HomeMy WebLinkAbout10-20-2021 - Agenda Pkg- CC Special MeetingCity Council
City of Hermosa Beach
Regular Meeting Agenda - Final
City Hall
1315 Valley Drive
Hermosa Beach, CA
90254
Mayor
Justin Massey
Mayor Pro Tem
Michael Detoy
Councilmembers
Stacey Armato
Mary Campbell
Raymond Jackson
6:00 PMWednesday, October 20, 2021
STATE OF THE CITY
1
October 20, 2021City Council Regular Meeting Agenda - Final
VIEWING OPTIONS FOR PUBLIC MEETINGS
Public meetings are broadcast live on Spectrum Channel 8 and Frontier Channel 31
in Hermosa Beach. Additional viewing options are provided as a courtesy.
ZOOM: Join the meeting link if available or participate by phone
YOUTUBE CHANNEL: www.youtube.com/channel/UCaiZxw06ue-Tgc8DmXYzh2Q
CITY WEBSITE: www.hermosabeach.gov and visit the Agendas/Minutes/Videos page
***PLEASE NOTE: IF YOU EXPERIENCE TECHNICAL DIFFICULTIES WHILE VIEWING
THE MEETING ON ONE OF THESE PLATFORMS, PLEASE TRY ONE OF THE OTHER
VIEWING OPTIONS***
Page 2 City of Hermosa Beach Printed on 3/26/2024
2
October 20, 2021City Council Regular Meeting Agenda - Final
5:00 P.M. - CLOSED SESSION
(LOCATION: Meetings convene in the Council Chambers and move to the Second Floor Conference
Room after Public Comment)
CALL TO ORDER IN COUNCIL CHAMBERS
ROLL CALL
PUBLIC COMMENT ON THE CLOSED SESSION AGENDA
JOIN THE VIRTUAL MEETING AT:
https://us02web.zoom.us/j/87032785286?pwd=RGVVZnduNGVIVGJLOFlvaFNuYTBlUT09
OR PARTICIPATE BY PHONE:
•Toll Free: 877-853-5257
•Meeting ID: 870 3278 5286, then #
•Passcode: 513185
ATTENDEES WILL BE MUTED UNTIL THE PUBLIC PARTICIPATION PERIOD IS OPENED.
If you are joining by phone, press * 6 to unmute your line. Comments from the public are
limited to 3 minutes per speaker.
RECESS TO CLOSED SESSION IN SECOND FLOOR CONFERENCE ROOM
Closed Session Topic
ADJOURNMENT OF CLOSED SESSION
Page 3 City of Hermosa Beach Printed on 3/26/2024
3
October 20, 2021City Council Regular Meeting Agenda - Final
6:00 P.M. – STUDY SESSION
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
Study Session Topic
PUBLIC COMMENT
ADJOURNMENT OF STUDY SESSION
Page 4 City of Hermosa Beach Printed on 3/26/2024
4
October 20, 2021City Council Regular Meeting Agenda - Final
6:00 P.M. - REGULAR AGENDA
All council meetings are open to the public. PLEASE ATTEND.
The Council receives a packet with detailed information and recommendations on nearly every agenda
item. City Council agenda packets are available for your review on the City's website located at
www.hermosabeach.gov. Complete agenda packets are also available for public inspection in the City
Clerk's office.
During the meeting, a packet is also available in the Council Chambers foyer or you can access the
packet at our website, www.hermosabch.org, on your laptop, tablet or smartphone through the wireless
signal available in the City Council chambers - Network ID: CHB-Guest, Password: chbguest
To comply with the Americans with Disabilities Act of 1990, Assistive Listening Devices (ALD) will be
available for check out at the meeting. If you require special assistance to participate in this meeting,
you must call or submit your request in writing to the Office of the City Clerk at (310) 318-0203 at least
48 hours prior to the meeting.
Oral and Written Communication
Persons who wish to have written materials included in the agenda packet at the time the agenda is
published on the City's website must submit the written materials to the City Manager's office by email
(esarmiento@hermosabeach.gov) or in person by noon of the Tuesday, one week before the meeting
date.
Written materials pertaining to matters listed on the posted agenda received after the agenda has been
posted will be added as supplemental materials under the relevant agenda item on the City's website at
the same time as they are distributed to the City Council by email. Supplemental materials may be
submitted via eComment (instructions below) or emailed to esarmiento@hermosabeach.gov.
Supplemental materials must be received before 4:00 p.m. on the date of the meeting to ensure
Council and staff have the ability to review materials prior to the meeting. Supplemental materials
submitted after 4:00 p.m. on the date of the meeting or submitted during the meeting will be posted
online the next day.
Submit Supplemental eComments in three easy steps:
Note: Your comments will become part of the official meeting record. You must provide your full name,
but please do not provide any other personal information (i.e. phone numbers, addresses, etc) that you
do not want to be published.
1. Go to the Agendas/Minutes/Video webpage and find the meeting you’d like to submit comments on.
Click on the eComment button for your selected meeting.
2. Find the agenda item for which you would like to provide a comment. You can select a specific
agenda item/project or provide general comments under the Oral/Written Communications item.
3. Sign in to your SpeakUp Hermosa Account or as a guest, enter your comment in the field provided,
provide your name, and if applicable, attach files before submitting your comment.
Public Participation Speaker Cards:
Page 5 City of Hermosa Beach Printed on 3/26/2024
5
October 20, 2021City Council Regular Meeting Agenda - Final
If you wish to speak during Public Participation, please fill out a speaker card at the meeting. The
purpose of the speaker card is to streamline and better organize our public comment process to
ensure names of speakers are correctly recorded in the minutes and where appropriate, to provide
contact information for staff follow-up.
Page 6 City of Hermosa Beach Printed on 3/26/2024
6
October 20, 2021City Council Regular Meeting Agenda - Final
I. CALL TO ORDER
II. PLEDGE OF ALLEGIANCE
III. ROLL CALL
IV. CLOSED SESSION REPORT
V. ANNOUNCEMENTS - UPCOMING CITY EVENTS
VI. APPROVAL OF AGENDA:This is the time for the City Council to change the order
in which it takes up items on this agenda, remove and/or continue agenda items and
pull items from the consent calendar for separate consideration.
VII. PROCLAMATIONS / PRESENTATIONS
VIII. CITY MANAGER REPORT - The City Manager and staff may provide brief reports
on pending City business. Longer oral reports to be provided are as follows:
b.REPORT
20-0781
QUARTERLY STRAND ENFORCEMENT UPDATE
IX. PUBLIC PARTICIPATION -- ORAL AND WRITTEN COMMUNICATIONS FROM THE
PUBLIC: This is the time for members of the public to address the City Council on
any items within the Council's jurisdiction not on this agenda, on items on this
agenda as to which public comment will not be taken (City Manager Reports, City
Councilmember Reports Consent Calendar items that are not pulled for separate
consideration and Future Agenda Items), on written communications, and to request
the removal of an item from the consent calendar. Public comments on the agenda
items called City Manager Reports, City Councilmembers Reports, Consent Calendar
items that are not pulled for separate consideration and Future Agenda Items will
only be heard at this time. Further, comments on public hearing items are heard only
during the public hearing. Members of the audience may also speak during
discussion of items removed from the Consent Calendar for separate consideration;
during Public Hearings; and, during discussion of items appearing under Municipal
Matters.
Page 7 City of Hermosa Beach Printed on 3/26/2024
7
October 20, 2021City Council Regular Meeting Agenda - Final
All comments from the public under this agenda item are limited to three minutes per
speaker, but this time allotment may be reduced due to time constraints. The City
Council acknowledges receipt of the written communications listed below. No action
will be taken on matters raised in oral and written communications, except that the
Council may take action to schedule issues raised in oral and written
communications for a future agenda. Speakers with comments regarding City
management or departmental operations are encouraged to submit those comments
directly to the City Manager.
X. CITY COUNCILMEMBER COMMENTS: Councilmembers may briefly respond to
public comments, may ask a question for clarification or make a brief announcement
or report on his or her own activities or meetings attended.
XI. CONSENT CALENDAR: The following matters will be acted upon collectively with
a single motion and vote to approve with the majority consent of the City Council.
Councilmembers may orally register a negative vote on any consent calendar item
without pulling the item for separate consideration prior to the vote on the consent
calendar. There will be no separate discussion of these items unless a Council
member removes an item from the Consent Calendar, either under Approval of the
Agenda or under this item prior to the vote on the consent calendar. Items removed
will be considered under Agenda Item XII (12), with public comment permitted at that
time. The title is deemed to be read and further reading waived of any ordinance
listed on the consent calendar for introduction or adoption.
f.REPORT
20-0761
ACTION MINUTES OF THE PUBLIC WORKS COMMISSION
MEETING OF SEPTEMBER 16, 2020
Recommendation:Staff recommends that the City Council receive and file the action minutes of the Public
Works Commission meeting of September 16, 2020.
b.REPORT
21-0114
CHECK REGISTERS
(Finance Director Viki Copeland)
Recommendation:Staff recommends that the City Council ratify the following check registers.
e.REPORT
21-0115
CAPITAL IMPROVEMENT PROGRAM STATUS REPORT
AS OF FEBRUARY 11, 2021
(Public Works Director Marnell Gibson)
Recommendation:Staff recommends that the City Council receive and file the Capital Improvement Program
Status Report as of February 11, 2021.
g.REPORT
21-0174
ACTION MINUTES OF THE PUBLIC WORKS COMMISSION
MEETING OF JANUARY 20, 2021
Recommendation:Staff recommends City Council receive and file the action minutes of the Public Works
Commission meeting of January 20, 2021.
Page 8 City of Hermosa Beach Printed on 3/26/2024
8
October 20, 2021City Council Regular Meeting Agenda - Final
f.REPORT
21-0248
CAPITAL IMPROVEMENT PROGRAM STATUS REPORT
AS OF APRIL 20, 2021
(Public Works Director Marnell Gibson)
Recommendation:Staff recommends City Council receive and file the Capital Improvement Program Status
Report as of April 20, 2021.
REPORT
21-0261
CHECK REGISTERS
(Finance Director Viki Copeland)
Recommendation:Staff recommends City Council ratify the following check registers.
REPORT
21-0369
CHECK REGISTERS
(Finance Director Viki Copeland)
Recommendation:Staff recommends City Council ratify the following check registers.
c.REPORT
21-0543
MEMORANDUM REGARDING REVENUE REPORT, EXPENDITURE
REPORT, COVID-19 REVENUE TRACKING REPORT, AND CIP
REPORT BY PROJECT FOR JUNE 2021
(Finance Director Viki Copeland)
e.REPORT
21-0565
CAPITAL IMPROVEMENT PROGRAM STATUS REPORT
AS OF SEPTEMBER 16, 2021
(Public Works Director Joe SanClemente)
Recommendation:Staff recommends City Council receive and file the Capital Improvement Program Status
Report as of September 16, 2021.
XII. ITEMS REMOVED FROM THE CONSENT CALENDAR FOR SEPARATE
DISCUSSION - Items pulled from the Consent Calendar will be handled separately.
Public comment will be taken prior to Council deliberation and action on each item
pulled from the Consent Calendar.
XIII. PUBLIC HEARINGS - TO COMMENCE AT 6:30 P.M.
XIV. MUNICIPAL MATTERS
XV. FUTURE AGENDA ITEMS - Requests from Councilmembers for possible future
agenda items and questions from Councilmembers regarding the status of future
agenda items. No discussion or debate of these requests shall be undertaken; the
sole action is whether to schedule the item for consideration on a future agenda. No
public comment will be taken. Councilmembers should consider the city's work plan
when considering new items. The existing list of future agenda items below is for
information only.
XVI. ADJOURNMENT
Page 9 City of Hermosa Beach Printed on 3/26/2024
9
October 20, 2021City Council Regular Meeting Agenda - Final
FUTURE MEETINGS AND CITY HOLIDAYS
CITY COUNCIL MEETINGS:
August 24, 2021 - Tuesday - Ceremonial Swearing-in for Ray Jackson
September 14, 2021 - Tuesday - 5:00 PM - Closed Session,
6:00 PM - City Council Meeting
September 28, 2021 - Tuesday - 5:00 PM - Closed Session,
6:00 PM - City Council Meeting
October 12, 2021 - Tuesday - 5:00 PM - Closed Session,
6:00 PM - City Council Meeting
October 23, 2021 - Saturday - Adjourned Regular Meeting:
9:00 AM - City Council Retreat
October 26, 2021 - Tuesday - 5:00 PM - Closed Session,
6:00 PM - City Council Meeting
November 9, 2021 - Tuesday - 5:00 PM - Closed Session,
6:00 PM - City Council Meeting (Mayor Transition)
November 23, 2021 - Tuesday - 5:00 PM - Closed Session,
6:00 PM - City Council Meeting
December 14, 2021 - Tuesday - 5:00 PM - Closed Session,
6:00 PM - City Council Meeting
December 28, 2020 - Tuesday - No Meeting (Dark)
BOARDS, COMMISSIONS AND COMMITTEE MEETINGS:
September 13, 2021 - Monday - 6:00 PM - Economic Development Committee Meeting
September 21, 2021 - Tuesday - 6:00 PM - Planning Commission Meeting
September 15, 2021 - Wednesday - 6:00 PM - Public Works Commission Meeting
October 4, 2021 - Monday - 6:00 PM - Economic Development Committee Meeting
October 5, 2021 - Tuesday - 7:00 PM - Parks and Recreation Advisory Commission Meeting
October 19, 2021 - Tuesday - 6:00 PM - Planning Commission Meeting
November 1, 2021 - Monday - 6:00 PM - Economic Development Committee Meeting
November 2, 2021 - Tuesday - 7:00 PM - Parks and Recreation Advisory Commission Meeting
November 16, 2021 - Tuesday - 6:00 PM - Planning Commission Meeting
November 17, 2021 - Wednesday - 6:00 PM - Public Works Commission Meeting
December 6, 2021 - Monday - 6:00 PM - Economic Development Committee Meeting
December 7, 2021 - Tuesday - 7:00 PM - Parks and Recreation Advisory Commission Meeting
December 13, 2021 - Monday - 6:00 PM - Planning Commission Meeting
CITY OFFICES CLOSED FRIDAY-SUNDAY AND ON THE FOLLOWING DAYS:
September 6, 2021 - Monday - Labor Day
November 11, 2021 - Thursday - Veteran's Day
November 25, 2021 - Thursday - Thanksgiving Day
Page 10 City of Hermosa Beach Printed on 3/26/2024
10
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 20-0781
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of December 08, 2020
QUARTERLY STRAND ENFORCEMENT UPDATE
City of Hermosa Beach Printed on 3/26/2024Page 1 of 1
powered by Legistar™11
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 20-0761
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 24, 2020
ACTION MINUTES OF THE PUBLIC WORKS COMMISSION
MEETING OF SEPTEMBER 16, 2020
Recommended Action:
Staff recommends that the City Council receive and file the action minutes of the Public Works
Commission meeting of September 16, 2020.
Attachments:
Minutes of September 16, 2020
Approved: Marnell Gibson, Public Works Director
Noted: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 3/26/2024Page 1 of 1
powered by Legistar™12
ACTION MINUTES
PUBLIC WORKS COMMISSION
REGULAR MEETING OF WEDNESDAY, September 16, 2020
CITY HALL, COUNCIL CHAMBERS
1315 VALLEY DRIVE
6:00 P.M.
COMMISSIONERS
Kathy Dunbabin Janice Brittain Kent F. Brown David Grethen Andrea N. Giancoli
*********************************************************************************************
******************
THIS MEETING IS HELD PURSUANT TO EXECUTIVE ORDER N-29-20 ISSUED BY GOVERNOR
GAVIN NEWSOM ON MARCH 17, 2020. ANY OR ALL COMMISSION MEMBERS MAY ATTEND AND
PARTICIPATE BY TELECONFERENCE/VIRTUAL MEETING. MEMBERS OF THE PUBLIC MAY
PARTICIPATE BY TELECONFERENCE.
*********************************************************************************************
******************
Public Participation
City Hall will be closed to the public until further notice. Members of the public may email comments to
anguyen@hermosabeach.gov until 5:00 p.m. on the meeting date. Members of the public may also participate by
phone or through Zoom.
PARTICIPATE BY PHONE:
1. Email anguyen@hermosabeach.gov to be added to the speaker list. Please indicate which item you would
like to speak on.
2. Dial-in to meeting:
• Toll Free: 877-853-5257
• Meeting ID: 893 8875 6805, then #
• Participant ID: press # to bypass
3. ATTENDEES WILL BE MUTED UNTIL THE PUBLIC PARTICIPATION PERIOD IS OPENED. When you are called on
to speak, press * 6 to unmute your line. Comments from the public are limited to 3 minutes per speaker.
Note: Your comments will become part of the official meeting record. You must provide your full name,
but please do not provide any other personal information (i.e. phone numbers, addresses, etc) that you
do not want to be published.
Public Works Commission agendas and staff reports are available for your review on the City’s web site
located at www.hermosabeach.gov.
4A 13
2
1. Call to Order
2. Pledge of Allegiance
3. Roll Call
4. Approval of Action Minutes
A. July 15, 2020
Minutes were revised and approved per Commissioner Grethen’s request. Commissioner
Brittain motioned to approve the action minutes for July 2020. Seconded by Commissioner
Dunbabin, the motion was approved and passed.
AYES: Dunbabin, Brittain, Grethen, Giancoli
NOES: None
ABSTAIN: None
ABSENT: Brown
5. Public Comment on Non-Agenda Items: None
6. Correspondence: None
7. Presentations
A. Measure W Funding Status Update – Douglas Krauss, Environmental Programs Manager
Environmental Programs Manager Douglas Krauss provided a summary of the upcoming
projects involving Measure W, a law passed by voters in 2018 to increase taxes for storm water
related projects. With Measure W, Los Angeles County anticipates acquiring $300 million in
proceeds annually to go towards projects increasing storm water capture and reducing urban
runoff pollution, which may increase water supply, improve water quality, and provide community
investment benefits. Of the total annual proceeds, 40% of the parcel tax based revenue is
allocated to each city within the Los Angeles County Flood Control Distrct. The City of Hermosa
Beach received and adopted its first transfer agreement in July 2020 which noted the annual
amount to be received as approximately $160,000. The City must spend 70% of the funding per
year to be in compliance with the measure’s requirements. For its first year project, the City is
joining the City of Torrance’s Green Streets Project, which they applied for on behalf of the Cities
of Torrance, Hermosa Beach Redondo Beach, and Manhattan Beach. In the City of Hermosa
Beach, the construction of a green street shall occur on Hermosa Avenue, from Herondo Street
to Fourth Street. As this is the first phase of the project, the City is contributing Measure W funds
to the design of the project. Completion is projected for summer 2021. More updates are
expected as the project progresses.
8. Items for Consideration
A. Proposed New Time for Future Public Works Commission Meetings
Recommendation:
It is recommended that the Public Works Commission consider:
1. Moving the start time for future Public Works Commission meetings from 7:00 PM to 6:00
PM.
Director Gibson brought forward for consideration a change of the start time for future PWC
meetings to be aligned with City Council’s decision to change their meetings from 7:00 PM to
4A 14
3
6:00 PM. Commissioner Grethen expressed concern regarding the recommended time change
given it might decrease the opportunity for public comment and engagement. Commissioner
Giancoli added the time change is appropriate with current COVID-19 impacts and that many
people are working from home. However, the time change should be revisited following the
culmination of COVID-19 mandates to allow Commissioners and the public sufficient time to
commute from work to City Hall or a place where they can join the meeting. Commissioner
Dunbabin motioned to approve the proposition. Seconded by Chairperson Brown, the motion
was approved and passed.
AYES: Dunbabin, Brittain, Brown, Giancoli
NOES: Grethen
ABSTAIN: None
ABSENT: None
B.Request to Remove and Replace Two Trees from the Public Right-of-Way at 845 4th Street
Recommendation:
It is recommended that the Public Works Commission consider:
1.A property owner requested to remove two (2) Mimosa trees fronting 845 4th Street
and;
2.Accept the installation of four (4) new Zone III approved trees at approximately the
same location.
The property owner’s request to remove and replace the trees comes as part of a new
development for 845 4th Street to be a single-family residence. In response to the City’s new
ordinance pertaining to the two to one tree replacement ratio, the property owner is proposing
the removal and replacement of the 2 existing Mimosa trees with 4 new Lemon Bottle Brush
Trees. The removal of the existing trees would address the damage these are causing to the
existing sidewalk. American Arbor Care completed an assessment of the trees and
recommended their removal. Commissioners Grethen and Dunbabin visited the site on their
own time and agreed with the recommendation. Commissioner Giancoli requested information
be provided to Commissioners regarding what happens to the trees after they are removed.
Staff will provide an update to Commissioners regarding what happens to trees that are
removed at the November 18, 2020 meeting. Commissioners recommended for future
recommendations to remove and replace trees to include the location of the new trees.
Commissioner Grethen motioned for the Public Works Commission to approve the request for
the removal of the trees fronting the property at 845 4th Street and require the property owner
to install at least 2 lemon bottlebrush trees at approximately the same location with any
additional trees of the 4 required to be replaced that cannot be planted onsite to be planted
elsewhere in the City as determined by Public Works staff. Seconded by Commissioner
Dunbabin, the motion passed.
AYES: Dunbabin, Brittain, Brown, Grethen, Giancoli
NOES: None
ABSTAIN: None
ABSENT: None
9.Commissioners’ Reports
Commissioner Dunbabin announced the City will issue a survey about the Clark Building to
residents. The purpose of this survey is to gather information regarding who uses the site and how,
as well as the number of people using it.
10.Monthly Reports
4A 15
4
A. Monthly Activity Reports – June 2020, July 2020
Director Gibson provided a recap of the Monthly Activity Reports noting that permits continue to come
in at a high rate. PW response rate service request continues to be high but noted that there has
been a significant increase in trash, vandalism and grafitti primarily in our parks and beach areas. For
example, the restrooms at the beach have undergone an increase in vandalism, which has resulted in
increased Public Works activity to remove the graffiti, repair faucets and shower heads, and clear toilet
clogs. In addition, due to reduced staff levels and crews being split into two different shifts, there has
been an increase in cross training activities for Public Works Field Operations staff to ensure jobs are
completed.
