Fund
8143 PCH-Aviation Beautification Project
8143-4200 Contract Services
8143-4201 Contract Serv/Private 0 32,000 7,051 32,000 32,000
Total Contract Services 0 32,000 7,051 32,000 32,000
Total PCH-Aviation Beautification Project 0 32,000 7,051 32,000 32,000
145 Proposition A Fund
8143 PCH-Aviation Beautification Project
8143-4200 Contract Services
8143-4201 Contract Serv/Private 0 0 0 0 275,000
Total Contract Services 0 0 0 0 275,000
Total PCH-Aviation Beautification Project 0 0 0 0 275,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
6
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
146 Proposition C Fund
8143 PCH-Aviation Beautification Project
8143-4200 Contract Services
8143-4201 Contract Serv/Private 0 128,000 8,202 128,000 503,000
Total Contract Services 0 128,000 8,202 128,000 503,000
Total PCH-Aviation Beautification Project 0 128,000 8,202 128,000 503,000
150 Grants Fund
8143 PCH-Aviation Beautification Project
8143-4200 Contract Services
8143-4201 Contract Serv/Private 0 0 0 0 124,006
Total Contract Services 0 0 0 0 124,006
Total PCH-Aviation Beautification Project 0 0 0 0 124,006
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
7
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Street and Highway Improvements 147- 8160-4201
150-8160-4201
PROJECT NO./TITLE: CIP 12-160 PCH Traffic Improvements
PROJECT DESCRIPTION:
The purpose of this project is to improve
operational mobility along State Route 1
(Pacific Coast Highway) which also provides
operational relief to I-405 by improving
operations in a parallel route. The work is
intended to widen and upgrade the
intersections by possible construction of
dedicated right and left-hand turn pockets,
restriping, and re-signalization. The proposed
project also includes improvements including
but not restricted to signage, parking, and
channelization improvements of the segment
on PCH between Anita Street and Artesia
Boulevard and cross streets as required. This
segment was identified for improvement as per
SCAG’s study (User-based Microanalysis of
SR 1, PCH) which was done in July 2009.
The scope of work will also include preliminary
engineering of PCH/Aviation Boulevard since
this intersection is a major intersection and is
part of the project study area.
The scope shown above is from the list of
projects funded through the South Bay
Measure R Program.
Traffic signal and pedestrian improvements at
the intersection of Pacific Coast Highway and
Pier Avenue are also included in the scope of
this project.
JUSTIFICATION:
STATUS:
Construction will continue for FY 13-14
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Engineering $118,000
Construction $139,261
Associate Engineer $4,739
CURRENT REQUEST
147 Measure R Funds $162,000
150 Grants Fund $100,000
PROJECT TOTAL: $262,000 TOTAL FY 13-14 CIP FUNDING: $262,000
8
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
147 Measure R Fund
8160 PCH Traffic Improvements
8160-4200 Contract Services
8160-4201 Contract Serv/Private 0 88,000 0 88,000 162,000
Total Contract Services 0 88,000 0 88,000 162,000
Total PCH Traffic Improvements 0 88,000 0 88,000 162,000
150 Grants Fund
8160 PCH Traffic Improvements
8160-4100 Personal Services
8160-4102 Regular Salaries 0 0 0 0 3,721
8160-4180 Retirement 0 0 0 0 307
8160-4188 Employee Benefits 0 0 0 0 650
8160-4189 Medicare Benefits 0 0 0 0 61
Total Personal Services 0 0 0 0 4,739
8160-4200 Contract Services
8160-4201 Contract Serv/Private 0 0 0 0 95,261
Total Contract Services 0 0 0 0 95,261
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
9
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Sewer Improvements 160-8308-4201
PROJECT NO./TITLE: CIP 13-308 Stormwater Improvements
PROJECT DESCRIPTION:
Preliminary study to investigate Stormwater
capital improvement projects that will identify
locations to divert, infiltrate, treat and reuse
urban stormwater runoff.
JUSTIFICATION:
To comply with MS4 permit requirements.