B. CIP Status with Verbal Updates
Above items are presented for information purposes only
Chairperson Brown inquired about the impacts COVID-19 has on the current fiscal year’s
budget. Director Gibson confirmed that the CIP budget has not been impacted thus far.
Director Gibson reviewed the CIP Status Report and discussed how the items arehighlilghted
when a milestone has been achieved or if there has been a significant change to the project.
Chairperson Brown inquired about the progress of the restroom renovations and expressed
concern given the 2-year span of this project. Deputy City Engineer Rodriguez stated the
project is in motion and is moving into the bidding phase.
11. Director’s Verbal Updates
Director Gibson provided a summary of items Public Works Staff have been heavily involved with as
a result of COVID-19. Some of these include the recent efforts for complete streets along Hermosa
Avenue and Pier Avenue, the issuance of outdoor sidewalk and dining deck permits, plexi-glass
installation in City offices, and newCDBG funding for a project to improve project ADA accessibility in
the Police Department and Community Center. Staff is working with the Hermosa Beach Little
League and Parks and Recreation Commission to install turf at the t-ball field prior to the start of the
2021 season.
12. Commissioner Items (Other Matters)
Commissioner Grethen introduced the idea of having a program by which trees that are removed
can be planted at certain locations adjacent to residential properties. Residents who wish to
participate in the program would then volunteer to care for the tree. Chairperson Brown supported
the idea and encouraged the inclusion of community groups, such as the Garden Club. This item
will be further considered at a future meeting.
13. Commissioner’s Announcements: None
14. Adjournment
4A 16
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 21-0114
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of February 23, 2021
CHECK REGISTERS
(Finance Director Viki Copeland)
Recommended Action:
Staff recommends that the City Council ratify the following check registers.
Attachments:
1.Check Register 1/28/2021
2.Check Register 2/4/2021
Respectfully Submitted by: Viki Copeland, Finance Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 3/26/2024Page 1 of 1
powered by Legistar™17
01/28/2021
Check Register
CITY OF HERMOSA BEACH
1
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96657 1/28/2021 ACCESS, INC.21-0002 ADA CONSULTING SERVICES/ JAN 202121696
301-8602-4201 6,105.00
Total : 6,105.0021696
96658 1/28/2021 ALKADIS, CHRISTOPHER TR 845 PER DIEM/ SUPERVISORY LEADERSHIP INST.11359
001-2101-4312 150.00
Total : 150.0011359
96659 1/28/2021 ASCAP 500606147 ASACAP MEMBERSHIP RENEWAL13900
001-4601-4315 367.00
Total : 367.0013900
96660 1/28/2021 AT&T 310 796-6526 991 3 PD COMPUTER CIRCUITS/ JAN 2100321
001-2101-4304 126.20
PD COMPUTER CIRCUITS/ JAN 2021960 461-1985 555 7
001-2101-4304 109.65
Total : 235.8500321
96661 1/28/2021 ATHENS SERVICES 9400153B SCRUBBER SERVICE/ OCT 202016660
001-3104-4201 764.75
001-3301-4201 5,926.76
001-3304-4201 764.74
CITYWIDE SWEEP/PORTER SERVICE/ DEC 20209692690
001-3104-4201 16,353.92
001-3301-4201 10,898.50
001-3304-4201 1,501.69
001-6101-4201 1,601.23
STEAM CLEAN/DEC 20209692690A
001-3104-4201 1,320.48
001-3301-4201 5,129.35
001-3304-4201 320.92
SCRUBBER SERVICE/ DEC 20209692690B
001-3301-4201 6,930.49
001-3304-4201 764.74
Total : 52,277.5716660
96662 1/28/2021 BARR, WARREN 011121 2020 STREET LIGHT TAX REBATE21226
105-3105 24.61
2b (1)18
01/28/2021
Check Register
CITY OF HERMOSA BEACH
2
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 24.61 96662 1/28/2021 BARR, WARREN21226
96663 1/28/2021 BEST BEST & KRIEGER LLP 894373 CITY ATTORNEY SERVICES-GENERAL/DEC 202020942
001-1131-4201 12,458.60
ATTY SRVS-NORTH SCHOOL MOU/DEC 2020894374
001-1131-4201 1,309.00
ATTY SERVICES-GREENWICH UD/DEC 2020894375
001-2133 1,140.70
ATTY SERVICES-PUB REC REQUESTS/DEC 2020894376
001-1131-4201 2,259.30
ATTY SRVS- COVID-19 EMERG RESPONSE/DEC894377
157-2702-4201 1,365.10
ATTY SERVICES-LAND USE/DEC 2020894378
001-1131-4201 2,599.30
ATTY SERVICES-CROSSFIT/ DEC 2020894379
705-1133-4201 1,733.95
ATTY SERVICES- ROTH V TRAN/ DEC 2020894380
705-1133-4201 1,321.55
ATTY SERVICES-HERMOSA FITNESS/DEC 2020894381
705-1133-4201 2,854.80
ATTORNEY SERVICES-FANGARY/DEC 2020894382
705-1133-4201 14,860.25
ATTORNEY SERVICES-BROIN/ DEC 2020894384
705-1133-4201 109.00
ATTORNEY SERVICES - HR/ DEC 2020894385
001-1203-4201 4,275.80
ATTY SRVS-TELECOMMUNICATIONS/DEC 2020894386
001-1131-4201 406.40
Total : 46,693.7520942
96664 1/28/2021 BMI 39026627 BMI MEMBERSHIP RENEWAL16693
001-4601-4315 368.00
Total : 368.0016693
96665 1/28/2021 EMPIRE PIPE CLEANING AND EQUIP 12054 CLEAN & VIDEO INSPECT SEWERS/ DEC 202007853
160-3102-4201 26,190.44
Total : 26,190.4407853
96666 1/28/2021 FRANCO, MATTHEW TR 846 PER DIEM/ICI IDENTITY THEFT20265
19
01/28/2021
Check Register
CITY OF HERMOSA BEACH
3
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96666 1/28/2021 (Continued)FRANCO, MATTHEW20265
001-2101-4312 250.00
Total : 250.0020265
96667 1/28/2021 FRONTIER 209-109-0013-1206175 PD COMPUTER CIRCUITS/ JAN 2119884
001-2101-4304 901.82
LANDLINES & COMPUTER LINKS/ JAN 21209-188-4669-0714985
001-3302-4304 75.85
001-2101-4304 723.08
001-4204-4321 233.64
001-4202-4304 61.12
001-4201-4304 172.21
001-3304-4304 63.06
001-1204-4304 58.92
EOC ANALOG LINES/ JAN 2021310-318-0113-1203155
715-1206-4304 1,240.75
CASHIER TAPS LINE/ JAN 2021310-318-8751-0128095
001-1204-4304 57.63
JAIL BREATHALYZER/ JAN 21310-318-9210-0827185
001-2101-4304 71.20
CHAMBERS EOC ANALOG LINES/JAN 2021310-318-9800-1204155
715-1206-4304 1,493.17
2ND FLOOR CANON FAX LINE/ JAN 2021310-372-6186-0831895
001-1121-4304 12.54
001-1141-4304 12.55
001-1201-4304 12.54
001-1202-4304 12.55
001-1203-4304 12.54
PERSONNEL FAX LINE/ JAN 2021310-372-6373-0311045
001-1203-4304 58.95
FIBER OPTIC LINES/ DEC 2020323-155-6779-0822065
715-1206-4201 215.98
FIBER OPTIC LINES/ JAN 2021323-155-6779-0822065
715-1206-4201 215.98
EOC CABLE & INTERNET/ JAN 2021323-159-2268-0924145
001-1201-4304 291.20
Total : 5,997.2819884
96668 1/28/2021 GOLDEN TOUCH CLEANING, INC.67763 JANITORIAL SRVCS/DEC 202020627
20
01/28/2021
Check Register
CITY OF HERMOSA BEACH
4
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96668 1/28/2021 (Continued)GOLDEN TOUCH CLEANING, INC.20627
001-4204-4201 6,861.00
157-2702-4201 3,866.69
Total : 10,727.6920627
96669 1/28/2021 GRAINGER 9768509615 MAT REQ 435314/MAINTENANCE SUPP/JAN 2110836
001-4204-4309 283.95
Total : 283.9510836
96670 1/28/2021 JOHN L HUNTER AND ASSOC INC HB1MS412010 NPDES PROGRAM SERVICES/ OCT 202005356
161-3109-4201 4,065.00
NPDES PROGRAM SERVICES/ NOV 2020HB1MS412011
161-3109-4201 3,716.25
Total : 7,781.2505356
96671 1/28/2021 JOHNSON, ANN 2002600.003 CLASS REFUND22213
001-2111 60.00
Total : 60.0022213
96672 1/28/2021 LA CO SHERIFFS DEPARTMENT 210936BL MAT REQ 435229/PRISONER MEALS/NOV 202000151
001-2101-4306 49.05
Total : 49.0500151
96673 1/28/2021 LA SUPERIOR COURT - TORRANCE PO 35865 SURCHARGES OWED ON CITATION PAYMENTS00118
001-3302 50,406.10
Total : 50,406.1000118
96674 1/28/2021 LEONARD, MICHELE 2002598.003 CLASS REFUND22211
001-2111 60.00
Total : 60.0022211
96675 1/28/2021 MERCHANTS LANDSCAPE SERVICES 57266 CITYWIDE LANDSCAPING SERVICES/DEC 202018071
001-6101-4201 21,200.00
CITYWIDE LANDSCAPING SERVICES/DEC 202057267
105-2601-4201 3,600.00
SAND INSTALLATION57275
105-2601-4201 389.00
Total : 25,189.0018071
96676 1/28/2021 NATIONAL CONSTRUCTION RENTALS 5968643 FENCING FOR VALLEY PARK16663
21
01/28/2021
Check Register
CITY OF HERMOSA BEACH
5
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96676 1/28/2021 (Continued)NATIONAL CONSTRUCTION RENTALS16663
157-2702-4201 827.64
Total : 827.6416663
96677 1/28/2021 OFFICE DEPOT 144210395001 MAT REQ 435055/OFFICE SUPPLIES/JAN 2113114
001-1204-4305 22.77
MAT REQ 435055/OFFICE SUPPLIES/ JAN 21144214503001
001-1204-4305 49.90
MAT REQ 435055/OFFICE SUPPLIES/ JAN 21144214510001
001-1204-4305 18.60
MAT REQ 435306/OFFICE SUPPLIES/ JAN 21147841571001
001-4202-4305 21.01
MAT REQ 435306/OFFICE SUPPLIES/JAN 21147841923001
001-4202-4305 38.00
MAT REQ 437820/OFFICE SUPPLIES/JAN 21148338957001
001-3302-4309 60.17
Total : 210.4513114
96678 1/28/2021 PFEIFER, EDITH 012521 2020 STREET LIGHT & SEWER TAX REBATE09791
001-6871 126.60
105-3105 24.61
Total : 151.2109791
96679 1/28/2021 POSM SOFTWARE LLC 1971 POSM ANNUAL MEMBERSHIP RENEWAL19894
160-3102-4201 3,000.00
Total : 3,000.0019894
96680 1/28/2021 PROVIDENCE LITTLE CO OF 76200102676601 FIRST AID/ K MATEKO08445
001-1203-4320 465.00
Total : 465.0008445
96681 1/28/2021 PROVIDENCE MEDICAL Guarantor 600000284 PRE-EMPLOYMENT PHYSICALS/ DEC 202001911
001-1203-4320 150.00
Total : 150.0001911
96682 1/28/2021 REDONDO BEACH, CITY OF 571677 TRANSCRIPTION FEES FOR AUDIO/BODY CAM FO03282
001-1132-4201 298.32
Total : 298.3203282
96683 1/28/2021 SBCU VISA 0077959 CC IACP MEMBERSHIP RENEWAL FOR CHIEF LEBARO03353
22
01/28/2021
Check Register
CITY OF HERMOSA BEACH
6
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96683 1/28/2021 (Continued)SBCU VISA03353
001-2101-4315 190.00
PD DRINKING WATER DELIVERY/SEP - DEC 20200L0034513168 CC
001-2101-4305 920.19
CANON DIGITAL CAMERAS FOR PATROL1041856 CC
001-2101-4305 824.95
001-2101-4305 78.35
INTEREST CHARGE123120 CC
001-4202-4201 41.34
001-2026 41.34
001-2027 -41.34
THANKSGIVING MEAL FOR ON-DUTY PD STAFF138502 CC
001-2101-4305 99.02
RANGE MAINTENANCE: AIR FILTERS1690641 CC
001-2101-4309 387.36
001-2101-4309 36.80
CPCA MEMBERSHIP RENEWAL FOR LT. PHILLIPS17337 CC
001-2101-4315 145.00
K9 OFFICER DOG FOOD/ DEC 20201869051 CC
170-2105-4309 52.90
CCUG AGENCY MEMBERSHIP RENEWAL2175 CC
001-2101-4315 125.00
FACE MASKS5411416 CC
157-2702-4305 63.96
157-2702-4305 6.08
RANGE MAINTENANCE: AIR FILTERS5828209 CC
001-2101-4309 25.16
RETURNED CAMERA LENS MOUNT5828209 CC
001-2101-4309 -18.60
REPLACEMENT HDMI CABLE FOR RECORDS TV7028239 CC
001-2101-4305 19.03
SAM FELDMAN ANTENNAS FOR MOTOR OFFICE7057817 CC
001-2101-4305 344.99
001-2101-4305 32.77
PHONE CHARGERS8181048 CC
001-4202-4305 37.47
001-4202-4305 3.55
FACE MASKS8822613 CC
157-2702-4305 31.98
23
01/28/2021
Check Register
CITY OF HERMOSA BEACH
7
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96683 1/28/2021 (Continued)SBCU VISA03353
157-2702-4305 3.04
Total : 3,450.3403353
96684 1/28/2021 SHOETERIA 0014951-IN YARD STAFF BOOTS/ DAVIS20539
001-4202-4314 101.80
YARD STAFF BOOTS/VILLA, GALLEGOS,0014952-IN
001-4202-4314 500.00
YARD STAFF BOOTS/WILCOSKY, COCKING,0014953-IN
001-4202-4314 491.43
Total : 1,093.2320539
96685 1/28/2021 SOCAL GAS 170-781-3287 9 YARD CNG/VEHICLE FUEL/ DEC 202000170
715-6101-4310 36.51
715-4204-4310 36.51
715-3104-4310 36.51
Total : 109.5300170
96686 1/28/2021 SPCALA 2020-1231 ANIMAL SHELTERING SERVICES/DEC 202018821
001-3302-4201 875.00
Total : 875.0018821
96687 1/28/2021 SPECTRUM BUSINESS 8448300300402150 1301 HERMOSA/540 PIER CONNECTION/DEC 2020236
001-2101-4304 798.92
Total : 798.9220236
96688 1/28/2021 SPECTRUM BUSINESS 8448300300352413 1301 HERMOSA/540 PIER CONNECTION/JAN 2120236
001-2101-4304 276.49
Total : 276.4920236
96689 1/28/2021 SPECTRUM BUSINESS 8448300300350359 1301 HERMOSA/RCC CONNECTION/DEC 202020236
001-2101-4304 149.99
Total : 149.9920236
96690 1/28/2021 SPECTRUM BUSINESS 8448300300350359 1301 HERMOSA/RCCC CONNECTION/JAN 2120236
001-2101-4304 149.99
Total : 149.9920236
96691 1/28/2021 SPECTRUM BUSINESS 8448300300049969 PD CABLE/ JAN 2120236
001-2101-4201 76.16
24
01/28/2021
Check Register
CITY OF HERMOSA BEACH
8
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 76.16 96691 1/28/2021 SPECTRUM BUSINESS20236
96692 1/28/2021 SPECTRUM BUSINESS 8448300300049969 PD CABLE/DEC 202020236
001-2101-4201 72.09
Total : 72.0920236
96693 1/28/2021 SPRINT 269424317-229 COMM SERVICES TRUNK MODEMS/DEC 202010098
001-3302-4304 262.94
Total : 262.9410098
96694 1/28/2021 SWA GROUP INC 182559 LANDSCAPE ARCHITECTURAL SERVICES/AUG 20222203
125-8538-4201 2,020.00
LANDSCAPE ARCHITECTURAL SERVICES/SEP 202182942
125-8538-4201 11,867.50
LANDSCAPE ARCHITECTURAL SERVICES/OCT 202183179
125-8538-4201 6,060.00
LANDSCAPE ARCHITECTURAL SERVICES/NOV 202183445
125-8538-4201 505.00
Total : 20,452.5022203
96695 1/28/2021 TRIANGLE HARDWARE Stmt 01/31/21 MAINTENANCE SUPPLIES/JAN 2100123
001-3104-4309 1,641.73
001-4204-4309 2,744.86
001-6101-4309 59.47
105-2601-4309 1,301.35
715-4206-4309 11.78
001-2021 175.53
001-2022 -175.53
Total : 5,759.1900123
96696 1/28/2021 TROTTER, CRAIG 2002602.003 CLASS REFUND22210
001-2111 92.40
Total : 92.4022210
96697 1/28/2021 UNDERGROUND SERVICE ALERT 1220200319 DIG ALERTS/DEC 202008207
161-3109-4201 102.40
STATE FEES/DEC 2020dsb20197198
161-3109-4201 42.66
Total : 145.0608207
25
01/28/2021
Check Register
CITY OF HERMOSA BEACH
9
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96698 1/28/2021 UNITED STATES POSTAL SERVICE Box 728 PO BOX YEARLY FEE FOR CITATION PAYMENTS20388
001-1203-4305 326.00
Total : 326.0020388
96699 1/28/2021 WALLER, MICHELE L 010421 2020 STREET LIGHTING REBATE18959
105-3105 24.61
Total : 24.6118959
96700 1/28/2021 WESTERN AUDIO VISUAL 14679 CHAMBERS A/V UPGRADE/FINAL INVOICE22022
001-8672-4201 20,120.18
Total : 20,120.1822022
1272021 1/27/2021 EXXON MOBIL BUSINESS FLEET 695845691 VEHICLE FUEL MM/11-11 TO 12-10-2010668
715-2101-4310 3,938.87
715-3104-4310 293.44
715-3302-4310 924.03
715-4204-4310 156.17
715-6101-4310 265.14
Total : 5,577.6510668
15530683 1/25/2021 SOCAL GAS 097 904 5900 3 GAS BILL/ DEC 202000170
001-4204-4303 101.12
Total : 101.1200170
15530743 1/25/2021 SOCAL GAS 102 104 5900 3 GAS BILL/ DEC 202000170
001-4204-4303 108.92
Total : 108.9200170
15530924 1/25/2021 SOCAL GAS 115 404 6900 1 GAS BILL/ DEC 202000170
001-4204-4303 139.39
Total : 139.3900170
15531275 1/25/2021 SOCAL GAS 141 204 4600 1 GAS BILL/ DEC 202000170
001-4204-4303 20.49
Total : 20.4900170
30899680 1/26/2021 SOCAL GAS 139 104 4600 7 GAS BILL/ DEC 202000170
001-4204-4303 15.29
Total : 15.2900170
26
01/28/2021
Check Register
CITY OF HERMOSA BEACH
10
3:36:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
Bank total : 298,516.64 50 Vouchers for bank code :boa
298,516.64Total vouchers :Vouchers in this report 50
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 10 inclusive, of the check
register for 1/28/2021 are accurate funds are available for
payment, and are in conformance to the budget."
By
Finance Director
Date 2/11/2021
27
02/04/2021
Check Register
CITY OF HERMOSA BEACH
1
3:48:10PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96701 2/4/2021 CAMPBELL, KELLY 2002601.003 CLASS REFUND22212
001-2111 96.80
Total : 96.8022212
96702 2/4/2021 CANON BUSINESS SOLUTIONS, INC 4034568865 PW ADMIN COPIER MAINT/ 8-16 TO 11-15-2010838
715-1208-4201 110.65
Total : 110.6510838
96703 2/4/2021 CDWG 6201966 NEW WIRED ERGONOMIC KEYBOARD09632
715-1206-5401 83.92
715-1206-5401 7.97
PRINTER TONER/ JAN 216705913
001-2101-4305 480.44
Total : 572.3309632
96704 2/4/2021 COLANTUONO, HIGHSMITH &45930 LEGAL SERVICES/UUT LAWSUIT/OCT-DEC 202021871
705-1133-4201 74.34
Total : 74.3421871
96705 2/4/2021 DEPT OF INDUSTRIAL RELATIONS, STATE OF CAOSIP 67815 ASSESSMENT FOR FY 20/2114909
705-1217-4201 31,428.77
Total : 31,428.7714909
96706 2/4/2021 DIV OF THE STATE ARCHITECT PO 35855 BUSINESS LICENSE STATE CASP FEES (SB 11818263
001-6851 244.00
Total : 244.0018263
96707 2/4/2021 EFRAM MOBIL 007983 PROPANE01400
001-3104-4309 111.25
Total : 111.2501400
96708 2/4/2021 ELITE PRIVATE INVESTIGATION 202021 INVESTIGATION SERVICES/SDEC 202022113
001-2101-4201 2,914.99
Total : 2,914.9922113
96709 2/4/2021 FJR PACIFIC, INC.23174 SERVER ROOM COMPRESSOR21217
715-4204-4201 863.34
SERVER ROOM COMPRESSOR23191
715-4204-4201 1,227.43
2b (2)28
02/04/2021
Check Register
CITY OF HERMOSA BEACH
2
3:48:10PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 2,090.77 96709 2/4/2021 FJR PACIFIC, INC.21217
96710 2/4/2021 GENERAL TECHNOLOGIES & SOLUTIO 190507-08 OUTDOOR DINING PERMITS/OCT-DEC 202022000
157-2702-4201 1,900.00
Total : 1,900.0022000
96711 2/4/2021 LAURA MECOY COMMUNICATIONS LLC 1-2021 PUBLIC INFORMATION OFFICER/DEC 202020347
157-2702-4201 3,401.16
001-1201-4201 2,598.84
Total : 6,000.0020347
96712 2/4/2021 LEARNED LUMBER Stmt Date 1-31-21 MAINTENANCE SUPPLIES/ JAN 2100167
001-3104-4309 19.77
105-2601-4309 17.52
Total : 37.2900167
96713 2/4/2021 MANIACI INSURANCE SERVICES 940 BENEFITS CONNECT ADMIN/ FEB 2118312
001-1203-4201 608.94
Total : 608.9418312
96714 2/4/2021 MARQUEZ-VIRAMONTES, MARIA PO 35866 TUITION REIMBURSEMENT FOR PSO MARQUEZ PE22038
001-2101-4317 2,814.06
TUITION REIMBURSEMENT FOR PSO MARQUEZPO 35877
001-2101-4317 1,189.99
Total : 4,004.0522038
96715 2/4/2021 MONROY, AMADED 1141 VEHICLE UPHOLSTERY REPAIR/ # 6012250
715-3104-4311 200.00
Total : 200.0012250
96716 2/4/2021 MUENCHOW, LAURA 2002599.003 CLASS REFUND11443
001-2111 60.00
Total : 60.0011443
96717 2/4/2021 OFFICE DEPOT 145124545002 MAT REQ 791490/ EARBUDS FOR13114
157-2702-4305 61.23
MAT REQ 987295/OFFICE SUPPLIES/ JAN 21146063687001
001-4601-4305 9.54
MAT REQ 987295/OFFICE SUPPLIES/JAN 21146066615001
001-4601-4305 54.74
29
02/04/2021
Check Register
CITY OF HERMOSA BEACH
3
3:48:10PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96717 2/4/2021 (Continued)OFFICE DEPOT13114
MAT REQ 987296/OFFICE SUPPLIES/JAN 21148974683001
001-4601-4305 66.13
MAT REQ 863090/FACE MASKS - COVID149336486001
157-2702-4305 54.20
MAT REQ 863090/FACE MASKS-COVID149345999001
157-2702-4305 12.45
MAT REQ 791300/OFFICE SUPPLIES/JAN 21149556326001
001-2101-4305 99.15
Total : 357.4413114
96718 2/4/2021 OFFICE DEPOT 142291667001 PW CALENDAR FOR 202116007
001-4202-4305 110.64
001-4202-4305 10.51
PW CALENDAR FOR 2021142291667002
001-4202-4305 81.43
001-4202-4305 7.74
PW CALENDAR FOR 2021142291855001
001-4202-4305 14.99
001-4202-4305 1.42
Total : 226.7316007
96719 2/4/2021 PRUDENTIAL OVERALL SUPPLY 41032511 YARD UNIFORMS CREDIT/ JAN 2117676
001-4202-4314 -93.28
YARD UNIFORMS, TOWELS, & MATS/JAN 21Stmt Date 1-23-21
001-2101-4309 66.16
001-3104-4309 48.36
001-3302-4309 59.56
001-4202-4314 387.58
001-4204-4309 159.92
715-4206-4309 39.36
Total : 667.6617676
96720 2/4/2021 RED SECURITY GROUP, LLC 68998 LOCKSMITH SERVICES/ JAN 2113255
001-4204-4309 84.82
KEYS MADE/ JAN 2169399
715-2101-4311 22.17
KEYS MADE/ JAN 2169411
001-3104-4309 5.48
30
02/04/2021
Check Register
CITY OF HERMOSA BEACH
4
3:48:10PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 112.47 96720 2/4/2021 RED SECURITY GROUP, LLC13255
96721 2/4/2021 REDONDO BEACH, CITY OF 571905 CITY PROSECUTOR SERVICES/DEC 202003282
001-1132-4201 16,667.00
Total : 16,667.0003282
96722 2/4/2021 RJ PRINTING & PROMOTIONAL 622 WINDOW ENVELOPES, #10 WITH RETURN21153
001-1208-4305 520.60
001-1208-4305 45.37
Total : 565.9721153
96723 2/4/2021 ROSS, SHERI E HM12-2020 CITATION HEARING OFFICER/DEC 202022138
001-1201-4201 1,425.00
Total : 1,425.0022138
96724 2/4/2021 SMART & FINAL Stmt Date 2-1-21 OFFICE/CLEANING/FOOD SUPPLIES/ JAN 2100114
001-2101-4305 232.97
001-2101-4306 12.43
001-3302-4305 87.07
Total : 332.4700114
96725 2/4/2021 SOUTH BAY FORD 500976 VEHICLE REPAIR - HB7/NOV 202010532
715-2101-4311 237.50
Total : 237.5010532
96726 2/4/2021 SOUTH BAY SHELL AND CAR WASH 010121 CAR WASHES/OCT - DEC 202018595
715-2101-4311 336.00
715-3302-4311 96.00
Total : 432.0018595
96727 2/4/2021 SOUTHERN CALIFORNIA EDISON CO 2-01-414-3747 ELECTRICITY/ JAN 2100159
105-2601-4303 23.82
Total : 23.8200159
96728 2/4/2021 SPECTRUM BUSINESS 8448300300088884 CABLE-YARD/ DEC 202020236
001-4202-4201 145.41
CABLE-YARD/ JAN 218448300300088884
001-4202-4201 145.41
Total : 290.8220236
31
02/04/2021
Check Register
CITY OF HERMOSA BEACH
5
3:48:10PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96729 2/4/2021 SPECTRUM BUSINESS 8448300300046247 CABLE-CITY HALL/ JAN 2120236
001-4202-4201 108.73
Total : 108.7320236
96730 2/4/2021 SPICERS PAPER INC 2591217 COPIER PAPER ~10232
001-2021 13.38
001-2022 -13.38
001-1208-4305 1,325.02
001-1208-4305 127.15
Total : 1,452.1710232
96731 2/4/2021 THE BANK OF NEW YORK MELLON 252-2351400 SAFEKEEPING FEES/OCT - DEC 202013270
001-1141-4201 875.00
Total : 875.0013270
96732 2/4/2021 THE COUNSELING TEAM INTERNATIO 78010 POLICE DEPT COUNSELING SRVCS/ DEC 202020121
001-1203-4320 250.00
Total : 250.0020121
96733 2/4/2021 TIPAN, XOCHITL PO 35879 REIMBURSEMENT FOR TEAM BUILDING COFFEE A19988
001-2101-4305 97.93
Total : 97.9319988
96734 2/4/2021 TIREHUB LLC 18121936 VEHICLE TIRES - HB121146
715-2101-4311 565.02
VEHICLE TIRES - #3718121937
715-2101-4311 385.65
VEHICLE TIRES - #5218378665
715-3302-4311 310.30
Total : 1,260.9721146
96735 2/4/2021 UPTIME COMPUTER SERVICE 31984 MONTHLY PRINTER MAINTENANCE/FEB 2104768
715-1206-4201 554.45
Total : 554.4504768
96736 2/4/2021 VERIZON BUSINESS SERVICES 71713885 VOIP PHONES - BASE 30/DEC 202018666
001-3302-4304 109.24
VOIP PHONES-EOC GYM/DEC 202071714600
001-1201-4304 62.20
VOIP PHONES - BARD ST/ DEC 202071715235
32
02/04/2021
Check Register
CITY OF HERMOSA BEACH
6
3:48:10PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
96736 2/4/2021 (Continued)VERIZON BUSINESS SERVICES18666
001-3302-4304 70.12
VOIP PHONES - YARD/DEC 202071715242
001-4202-4304 145.65
Total : 387.2118666
96737 2/4/2021 WILLDAN ENGINEERING 00223786 CODE ENFORCEMENT SERVICES/DEC 202010703
157-2702-4201 9,295.00
Total : 9,295.0010703
96738 2/4/2021 ZUMAR INDUSTRIES INC 91507 MAT REQ 987186/STREET SIGN MAINTENANCE01206
001-3104-4309 764.29
Total : 764.2901206
17872215 2/1/2021 PITNEY BOWES INC Check Run 2/4/21 POSTAGE REFILL/ JAN 2113838
001-1208-4305 1,000.00
Total : 1,000.0013838
23040932 2/3/2021 ADMINSURE AS AGENT FOR THE Check Run 2/4/21 WORK COMP CLAIMS REIMB/ FEB 2114691
705-1217-4324 17,882.48
Total : 17,882.4814691
43180932 2/3/2021 ADMINSURE AS AGENT FOR THE Check Run 2/4/21 WORK COMP CLAIMS REIMB/ JAN 2114691
705-1217-4324 19,510.99
Total : 19,510.9914691
216500027 2/3/2021 ADMINSURE AS AGENT FOR THE Check Run 2/4/21 LIABILITY CLAIMS REIMB/FEB 202114691
705-1209-4324 18,205.20
Total : 18,205.2014691
Bank total : 143,437.48 42 Vouchers for bank code :boa
143,437.48Total vouchers :Vouchers in this report 42
33
02/04/2021
Check Register
CITY OF HERMOSA BEACH
7
3:48:10PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 7 inclusive, of the check
register for 2/4/2021 are accurate funds are available for
payment, and are in conformance to the budget."
By
Finance Director
Date 2/11/2021
34
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 21-0115
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of February 23, 2021
CAPITAL IMPROVEMENT PROGRAM STATUS REPORT
AS OF FEBRUARY 11, 2021
(Public Works Director Marnell Gibson)
Recommended Action:
Staff recommends that the City Council receive and file the Capital Improvement Program Status
Report as of February 11, 2021.
Number of Projects/Studies by Phase # of Projects/Studies
Study/Conceptual Planning 9
Preliminary Design 13
Final Engineering Design 12
Project Approvals/ Bidding 1
Construction 1
Closeout 2
Total Projects 31
Total Studies 7
Number of Projects/Studies by Completion Timeline # of Projects/Studies
1 - Complete by end of FY 19-20 6
2 - Complete in FY 20-21 12
3 - 3 years to completion 0
4 - 5 years to completion 0
5 - TBD 18
Projects/Studies Complete 2
Total Projects 31
Total Studies 7
City of Hermosa Beach Printed on 3/26/2024Page 1 of 2
powered by Legistar™35
Staff Report
REPORT 21-0115
Number of Projects/Studies by Category # of Projects/Studies
Street & Highway Improvements 10
Sewer & Storm Drain Improvements 6
Park Improvements 2
Public Building & Ground Improvements 20
Total Projects 31
Total Studies 7
# of Projects/Studies
Number of Projects/Studies by Manager Lead Support Total
Lucho Rodriguez 5 0 5
Reed Salan 0 0 0
Romany Basilyous 7 0 7
Andrew Nguyen 7 2 9
Michelle Licata 3 1 4
Doug Krauss 3 1 4
Leeanne Singleton 2 0 2
Kelly Orta 2 0 2
Jonathan Pascual 5 0 5
TBD 11 0 11
Total Projects/Studies 38
Attachments:
Capital Improvement Program Status Report as of February 11, 2021.
Respectfully Submitted by: Marnell Gibson, Public Works Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 3/26/2024Page 2 of 2
powered by Legistar™36
City of Hermosa Beach
Updated 02.11.21 FY 2020-21 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
SH 102 Bus Stops Improvements 900,000$ Romany
Basilyous X
Complete Preliminary
Design -
3/21
12/21
Preliminary Design.This project will improve bus stops throughout the City. These improvements will include
Americans with Disabilities Act (ADA) accessible curb ramps, concrete bus pads, crosswalk,
striping improvements, furnishing, and other general improvements within direct vicinity of
the bus stops.
SH 143 PCH Mobility Improvement Project 541,680$ Lucho
Rodriguez
X TBD TBD
On Hold. Study/Conceptual Planning. Staff in conversation with Cal Trans, Metro and
Council of Governments for funding possibilities.
This project would retain the existing number of lanes including north and south bound flex
lanes and maintain lane widths of ten (10) feet, and flex lanes of twelve (12) feet with zero
(0) feet shoulders. Collectively, the improvements will address existing, near-term, and long-
range future traffic conditions along this corridor by improving intersection operations,
reducing instances of unsafe turning movements, create a safe and more comfortable
environment for pedestrians and transit riders, and improving the efficient movement of
vehicles along the corridor.
SH 164 Hermosa Avenue Green Street 140,000$ Doug Krauss
Michelle Licata X Complete Preliminary
Design - 9/21 TBD
Preliminary Design. Preparation of plans and specifications by consultant (CWE) through
grant managed by City of Torrance. This project is also part of Study 103.
The project will design and implement Low Impact Development (LID) and green
infrastructure on Hermosa Ave from 4th Street to Herondo Avenue, which will include a
variety of green street design elements. This project is part of Study 103 Sea Level Rise Risk
Assessment Grant recipient for preliminary design. This project is also part of a multicity
green street project lead by City of Torrance.
SH 186 Street Improvements - Various Locations 1,609,000$ Romany
Basilyous
X
Complete Final
Engineering Design -
2/21
09/21
Final Engineering Design. Finalizing plans and specifications in house.This project provides for pavement rehabilitation of streets at various locations. The project
will also repair/replace deteriorated portions of sidewalk, curb and gutter, and curb ramps.
This project also includes the resurfacing of 24th Street between Valley Drive and Park
Avenue. The scope of work includes the construction of curb and gutter as needed to correct
street drainage deficiencies as well as lowering of public utilities (by utility companies) to
standard depth to permit the proper street construction. This work will be performed following
the sewer and storm drain repairs identified in the Sewer and Drainage Master Plans. Project
will be bided out together with Project 190.
SH 188 Strand Bikeway and Walkway Improvements at 35th Street 10,000$ TBD
X TBD TBD
Part of Study 103 Sea Level Rise Risk Assessment Grant. Proposals received and under
review.
This project would provide improved accessibility and connectivity for bicyclists travelling
between the Cities of Hermosa Beach and Manhattan Beach via The Strand at 35th Street.
The project will also consider the addition of a dedicated ADA path to provide greater ADA
accessibility to The Strand. This project is part of Study 103 Sea Level Rise Risk
Assessment Grant recipient for preliminary design.
SH 190 Annual Street Improvements 200,000$ Romany
Basilyous X
Complete Final
Engineering Design -
2/21
09/21
Final Engineering Design. Finalizing plans and specifications in house.This project provides for pavement rehabilitation of streets at various locations. The project
will also repair/replace deteriorated portions of sidewalk, curb and gutter, and curb ramps.
This work will be performed following the sewer and storm drain repairs identified in the
Sewer and Drainage Master Plans. Project will be combined with Project 186.
SH 191 Annual Street Improvements 50,000$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project provides for pavement rehabilitation of streets at various locations. The project
will also repair/replace deteriorated portions of sidewalk, curb and gutter, and curb ramps.
This work will be performed following the sewer and storm drain repairs identified in the
Sewer and Drainage Master Plans.
SH 192 Annual Striping Improvements (NEW)100,000$ Michelle Licata
X
Complete Preliminary
Design -
4/21
09/21
Preliminary Design.This project provides traffic striping, markings, and signage improvements and modifications
throughout the City at various locations to improve safety and visibility. This project will help
address needed thermoplastic striping which the City is not capable of installing directly.
SH 193 Pedestrian Crossing Safety Improvements (NEW)450,000$ Andrew Nguyen
Jonathan
Pascual X
Complete Preliminary
Design -
3/21
TBD
Preliminary Design.This project will implement rectangular rapid flashing beacons and other measures at
several uncontrolled pedestrian crossings on Hermosa Avenue at 4th, 6th, 19th, 24th, 25th
Streets, and at Herondo Street and Monterey Blvd. and the crossing in front of Clark Building
on Valley Drive.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 1 of 4
37
City of Hermosa Beach
Updated 02.11.21 FY 2020-21 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
SSD 417 Annual Storm Drain Improvements - Various Locations 2,044,966$ Romany
Basilyous
X
Complete Final
Engineering Design -
5/21
12/21
Final Engineering Design. On-call design firm finalizing plans and specifications.Storm drain improvements throughout the City. Locations will be as identified and prioritized
per the Storm Drain Master Plan. Projects will address deficiencies, ponding, and repairs as
well as where new storm drains are needed citywide. This project will also address
operational deficiencies at the outfall structures at 18th Street and 19th Street.
Improvements include for design and construction activities on an annual basis. Project to be
bided out together with Project 422.
SSD 419 Storm Drain Pipe Screens 120,000$ Romany
Basilyous
X Complete Construction -
05/21 06/21
Construction. Obtaining permits from LA County. Construction to be completed by May.The City has revised its strategy for addressing the Santa Monica Bay Debris Total
Maximum Daily Load (TMDL) using State Board-approved full capture devices or systems to
achieve 100% reduction of trash from the Municipal Separate Storm Sewer System (MS4).
The City will install approximately 160 screen assemblies inside various storm drain catch
basins throughout the City, in front of the outlet pipe, preventing debris from entering the
storm drain system. They City has installed approximately 120 screens previously.
SSD 421 Annual Sewer Improvements 2,210,783$ Andrew Nguyen
X
Complete Final
Engineering Design -
2/21
06/21
Final Engineering Design. On-call design firm finalizing plans and specifications for Phase 1
of project. Project consists of 2 phases. Phase 1 includes lining work and point repairs.
Phase 2 includes point repairs, pipe replacement, and maintenance access hole
rehabilitation. Phase 2 to start after completion of Phase 1.
This project includes design and construction of sewer improvements and repairs based on
the Sewer Master Plan.
SSD 422 Annual Storm Drain Improvements 500,000$ Romany
Basilyous
X
Complete Final
Engineering Design -
5/21
12/21
Final Engineering Design. On-call design firm finalizing plans and specifications.Storm drain improvements throughout the City. Locations will be as identified and prioritized
per the Storm Drain Master Plan. Projects will address deficiencies, ponding, and repairs as
well as where new storm drains are needed citywide. This project will also address
operational deficiencies at the outfall structures at 18th Street and 19th Street.
Improvements include for design and construction activities on an annual basis. Project will
be bid out together with Project 417.
SSD 423 Annual Sewer Improvements 250,000$ Andrew Nguyen X TBD TBD Preliminary Design. Pending staff availability.This project includes design and construction of sewer improvements and repairs based on
the Sewer Master Plan.
SSD 424 Annual Storm Drain Improvements 250,000$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.Storm drain improvements throughout the City. Locations will be as identified and prioritized
per the Storm Drain Master Plan. Projects will address deficiencies, ponding, and repairs as
well as where new storm drains are needed citywide. This project will also address
operational deficiencies at the outfall structures at various locations. Improvements include
for design and construction activities on an annual basis.
PBG 601 Prospect Avenue Curb Ramps 63,710$ Andrew Nguyen
Jonathan
Pascual X
Complete Final
Engineering Design -
2/21
06/21
Final Engineering Design. Finalizing plans and specifications. This project provides improvements and relocation of sidewalks, curb ramps and
obstructions along Prospect Avenue in order to comply with the Americans with Disabilities
Act (ADA) and meet the latest Federal Standards. Project to be bided out together with
Project 698.
PBG 602 City Wide ADA Improvements (NEW)50,000$ TBD X TBD TBD
Preliminary Design. Pending staff availability.This project provides improvements city wide in order to comply with the Americans with
Disabilities Act (ADA) and meet the latest Federal Standards along with the City’s Transition
Plan being developed.
PBG 608 Downtown Lighting Improvements 60,000$ TBD X TBD TBD Preliminary Design. Pending staff availability.This project will improve safety, security and ambiance in the downtown area through lighting
improvements as determined by the Downtown Security Assessment Report.
PBG 609 Downtown Strategic Plan Implementation 468,161$ Andrew Nguyen
X
Complete Final
Engineering Design -
2/21
04/21
Final Engineering Design. Preparing plans and specifications for Pier Plaza catenary lights
and light dimming units.
The purpose of this project is to mitigate safety concerns with lighting improvements for the
City’s downtown area. This project will install catenary lights and dimming units on Pier
Plaza.
PBG 615 New Corporate Yard Facilities 1,313,498$ Doug Krauss
Lucho
Rodriguez X TBD TBD
Preliminary Design. Environmental consultant preparing studies to respond to County's
comments.
This project is for the design and construction of a new city yard.
Construction will be done in two phases. Phase 1 to include one metal prefabricated building
to house a new mechanic, paint/sign shop and contracted services. New wash down station
area. Phase 2 to include demolition of existing buildings. Construction of new administration
building. General yard improvements (fencing, landscaping, drainage).
PBG 629 Municipal Pier Structural Assessment and Repairs 413,075$ Lucho
Rodriguez X
Complete Final
Engineering Design -
3/21
12/21
Final Engineering Design. Next steps are to submit to Costal Commission for approval in
conjunction with CIP 660
Repairs of the municipal pier structural elements including the piles, pile caps, deck and the
lifeguard storage room.
PBG 660 Municipal Pier Electrical Repairs 535,184$ Michelle Licata
X
Complete Final
Engineering Design -
3/21
12/21
Final Engineering Design. Next steps are to submit to Costal Commission for approval in
conjunction with CIP 629
The pier electrical repairs will involve the replacement of existing conduit, junction boxes,
connections and wiring so that the lights can be functional. The project will also eliminate the
service box towards the end of the pier and create a new service connection point for the
foghorn at the end of the pier. This project will also include the replacement of the bollard
lighting at the pier with new LED lighting fixtures.
PBG 669 City Park Restrooms and Renovation 1,545,620$ Lucho
Rodriguez X
Complete Project
Approvals/Bidding -
3/21
10/21
Project Approvals/Bidding. Plans received from designer. Advertising for construction bids in
March.
This project consists of construction of new ADA compliant restrooms at Forts Lots-of-Fun,
Seaview Parkette, South Park, and Clark Field. This project also plans to renovate existing
restrooms at South Park and Clark Field.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 2 of 4
38
City of Hermosa Beach
Updated 02.11.21 FY 2020-21 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
PBG 672 Council Chamber Audiovisual Improvements 310,638$ Romany
Basilyous X Closeout Closeout
Closeout.Project will replace audio visual equipment in the Council Chambers including additional
enhancements such as Video Wall Solution (110” seamless sidewall display) and 55” lobby
overflow display.