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Study $40,000
CURRENT REQUEST
160 Sewer Fund $40,000
PROJECT TOTAL: $40,000 TOTAL FY 13-14 CIP FUNDING: $40,000
10
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
160 Sewer Fund
8308 Storm Water Improvements
8308-4200 Contract Services
8308-4201 Contract Serv/Private 0 0 0 0 40,000
Total Contract Services 0 0 0 0 40,000
Total Storm Water Improvements 0 0 0 0 40,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
11
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Sewer Improvements 160-8401-4201
301-8401-4201
PROJECT NO./TITLE: CIP 13-401 Sewer Improvements Various locations
PROJECT DESCRIPTION:
Design for Sanitary sewer rehabilitation at
various locations as determined by CIP 07-422
Update of the City’s Sewer Master Plan
performed in FY 2007-08.
JUSTIFICATION:
The entire City’s sanitary sewer network was
inventoried during the citywide sewer video
project performed in FY07-08 as part of CIP
07-422 Update of the City’s Sewer Master Plan.
As a result sewer segments were identified and
prioritized for repair based on the level of
distress. This project will include engineering
and construction of sewer work required to be
performed in association and in advance of
streets designated for rehabilitation in FY 2012-
13.
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Construction $400,000
Construction Support $25,000
Engineering $25,000
CURRENT REQUEST
160 Sewer Fund $400,000
PROJECT TOTAL: $400,000 TOTAL FY 13-14 CIP FUNDING: $400,000
12
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
160 Sewer Fund
8401 Sewer Impr Various Locations 2012
8401-4200 Contract Services
8401-4201 Contract Serv/Private 0 723,337 33 723,337 400,000
Total Contract Services 0 723,337 33 723,337 400,000
Total Sewer Impr Various Locations 2012 0 723,337 33 723,337 400,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
13
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Parks Improvements 125-8538-4201
PROJECT NO./TITLE: CIP 13-538 Citywide Park Master Plan
PROJECT DESCRIPTION:
Update the City’s 1995 Park Master Plan by
assessing park facilities and developing a
comprehensive maintenance plan and long
term capital improvement plan.
JUSTIFICATION:
Streamline maintenance processes by creating
a comprehensive maintenance plan, as well as
provide additional beautification and usability of
parks throughout the City through various CIP
projects.
STATUS:
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Planning $60,261
Associate Engineer $4,739
CURRENT REQUEST
125 Park/Rec Facility Tax Fund $65,000
PROJECT TOTAL: $65,000 TOTAL FY 13-14 CIP FUNDING: $65,000
14
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
125 Park/Rec Fund
8538 Citywide Park Master Plan
8538-4100 Personal Services
8538-4102 Regular Salaries 0 0 0 0 3,721
8538-4180 Retirement 0 0 0 0 307
8538-4188 Employee Benefits 0 0 0 0 650
8538-4189 Medicare Benefits 0 0 0 0 61
Total Personal Services 0 0 0 0 4,739
8538-4200 Contract Services
8538-4201 Contract Serv/Private 0 0 0 0 60,261
Total Contract Services 0 0 0 0 60,261
Total Citywide Park Master Plan 0 0 0 0 65,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
15
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Buildings and Ground Improvements 125-8602-4201
001-8602-4201
PROJECT NO./TITLE: CIP 11-602 Clark Field Energy Efficient Electrical Upgrades
PROJECT DESCRIPTION:
Relocate electric panel and controls from
Announcer’s Booth to the lower electrical room at
Clark Field.
JUSTIFICATION: The existing equipment in the
Announcer’s Booth is in very poor condition and
does not qualify for Area Lighting power rates.
Once relocated to the lower electrical room, the
new equipment will qualify for Area Lighting power
rates, improve safety, reduce maintenance
problems, and allow greater operating flexibility for
the field lighting increasing energy efficiency.