PBG 682 Parking Lot D Improvements 663,655$ Doug Krauss
X
Complete Final
Engineering Design -
4/21
12/21
Final Engineering Design. Construction pending California Coastal Conservancy Board
approval of grant in April 2021.
The project will install a rapid electric vehicle charging station, expand bicycle parking and
capture and treat storm water run-off from road and parking surfaces.
PBG 684 Emergency Operations Center (EOC) Renovations 192,880$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project will add restrooms to the EOC and renovate the adjacent room for future EOC
uses. The EOC is located within a building designated as a historical building, which will
require a Certificate of Appropriateness to complete the repairs. This project will be
completed in two phases. Phase 1 includes restroom construction including flooring, lighting,
wall and ceiling repairs, painting, new plumbing, and installing fixtures. Phase 2 includes
complete room renovation including new flooring, ceiling, lighting, furnishings, and relocation
of Emergency System IT equipment, including a new switch, 2 UPC batteries, and firewall to
support the EOC. Security Improvements to include new key fob locking systems.
PBG 689 Clark Building Renovations 420,072$ Lucho
Rodriguez
Jonathan
Pascual X
Complete Final
Engineering Design -
6/21
06/22
Final Engineering Design. On-call design firm finalizing plans and specifications.The project proposes:
1. Design, Operational Review
2. Kitchen Remodel - including new commercial appliances, sinks, countertops, lighting, tile,
flooring, doors and ADA upgrades.
3. Restrooms Remodel - including new flooring, fixtures, stalls, sinks, toilets, lighting, and
ADA upgrades. Electrical, plumbing, sewer line upgrades.
4. Install new Heating, ventilation, and air conditioning.
5. Acoustic panels and new lighting throughout ballroom area.
6. ADA upgrades to entrance building entrance points.
PBG 692 14th Street Beach Restroom Rehabilitation 1,000,000$ TBD
X TBD TBD
Study/Conceptual Planning.This project proposes to construct a new restroom facility which includes replacement of the
entire building; restrooms; appurtenant plumbing; ADA improvements for compliance. This
project will also include the replacement of the existing sewer lift station components which
includes 2 submersible pumps; motor control panel; associated plumbing; addition of
telemetry for condition/outage notifications.
PBG 695 Parking Lot A Improvements 632,260$ TBD
X TBD TBD
Preliminary Design. Secure design services to prepare plans and specifications. This project will consist of upgrading Parking Lot A to meet ADA standards, with
improvements including:
• New layout to maximize parking capacity and improve circulation.
• Consideration of the layout of parking spaces on 11th Street and explore incorporating 11th
Street parking spaces into the Lot A pay station system.
• New surfacing and lighting.
• New trash enclosures adjacent to commercial buildings and removal of the trash enclosure
and joint compactor.
• Low impact development elements including permeable pavers and landscaping.
Coastal Commission permits will be required.
PBG 696 Police Station Improvements 33,000$ TBD X TBD TBD
Preliminary Design. Pending staff availability.The Police Station is in need of improvements including increased security measures and
improvements to report writing room and evidence and property room. The restrooms in the
basement of the Police Station are in need of improvements.
PBG 698 ADA improvements 120,000$ Andrew Nguyen
Jonathan
Pascual X
Complete Final
Engineering Design -
2/21
06/21
Final Engineering Design. Finalizing plans and specifications. The project proposes: Improvements and relocation of sidewalks, curb ramps and
obstructions along Prospect Avenue in order to follow the Americans with Disabilities Act
(ADA) and meet the latest Federal Standards. Project to be bided out together with Project
601.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 3 of 4
39
City of Hermosa Beach
Updated 02.11.21 FY 2020-21 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
SH 101 Hermosa Avenue Greenwich Village Street Realignment
(STUDY)
10,000$ TBD
X TBD TBD
Part of Study 103 Sea Level Rise Risk Assessment Grant. Proposals received and under
review.
This study will evaluate potential improvements at the intersections of:
• Hermosa Avenue and Greenwich Village; and
• Manhattan Avenue and Greenwich Village/27th Street
The study will evaluate opportunities improve the flow and visibility for pedestrian, bikes, and
vehicles at the two intersections. This study is part of Study 103 Sea Level Rise Risk
Assessment Grant recipient for preliminary design.
PBG 103 Sea Level Rise Risk Assessment (NEW)
(STUDY)
279,058$ Leeanne
Singleton X
Complete
Study/Conceptual
Planning - 6/21
09/21
Study/Conceptual Planning. Proposals received and under review.This study will assess the risk of sea level rise in three areas along Hermosa Avenue, 35th
Street, Greenwich Village, and 4th Street to Herondo Avenue. It incorporates three other
projects. Project 164 Hermosa Avenue Green Street, Project 188 Strand Bikeway and
Walkway Improvements at 35th Street, and Study 101 Hermosa Avenue Greenwich Village
Street Realignment.
PI 538 Citywide Park Master Plan
(STUDY)
215,475$ Leeanne
Singleton
X TBD TBD
Study/Conceptual Planning.The City is seeking to prepare a Parks Master Plan that achieves the following goals:
• Engages the community and local recreational organizations in a dialogue about parks and
open space resources in Hermosa Beach;
• Identifies the current demand/utilization and the future/evolving parks and recreational
facility needs for the Hermosa Beach community;
• Leverages the vision and goals of the recently adopted General Plan and the Community
Decision-Making Tool;
• Identifies an appropriate balance between organized and informal recreational activities at
the City’s parks and open spaces;
• Serves as a dynamic useful planning and implementation document that enjoys broad
community and political support;
• Provides a comprehensive strategy to maintain, rehabilitate and improve the City’s network
of parks, facilities, and open space assets, including current unfunded park and recreational
opportunities;
• Evaluates the effective use of the City’s financial and physical resources and opportunities
to fund implementation of the recommendations in the Master Plan.
PI 544 Greenbelt Accessible Path Assessment
(STUDY)
10,000$ TBD X TBD TBD
On Hold. Secure design services to prepare a conceptual design/feasibility of a path on the
Green Belt.
Determine the feasibility of installing an ADA surface path on the Greenbelt to provide a firm,
natural looking and permeable path that increases accessibility for the disabled and boosts
accessibility for all.
PBG 668 Library Community Needs Assessment
(STUDY)
42,522$ Kelly Orta
X TBD TBD
On Hold. On hold until funding opportunities become available for a new or renovated library
facility.
Phase II consists of preparation of conceptual designs and estimates for:
• Keeping the city’s library at its current location, to include: Renovation and expansion of
existing building or adding a second floor to the existing building (before preparation of
renovation schemes for the existing building, the structural condition must be assessed to
make sure that the building is not beyond its useful life); Construction of a two (2) story
library building at the existing location; or
• Construction of a new library at a new site
• Relocation of “Friends of the Library” from Bard Street to a more appropriate location.
Funding is reimbursed to the City through the Library’s Excess Operating Funds through
agreement with the LA County Library. Other funding options will be explored.
PBG 693 Community Theater Needs Assessment
(STUDY)
79,295$ Kelly Orta
X Closeout Closeout
Closeout. Assessment report has been completed. This needs assessment will include an analysis and conceptual cost estimates of two
scenarios:
a. A major renovation of the Community Theatre to transform it into a regional performing
arts center; and
b. A conservative renovation to upgrade the Community Theatre, taking into consideration its
current users and maintaining the community focus of the facility. Market trends for similar
and/or other theaters will also be included.
PBG 694 Parking Structure (Lot C) Structural Assessment
(STUDY)
40,000$ Andrew Nguyen
Jonathan
Pascual
X
Complete
Study/Conceptual
Planning - 2/21
03/21
Study/Conceptual Planning. Finalizing assessment report.Prepare a structural assessment report for the parking structure, to analyze cracks in walls
and decks.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 4 of 4
40
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 21-0174
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of March 23, 2021
ACTION MINUTES OF THE PUBLIC WORKS COMMISSION
MEETING OF JANUARY 20, 2021
Recommended Action:
Staff recommends that the City Council receive and file the action minutes of the Public Works
Commission meeting of January 20, 2021.
Attachments:
Minutes of January 20, 2021
Approved: Marnell Gibson, Public Works Director
Noted: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 5/3/2022Page 1 of 1
powered by Legistar™41
ACTION MINUTES
PUBLIC WORKS COMMISSION
REGULAR MEETING OF WEDNESDAY, January 20, 2021
CITY HALL, COUNCIL CHAMBERS
1315 VALLEY DRIVE
6:00 P.M.
COMMISSIONERS
Janice Brittain Scott Hayes David Grethen Andrea N. Giancoli Kathy Dunbabin
*********************************************************************************************
******************
THIS MEETING IS HELD PURSUANT TO EXECUTIVE ORDER N-29-20 ISSUED BY GOVERNOR
GAVIN NEWSOM ON MARCH 17, 2020. ANY OR ALL COMMISSION MEMBERS MAY ATTEND AND
PARTICIPATE BY TELECONFERENCE/VIRTUAL MEETING. MEMBERS OF THE PUBLIC MAY
PARTICIPATE BY TELECONFERENCE.
*********************************************************************************************
******************
PUBLIC PARTICIPATION
City Hall will be closed to the public until further notice. Members of the public may email comments to
anguyen@hermosabeach.gov until 5:00 p.m. on the meeting date. Members of the public may also participate by
phone or through Zoom.
JOIN THE VIRTUAL PUBLIC WORKS COMMISSION MEETING AT:
https://us02web.zoom.us/j/83076777652?pwd=Z3lQcDFpUU1obDVuMUpnMGlQME1pUT09
OR
PARTICIPATE BY PHONE:
1. Email anguyen@hermosabeach.gov to be added to the speaker list. Please indicate which item you would
like to speak on.
2. Dial-in to meeting:
• Toll Free: 877-853-5257
• Public Works Commission Webinar ID: 830 7677 7652
• Passcode: 748636
3. ATTENDEES WILL BE MUTED UNTIL THE PUBLIC PARTICIPATION PERIOD IS OPENED. When you are called on
to speak, press * 6 to unmute your line. Comments from the public are limited to 3 minutes per speaker.
Note: Your comments will become part of the official meeting record. You must provide your full name,
but please do not provide any other personal information (i.e. phone numbers, addresses, etc.) that you
do not want to be published.
Public Works Commission agendas and staff reports are available for your review on the City’s web site
located at www.hermosabeach.gov.
42
1. Call to Order
2. Pledge of Allegiance
3. Roll Call
Present: Chairperson Grethen, Vice Chairperson Giancoli, Commissioner Dunbabin, Commissioner
Brittain, and Commissioner Hayes
Staff present: Marnell Gibson, Director of Public Works; Lucho Rodriguez, Deputy City Engineer;
Andrew Nguyen, Assistant Engineer
4. Introduction of New Public Works Superintendent John Cordova
Director Gibson introduced new Public Works Superintendent John Cordova and provided a brief
summary of his employment history with the City of Hermosa Beach and qualifications. John
Cordova previously worked for the City of Hermosa Beach Department of Public Works for thirteen
(13) years and held the position of Crew Supervisor. In 2020, he left to work for the City of Vernon
as Public Works Superintendent. In 2021, he returned to the City of Hermosa Beach to fulfill the
Superintendent Position bringing with him his experience, skills, and knowledge. Having been born
and raised in the South Bay area, he has a passion for the area, especially the City of Hermosa
Beach. Commissioners welcomed him.
5. Approval of Action Minutes
A. November 18, 2020
Minutes were revised per the requests of Chairperson Grethen, Vice Chairperson Giancoli, and
Commissioner Brittain. Commissioner Dunbabin motioned to approve the action minutes for
November 2020. Seconded by Commissioner Brittain, the motion was approved and passed.
AYES: Brittain, Giancoli, Dunbabin, Hayes, Grethen
NOE: None
ABSTAIN: None
ABSENT: None
6. Public Comment on Non-Agenda Items: Anyone wishing to address the Commission on items
pertaining to Public Works that are not listed on the agenda and pertaining to Public Works may do
so at this time. Comments from the public are limited to three minutes per speaker.
Bob Atkins shared his concern about the modifications to Pier Avenue. He recommended the
changes be reviewed given Pier Avenue is a tsunami escape. As Mr. Atkins believed this was an
item that was approved by the Public Works Commission, Commissioner Dunbabin briefly clarified
this particular item was taken directly to City Council for approval and was not presented to the
Public Works Commission for review. Director Gibson added the modifications are part of a pilot
program.
David Sherwood provided comments about a traffic safety request he submitted for improvements
on Gould Avenue that was denied. His request consisted of adding a keep clear section at the exit
of the parking structure next to the Hermosa Hotel to allow persons exiting the structure to reach the
left turn lane to head northbound on Pacific Coast Highway. He claimed the request was reviewed
by a consultant working for the City and was denied given his request is not something that has
been done in the City previously. Mr. Sherwood would like Public Works staff to review his request.
7. Correspondence: None
43
8. Presentations
A. Hermosa Avenue Green Street Project – Douglas Krauss, Environmental Programs Manager
Environmental Programs Manager Douglass Krauss provided an update. The project is moving into
the design and engineering phase now that a grant has been obtained. As the lead for this project,
the City of Torrance applied and received the grant in November 2020. It should be noted the grant
is only able to fund design and engineering, as there is some cost share with each of the Watershed
Management Groups Cities. At this stage, the cost share among the four cities is $137,500, which
the City of Hermosa Beach paid for using funds received from Measure W – The Safe Clean Water
Act. The City of Torrance has applied for a grant to fund the construction phase. City of Hermosa
Beach staff met with the consultant, who is assessing the area – Hermosa Avenue, between
Herondo Street and Fourth Street – for potential structures. Once the design and engineering phase
is completed in the Fall, staff will engage in community outreach to provide information about the
project.
9. Items for Consideration
A. Request to Remove and Replace Two Trees from the Public Right-of-Way at 85 18th Street
(Title Updated 1/16/21)
Recommendation:
It is recommended that the Public Works Commission consider:
1. A property owner request to remove two (2) Ficus trees fronting 85 18th Street and;
2. Accept the installation of two (2) new Melaleuca Leucadendra (Cajenput Tree)
replacement trees per City approved tree list within the encroachment area at 85
18th Street and two (2) additional approved replacement trees somewhere else as
determined by Public Works Staff.
Public Works staff received the above request. An assessment of the two (2) Ficus trees
revealed one of these is greater than 12 inches while the other is less than 12 inches. Staff
contacted American Care Arborist to evaluate the tree that is larger than 12 inches in
diameter. The arborist’s report recommended the removal of the tree due to its invasive
roots and poor planting location. The tree is very close to an existing concrete wall within the
encroachment area, which has created cracks on the wall, as well as lifting of the existing
public sidewalk on the walkway. The property is part of a remodel and an addition to the
property. Part of their improvements requirements include repairs to 18th Street within the
walkway. The work is expected to be completed in approximately 60 to 90 days. In addition
to the arborist’s recommendation, staff also recommends the removal of the Ficus trees
given the existence of a 15-inch underground drainage pipe within the same general vicinity
of their location. Commissioner Hayes shared he visited the site and inquired if a tree that is
growing into another planter on the other side of the property is expected to stay in its
location. Staff responded it is expected to remain, as it was not listed in the application.
However, staff stated this is something they can bring to the contractor’s attention when the
Ficus trees are removed to ensure the tree on the other side of the property is not damaging
the existing tree within the walk street. Commissioner Grethen appreciated the report and
highlighted that removal of a tree has specific requirements per the municipal code, which go
beyond the fact that a tree is not on the City’s approved tree list. Not being on the City’s
approved tree list does not warrant its removal.
Commissioner Brittain made a motion to approve the request. Seconded by Commissioner
Dunbabin, the motion was approved and passed.
44
AYES: Brittain, Hayes, Giancoli, Dunbabin, Grethen
NOES: None
ABSTAIN: None
ABSENT: None
B. LA County Public Works - West Coast Basin Barrier Project New Wells - Plaque for Kiosk
Recommendation:
It is recommended that the Public Works Commission consider:
1. Selecting a plaque option to be installed on the Greenbelt as part of Los Angeles
County’s West Coast Basin Barrier Project Unit 13.
Staff presented a summary of Los Angeles County’s upcoming project and asked for the
Commission to select a display and location of the plaques. L.A. County’s project
consists of the replacement of injection wells on the Greenbelt and the placement of a
new information kiosk and plaque. The information kiosk will provide details about the
importance of seawater barriers in protecting the groundwater supply. The kiosk will
measure approximately seven (7) by eight (8) feet and the plaque will measure
approximately three (3) by two (2) feet. As this project is only between the Cities of
Hermosa Beach and Manhattan Beach, the kiosk and plaque will be placed on Gould
Avenue and Valley Drive, which is where the two cities meet. Following the presentation,
Commissioner Grethen inquired if the kiosk and plaque will be one-sided and if they will
be located to the east of the wood chip trail. Staff confirmed they are one-sided, and
their location will be facing southeast toward Valley Drive. As there was no public
comment for this matter, discussion opened for Commissioners. Commissioner Hayes
expressed his preference for option 3 out of the 5 because it grants the option to keep
the plaque separate from the kiosk. Additionally, he preferred having the boulder
underneath to keep it compact. Commissioner Dunbabin and Chairperson Grethen
agreed with Commissioner Hayes selection.
Commissioner Hayes made a motion to approve the selection of option 3. Seconded by
Commissioner Dunbabin, the motion passed.
AYES: Brittain, Hayes, Giancoli, Dunbabin, Grethen
NOES: None
ABSTAIN: None
ABSENT: None
C. A Safer Prospect Traffic Safety Demonstration Project
Recommendation:
It is recommended that the Public Works Commission consider:
1. Review and provide input on the draft traffic safety demonstration project concepts
for the Prospect Corridor and;
2. Recommend the City Council approve the temporary installation of the traffic safety
demonstration project concepts from March through approximately June 2021.
Environmental Analyst Leeanne Singleton provided a presentation of the upcoming A Safer
Prospect Traffic Safety Demonstration Project with the assistance of Sam Zneimer, Alta
Planning and Design Consultant. Alta Planning and Design is the consulting team that was
45
hired by the City and the Southern California Association of Governments to lead the design,
engagement, and implementation of this demonstration project. Following some delays caused
by COVID-19, the City is ready to move forward with the project, which centers on evaluating
traffic safety with specific focus on the concerns submitted by community members at the July
and December 2020 community meetings. Their main concerns centered on pedestrian safety,
safer speeds, and compliance to stop signs.
Environmental Analyst Singleton received public correspondence from Sonia McCoy, Sam
Perrotti, and Bob Atkins. Ms. McCoy expressed a preference for the crosswalk to be installed
closer to 14th Street. Mr. Perrotti noted there is a project under construction in the northeast
corner of Prospect Avenue and 15th Street. To address this matter, Environmental Analyst
Singleton coordinated with the property owner and contractor to make slight modifications to
shorten/scale the last corner along Prospect Avenue, given their driveway will face that direction,
through the final design phase. Mr. Atkins provided some comments about the planned location
for the crosswalk between 14th Street and 15th Street. The initial recommendation presented to
the Commission proposed the location closer to 15th Street. To address this concern,
Commissioners are being presented with three options to choose from for the location of the
crosswalk. These include 15th Street, mid-block between 14th Street and 15th Street, or closer to
14th Street without the pedestrian island. Bob Atkins, Robert, Ethan Kramer, and Kent Allen
provided public comments during this meeting.
Commissioners had the opportunity to ask questions about the items presented. Following
careful consideration, Commissioners voted on the items. The first item consisted of the
approval for the concept for 9th Street and 10th Street. Commissioner Brittain motioned to
approve the concept. Seconded by Vice Chairperson Giancoli, the motion passed.
AYES: Brittain, Hayes, Giancoli, Grethen
NOES: Dunbabin
ABSTAIN: None
ABSENT: No
The second item consisted of accepting the draft concepts for 14th Street and 15th Street. Vice
Chairperson Giancoli made a motion to accept draft concept c, while addressing the concerns
about the fire hydrant. Seconded by Commissioner Brittain, the motion passed. Commissioner
Dunbabin asked that the minutes reflect the following: she would have voted in favor except that
she believes the crosswalk proposed for 14th Street and 15th Street should run from 14th Street
to 14th Street.
AYES: Brittain, Hayes, Giancoli, Grethen
NOES: Dunbabin
ABSTAIN: None
ABSENT: No
10. Commissioners’ Reports: None
11. Monthly Reports
A. Monthly Activity Reports: None
B. CIP Status with Verbal Updates:
Above items are presented for information purposes only
46
Director Gibson provided updates for specific CIP Projects.
CIP 672 – Council Chamber Audio Visual Improvements
The project moved into the close out phase. The project’s original scope of work was completed
in August 2020. However, added scope extended the duration of the project.
CIP 689 – Clark Building Renovations
The project received community input for its usage and functionality in conjunction with the
modifications that will be needed to move it into the design phase.
CIP 544 – Greenbelt Accessible Path Assessment (STUDY)
This CIP study remains on hold.
CIP 668 – Library Community Needs Assessment (STUDY)
This CIP study remains on hold.
Chairperson Grethen inquired about the status of the six different elements noted on the report
for the Clark Building Renovations. Deputy City Engineer Lucho Rodriguez shared that staff met
to discuss the status of the project and determined it is still in the design phase. He also shared
staff anticipates having a presentation for Commissioners during the March 2021 meeting in the
event there are milestones completed in the design phase by then. Otherwise, the presentation
is likely to occur during the May 2021 meeting. Staff will meet with the subcommittee soon.
Vice Chairperson Giancoli inquired about the status of the project at Pier Avenue and PCH, which
has been on hold pending Caltrans’ response. Director Gibson stated the project continues to be
on hold per Caltrans.
Chairperson Grethen asked for a summary of the recent developments for CIP 103-Sea Level
Rise Risk Assessment Study. Deputy City Engineer Rodriguez shared staff received four
proposals and held interviews the week of January 11. Staff is in the process of selecting the
consultant and will present their selection to City Council in a couple of months.
Commissioner Hayes asked if CIP 601-Prospect Avenue Curb Ramps would conflict with the
demonstration project happening in the fall to which Assistant Engineer Andrew Nguyen
responded it would not.
Commissioner Hayes also asked how staff decides what areas of the City are worked on at any
given year for annual storm drain and sewer improvements. Assistant Engineer Nguyen stated
the process involves the Sewer Master Plan and Storm Drain Plan that a consultant reviews for
the conditions of the sewer pipes and storm drainpipes in the City. The consultant then prioritizes
which pipes need to be repaired first. Chairperson Grethen encouraged him to also discuss the
Annual Street Improvement Project, which consists of paving streets around the City. Assistant
Engineer Nguyen provided a summary and shared that the storm drain and sewer repairs control
where paving occurs as the goal is to ensure storm drain and sewer repairs and street paving are
completed simultaneously to minimize disruptions.
12. Director’s Verbal Updates
Director Gibson addressed item 11 A – Monthly Activity Reports and apologized for not having any
reports to present at this meeting. She indicated the reason pertained to staff shortages given the
holiday season. However, at the March 2021 meeting, there will be four months’ worth of data to
review and cross compare. She also shared staff is looking at some opportunities to improve the
reporting data.
47
Staff continues receiving a high number of permit applications and having emergency responses and
complaints that occasionally turn into unplanned projects. The downtown restriping efforts, which
staff is monitoring and receiving input to assess how it will progress. Staff is anticipating an increase
in requests to expand dining decks for businesses, which might consist of brand new decks while
others may just consist of expanding footprints.
Lastly, Director Gibson provided an update regarding the ADA Beach Path that staff had piloted in
2020. After receiving feedback that the path was not wide or long enough, staff purchased
additional beach tiles and reviewed ADA requirements. As there were still some concerns, staff
have been working with a consultant for recommendations for the best locations and modifications.
In addition to working with the consultant, staff is also working with Lifeguards, County Beaches and
Harbors, and operational needs to complete this project.
13. Commissioner Items (Other Matters): None
14. Commissioner’s Announcements: None
15. Adjournment
48
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 21-0248
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of April 27, 2021
CAPITAL IMPROVEMENT PROGRAM STATUS REPORT
AS OF APRIL 20, 2021
(Public Works Director Marnell Gibson)
Recommended Action:
Staff recommends City Council receive and file the Capital Improvement Program Status Report as
of April 20, 2021.
Number of Projects/Studies by Phase # of Projects/Studies
Study/Conceptual Planning 10
Preliminary Design 11
Final Engineering Design 9
Project Approvals/ Bidding 7
Construction 3
Closeout 4
Total Projects 37
Total Studies 7
Number of Projects/Studies by Completion Timeline # of Projects/Studies
1 - Complete by end of FY 20-21 4
2 - Complete in FY 21-22 14
3 - 3 years to completion 0
4 - 5 years to completion 0
5 - TBD 22
Projects/Studies Complete 4
Total Projects 37
Total Studies 7
City of Hermosa Beach Printed on 3/26/2024Page 1 of 2
powered by Legistar™49
Staff Report
REPORT 21-0248
Number of Projects/Studies by Category # of Projects/Studies
Street & Highway Improvements 11
Sewer & Storm Drain Improvements 7
Park Improvements 4
Public Building & Ground Improvements 22
Total Projects 37
Total Studies 7
# of Projects/Studies
Number of Projects/Studies by Manager Lead Support Total
Lucho Rodriguez 9 1 10
Reed Salan 1 0 1
Romany Basilyous 5 0 5
Andrew Nguyen 8 2 10
Michelle Licata 4 1 5
Doug Krauss 6 1 7
Leeanne Singleton 2 0 2
Kelly Orta 2 0 2
TBD 9 0 9
Total Projects/Studies 44
Attachments:
Capital Improvement Program Status Report as of April 20, 2021.
Respectfully Submitted by: Marnell Gibson, Public Works Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 3/26/2024Page 2 of 2
powered by Legistar™50
City of Hermosa Beach
Updated 04.20.21 FY 2020-21 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
SH 102 Bus Stops Improvements 900,000$ Romany
Basilyous X
Complete Preliminary
Design -
6/21
12/21
Preliminary Design.This project will improve bus stops throughout the City. These improvements will include Americans with Disabilities Act (ADA)
accessible curb ramps, concrete bus pads, crosswalk, striping improvements, furnishing, and other general improvements
within direct vicinity of the bus stops.
SH 143 PCH Mobility Improvement Project 411,680$ Lucho
Rodriguez
X TBD TBD
On Hold. Study/Conceptual Planning. Metro Approved funding of $1.8 million for the City for
the project development phases - PA&ED (Project Approval and Environmental Document) as
a result of Public Work's Measure M application in 2020. Metro is procuring the services of
their on-call consultants to assist with this phase. Estimated date of kick-off meeting, July
2021.
This project would retain the existing number of lanes including north and south bound flex lanes and maintain lane widths of
ten (10) feet, and flex lanes of twelve (12) feet with zero (0) feet shoulders. Collectively, the improvements will address existing,
near-term, and long-range future traffic conditions along this corridor by improving intersection operations, reducing instances
of unsafe turning movements, create a safe and more comfortable environment for pedestrians and transit riders, and
improving the efficient movement of vehicles along the corridor.
SH 164 Hermosa Avenue Green Street 140,000$ Doug Krauss
Michelle Licata X
Complete Preliminary
Design -
9/21
TBD
Preliminary Design. Preparation of plans and specifications by consultant (CWE) through
grant managed by City of Torrance. This project is also part of Study 103.
The project will design and implement Low Impact Development (LID) and green infrastructure on Hermosa Ave from 4th
Street to Herondo Avenue, which will include a variety of green street design elements. This project is part of Study 103 Sea
Level Rise Risk Assessment Grant recipient for preliminary design. This project is also part of a multicity green street project
lead by City of Torrance.
SH 186 Street Improvements - Various Locations 1,485,095$ Lucho
Rodriguez
X
Complete Project
Approvals/Bidding -
4/21
12/21
Project Approvals/Bidding. Project out to bid in April.This project provides for pavement rehabilitation of streets at various locations. The project will also repair/replace deteriorated
portions of sidewalk, curb and gutter, and curb ramps. This project also includes the resurfacing of 24th Street between Valley
Drive and Park Avenue. The scope of work includes the construction of curb and gutter as needed to correct street drainage
deficiencies as well as lowering of public utilities (by utility companies) to standard depth to permit the proper street
construction. This work will be performed following the sewer and storm drain repairs identified in the Sewer and Drainage
Master Plans. Project will be bided out together with Project 190.
SH 188 Strand Bikeway and Walkway Improvements at 35th Street 10,000$ TBD
X TBD TBD
Part of Study 103 Sea Level Rise Risk Assessment Grant. Proposals received and under
review.
This project would provide improved accessibility and connectivity for bicyclists travelling between the Cities of Hermosa
Beach and Manhattan Beach via The Strand at 35th Street. The project will also consider the addition of a dedicated ADA path
to provide greater ADA accessibility to The Strand. This project is part of Study 103 Sea Level Rise Risk Assessment Grant
recipient for preliminary design.
SH 190 Annual Street Improvements 200,000$ Romany
Basilyous X
Complete Project
Approvals/Bidding -
5/21
12/21
Project Approvals/Bidding. Project out to bid in April.This project provides for pavement rehabilitation of streets at various locations. The project will also repair/replace deteriorated
portions of sidewalk, curb and gutter, and curb ramps. This work will be performed following the sewer and storm drain repairs
identified in the Sewer and Drainage Master Plans. Project will be combined with Project 186.
SH 191 Annual Street Improvements 45,000$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project provides for pavement rehabilitation of streets at various locations. The project will also repair/replace deteriorated
portions of sidewalk, curb and gutter, and curb ramps. This work will be performed following the sewer and storm drain repairs
identified in the Sewer and Drainage Master Plans.
SH 192 Annual Striping Improvements (NEW)100,000$ Michelle Licata X
Complete Final
Engineering Design -
5/21
09/21 Final Engineering Design.This project provides traffic striping, markings, and signage improvements and modifications throughout the City at various
locations to improve safety and visibility. This project will help address needed thermoplastic striping which the City is not
capable of installing directly.
SH 193 Pedestrian Crossing Safety Improvements (NEW)450,000$ Andrew
Nguyen X
Complete Preliminary
Design -
5/21
TBD
Preliminary Design.This project will implement rectangular rapid flashing beacons and other measures at several uncontrolled pedestrian
crossings on Hermosa Avenue at 4th, 6th, 19th, 24th, 25th Streets, and at Herondo Street and Monterey Blvd. and the crossing
in front of Clark Building on Valley Drive.
SSD 417 Annual Storm Drain Improvements - Various Locations 2,044,966$ Romany
Basilyous
X
Complete Final
Engineering Design -
5/21
12/21
Final Engineering Design. On-call design firm finalizing plans and specifications.Storm drain improvements throughout the City. Locations will be as identified and prioritized per the Storm Drain Master Plan.
Projects will address deficiencies, ponding, and repairs as well as where new storm drains are needed citywide. This project
will also address operational deficiencies at the outfall structures at 18th Street and 19th Street. Improvements include for
design and construction activities on an annual basis. Project to be bided out together with Project 422.
SSD 419 Storm Drain Pipe Screens 117,324$ Doug Krauss
X Complete Construction -
05/21 06/21
Construction. Obtaining permits from LA County. Construction to be completed by May.The City has revised its strategy for addressing the Santa Monica Bay Debris Total Maximum Daily Load (TMDL) using State
Board-approved full capture devices or systems to achieve 100% reduction of trash from the Municipal Separate Storm Sewer
System (MS4). The City will install approximately 160 screen assemblies inside various storm drain catch basins throughout
the City, in front of the outlet pipe, preventing debris from entering the storm drain system. They City has installed
approximately 120 screens previously.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 1 of 4
51
City of Hermosa Beach
Updated 04.20.21 FY 2020-21 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
SSD 421 Annual Sewer Improvements 2,022,822$ Andrew
Nguyen X
Complete Project
Approvals/Bidding -
5/21
07/21
Project Approvals/Bidding. Preparing to bid Phase 1 of project in May. Project consists of 2
phases. Phase 1 includes lining work and point repairs. Phase 2 includes point repairs, pipe
replacement, and maintenance access hole rehabilitation. Phase 2 to start after completion of
Phase 1.
This project includes design and construction of sewer improvements and repairs based on the Sewer Master Plan.
SSD 422 Annual Storm Drain Improvements 500,000$ Romany
Basilyous
X
Complete Final
Engineering Design -
5/21
12/21
Final Engineering Design. On-call design firm finalizing plans and specifications.Storm drain improvements throughout the City. Locations will be as identified and prioritized per the Storm Drain Master Plan.
Projects will address deficiencies, ponding, and repairs as well as where new storm drains are needed citywide. This project
will also address operational deficiencies at the outfall structures at 18th Street and 19th Street. Improvements include for
design and construction activities on an annual basis. Project will be bid out together with Project 417.
SSD 423 Annual Sewer Improvements 250,000$ Andrew
Nguyen X TBD TBD Preliminary Design. Pending staff availability.This project includes design and construction of sewer improvements and repairs based on the Sewer Master Plan.
SSD 424 Annual Storm Drain Improvements 250,000$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.Storm drain improvements throughout the City. Locations will be as identified and prioritized per the Storm Drain Master Plan.
Projects will address deficiencies, ponding, and repairs as well as where new storm drains are needed citywide. This project
will also address operational deficiencies at the outfall structures at various locations. Improvements include for design and
construction activities on an annual basis.
PBG 601 Prospect Avenue Curb Ramps 63,710$ Andrew
Nguyen X
Complete Project
Approvals/Bidding -
5/21
06/21
Project Approvals/Bidding. Preparing to bid project in May.This project provides improvements and relocation of sidewalks, curb ramps and obstructions along Prospect Avenue in order
to comply with the Americans with Disabilities Act (ADA) and meet the latest Federal Standards. Project to be bided out
together with Project 698.
PBG 602 City Wide ADA Improvements (NEW)72,000$ Lucho
Rodriguez *TBD TBD
Construction/Misc. Ordered additional tiles for the beach access path, hired a CASP
specialist, and analyzed 8 grievances. This is an ongoing program with various components.
The current budget has been expended.
This project provides improvements city wide in order to comply with the Americans with Disabilities Act (ADA) and meet the
latest Federal Standards along with the City’s Transition Plan being developed.
PI 603 South Park slope and Irrigation Repairs (NEW)35,000$ Lucho
Rodriguez X Complete Construction -
06/21 06/21
Construction. Reopening of slope area of South Park.This project will address sloped areas around the playground area at South Park. Funding would be utilized to install interim
measures in order to open up the area to the public while the City pursues more permanent measures for repairs required of
the entire park, including irrigation and landscaping.
PBG 608 Downtown Lighting Improvements 60,000$ TBD X TBD TBD Preliminary Design. Pending staff availability.This project will improve safety, security and ambiance in the downtown area through lighting improvements as determined by
the Downtown Security Assessment Report.
PBG 609 Downtown Strategic Plan Implementation 468,161$ Andrew
Nguyen X
Complete Final
Engineering Design -
5/21
09/21 Final Engineering Design. Preparing plans and specifications for Pier Plaza catenary lights
and light dimming units.
The purpose of this project is to mitigate safety concerns with lighting improvements for the City’s downtown area. This project
will install catenary lights and dimming units on Pier Plaza.
PBG 615 New Corporate Yard Facilities 1,340,050$ Doug Krauss
Lucho
Rodriguez X TBD TBD
Preliminary Design. Environmental consultant preparing studies to respond to County's
comments.
This project is for the design and construction of a new city yard.
Construction will be done in two phases. Phase 1 to include one metal prefabricated building to house a new mechanic,
paint/sign shop and contracted services. New wash down station area. Phase 2 to include demolition of existing buildings.
Construction of new administration building. General yard improvements (fencing, landscaping, drainage).
PBG 629 Municipal Pier Structural Assessment and Repairs 413,075$ Michelle Licata X
Complete Final
Engineering Design -
5/21
12/21 Final Engineering Design. Next steps are to submit to Costal Commission for approval in
conjunction with CIP 660
Repairs of the municipal pier structural elements including the piles, pile caps, deck and the lifeguard storage room.
PBG 660 Municipal Pier Electrical Repairs 520,284$ Michelle Licata
X
Complete Final
Engineering Design -
5/21
12/21
Final Engineering Design. Next steps are to submit to Costal Commission for approval in
conjunction with CIP 629
The pier electrical repairs will involve the replacement of existing conduit, junction boxes, connections and wiring so that the
lights can be functional. The project will also eliminate the service box towards the end of the pier and create a new service
connection point for the foghorn at the end of the pier. This project will also include the replacement of the bollard lighting at the
pier with new LED lighting fixtures.
PBG 669 City Park Restrooms and Renovation 1,545,620$ Lucho
Rodriguez X
Complete Project
Approvals/Bidding -
6/21
06/22
Project Approvals/Bidding. Project out to bid in April.This project consists of construction of new ADA compliant restrooms at Forts Lots-of-Fun, Seaview Parkette, South Park, and
Clark Field. This project also plans to renovate existing restrooms at South Park and Clark Field.
PBG 672 Council Chamber Audiovisual Improvements 284,649$ Romany
Basilyous X Closeout Closeout
Closeout.Project will replace audio visual equipment in the Council Chambers including additional enhancements such as Video Wall
Solution (110” seamless sidewall display) and 55” lobby overflow display.
PBG 682 Parking Lot D Improvements 663,655$ Doug Krauss
X
Complete Final
Engineering Design -
12/21
12/22
Final Engineering Design. Coastal Conservancy Board grant approved in April 2021. Pending
application for construction funds with Measure W grant.
The project will install a rapid electric vehicle charging station, expand bicycle parking and capture and treat storm water run-off
from road and parking surfaces.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 2 of 4
52
City of Hermosa Beach
Updated 04.20.21 FY 2020-21 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
PBG 684 Emergency Operations Center (EOC) Renovations 192,880$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project will add restrooms to the EOC and renovate the adjacent room for future EOC uses. The EOC is located within a
building designated as a historical building, which will require a Certificate of Appropriateness to complete the repairs. This
project will be completed in two phases. Phase 1 includes restroom construction including flooring, lighting, wall and ceiling
repairs, painting, new plumbing, and installing fixtures. Phase 2 includes complete room renovation including new flooring,
ceiling, lighting, furnishings, and relocation of Emergency System IT equipment, including a new switch, 2 UPC batteries, and
firewall to support the EOC. Security Improvements to include new key fob locking systems.
PBG 689 Clark Building Renovations 420,072$ Lucho
Rodriguez
X
Complete Final
Engineering Design -
6/21
06/22
Final Engineering Design. On-call design firm finalizing plans and specifications.The project proposes:
1. Design, Operational Review
2. Kitchen Remodel - including new commercial appliances, sinks, countertops, lighting, tile, flooring, doors and ADA upgrades.
3. Restrooms Remodel - including new flooring, fixtures, stalls, sinks, toilets, lighting, and ADA upgrades. Electrical, plumbing,
sewer line upgrades.
4. Install new Heating, ventilation, and air conditioning.
5. Acoustic panels and new lighting throughout ballroom area.
6. ADA upgrades to entrance building entrance points.
PBG 692 14th Street Beach Restroom Rehabilitation 788,000$ TBD
X TBD TBD
Study/Conceptual Planning.This project proposes to construct a new restroom facility which includes replacement of the entire building; restrooms;
appurtenant plumbing; ADA improvements for compliance. This project will also include the replacement of the existing sewer
lift station components which includes 2 submersible pumps; motor control panel; associated plumbing; addition of telemetry
for condition/outage notifications.
PBG 695 Parking Lot A Improvements 592,260$ TBD
X TBD TBD
Preliminary Design. Secure design services to prepare plans and specifications. This project will consist of upgrading Parking Lot A to meet ADA standards, with improvements including:
• New layout to maximize parking capacity and improve circulation.
• Consideration of the layout of parking spaces on 11th Street and explore incorporating 11th Street parking spaces into the Lot
A pay station system.
• New surfacing and lighting.
• New trash enclosures adjacent to commercial buildings and removal of the trash enclosure and joint compactor.
• Low impact development elements including permeable pavers and landscaping.
Coastal Commission permits will be required.
PBG 696 Police Station Improvements 33,000$ TBD X TBD TBD
Preliminary Design. Pending staff availability.The Police Station is in need of improvements including increased security measures and improvements to report writing room
and evidence and property room. The restrooms in the basement of the Police Station are in need of improvements.
PBG 698 ADA improvements 71,298$ Andrew
Nguyen X
Complete Project
Approvals/Bidding -
5/21
06/21
Project Approvals/Bidding. Preparing to bid project in May.The project proposes: Improvements and relocation of sidewalks, curb ramps and obstructions along Prospect Avenue in order
to follow the Americans with Disabilities Act (ADA) and meet the latest Federal Standards. Project to be bided out together with
Project 601.
SH 101 Hermosa Avenue Greenwich Village Street Realignment
(STUDY)
10,000$ TBD
X TBD TBD
Part of Study 103 Sea Level Rise Risk Assessment Grant. Proposals received and under
review.
This study will evaluate potential improvements at the intersections of:
• Hermosa Avenue and Greenwich Village; and
• Manhattan Avenue and Greenwich Village/27th Street
The study will evaluate opportunities improve the flow and visibility for pedestrian, bikes, and vehicles at the two intersections.
This study is part of Study 103 Sea Level Rise Risk Assessment Grant recipient for preliminary design.
PBG 103 Sea Level Rise Risk Assessment (NEW)
(STUDY)
279,058$ Leeanne
Singleton X
Complete
Study/Conceptual
Planning - 6/21
09/21
Study/Conceptual Planning. Consultant selected and preparing report.This study will assess the risk of sea level rise in three areas along Hermosa Avenue, 35th Street, Greenwich Village, and 4th
Street to Herondo Avenue. It incorporates three other projects. Project 164 Hermosa Avenue Green Street, Project 188 Strand
Bikeway and Walkway Improvements at 35th Street, and Study 101 Hermosa Avenue Greenwich Village Street Realignment.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 3 of 4
53
City of Hermosa Beach
Updated 04.20.21 FY 2020-21 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
PI 538 Citywide Park Master Plan
(STUDY)
215,475$ Leeanne
Singleton
X TBD TBD
Study/Conceptual Planning.The City is seeking to prepare a Parks Master Plan that achieves the following goals:
• Engages the community and local recreational organizations in a dialogue about parks and open space resources in Hermosa
Beach;
• Identifies the current demand/utilization and the future/evolving parks and recreational facility needs for the Hermosa Beach
community;
• Leverages the vision and goals of the recently adopted General Plan and the Community Decision-Making Tool;
• Identifies an appropriate balance between organized and informal recreational activities at the City’s parks and open spaces;
• Serves as a dynamic useful planning and implementation document that enjoys broad community and political support;
• Provides a comprehensive strategy to maintain, rehabilitate and improve the City’s network of parks, facilities, and open
space assets, including current unfunded park and recreational opportunities;
• Evaluates the effective use of the City’s financial and physical resources and opportunities to fund implementation of the
recommendations in the Master Plan.
PI 544 Greenbelt Accessible Path Assessment
(STUDY)
10,000$ Lucho
Rodriguez X TBD TBD Study/Conceptual Planning. Consultant studying feasibility of an accessible path on the
Greenbelt.
Determine the feasibility of installing an ADA surface path on the Greenbelt to provide a firm, natural looking and permeable
path that increases accessibility for the disabled and boosts accessibility for all.
PBG 668 Library Community Needs Assessment
(STUDY)
60,000$ Kelly Orta
X TBD TBD
On Hold. On hold until funding opportunities become available for a new or renovated library
facility.
Phase II consists of preparation of conceptual designs and estimates for:
• Keeping the city’s library at its current location, to include: Renovation and expansion of existing building or adding a second
floor to the existing building (before preparation of renovation schemes for the existing building, the structural condition must be
assessed to make sure that the building is not beyond its useful life); Construction of a two (2) story library building at the
existing location; or
• Construction of a new library at a new site
• Relocation of “Friends of the Library” from Bard Street to a more appropriate location. Funding is reimbursed to the City
through the Library’s Excess Operating Funds through agreement with the LA County Library. Other funding options will be
explored.