STATUS:
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Construction $31,000
CURRENT REQUEST
125 Park Recreation Facility Tax Fund $30,000
001 General Funds (Committed Funds- Clark Field) $1,000
PROJECT TOTAL: $31,000 TOTAL FY 11-12 CIP FUNDING: $31,000
16
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
001 General Fund
8602 Clark Field Electrical Upgrades
8602-4200 Contract Services
8602-4201 Contract Serv/Private 0 0 0 0 1,000
Total Contract Services 0 0 0 0 1,000
Total Clark Field Electrical Upgrades 0 0 0 0 1,000
125 Park/Rec Fund
8602 Clark Field Electrical Upgrades
8602-4200 Contract Services
8602-4201 Contract Serv/Private 0 30,000 300 30,000 30,000
Total Contract Services 0 30,000 300 30,000 30,000
Total Clark Field Electrical Upgrades 0 30,000 300 30,000 30,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
17
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Building and Grounds 001- 8606-4201
PROJECT NO./TITLE: CIP 13-606 Fire Station Renovation & Upgrades
PROJECT DESCRIPTION:
Upgrades and/or repairs to the following:
Kitchen cabinets: $5,000
Exterior sliding glass door, lock, and
frame: $3,000
Apparatus bay door: $25,000
The 50+ year old Hermosa Beach Fire
Department Building is in need of repairs,
upgrades and replacement of old & worn
building/living necessities. These include: the
paging/lighting system, apparatus bay door,
painting, window & floor coverings, and cracks
in the apparatus bay floor.
STATUS:
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Construction $33,000
CURRENT REQUEST
001 General Fund $33,000
PROJECT TOTAL: $33,000 TOTAL FY 13-14 CIP FUNDING: $33,000
18
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
001 General Fund
8606 Fire Station Renovation & Upgrades
8606-4200 Contract Services
8606-4201 Contract Serv/Private 0 20,370 643 20,370 33,000
Total Contract Services 0 20,370 643 20,370 33,000
Total Fire Station Renovation & Upgrades 0 20,370 643 20,370 33,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
19
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Buildings and Ground Improvements 001-8613-4201
PROJECT NO./TITLE: CIP 13-613 City Yard Roof
PROJECT DESCRIPTION:
Repair roof of fleet maintenance and traffic
safety facilities at the City Yard.
JUSTIFICATION: Address leaking roof
STATUS:
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Construction $30,000
CURRENT REQUEST
001 General Fund $30,000
PROJECT TOTAL: $30,000 TOTAL FY 11-12 CIP FUNDING: $30,000
20
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
001 General Fund
8613 City Yard Roof
8613-4200 Contract Services
8613-4201 Contract Serv/Private 0 0 0 0 30,000
Total Contract Services 0 0 0 0 30,000
Total City Yard Roof 0 0 0 0 30,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
21
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-2014
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: PUBLIC BUILDING AND GROUNDS 001-8619-8201
IMPROVEMENTS
PROJECT NO./TITLE: 13- 619 Police Facilities Improvements
PROJECT DESCRIPTION:
The project involves securing the back ramp
of the police department and installing a
modular office for the traffic bureau.
JUSTIFICATION:
Security Gate: The ramp off of Bard Street
is used to park police vehicles, transport
prisoners to the jail, to access the fire
department and for the fire department to
use in emergencies when their front door is
inoperative. The security of the police and
fire departments is important. Expensive city
equipment is exposed, as well as, personal
property. To prevent access by
unauthorized personnel, it is recommended
that a security gate be installed.
Modular Traffic Office: The traffic bureau is
exchanging locations with the friends of the
library. The new location will give the ability
to use the added space for an armory,
traffic office, and parking area for the police
motorcycles. This work would also include
the installation of a garage door at the front
of the building, roofing and run electrical
and data cables to the modular unit.
STATUS:
COST TO COMPLETE PROJECT
REMAINING PRIOR YEARS FUNDS
Design and Construction $70,000
CURRENT REQUEST
001 General Fund $70,000
PROJECT TOTAL: $70,000 TOTAL FY 13-14 CIP FUNDING: $70,000
22
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
001 General Fund
8619 Police Facility Improvements
8619-4200 Contract Services
8619-4201 Contract Serv/Private 0 0 0 0 70,000
Total Contract Services 0 0 0 0 70,000
Total Police Facility Improvements 0 0 0 0 70,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
23
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Buildings and Ground Improvements 122-8631-4201
PROJECT NO./TITLE: CIP 13-631 14th Street Beach Restroom Rehabilitation
PROJECT DESCRIPTION:
The project consists of replacing the control
panel, pumps, other miscellaneous repairs
including replacing plumbing fixtures and
doors for the restroom located at:
14th Street and The Strand
JUSTIFICATION:
The restroom is over 30 years old and is in
a state of disrepair. The beach restrooms
became the City’s responsibility as part of
the contract with L.A. County Lifeguards.