PBG 693 Community Theater Needs Assessment
(STUDY)
3,320$ Kelly Orta
X Closeout Closeout
Closeout. Assessment report has been completed. This needs assessment will include an analysis and conceptual cost estimates of two scenarios:
a. A major renovation of the Community Theatre to transform it into a regional performing arts center; and
b. A conservative renovation to upgrade the Community Theatre, taking into consideration its current users and maintaining the
community focus of the facility. Market trends for similar and/or other theaters will also be included.
PBG 694 Parking Structure (Lot C) Structural Assessment
(STUDY)
40,000$ Andrew
Nguyen X Closeout Closeout Closeout. Finalizing assessment report.Prepare a structural assessment report for the parking structure, to analyze cracks in walls and decks.
SH 160 PCH Traffic Improvements
(RECONCILIATION)
160,000$ Reed Salan
X TBD TBD
Project was to be closed out in FY 19-20 but delayed due to modifications requiring Caltrans
approval. Funding approved by Council during Midyear budget. Project to be completed and
closed out by FY 21-22.
The purpose of this project is to improve operational mobility along State Route 1 (Pacific Coast Highway) which also provides
operational relief to I-405 by improving operations in a parallel route. The proposed project also includes improvements
including but not restricted to truck turning radius, ADA curb ramps, striping and pedestrian signal improvements of the
segment on PCH between Anita Street and Artesia Boulevard.
Pedestrian signal, crosswalks and ADA curb ramps improvements at the intersections of PCH and Pier Avenue and PCH and
Aviation Boulevard including improvements at intersection to aid trucks turning onto Aviation.
SSD 401 EWMP Update/Feasibility Study
(RECONCILIATION)
107,963$ Doug Krauss
X TBD TBD
Funds to be paid to Beach Cities EWMP (Enhanced Watershed Management Plan) group for
feasibility studies per MOU and mandated by Municipal Separate Storm Sewer System (MS4)
permit. Payment to be made by July. EWMP plan is scheduled to be completed by
September.
Project to update EWMP (Enhanced Watershed Management Plan) and revise regional projects. Project to be lead by City of
Redono Beach for the Beach Cities Watershed group.
PI 542 Stormwater/Urban Runoff Diversion Project
(RECONCILIATION)
160,000$ Doug Krauss
X TBD TBD
Funds to be paid to the Beach Cities EWMP (Enhanced Watershed Management Plan) group
for feasibility studies per the MOU and as mandated by the Municipal Separate Storm Sewer
System (MS4) permit. Payment to be made by July. EWMP plan is scheduled to be
completed by September.
The original Greenbelt Infiltration project was cancelled. The City of Redondo Beach has taken the lead role to explore
alternative projects for the Beach Cities Watershed group.
PBG 650 Community Center General Improvements
(RECONCILIATION)
196,711$ Lucho
Rodriguez X Closeout Closeout
Project completed. Account to be closed and remaining funds to be released.Community Center exterior painting; includes remediate lead-based paint, paint doors, minor repairs. Community Center
interior painting; includes all interior classrooms, hallways, restrooms, Senior Activity Center, any exposed conduit & offices,
moldings, handrails & door frames. Tennis court resurface.
PBG 760 Tree Well Grates
(RECONCILIATION)
51,068$ Andrew
Nguyen X TBD TBD Project has been under dispute resolution. Funds to be used to purchase and install tree well
grates on Hermosa Ave.
This project will install iron tree grates in existing tree wells on Hermosa Ave.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 4 of 4
54
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 21-0261
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of May 13, 2021
CHECK REGISTERS
(Finance Director Viki Copeland)
Recommended Action:
Staff recommends City Council ratify the following check registers.
Attachments:
1.Check Register 4/15/2021
2.Check Register 4/22/2021
3.Check Register 4/28/2021
Respectfully Submitted by: Viki Copeland, Finance Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 3/26/2024Page 1 of 1
powered by Legistar™55
04/15/2021
Check Register
CITY OF HERMOSA BEACH
1
6:02:47PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97169 4/15/2021 ATHENS SERVICES 10141210 CITYWIDE SWEEP/STEAM CLEAN/PORTER/MAR2116660
001-3104-4201 16,353.92
001-3301-4201 10,898.50
001-3304-4201 1,501.69
001-6101-4201 1,601.23
CITYWIDE SWEEP/STEAM/SCRUB/PORTER/MAR2110141210A
001-3301-4201 6,047.04
001-3304-4201 1,427.64
CITYWIDE SWEEP/STEAM/SCRUB/PORTER/MAR2110141210B
001-3301-4201 6,787.10
001-3304-4201 764.74
PD/SHREDDING/2 BINS/APR2110192414
001-2101-4309 45.00
Total : 45,426.8616660
97170 4/15/2021 BARROWS, PATRICK PO 36070 INSTRUCTOR PAYMENT/CLASSES 9240/117271
001-4601-4221 2,118.48
Total : 2,118.4817271
97171 4/15/2021 BEACH GIRL PROPERTIES LLC 263 PARKING METERS - 70 14TH STREET/MAR2116371
001-3842 650.00
Total : 650.0016371
97172 4/15/2021 BRAUN LINEN SERVICE 1666771 to 1671760 PRISONER LAUNDRY/MAR2100163
001-2101-4306 250.55
Total : 250.5500163
97173 4/15/2021 BROWN, DENNIS Parcel 4181-023-006 STREET LIGHT TAX REBATE14236
105-3105 24.61
Total : 24.6114236
97174 4/15/2021 CALIFORNIA FENCE AND SUPPLY CO 7649 MOONDUST PARK FENCE REPAIR03621
001-6101-4309 695.00
Total : 695.0003621
97175 4/15/2021 CDWG 9798622 MAT REQ 791323/BRIEFING PRINTER TONER09632
001-2101-4305 163.81
EOC RADIO BATTERY BACKUP/SURGE PROTECTB081699
2b (1)56
04/15/2021
Check Register
CITY OF HERMOSA BEACH
2
6:02:47PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97175 4/15/2021 (Continued)CDWG09632
715-1206-5401 358.00
715-1206-5401 61.87
Total : 583.6809632
97176 4/15/2021 COMPLETES PLUS 01AP4271 VEHICLE MAINT/REPAIR PARTS/DEC2009436
715-3102-4311 -109.15
VEHICLE MAINT/REPAIR PARTS/DEC20-MAR2101AP4271 to 01AV1564
715-2101-4311 50.27
715-3302-4311 121.40
Total : 62.5209436
97177 4/15/2021 CONNOLLY, ELIZABETH Parcel 4188-030-009 STREET LIGHT & SEWER TAX REBATE20407
001-6871 126.60
105-3105 24.61
Total : 151.2120407
97178 4/15/2021 COUNTY OF LOS ANGELES C0009784 FIRE PROTECTION SERVICES/MAY2120781
001-2202-4251 458,519.00
180-2202-4251 3,589.00
001-2202-4111 10,630.00
301-2202-4251 30,306.00
Total : 503,044.0020781
97179 4/15/2021 EASY READER HD-21-010 MAT REQ 708586/LEGAL ADS/MAR2100181
001-1121-4323 120.75
Total : 120.7500181
97180 4/15/2021 FJR PACIFIC, INC.23195 PD 1ST FLOOR THERMOSTAT REPLACEMENT21217
001-4204-4201 700.00
COMM CTR RM 12 HEATER VENT PIPE23344
001-4204-4201 995.00
Total : 1,695.0021217
97181 4/15/2021 GENERAL TECHNOLOGIES & SOLUTIO 190507-10 TRAFFIC ENGINEER/OUTDOOR DINE/FEB-MAR2122000
157-2702-4201 2,755.00
Total : 2,755.0022000
97182 4/15/2021 GORODETSKY, VITALY Parcel 4186-028-045 STREET LIGHT & SEWER TAX REBATE14476
001-6871 126.60
57
04/15/2021
Check Register
CITY OF HERMOSA BEACH
3
6:02:47PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97182 4/15/2021 (Continued)GORODETSKY, VITALY14476
105-3105 24.61
Total : 151.2114476
97183 4/15/2021 GOVERNMENT FINANCE OFCRS ASSN 6732 AWARD PROGRAM FEE 19/2000059
001-1202-4201 460.00
Total : 460.0000059
97184 4/15/2021 HOME DEPOT CREDIT SERVICES 4011435 MAT REQ 874754/MAINT SUPPLIES/FEB2103432
001-4204-4309 435.72
MAT REQ 435364/MAINT SUPPLIES/FEB215012220
001-4204-4309 456.79
MAT REQ 435365/MAINT SUPPLIES/FEB215012221
001-4204-4309 183.68
REQ 435336/HEATER FOR JIM'S BAY5900618
001-4204-4309 152.21
MAT REQ 668243/MAINT SUPPLIES/FEB217620173
001-6101-4309 401.21
MAT REQ 435351/MAINT SUPPLIES/FEB218011925
001-4204-4309 270.90
Total : 1,900.5103432
97185 4/15/2021 LA UNIFORMS & TAILORING INC 8493/Mat Req 791322 POLICE UNIFORMS/14 P BUTTONS20771
001-2101-4314 185.22
Total : 185.2220771
97186 4/15/2021 MERCHANTS LANDSCAPE SERVICES 57702 50 TREES/GREENBELT B/T HERONDO & 2ND18071
001-6101-4201 1,505.00
CITYWIDE PARK LANDSCAPING/MAR2157713
001-6101-4201 21,200.00
CITYWIDE MEDIAN LANDSCAPING/MAR2157714
105-2601-4201 3,600.00
Total : 26,305.0018071
97187 4/15/2021 NETRIX LLC 464807 DATTO SERVER CLOUD LICENSING/APR2111539
715-1206-4201 1,957.55
IT SUPPORT SERVICES/APR21767793-5
715-1206-4201 16,096.21
ONSITE TECH/1 ADD'L DAY PER WK/APR21768333-3
58
04/15/2021
Check Register
CITY OF HERMOSA BEACH
4
6:02:47PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97187 4/15/2021 (Continued)NETRIX LLC11539
715-1206-4201 2,184.00
REMOTE SUPPORT LICENSING/MAR21768566
157-2702-4201 268.00
REMOTE SUPPORT LICENSING/APR21768566-3
157-2702-4201 268.00
DATTO SERVER CLOUD LICENSING/JAN21SIN030143
715-1206-4201 1,957.55
Total : 22,731.3111539
97188 4/15/2021 OFFICE DEPOT 15801383001 MAT REQ 791320/OFFICE SUPPLIES13114
001-2101-4305 74.22
MAT REQ 435059/OFFICE SUPPLIES159366018001
001-1204-4305 59.63
MAT REQ 708583/OFFICE SUPPLIES160369176001
001-1121-4305 14.99
MAT REQ 708583/OFFICE SUPPLIES160374669001
001-1121-4305 16.41
MAT REQ 708583/OFFICE SUPPLIES160374673001
001-1121-4305 49.26
MAT REQ 437824/OFFICE SUPPLIES162723938001
001-3302-4305 91.90
MAT REQ 437824/USB CABLES (7)16273938001
001-3302-4305 91.90
MAT REQ 708585/OFFICE SUPPLIES162743886001
001-1121-4305 57.36
MAT REQ 854018/YARD OFFICE SUPPLIES165114599001
001-4202-4305 3.74
Total : 459.4113114
97189 4/15/2021 OPENGOV INC INV00001762 INTERACTIVE BUDGET BOOK (2 OF 6)19485
001-1202-4201 17,995.00
Total : 17,995.0019485
97190 4/15/2021 PROVIDENCE MEDICAL GuarantorID600000285 PRE-EMPLOYMENT PHYSICALS/FEB2101911
001-1203-4320 436.00
Total : 436.0001911
97191 4/15/2021 RACE COMMUNICATIONS Stmt No. RC482942 DEDICATED INTERNET SERVICE/APR2122179
59
04/15/2021
Check Register
CITY OF HERMOSA BEACH
5
6:02:47PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97191 4/15/2021 (Continued)RACE COMMUNICATIONS22179
715-1206-4201 1,022.00
Total : 1,022.0022179
97192 4/15/2021 RICHIE, JOHNATHAN PO 36073 INSTRUCTOR PMT/CLASSES 9245/620932
001-4601-4221 899.92
Total : 899.9220932
97193 4/15/2021 SAGECREST PLANNING AND ENVIRON 2357 SENIOR PLANNER/FEB21-MAR2121406
001-4101-4201 1,732.50
Total : 1,732.5021406
97194 4/15/2021 SIDRICK, BRAD M.Parcel 4184-025-077 STREET LIGHT & SEWER TAX REBATE20395
105-3105 24.61
001-6871 126.60
Total : 151.2120395
97195 4/15/2021 SOUTHERN CALIFORNIA EDISON CO 2-00-989-7315 ELECTRICITY/FEB21-MAR2100159
001-3104-4303 599.74
ELECTRICITY/MAR212-01-4104-4281
105-2601-4303 9,128.13
ELECTRICITY/MAR212-01-414-1071
001-4204-4303 659.22
105-2601-4303 231.93
ELECTRICITY/FEB21-MAR212-01-414-1071
001-4204-4303 6,272.54
ELECTRICITY/MAR212-01-414-2152
001-6101-4303 41.10
ELECTRICITY/FEB21-MAR212-01-414-2152
001-6101-4303 987.20
ELECTRICITY/MAR212-01-414-3747
105-2601-4303 21.94
ELECTRICITY/FEB21-MAR212-01-414-4281
105-2601-4303 3,789.53
Total : 21,731.3300159
97196 4/15/2021 SPECTRUM BUSINESS 8448300300046247 CITY HALL/CABLE/APR2120236
715-4204-4201 108.72
Total : 108.7220236
60
04/15/2021
Check Register
CITY OF HERMOSA BEACH
6
6:02:47PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97197 4/15/2021 STANLEY CONVERGENT SECURITY 6001010061 MOTORS/BARD ST/CAMERA REPAIR16806
715-2101-4201 261.00
Total : 261.0016806
97198 4/15/2021 TURKOLU, MELINDA Parcel 4169-037-015 STREET LIGHT & SEWER TAX REBATE13960
105-3105 24.61
001-6871 126.60
Total : 151.2113960
97199 4/15/2021 VERIZON BUSINESS SERVICES 71786253 VOIP PHONES/BARD/FEB2118666
001-3302-4304 70.09
VOIP PHONES/COMM RES/FEB2171786259
001-4601-4304 143.01
VOIP PHONES/BASE 3/FEB2171786722
001-3302-4304 109.25
VOIP PHONES/EOC OVER GYM/FEB2171786732
001-1201-4304 62.20
VOIP PHONES/YARD/FEB2171787382
001-4202-4304 145.68
VOIP PHONES/CITY HALL/PD/FEB2171787595
001-1101-4304 38.58
001-1121-4304 60.93
001-1132-4304 18.22
001-1141-4304 36.41
001-1201-4304 149.29
001-1202-4304 91.04
001-1203-4304 72.84
001-1204-4304 109.24
001-1208-4304 6.80
001-2101-4304 791.07
001-4101-4304 133.59
001-4201-4304 146.71
001-4202-4304 182.00
001-4204-4321 18.21
160-3102-4201 18.21
715-1206-4304 18.22
Total : 2,421.5918666
97200 4/15/2021 WILLDAN FINANCIAL SERVICES 010-47374 DISTRICT ADMIN/JAN21-MAR2115188
61
04/15/2021
Check Register
CITY OF HERMOSA BEACH
7
6:02:47PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97200 4/15/2021 (Continued)WILLDAN FINANCIAL SERVICES15188
139-1219-4201 349.64
135-1219-4201 372.86
Total : 722.5015188
97201 4/15/2021 WITTMAN ENTERPRISES LLC 2102062 AMBULANCE TRANSPORT BILLING/FEB2113359
001-1202-4201 2,950.74
Total : 2,950.7413359
2009337440 4/12/2021 EMPLOYMENT DEVELOPMENT DEPT 4/15/21 Check Run UNEMPLOY/OCT-DEC20/PENALTY REFUND/CARES01397
705-1215-4186 14,451.48
158-3756 -7,982.50
Total : 6,468.9801397
Bank total : 666,823.02 34 Vouchers for bank code :boa
666,823.02Total vouchers :Vouchers in this report 34
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 7 inclusive, of the check register
for 4/15/2021 are accurate funds are available for payment,
and are in conformance to the budget."
By
Finance Director
Date 4/29/20201
62
04/22/2021
Check Register
CITY OF HERMOSA BEACH
1
5:47:00PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97202 4/22/2021 ACCELA INC INV-ACC53757 CIVIC PLATFORM/5 LICENSES/APR21-JUN2105817
715-4201-4201 1,528.15
Total : 1,528.1505817
97203 4/22/2021 ACCESS, INC.21-0008 ADA CONSULTING/MAR2121696
301-8602-4201 9,250.00
Total : 9,250.0021696
97204 4/22/2021 AMERICAN ARBOR CARE 62036 ARBORIST SERVICES/85 18TH ST/JAN2120197
001-6101-4201 200.00
ARBORIST SERVICES/1251 7TH PLACE/FEB2162222
001-6101-4201 250.00
Total : 450.0020197
97205 4/22/2021 ARCHITAG LLP 2017-05 CLARK BLDG RENOVATION ARCHITECT/MAR2122108
301-8689-4201 4,000.00
Total : 4,000.0022108
97206 4/22/2021 AT&T 310 796-6526 991 3 PD COMPUTER CIRCUITS/APR2100321
001-2101-4304 126.28
PD COMPUTER CIRCUITS/APR21960 461-1985 555 7
001-2101-4304 109.65
Total : 235.9300321
97207 4/22/2021 BEST BEST & KRIEGER LLP 901396 GENERAL CITY ATTORNEY SERVICES/MAR2120942
001-1131-4201 23,611.40
CITY ATTORNEY/NORTH SCHOOL MOU/MAR21901397
001-1131-4201 374.00
ATTORNEY/GREENWICH UNDERGRND/MAR21901398
001-2142 1,215.50
ATTORNEY/PUBLIC RECORDS REQS/MAR21901399
001-1131-4201 11,580.40
CITY ATTORNEY SERVICES/COVID-19/MAR21901400
157-2702-4201 2,487.10
CITY ATTORNEY SERVICES/LAND USE/MAR21901401
001-1131-4201 4,413.20
CITY ATTORNEY SERVICES/CROSSFIT/MAR21901402
705-1133-4201 12,011.72
2b (2)63
04/22/2021
Check Register
CITY OF HERMOSA BEACH
2
5:47:00PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97207 4/22/2021 (Continued)BEST BEST & KRIEGER LLP20942
CITY ATTORNEY SRVCS/ROTH V TRAN/MAR21901403
705-1133-4201 355.60
CITY ATTORNEY/HERMOSA FITNESS/MAR21901404
705-1133-4201 27,760.95
CITY ATTORNEY SERVICES/FANGARY/MAR21901405
705-1133-4201 14,348.73
CITY ATTORNEY SERVICES/MUZATKO/MAR21901406
705-1133-4201 1,666.80
CITY ATTORNEY SERVICES/BROIN/MAR21901407
705-1133-4201 152.60
CITY ATTORNEY SERVICES/KUERTEN/MAR21901408
705-1133-4201 65.40
CITY ATTORNEY SRVCS/PERSONNEL/MAR21901409
001-1203-4201 12,970.60
CITY ATTORNEY/TELECOMMUNICATIONS/MAR21901410
001-1131-4201 584.20
Total : 113,598.2020942
97208 4/22/2021 BOUCHER, SUSAN C Parcel 4185-019-029 STREET LIGHT & SEWER TAX REBATE14146
001-6871 126.60
105-3105 24.61
Total : 151.2114146
97209 4/22/2021 BROMBEREK, CLARENCE S Parcel 4185-002-018 STREET LIGHT & SEWER TAX REBATE20475
001-6871 126.60
105-3105 24.61
Total : 151.2120475
97210 4/22/2021 CAPITAL WHOLESALE LIGHTING 437476 to 438544 ELECTRICAL/LIGHTING SUPPLIES/FEB21-MAR2121720
001-4204-4309 405.72
105-2601-4309 2,323.49
Total : 2,729.2121720
97211 4/22/2021 COMMERCIAL BUILDING MANAGEMENT 67981 JANITORIAL/COVID PORTER/CITY BLDGS/MAR2120627
001-4204-4201 6,861.00
157-2702-4201 3,866.69
Total : 10,727.6920627
64
04/22/2021
Check Register
CITY OF HERMOSA BEACH
3
5:47:00PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97212 4/22/2021 CONTINENTAL MAPPING SERVICE 040121 PUBLIC NOTICES/1227 HERMOSA/APR2120398
001-4101-4201 1,000.00
Total : 1,000.0020398
97213 4/22/2021 CPPA 2021-0113 ORGANIZATION-LEVEL ANNUAL MEMBERSHIP12514
001-3302-4315 250.00
Total : 250.0012514
97214 4/22/2021 DEWEY PEST CONTROL Account 759408 PEST CONTROL/CITY-OWNED BLDGS/APR2111449
001-4204-4201 849.00
Total : 849.0011449
97215 4/22/2021 DEWEY PEST CONTROL Account 1233239 SEWER RAT ABATEMENT/APR2111449
160-3102-4201 272.00
Total : 272.0011449
97216 4/22/2021 DIV OF THE STATE ARCHITECT PO 36085 BUS LIC STATE CASP FEES/JAN21-MAR2118263
001-6851 268.70
Total : 268.7018263
97217 4/22/2021 FEDEX OFFICE 008200581434 MAT REQ 791216/CLARK BLDG PLANS06293
301-8689-4201 240.78
REQ 479068/COLOR PRINTS/CERTIFICATES008200582032
001-1101-4305 1.34
Total : 242.1206293
97218 4/22/2021 FRONTIER 209-190-0013-1206175 PD COMPUTER CIRCUITS/APR2119884
001-2101-4304 904.36
EOC ANALOG LINES/APR21310-318-0113-1203155
715-1206-4304 1,275.43
CASHIER TAPS LINE/APR21310-318-8751-0128095
001-1204-4304 57.82
JAIL BREATHALYZER/APR21310-318-9210-0827185
001-2101-4304 73.80
EOC CABLE/INTERNET/APR21323-159-2268-0924145
001-1201-4304 294.88
Total : 2,606.2919884
97219 4/22/2021 GENERAL INDUSTRIAL SUPPLY 1183856-01 MAT REQ 854039/GLOVES FOR YARD15406
001-3104-4309 131.40
65
04/22/2021
Check Register
CITY OF HERMOSA BEACH
4
5:47:00PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 131.40 97219 4/22/2021 GENERAL INDUSTRIAL SUPPLY15406
97220 4/22/2021 GROH, MARK LEE HB-015 CITATION HEARING EXAMINER/APR2121597
001-1204-4201 72.00
Total : 72.0021597
97221 4/22/2021 IPS GROUP INC INV58968 PARKING METER WIRELESS/CC FEES/MAR2119314
001-3305-4201 779.83
001-3304-4201 742.48
001-3302-4201 13,354.59
Total : 14,876.9019314
97222 4/22/2021 LANDSCAPE STRUCTURES, INC.INV-096521 SWING CLAMPS FOR CITYWIDE USE12190
001-6101-4309 185.40
001-6101-4309 16.00
Total : 201.4012190
97223 4/22/2021 LAURA MECOY COMMUNICATIONS LLC 2011 PUBLIC INFORMATION OFFICER/MAR2120347
001-1201-4201 2,743.80
157-2702-4201 3,256.20
Total : 6,000.0020347
97224 4/22/2021 MANIACI INSURANCE SERVICES 942 BENEFITS CONNECT ADMIN/MAR2118312
001-1203-4201 602.82
Total : 602.8218312
97225 4/22/2021 MCCLOUD, JESSICA Receipt 1021326.001 CANCELLED CLASS 9226 REFUND22261
001-2111 96.80
Total : 96.8022261
97226 4/22/2021 MCCORMICK AMBULANCE 252176 AMBULANCE TRANSPORT SERVICES/MAR2120898
001-1201-4201 22,440.00
Total : 22,440.0020898
97227 4/22/2021 MILLER PLANNING ASSOCIATES 20007-0321-04 ZONE/SUBDIVIDE ORDINANCE UPDATE/MAR2121660
150-4105-4201 4,492.50
Total : 4,492.5021660
97228 4/22/2021 MOST DEPENDABLE FOUNTAINS INV63108 STRAND SHOWER REPLACEMENT PARTS11454
001-6101-4309 346.00
66
04/22/2021
Check Register
CITY OF HERMOSA BEACH
5
5:47:00PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97228 4/22/2021 (Continued)MOST DEPENDABLE FOUNTAINS11454
001-6101-4309 31.16
Total : 377.1611454
97229 4/22/2021 NOWICKI, KAREN PO 36067 REIMB/CMTA CONFERENCE REGISTRATION18350
001-1141-4317 175.00
Total : 175.0018350
97230 4/22/2021 OFFICE DEPOT 164951290001 MAT REQ 791324/OFFICE SUPPLIES13114
001-2101-4305 78.72
MAT REQ 863094/OFFICE SUPPLIES164954477001
001-4101-4305 23.26
MAT REQ 863094/OFFICE SUPPLIES164954796001
001-4101-4305 66.19
MAT REQ 854018/YARD/DRY ERASE BOARD165114598001
001-4202-4305 38.31
MAT REQ 854021/YARD/PENCIL HOLDER165264903001
001-4202-4305 21.89
MAT REQ 854021/YARD/OFFICE SUPPLIES165265787001
001-4202-4305 34.02
MAT REQ 791325/OFFICE SUPPLIES166389413001
001-2101-4305 20.13
MAT REQ 791325/OFFICE SUPPLIES166389635001
001-2101-4305 10.84
MAT REQ 791325/OFFICE SUPPLIES166389636001
001-2101-4305 28.01
Total : 321.3713114
97231 4/22/2021 ONWARD ENGINEERING 5522 SANITARY SEWER/CIVIL ENGINEER/NOV2021596
001-2131 6,160.00
Total : 6,160.0021596
97232 4/22/2021 POMERANITZ, EFRAT G.PO 36082 INSTRUCTOR PMT/CLASSES 9161/9215/8-919853
001-4601-4221 1,180.35
Total : 1,180.3519853
97233 4/22/2021 RICHIE, JOHNATHAN po 36083 INSTRUCTOR PMT/CLASSES 9191-520932
001-4601-4221 2,583.00
Total : 2,583.0020932
67
04/22/2021
Check Register
CITY OF HERMOSA BEACH
6
5:47:00PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97234 4/22/2021 RIO HONDO COMMUNITY COLLEGE S21-96-ZHRB RECRUIT ANDRADE/PRE-ACADEMY CLASS01070
001-2101-4317 23.83
Total : 23.8301070
97235 4/22/2021 RJ PRINTING & PROMOTIONAL 655 POLICE DEPT EXCEPTION SLIPS21153
001-2101-4305 615.60
001-2101-4305 55.10
Total : 670.7021153
97236 4/22/2021 SAFEWARE, INC 1797102 LASER EYE PERSONAL PROTECTION EQUIPMENT22257
150-2120-4201 8,219.17
001-2101-4305 637.63
150-2120-4201 780.82
001-2101-4305 60.57
Total : 9,698.1922257
97237 4/22/2021 SALIK, JENNIFER Receipt 1021361.001 CLASS 9223 WITHDRAWAL REFUND22260
001-2111 81.80
Total : 81.8022260
97238 4/22/2021 SHERWIN-WILLIAMS 58834 & 14422 PAINTING SUPPLIES/MAR2117903
001-3104-4309 613.90
Total : 613.9017903
97239 4/22/2021 SOCAL GAS Acct 011 004 5767 8 YARD BLDGS/NATURAL GAS/MAR2100170
001-4204-4303 30.63
Total : 30.6300170
97240 4/22/2021 SOUTH BAY CENTER FOR PO 35577 DISPUTE RESOLUTION SERVICES/JAN21-MAR2110764
001-1201-4201 800.00
Total : 800.0010764
97241 4/22/2021 SPCALA 2021-0331 ANIMAL SHELTERING SERVICES/MAR2118821
001-3302-4201 875.00
Total : 875.0018821
97242 4/22/2021 TR COPY & PRINTING COMPANY 7790 PARKING PERMIT WINDOW ENVELOPES15279
001-1204-4305 270.00
001-1204-4305 25.65
68
04/22/2021
Check Register
CITY OF HERMOSA BEACH
7
5:47:00PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 295.65 97242 4/22/2021 TR COPY & PRINTING COMPANY15279
97243 4/22/2021 TUMBLEWEED TRANSPORTATION 0013816-IN STAR KINDER PROG TRANSPORT/MAR2120749
145-3411-4201 4,600.00
STAR KINDER PROG TRANSPORT/FINAL INVOICE0013839-IN
145-3411-4201 4,600.00
Total : 9,200.0020749
97244 4/22/2021 TUVERSON, JULIA Receipt 2002631.003 CLASS 9273 REFUND FOR SCHEDULE CONFLICT22262
001-2111 133.60
Total : 133.6022262
97245 4/22/2021 UNDERGROUND SERVICE ALERT 320210318 DIG ALERTS/MAR2108207
161-3109-4201 122.20
DIG ALERT/STATE FEES/MAR21dsb20201481
161-3109-4201 48.07
Total : 170.2708207
97246 4/22/2021 UPTIME COMPUTER SERVICE 32081 PRINTER MAINTENANCE/MAY2104768
715-1206-4201 554.45
Total : 554.4504768
97247 4/22/2021 US BANK 1746642 2015 LEASE REVENUE BOND/INT PMT19648
201-1220-6701 167,527.77
Total : 167,527.7719648
97248 4/22/2021 WILLDAN ENGINEERING 00224355 CODE ENFORCEMENT SERVICES/MAR2110703
157-2702-4201 10,400.00
Total : 10,400.0010703
97249 4/22/2021 ZEP MANUFACTURING COMPANY 9006128777 REQ 673830/GRAFFITI REMOVAL SUPPLIES09234
001-3104-4309 200.69
REQ 673828/GRAFFITI REMOVAL SUPPLES9006128779
001-3104-4309 394.82
Total : 595.5109234
97250 4/22/2021 ZUMAR INDUSTRIES INC 92294 MAT REQ 987194/STREET SIGN MAINTENANCE01206
001-3104-4309 333.15
MAT REQ 987196/STREET SIGN MAINT92322
001-3104-4309 892.21
69
04/22/2021
Check Register
CITY OF HERMOSA BEACH
8
5:47:00PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97250 4/22/2021 (Continued)ZUMAR INDUSTRIES INC01206
MAT REQ 987193/STREET SIGN MAINTENANCE92384
001-3104-4309 805.22
MAT REQ 987198/STREET SIGN MAINT92385
001-3104-4309 580.55
MAT REQ 987195/STREET SIGN ANCHORS92423
001-3104-4309 874.67
MAT REQ 987197/STREET SIGN TUBING92424
001-3104-4309 677.54
MAT REQ 854454/STREET SIGN MAINT92440
001-3104-4309 843.36
Total : 5,006.7001206
Bank total : 414,698.41 49 Vouchers for bank code :boa
414,698.41Total vouchers :Vouchers in this report 49
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 8 inclusive, of the check
register for 4/22/2021 are accurate funds are available for
payment, and are in conformance to the budget."
By
Finance Director
Date 4/29/21
70
04/28/2021
Check Register
CITY OF HERMOSA BEACH
1
4:56:48PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97251 4/28/2021 SBCU VISA 01C0034513168 CC DRINKING WATER 2/13/21-3/12/2103353
001-2101-4305 268.82
JEEP HB10/SPARE TIRE/CARGO MAT11-000015-1 CC
715-2101-4311 280.05
FUJISAKI/HEARING EXAMINER TRAINING5516 CC
001-3302-4317 175.00
ONLINE SERVICE CREDITS/MAR21-MAR2394009877 CC
715-1206-4201 100.00
SCHEID/ADD'L CELL DATA STORAGE/MAR21Doc#176418516856 CC
001-2101-4305 0.99
FINANCE CHARGEFinance Charge CC
001-2101-4201 1.28
001-2026 1.28
001-2027 -1.28
FINANCE CHARGEFinance Charge CC
001-4202-4201 6.08
001-2026 6.08
001-2027 -6.08
FINANCE CHARGEFinance Charge CC
001-1201-4201 8.37
FINANCE CHARGEFinance Charge CC
001-1201-4201 6.02
FINANCE CHARGEFinance Charge CC
001-1201-4201 3.62
FINANCE CHARGEFinance Charge CC
001-4202-4201 4.69
001-2026 4.69
001-2027 -4.69
FINANCE CHARGEFinance Charge CC
001-4202-4201 9.75
001-2026 9.75
001-2027 -9.75
FINANCE CHARGEFinance Charge CC
001-4202-4201 3.99
001-2026 3.99
001-2027 -3.99
CONFERENCE LINE/FEB21IC30411-0221 CC
001-1201-4304 8.35
2b (3)71
04/28/2021
Check Register
CITY OF HERMOSA BEACH
2
4:56:48PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97251 4/28/2021 (Continued)SBCU VISA03353
REFUND OF INTEREST CHARGED IN ERRORInterest Charge CC
001-2026 -0.83
001-2027 0.83
001-4202-4201 -0.83
LATE PAYMENT FEELate Payment Fee CC
001-4202-4201 10.00
001-2026 10.00
001-2027 -10.00
LATE PAYMENT FEELate Pmt Fee CC
001-4202-4201 0.67
001-2026 0.67
001-2027 -0.67
POLISHING & CLEANING SUPPLIES FOR MOTORSOrder No. 928088 CC
715-2101-4311 221.90
715-2101-4311 21.06
CLARK FLD BATTING CAGE ELECTRICAL PANELOrderS117716653002CC
105-2601-4309 1,365.00
105-2601-4309 129.67
REFUND/MOTOR OFFICE ANTENNASPO 35770 CC
001-2101-4305 -308.76
ARCHITECTURAL PRINTSPO 35952 CC
301-8669-4201 856.29
ARMATO/POLICYMAKERS ROUNDTABLEPO 35970 CC
001-1101-4317 15.00
BAIT BIKES/10 CABLE LOCKS/1 SEAT CLAMPPO 35974 CC
001-2101-4305 138.45
001-2101-4305 13.15
PIER PLAZA STRING LIGHTS FOR STOCKPO 35991 CC
105-2601-4309 860.35
105-2601-4309 81.75
SIILVER LEAF HONOR GUARD UNIFORM PINSPO 35993 CC
001-2101-4305 110.93
DOVE/FRANCO/FIELD TRAIN OFFICER UPDATEPO 36028 CC
001-2101-4317 925.00
DOVE/FRANCO/FIELD TRAIN OFFICER UPDATEPO 36028 CC
001-2101-4317 185.00
POELSTRA/FRANCO/ZUBER/PEER SUPPORT TRAINPO 36038 CC
001-2101-4312 500.00
72
04/28/2021
Check Register
CITY OF HERMOSA BEACH
3
4:56:48PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97251 4/28/2021 (Continued)SBCU VISA03353
SMITH/DE-ESCALATION/TACTICAL COMMPO 36039 CC
001-2101-4313 150.00
POELSTRA/SMITH/FUJISAKI/SOCIAL MEDIA TRAPO 36041 CC
001-2101-4317 1,437.00
LOT TIE AGREEMENT/NOTARY SERVICESPO 36077 CC
001-4101-4305 15.00
TIPAN/CRIME ANALYSIS/CANCELLATION FEEReceipt 7223310 CC
001-2101-4317 51.32
BAGNARA RETIREMENT CUPCAKESReceipt CC
001-1203-4305 47.98
SENIOR CENTER MOVIES/MUSIC/MAR21Receipt CC
001-4601-4328 9.99
SOUTH BAY CHIEFS LUNCHEON/SODAS/WATERReceipt CC
001-2101-4305 44.27
SOUTH BAY CHIEFS LUNCHEON/FOODReceipt CC
001-2101-4305 603.16
LUNCH/DISTRICT ATTORNEY INTERVIEWERSReceipt CC
001-2101-4305 28.92
AIELLO RETIREMENT CUPCAKESReceipt CC
001-2101-4305 44.14
ALKADIS/SHERMAN BLOCK SUPERVISORY 4TR 851 CC
001-2101-4312 422.70
Total : 8,856.1203353
Bank total : 8,856.12 1 Vouchers for bank code :boa
8,856.12Total vouchers :Vouchers in this report 1
73
04/28/2021
Check Register
CITY OF HERMOSA BEACH
4
4:56:48PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 4 inclusive, of the check
register for 4/28/2021 are accurate funds are available for
payment, and are in conformance to the budget."
By
Finance Director
Date 4/29/21
74
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 21-0369
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of June 22, 2021
CHECK REGISTERS
(Finance Director Viki Copeland)
Recommended Action:
Staff recommends City Council ratify the following check registers.
Attachments:
1.Check Register 5/27/2021
2.Check Register 6/3/2021
Respectfully Submitted by: Viki Copeland, Finance Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 3/26/2024Page 1 of 1
powered by Legistar™75
05/27/2021
Check Register
CITY OF HERMOSA BEACH
1
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97435 5/27/2021 ALBRECHT, JACKIE Refund CLASS WITHDRAWAL REFUND21931
001-2111 3,660.00
Total : 3,660.0021931
97436 5/27/2021 AMERICAN ARBOR CARE 62638 CLARK FLD/LOMA ENTRANCE/ROOTS CONSULT20197
001-6101-4201 250.00
Total : 250.0020197
97437 5/27/2021 BEECASSO LIVE BEE REMOVAL INC 2009 CLARK FIELD BATTING CAGES/BEE REMOVAL20705
001-6101-4201 225.00
Total : 225.0020705
97438 5/27/2021 BEST BEST & KRIEGER LLP 904079 GENERAL CITY ATTORNEY SERVICES/APR2120942
001-1131-4201 20,009.00
LEGAL/PUBLIC RECORDS REQUESTS/APR21904080
001-1131-4201 21,588.30
CITY ATTORNEY SERVICES/COVID-19/APR21904081
157-2702-4201 3,459.50
CITY ATTORNEY/ADA/DISABILITY/APR21904082
001-1203-4201 3,422.10
CITY ATTORNEY/LAND USE/APR21904083
001-1131-4201 2,543.20
CITY ATTORNEY SERVICES/CROSSFIT/APR21904084
705-1133-4201 7,143.59
CITY ATTORNEY/ROTH V TRAN/APR21904085
705-1133-4201 25.40
CITY ATTORNEY/HERMOSA FITNESS/APR21904086
705-1133-4201 26,596.75
CITY ATTORNEY SERVICES/FANGARY/APR21904087
705-1133-4201 14,822.90
CITY ATTORNEY/KUERTEN/APR21904089
705-1133-4201 436.00
CITY ATTORNEY/PERSONNEL/APR21904090
001-1203-4201 1,118.20
Total : 101,164.9420942
97439 5/27/2021 CALIFORNIA WATER SERVICE Account 4286211111 WATER USAGE/APR2100016
105-2601-4303 4,049.85
2b (1)76
05/27/2021
Check Register
CITY OF HERMOSA BEACH
2
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97439 5/27/2021 (Continued)CALIFORNIA WATER SERVICE00016
001-6101-4303 32,371.55
001-4204-4303 1,511.80
001-3304-4303 269.86
Total : 38,203.0600016
97440 5/27/2021 CANON BUSINESS SOLUTIONS, INC 4036202032 COPIER USAGE 1/10/21-4/9/2110838
715-1208-4201 1,082.45
715-2101-4201 55.79
715-1201-4201 93.05
Total : 1,231.2910838
97441 5/27/2021 CHARGEPOINT INC IN103063 ELECTRIC VEHICLE CHARGERS/DEC20-MAR2318400
001-3104-4201 1,410.00
Total : 1,410.0018400
97442 5/27/2021 CHENG, PAMELA Receipt 1022982.001 CLASS 9352 & 9365 WITHDRAW REFUND22308
001-2111 775.00
Total : 775.0022308
97443 5/27/2021 COUNTY OF LOS ANGELES RE-PW-21051006403 ARTESIA BLVD MEDIAN MAINT/APR2100879
105-2601-4303 186.74
Total : 186.7400879
97444 5/27/2021 DEPARTMENT OF JUSTICE 507059 MAT REQ 791428/FINGERPRINTING/APR2100364
001-1203-4251 258.00
Total : 258.0000364
97445 5/27/2021 DEPARTMENT OF TRANSPORTATION SL210674 SIGNALS & LIGHTING MAINT/JAN21-MAR2100267
105-2601-4251 2,025.78
Total : 2,025.7800267
97446 5/27/2021 DEWEY PEST CONTROL Account 759408 PEST CONTROL/SEWER RAT ABATEMENT11449
001-4204-4201 849.00
Total : 849.0011449