Two of the three beach restrooms were
completed in 2012. The 14th Street
Restroom Facilities were unable to be
replaced due to insufficient funds. Repairs
will enable the use of the restroom during
the summer weekends.
STATUS:
Construction can be expected to start in
FY13-14.
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Construction $25,000
CURRENT REQUEST
122 Tyco Fund
$25,000
Total $25,000
24
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
122 Tyco Fund
8631 14th St. Beach Restroom Rehabilitation
8631-4200 Contract Services
8631-4201 Contract Serv/Private 830,930 21,521 21,521 21,521 25,000
Total Contract Services 830,930 21,521 21,521 21,521 25,000
Total 14th St. Beach Restroom Rehabilitation 830,930 21,521 21,521 21,521 25,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
25
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Buildings and Ground Improvements 125-8649-4201
PROJECT NO./TITLE: CIP 13-649 Community Center General Improvement
PROJECT DESCRIPTION:
On-going improvements to the Community Center including
energy efficiency improvements, miscellaneous repairs and
other improvements.
South Wing Rewiring and Theatre lights will be completed in
2012/2013.
STATUS:
Development of Strategic Plan in FY13-14. The project will be
coordinated with the expected General Plan update, which
may extend the strategic planning period.
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Engineering Design $25,000
Construction $55,522
Associate Engineer $9,478
001 General Fund
CURRENT REQUEST
125 Park/Rec Facility Tax Fund $90,000
PROJECT TOTAL: $90,000 TOTAL FY 13-14 CIP FUNDING: $90,000
26
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
125 Park/Rec Fund
8649 Comm Ctr General Improvements
8649-4100 Personal Services
8649-4102 Regular Salaries 0 0 0 0 7,443
8649-4180 Retirement 0 0 0 0 614
8649-4188 Employee Benefits 0 0 0 0 1,300
8649-4189 Medicare Benefits 0 0 0 0 122
Total Personal Services 0 0 0 0 9,479
8649-4200 Contract Services
8649-4201 Contract Serv/Private 0 90,000 0 90,000 80,521
Total Contract Services 0 90,000 0 90,000 80,521
Total Comm Ctr General Improvements 0 90,000 0 90,000 90,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
27
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Buildings and Grounds 140-8655-4201
Improvements
PROJECT NO./TITLE: CIP 13-655 City Facilities ADA Transition Plan and Improvements
PROJECT DESCRIPTION:
The objective of this study is to provide an ADA
accessibility assessment for all the City’s
facilities and make ADA improvements.
JUSTIFICATION:
To identify existing conditions of the facilities
for planning future ADA improvements to
comply with the ADA.
STATUS:
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Preliminary Engineering $50,775
Construction $16,940
CURRENT REQUEST
140 CDBG Funds $67,715
PROJECT TOTAL: $67,715 TOTAL FY 13-14 CIP FUNDING: $67,715
28
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
140 CDBG Funds
8655 City Facilities Conditions/ADA Assessment
8655-4200 Contract Services
8655-4201 Contract Serv/Private 0 0 0 0 67,715
Total Contract Services 0 0 0 0 67,715
Total City Facilities Conditions/ADA Assessment 0 0 0 0 67,715
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
29
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Buildings and Ground Improvements 001-8656-4201
105-8656-4201
125-8656-4201
150-8656-4201
PROJECT NO./TITLE: CIP 13-656 Citywide Energy Conservation Upgrade
PROJECT DESCRIPTION:
Conduct energy audits for all City facilities in order to assess
areas where the City can reduce electricity and natural gas
uses and costs. This will also help explore mechanism to
attain higher levels of energy efficiency including the use of
solar panels.
The scope of this project also includes installation of energy
efficient lighting on the Strand and Hermosa Avenue between
10th Street and 14th Street, and design of exterior lighting for
the lawn bowling facility at Clark Field
STATUS:
Development of Strategic Plan in FY13-14. The project will be
coordinated with the expected General Plan update, which
may extend the strategic planning period.
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Engineering $80,000
Engineering $50,000
CURRENT REQUEST
001 General Fund
125 Park/Rec Facility Tax Fund
150 Grants Fund
$50,000
$25,000
$55,000
PROJECT TOTAL: $130,000 TOTAL FY 13-14 CIP FUNDING: $130,000
30
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
001 General Fund
8656 Citywide Energy Conservation Upgrades
8656-4200 Contract Services
8656-4201 Contract Serv/Private 0 0 0 0 50,000
Total Contract Services 0 0 0 0 50,000
Total Citywide Energy Conservation Upgrades 0 0 0 0 50,000
125 Park/Rec Fund
8656 Citywide Energy Conservation Upgrades
8656-4200 Contract Services
8656-4201 Contract Serv/Private 0 0 0 0 25,000
Total Contract Services 0 0 0 0 25,000
Total Citywide Energy Conservation Upgrades 0 0 0 0 25,000
150 Grants Fund
8656 Citywide Energy Conservation Upgrades
8656-4200 Contract Services
8656-4201 Contract Serv/Private 0 0 0 0 55,000
Total Contract Services 0 0 0 0 55,000
Total Citywide Energy Conservation Upgrades 0 0 0 0 55,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
31
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Buildings and Ground Improvements 122-8609-4201
PROJECT NO./TITLE: CIP 13-659 Municipal Pier Structural Repairs – Phase II
PROJECT DESCRIPTION:
Phase I of the Municipal Pier structural repairs will be
completed in May 2013.
Phase II will focus on repairing 8 more damaged piles
which were identified in the February 2012 Pier
Evaluation Report as medium priority level. More
damage will be compiled from the observation of the
City’s Inspector and the construction crew performing
the repairs of Phase I.
STATUS:
Development of Strategic Plan in FY13-14. The project
will be coordinated with the expected General Plan
update, which may extend the strategic planning period.
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Preliminary Engineering $20,000
Engineering Design $30,000
Construction $145,000
CURRENT REQUEST
122 Tyco Fund
$195,000
PROJECT TOTAL: $195,000 TOTAL FY 13-14- CIP FUNDING: $195,000
32
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
122 Tyco Fund
8659 Municipal Pier Structural Repairs Ph.II
8659-4200 Contract Services
8659-4201 Contract Serv/Private 0 0 0 0 195,000
Total Contract Services 0 0 0 0 195,000
Total Municipal Pier Structural Repairs Ph.II 0 0 0 0 195,000
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
33
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Buildings and Ground Improvements 001-8663-4201
PROJECT NO./TITLE: CIP 13-663 Parking Structure Repairs
PROJECT DESCRIPTION:
The project will entail physical repairs to various
visible cracks in the slab-on-grade, elevated slabs,
exposed and/or corroded reinforcement, and
corrosion in the embedded sleeves supporting
handrail/guiderail posts.
Repairs will be performed in accordance with the
recommended repair strategies as outlined in the
assessment report completed in FY 12-13.
JUSTIFICATION:
The parking structure is approximately ten years
old and beginning to degrade in the marine
environment. Timely repairs may minimize
damage and reduce the need for future
maintenance and repairs. Items showing signs of
deterioration include the concrete deck, exposed
metal work, and surface painting.
STATUS:
Assessment was completed FY 12-13.
Repairs scheduled for FY 13-14
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Construction $69,952
CURRENT REQUEST
001 General Fund (GF) $60,000
001 GF Committed Funds – Parking Facility $9,952
PROJECT TOTAL: $69,952 TOTAL FY 13-14 CIP FUNDING: $69,952
34
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
001 General Fund
8663 Parking Structure Repairs
8663-4200 Contract Services
8663-4201 Contract Serv/Private 0 0 0 0 69,592
Total Contract Services 0 0 0 0 69,592
Total Parking Structure Repairs 0 0 0 0 69,592
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
35
CITY OF HERMOSA BEACH
CAPITAL IMPROVEMENT PROJECT REQUEST
FISCAL YEAR 2013-14
DEPARTMENT: PUBLIC WORKS PRIORITY NO.: ACCOUNT NO.:
CATEGORY: Public Buildings and Ground Improvements 001-8664-4201
PROJECT NO./TITLE: CIP 13-664 City Facility Condition Assessment & Asbestos Report
PROJECT DESCRIPTION
The objective of this study is to compile an
inventory of the condition of the City’s structures
(including asbestos assessment) and a prioritized
list of repairs with estimated costs. The study will
provide a schedule of preventive maintenance
activities which should assist in the compilation of
CIP budgets.
JUSTIFICATION:
To facilitate future repairs and improvements.
STATUS:
COST TO COMPLETE PROJECT REMAINING PRIOR YEAR FUNDS
Assessment $55,739
CURRENT REQUEST
001 General Fund (CDBG Exchange Funds) $55,739
PROJECT TOTAL: $55,739 TOTAL FY 13-14 CIP FUNDING: $55,739
36
2011-12 2012-13 2012-13 2012-13 2013-14
Expended Total Budget YTD Thru Jan Yr. End Est Dept Request
001 General Fund
8664 City Facility Assessment/Asbesto Rprt
8664-4200 Contract Services
8664-4201 Contract Serv/Private 0 0 0 0 55,739
Total Contract Services 0 0 0 0 55,739
Total City Facility Assessment/Asbesto Rprt 0 0 0 0 55,739
CITY OF HERMOSA BEACH
DEPARTMENT EXPENDITURE DETAIL
2013-14 BUDGET
37
Tentative Future Agenda
PLANNING COMMISSION
City of Hermosa Beach
AUGUST 20, 2013
Project Title Public
Notice
Meeting
Date
Date
Rec’d Remarks
6 month Conditional Use Permit review, including 6 month
review for 705 Pier Avenue (Club 705) and 1238 Hermosa
Avenue (Café Boogaloo).
PT/
PD
8/20 7/8
f:b95\cd\wpc - future agenda 7/11/13
9d
Easy Reader
Run Date: July 4, 2013 DISPLAY
Acct: 7010-2110
City of Hermosa Beach
PUBLIC NOTICE
NOTICE IS HEREBY GIVEN that the Planning Commission of the City of Hermosa Beach shall hold a
public hearing on Tuesday, July 16, 2013, to consider the following:
1. Conditional Use Permit, Precise Development Plan and Tentative Parcel Map No. 72198 for a 2-unit
condominium on east lot at 920 17th Street (continued from the May 22, 2013 meeting).
2. Conditional Use Permit, Precise Development Plan and Tentative Parcel Map No. 72199 for a 2-unit
condominium on west lot at 920 17th Street (continued from the May 22, 2013 meeting).
3. Conditional Use Permit Amendment proposing to change an existing restaurant with on-sale beer
and wine and hours of operation from 11 a.m. to 11:00 p.m. daily, to allow an earlier opening to
accommodate breakfast dining, open air dining, and an amended floor plan, at 425 Pier Avenue
(currently Buona Vita Pizzeria).
SAID PUBLIC HEARINGS shall be held at 7:00 P.M., or as soon thereafter as the matter may be heard,
in the City Council Chambers, City Hall, 1315 Valley Drive, Hermosa Beach, CA 90254.
ANY AND ALL PERSONS interested are invited to participate and speak at these hearings at the above
time and place. For inclusion in the agenda packet to be distributed, written comments of interested
parties should be submitted to the Community Development Department, Planning Division, in care of
City Hall at 1315 Valley Drive, Hermosa Beach, CA 90254 prior to Thursday, July 11, 2013, at 12:00
noon. All written testimony by any interested party will be accepted prior to or at the scheduled time on
the agenda for the matter.
IF YOU CHALLENGE the above matter(s) in court, you may be limited to raising only those issues you
or someone else raised at the public hearing described in this notice, or in written correspondence
delivered to the Community Development Department, Planning Division, at, or prior to, the public
hearing.
FOR FURTHER INFORMATION, please contact the Community Development Department, Planning
Division, at (310) 318-0242 or fax to (310) 937-6235. The Department is open from 7:00 a.m. to 6:00
p.m. Monday through Thursday. Please contact a staff planner to discuss any project on the Planning
Commission agenda. A copy of the staff report(s) in the Planning Commission packet will be available
for public review at the end of the business day on Thursday, July 11, 2013, at the Hermosa Beach
Police Department, Public Library, and on the City’s website at www.hermosabch.org. Relevant
Municipal Code sections are also available on the website.
Elaine Doerfling
City Clerk
f:95\cclerk\legads\display\2013\planning\pc07-16-13