97447 5/27/2021 DEWEY PEST CONTROL Account 1233239 SEWER RAT ABATEMENT/MAY2111449
160-3102-4201 272.00
Total : 272.0011449
77
05/27/2021
Check Register
CITY OF HERMOSA BEACH
3
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97448 5/27/2021 FRONTIER 209-188-4669-0714985 LANDLINES/COMPUTER LINKS/MAY2119884
001-3302-4304 76.35
001-2101-4304 733.33
001-4204-4321 238.72
001-4202-4304 63.44
001-4201-4304 177.10
001-3304-4304 63.25
001-1204-4304 61.27
PD COMPUTER CIRCUITS/MAY21209-190-0013-1206175
001-2101-4304 904.36
EOC ANALOG LINES/MAY21310-318-0113-1203155
715-1206-4304 1,284.48
CASHIER TAPS LINE/MAY21310-318-8751-0128095
001-1204-4304 57.82
JAIL AREA BREATHALYZER/MAY21310-318-9210-0827185
001-2101-4304 73.80
CHAMBERS EOC ANALOG LINES/MAY21310-318-9800-1204155
715-1206-4304 1,522.43
2ND FL CITY HALL CANON FAX 5/16-6/15/21310-372-6186-0831895
001-1121-4304 13.01
001-1141-4304 13.02
001-1201-4304 13.01
001-1202-4304 13.02
001-1203-4304 13.01
PERSONNEL FAX LINE/JUN21310-372-6373-0311045
001-1203-4304 61.27
EOC LANDLINES 5/17-6/16/21310-379-0652-1216195
001-1201-4304 65.68
FIBER OPTIC LINE 5/13/21-6/12/21323-155-6779-0822065
715-1206-4201 215.98
EOC CABLE & INTERNET/MAY21323-159-2268-0924145
001-1201-4304 296.08
Total : 5,960.4319884
97449 5/27/2021 GRAINGER 9904087849 MAT REQ 673850/GRAFFITI REMOVER10836
001-4204-4309 21.93
MAT REQ 673850/GRAFFITI REMOVER9904583201
001-4204-4309 44.48
78
05/27/2021
Check Register
CITY OF HERMOSA BEACH
4
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 66.41 97449 5/27/2021 GRAINGER10836
97450 5/27/2021 HARRIS & ASSOCIATES 48380 CONSTRUCTION MGMT/APR2102102
150-8184-4201 92.50
Total : 92.5002102
97451 5/27/2021 HOUGHTON, KELLY Receipt 1022981.001 CLASS 9365 WITHDRAWAL REFUND22313
001-2111 380.00
Total : 380.0022313
97452 5/27/2021 INTERWEST CONSULTING GROUP INC 68892 TRAFFIC ENGINEERING/APR2121849
001-3104-4201 1,120.00
Total : 1,120.0021849
97453 5/27/2021 KESTUTIS GEDGAUDAS, SOUSAN SHAHSAVARI ORPO 36167 REDUCED CITATION 37014933 REFUND22295
001-3302 28.00
Total : 28.0022295
97454 5/27/2021 LAW OFFICE OF C PATRICK HAMBLI 3105 PERSONNEL/LEGAL SERVICES/MAR2122299
001-1203-4201 726.00
Total : 726.0022299
97455 5/27/2021 LEMMER, WILLIAM PO 36208 DISMISSED CITATION NO. 4001179822304
001-3302 53.00
Total : 53.0022304
97456 5/27/2021 MAGINNIS, STEPHANIE Receipt 2002666.003 CLASS 9315 WITHDRAWAL REFUND22312
001-2111 170.00
Total : 170.0022312
97457 5/27/2021 MAGNUM VENTURE PARTNERS PO 36198 INSTRUCTOR PAYMENT/CLASSES 9259-6018274
001-4601-4221 4,130.00
Total : 4,130.0018274
97458 5/27/2021 MCCORMICK AMBULANCE 253660 AMBULANCE TRANSPORT SERVICES/APR2120898
001-1201-4201 25,520.00
Total : 25,520.0020898
97459 5/27/2021 MERCHANTS LANDSCAPE SERVICES 57877 CITYWIDE PARK LANDSCAPING/APR2118071
001-6101-4201 21,200.00
79
05/27/2021
Check Register
CITY OF HERMOSA BEACH
5
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97459 5/27/2021 (Continued)MERCHANTS LANDSCAPE SERVICES18071
CITYWIDE MEDIAN LANDSCAPING/APR2157878
105-2601-4201 3,600.00
SOUTH PARK HILLSIDE EROSION CONTROL57977
301-8603-4201 1,527.12
GREENBELT/PLANT 5 MILKWEEDS/APR2157978
001-6101-4309 1,000.00
Total : 27,327.1218071
97460 5/27/2021 NATIONAL CONSTRUCTION RENTALS 6123363 FENCE REMOVAL/ADD'L FEE DUE TO RAIN16663
157-2702-4201 300.00
Total : 300.0016663
97461 5/27/2021 NETRIX LLC 466203 DATTO SERVER CLOUD LICENSING/MAY2111539
715-1206-4201 1,957.55
IT SUPPORT SERVICES/MAY21767793-6
715-1206-4201 16,096.21
ONSITE TECH/ADD'L DAY PER WK/MAY21768333-4
715-1206-4201 2,184.00
REMOTE SUPPORT LICENSING/MAY21768566-4
157-2702-4201 268.00
Total : 20,505.7611539
97462 5/27/2021 O'DOWD, KATIE Receipt 1022640.001 CLASS 9304 WITHDRAWAL REFUND22311
001-2111 98.50
Total : 98.5022311
97463 5/27/2021 OLYMPIC AUTO CENTER 14214/Req 435030 '19 FORD F250/RIGHT DOOR REPLACE00093
715-4204-4311 1,541.81
Total : 1,541.8100093
97464 5/27/2021 PARKS COFFEE CALIFORNIA, INC.70059762 COFFEE SERVICE/MAY2122071
001-2101-4305 48.48
001-2101-4306 48.47
Total : 96.9522071
97465 5/27/2021 PARS 47951 ALTERNATE RETIREMENT PLAN ADMIN/MAR2114693
001-1101-4185 6.36
001-1204-4185 0.60
001-3302-4185 2.95
80
05/27/2021
Check Register
CITY OF HERMOSA BEACH
6
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97465 5/27/2021 (Continued)PARS14693
001-4204-4185 5.52
001-4101-4185 6.16
001-4201-4185 6.16
001-4601-4185 98.75
Total : 126.5014693
97466 5/27/2021 PARSLEY, MEGAN Receipt 2002663.003 CLASS 9280 WITHDRAWAL REFUND21988
001-2111 69.20
Total : 69.2021988
97467 5/27/2021 RYDER, LISA R PO 36218 GREEN BUSINESS PROG/DEC20-MAY2116970
001-1201-4201 9,700.00
Total : 9,700.0016970
97468 5/27/2021 SBCU VISA 01D0034513168 CC DRINKING WATER DELIVERY 3/13-4/12/2103353
001-2101-4305 268.82
SUMMER PROGRAM AD IMAGE03033-20769602 CC
001-4601-4302 1.00
PHILLIPS/EXECUTIVE MGMT TRAINING1050 CC
001-2101-4317 2,500.00
FINANCE CHARGEFinance Charge CC
001-2101-4201 0.24
FINANCE CHARGEFinance Charge CC
001-1201-4201 3.82
FINANCE CHARGEFinance Charge CC
001-4201-4201 7.47
FINANCE CHARGEFinance Charge CC
001-4202-4201 19.66
FINANCE CHARGEFinance Charge CC
001-4202-4201 6.65
CONFERENCE LINE/MAR21IC30411-0321 CC
001-1201-4304 11.42
REVENUE BOND NOTARY SERVICEINV0375 CC
001-1202-4201 135.00
2 DETECTIVE JACKETSMat Req 791326 CC
001-2101-4317 147.32
LUIS/MEMBERSHIPOrder 3218511 CC
001-4101-4315 99.00
81
05/27/2021
Check Register
CITY OF HERMOSA BEACH
7
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97468 5/27/2021 (Continued)SBCU VISA03353
AED/2 PEDIATRIC ELECTRODE PADSOrder 52985 CC
001-1201-4201 202.00
001-1201-4201 19.20
K9 OFFICER DOG FOOD/MAR21Order Ending 5022 CC
170-2105-4309 64.32
SENIOR CENTER MOVIES/MUSIC/APR21Order ML092NHV14 CC
001-4601-4328 9.99
SCHEID/ADD'L CELL PHONE STORAGE/APR21Order MSLZY8VZ42 CC
001-2101-4305 0.99
LEBARON/ADD'L CELL PHONE STORAGE/MAY21Order MXFWXG7Q93 CC
001-2101-4305 2.99
VIDEO CREATION PROGRAMPO 35861 CC
715-4202-4201 3.70
FOREIGN CURRENCY CONVERSION FEEPO 35861 Fee CC
715-4202-4201 0.04
STAFFORD/INSPECTOR TRAININGPO 35863 CC
001-4201-4317 995.00
YARD STAFF/CELL PHONE CHARGERSPO 36036 CC
001-4202-4305 43.34
001-4202-4305 4.12
ERGONOMIC MOUSE PADS- SET OF 2PO 36053 CC
001-2101-4305 20.98
001-2101-4305 1.99
CLARK FIELD TENNIS COURT LIGHT SWITCHPO 36056 CC
105-2601-4309 428.74
105-2601-4309 39.90
YARD STAFF/FACE MASKS FOR COVIDPO 36079 CC
157-2702-4201 29.95
157-2702-4201 2.85
SHOOTING RANGE BATTERIESPO 36090 CC
001-2101-4201 139.96
001-2101-4201 13.30
AMERICAN FLAGSPO 36097 CC
001-4204-4309 358.00
001-4204-4309 34.01
CITY HALL/BASE 3/DRINKING FOUNTAIN FILTEPO 36107 CC
001-4204-4309 164.17
001-4204-4309 15.55
82
05/27/2021
Check Register
CITY OF HERMOSA BEACH
8
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97468 5/27/2021 (Continued)SBCU VISA03353
ADMIN SERGEANT/PRINTERPO 36123 CC
001-2101-4305 598.99
001-2101-4305 56.89
2 CITY TILE PLAQUESPO 36162 CC
001-1101-4305 20.00
RUSHTON/K9 TRAININGPO 36164 CC
001-2101-4317 199.00
4 OFFICERS/DRONE CERTIFICATION~PO 36179 CC
001-2101-4317 628.00
HERMOSABCH.ORG SSL RENEWALRcpt 1851061512 CC
715-1206-4201 449.99
ALKADIS/SHERMAN BLOCK SUPERVISOR #5TR 852 CC
001-2101-4312 422.70
Total : 8,171.0603353
97469 5/27/2021 SCHNABEL, KATHRYN Receipt 1022921.001 REFUND/TRANSFER/9361 TO 642622309
001-2111 37.50
Total : 37.5022309
97470 5/27/2021 SKYAR, MOLLY Receipt 1022988.001 CLASS 9459 WITHDRAWAL REFUND22310
001-2111 214.00
Total : 214.0022310
97471 5/27/2021 SOCAL GAS Account 17078132879 YARD CNG STATION/VEHICLE FUEL/APR2100170
715-3104-4310 68.59
715-4204-4310 68.59
715-6101-4310 68.59
Total : 205.7700170
97472 5/27/2021 SOUTHERN CALIFORNIA EDISON CO 700371314327 ELECTRICITY/APR2100159
105-2601-4303 106.14
Total : 106.1400159
97473 5/27/2021 THE COUNSELING TEAM INTERNATIO 79025 PD COUNSELING SERVICES/APR2120121
001-1203-4320 750.00
Total : 750.0020121
97474 5/27/2021 TORRANCE AUTO PARTS 277593 to 281568 AUTO REPAIR/MAINT PARTS/MAR21-APR2116735
715-2101-4311 313.24
83
05/27/2021
Check Register
CITY OF HERMOSA BEACH
9
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97474 5/27/2021 (Continued)TORRANCE AUTO PARTS16735
715-3302-4311 34.73
715-6101-4311 35.05
Total : 383.0216735
97475 5/27/2021 UNDERGROUND SERVICE ALERT 420210321 DIG ALERTS/APR2108207
161-3109-4201 117.25
DIG ALERTS/STATE FEES/APR21dsb20202053
161-3109-4201 48.07
Total : 165.3208207
97476 5/27/2021 UPTIME COMPUTER SERVICE 32117 MONTHLY PRINTER MAINTENANCE/JUN2104768
715-1206-4201 554.45
Total : 554.4504768
97477 5/27/2021 US ARMOR 32690 BLUMENFELD/BULLETPROOF VEST09374
001-2101-4350 406.10
150-2111-4350 406.09
Total : 812.1909374
97478 5/27/2021 VERIZON WIRELESS 9877406038 COMM DEV/CELL PHONES/MAR2103209
001-4201-4304 154.56
PD TRUNK MODEMS/MAR219877772699
153-2106-4201 418.11
COMM DEV/CELL PHONES/APR219879545571
001-4201-4304 128.05
PD TRUNK MODEMS/APR219879914515
153-2106-4201 418.11
Total : 1,118.8303209
97479 5/27/2021 WILLDAN ENGINEERING 00224472 CODE ENFORCEMENT SERVICES/APR2110703
157-2702-4201 8,320.00
CODE ENFORCEMENT SERVICES/MAY2100224486
157-2702-4201 1,040.00
Total : 9,360.0010703
97480 5/27/2021 WIRELESS CCTV LLC 82512 4G RAPID DEPLOY MOBILE CCTV CAMERA22297
150-2120-4201 10,969.96
Total : 10,969.9622297
84
05/27/2021
Check Register
CITY OF HERMOSA BEACH
10
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
100115859 4/21/2021 EXXON MOBIL BUSINESS FLEET 71208284 VEHICLE FUEL 3/11/21-4/10/2110668
001-1250 83.75
715-2101-4310 5,190.74
715-3104-4310 512.76
715-3302-4310 1,358.42
715-4201-4310 51.28
715-4204-4310 108.77
715-4206-4310 312.24
715-6101-4310 371.41
Total : 7,989.3710668
390221621 5/20/2021 PITNEY BOWES INC 5/27/21 Check Run POSTAGE METER REFILL/MAY2113838
001-1208-4305 1,000.00
Total : 1,000.0013838
450072683 5/26/2021 EXXON MOBIL BUSINESS FLEET 71747450 VEHICLE FUEL 4/11/21-5/10/2110668
001-1250 171.64
715-2101-4310 4,768.11
715-3104-4310 387.74
715-3302-4310 1,552.63
715-4204-4310 350.14
715-4206-4310 220.90
715-6101-4310 307.39
Total : 7,758.5510668
Bank total : 298,119.15 49 Vouchers for bank code :boa
298,119.15Total vouchers :Vouchers in this report 49
85
05/27/2021
Check Register
CITY OF HERMOSA BEACH
11
5:41:50PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 11 inclusive, of the check
register for 5/27/2021 are accurate funds are available for
payment, and are in conformance to the budget."
By
Finance Director
Date 5/27/2021
86
06/03/2021
Check Register
CITY OF HERMOSA BEACH
1
5:40:07PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97481 6/3/2021 ABRAMS, SAMUEL H Parcel 4185-011-011 STREET LIGHT TAX REBATE14090
105-3105 24.61
Total : 24.6114090
97482 6/3/2021 ABSOLUTE INTERNATIONAL SECURIT 2020102851 VACCINATION CLINIC SECURITY/MAY2121086
157-2702-4201 180.70
Total : 180.7021086
97483 6/3/2021 ADMINISTRATIVE SERVICES CO OP 11310 TAXI VOUCHER PROGRAM/APR2111437
145-3404-4201 1,922.67
Total : 1,922.6711437
97484 6/3/2021 ALKADIS, CHRISTOPHER TR 853 PER DIEM/SHERMAN SUPERVISORY #611359
001-2101-4312 150.00
Total : 150.0011359
97485 6/3/2021 AMERICAN GUARD SERVICES, INC. INV16963 CROSSING GUARD SERVICES/APR21/BAL DUE20685
001-2102-4201 1,360.10
Total : 1,360.1020685
97486 6/3/2021 AT&T MOBILITY 287301168383X0110202 EMERGENCY MGR/CELL/ACTIVATION CREDIT13361
001-1201-4304 -202.82
EMERGENCY MGR/CELL PHONE/JAN21287301168383X0210202
001-1201-4304 49.23
EMERGENCY MGR/CELL PHONE/FEB21287301168383X0310202
001-1201-4304 49.23
EMERGENCY MGR/CELL PHONE/MAR21287301168383X0410202
001-1201-4304 49.25
EMERGENCY MGR CELL PHONE/APR21287301168383X05102
001-1201-4304 49.25
EMERGENCY MGR/CELL PHONE/DEC2028730116838X01102021
001-1201-4304 49.23
Total : 43.3713361
97487 6/3/2021 BALIK, RANDY Receipt 2002674.003 SURF CAMP WITHDRAWAL REFUND22317
001-2111 1,565.00
Total : 1,565.0022317
97488 6/3/2021 BARROWS, PATRICK PO 36204 INSTRUCTOR PAYMENT/CLASS NO. 927117271
2b (2)87
06/03/2021
Check Register
CITY OF HERMOSA BEACH
2
5:40:07PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97488 6/3/2021 (Continued)BARROWS, PATRICK17271
001-4601-4221 252.00
Total : 252.0017271
97489 6/3/2021 BEACH GIRL PROPERTIES LLC 264 PARKING METERS - 70 14TH STREET/APR2116371
001-3842 650.00
PARKING METERS - 70 14TH STREET/MAY21265
001-3842 650.00
Total : 1,300.0016371
97490 6/3/2021 BLUE DIAMOND MATERIALS 2205092 MAT REQ 854062/ASPHALT FOR REPAIR06409
001-3104-4309 315.83
Total : 315.8306409
97491 6/3/2021 BUERGER, ANASTASIA Receipt 2002668.003 CLASS 9332 WITHDRAWAL REFUND22322
001-2111 52.25
Total : 52.2522322
97492 6/3/2021 CHOUEITI, CYNTHIA Receipt 1022835.001 SUMMER DAY CAMP REFUND21870
001-2111 170.00
Total : 170.0021870
97493 6/3/2021 COLLINS, DENNIS L.PO 36227 INSTRUCTOR PMT/CLASSES 9285/88/91/9105970
001-4601-4221 3,192.00
Total : 3,192.0005970
97494 6/3/2021 DADIGAN, KEATON TR 858 PER DIEM/EMERGENCY VEHICLE TRAINING22325
001-2101-4312 285.00
Total : 285.0022325
97495 6/3/2021 DEANDRADE, STEPHANIE TR 857 PER DIEM/EMERGENCY VEHICLE TRAINING22326
001-2101-4312 285.00
Total : 285.0022326
97496 6/3/2021 DUGARY, STEPHANIE Receipt 2002669.003 CLASS 9280 WITHDRAWAL REFUND21942
001-2111 69.20
Total : 69.2021942
97497 6/3/2021 ESA PCR 161247 1221 HERMOSA CONSTRUCT MONITOR/DEC2017096
001-2101 2,174.91
88
06/03/2021
Check Register
CITY OF HERMOSA BEACH
3
5:40:07PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97497 6/3/2021 (Continued)ESA PCR17096
1221 HERMOSA CONSTRUCT MONITOR/FEB21162605
001-2101 8,580.73
Total : 10,755.6417096
97498 6/3/2021 ESTATE OF KAN IBARA, THE PO 36203 AMBULANCE TRANSPORT OVERPAY REFUND22306
001-3840 2,629.00
Total : 2,629.0022306
97499 6/3/2021 GENERAL INDUSTRIAL SUPPLY 1183856-02 MAT REQ 854063/LATEX GLOVES15406
157-2702-4309 131.40
Total : 131.4015406
97500 6/3/2021 GOEMINNE, PAIGE PO 36207 DISMISSED CITATION 40013900 REFUND22301
001-3302 38.00
Total : 38.0022301
97501 6/3/2021 GOLDEN, JAMIE Receipt 1022676.001 CLASS 9336 WITHDRAWAL REFUND22323
001-2111 141.75
Total : 141.7522323
97502 6/3/2021 JONES, KEVIN TR 856 PER DIEM/EMERGENCY VEHICLE TRAINING22327
001-2101-4312 285.00
Total : 285.0022327
97503 6/3/2021 K9 SERVICES LLC HBPD-14 K9 OFFICER TRAINING/MAY2121552
170-2105-4317 250.00
Total : 250.0021552
97504 6/3/2021 KHAN, SHAFAQ Receipt 1022780.001 CLASS 9333 WITHDRAWAL REFUND22324
001-2111 151.75
Total : 151.7522324
97505 6/3/2021 LAURA MECOY COMMUNICATIONS LLC 2019 PUBLIC INFORMATION OFFICER 20/2120347
001-1201-4201 870.00
157-2702-4201 5,130.00
Total : 6,000.0020347
97506 6/3/2021 LEARNED LUMBER B739131 to B740061 MAINTENANCE SUPPLIES/MAY2100167
001-3104-4309 478.60
89
06/03/2021
Check Register
CITY OF HERMOSA BEACH
4
5:40:07PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 478.60 97506 6/3/2021 LEARNED LUMBER00167
97507 6/3/2021 MATTHEWS, IVAN Receipt 2002671.003 CLASS 9414 WITHDRAWAL REFUND22320
001-2111 320.00
Total : 320.0022320
97508 6/3/2021 MCBRIDE, RYAN TR 859 PER DIEM/EMERGENCY VEHICLE TRAINING22328
001-2101-4312 285.00
Total : 285.0022328
97509 6/3/2021 MCCOY, SONIA T Parcel 4185-018-014 STREET LIGHT & SEWER TAX REBATE08093
105-3105 24.61
001-6871 126.60
Total : 151.2108093
97510 6/3/2021 MITCHEL, HOLLY Receipt 2002672.003 CLASS 9304 WITHDRAWAL REFUND22319
001-2111 83.50
Total : 83.5022319
97511 6/3/2021 MUZA ENERGY, INC.PO 36201 INSTALL 3 ELECTRIC VEHICLE CHARGERS22305
152-3701-4201 16,011.01
001-1201-4395 3,206.24
Total : 19,217.2522305
97512 6/3/2021 OFFICE DEPOT 170177724001 MAT REQ 791060/PAPER/SCISSORS/TAPE13114
001-1202-4305 23.65
001-1208-4305 42.04
MAT REQ 863095/OFFICE SUPPLIES170648133001
001-4201-4305 14.31
157-2702-4305 69.07
MAT REQ 863096/OFFICE SUPPLIES173206080001
001-4201-4305 14.11
157-2702-4305 54.25
Total : 217.4313114
97513 6/3/2021 PEP BOYS 8141084191 thru 4587 AUTO SUPPLIES/APR21-MAY2100608
715-2101-4311 453.04
715-3104-4311 185.84
715-3302-4311 84.79
715-4202-4311 18.60
90
06/03/2021
Check Register
CITY OF HERMOSA BEACH
5
5:40:07PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 742.27 97513 6/3/2021 PEP BOYS00608
97514 6/3/2021 POMERANITZ, EFRAT G.PO 36210 INSTRUCTOR PAYMENT/CLASSES 9296-819853
001-4601-4221 1,836.80
Total : 1,836.8019853
97515 6/3/2021 PROVIDENCE MEDICAL GuarantorID600000285 PRE-EMPLOYMENT PHYSICAL/APR2101911
001-1203-4320 291.00
Total : 291.0001911
97516 6/3/2021 REDONDO BEACH, CITY OF 572777 CITY PROSECUTOR SERVICES/AP2103282
001-1132-4201 16,667.00
Total : 16,667.0003282
97517 6/3/2021 SANTA ANA COLLEGE 81127 ADAMS/BASIC ACADEMY FEES12780
001-2101-4317 943.00
ADAMS/PRE-ACADEMY FEES81131
001-2101-4317 115.00
Total : 1,058.0012780
97518 6/3/2021 SMART & FINAL 3220630003301 REQ 791374/BRIEFING ROOM/CUPS00114
001-2101-4305 91.54
MAT REQ 437825/SODAS & ICE32206300111110
001-3302-4305 38.05
MAT REQ 437827/OFFICE SUPPLIES3220630023903
001-3302-4305 144.88
MAT REQ 791373/JAIL SUPPLIES3220630024003
001-2101-4306 4.80
JAIL SUPPLIES/COFFEE AND CUPSMat Req 791380
001-2101-4306 82.03
Total : 361.3000114
97519 6/3/2021 SMARTCOVER SYSTEMS 18247 OUTFALL/PUMP STATIONS/YRLY MONITOR FEE20282
160-3102-4201 1,526.00
Total : 1,526.0020282
97520 6/3/2021 SOCAL GAS 01100457678 YARD BLDGS/NATURAL GAS/APR2100170
001-4204-4303 27.30
CITY-OWNED BLDGS/NATURAL GAS/APR216/3/21 Check Run
001-4204-4303 190.21
91
06/03/2021
Check Register
CITY OF HERMOSA BEACH
6
5:40:07PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 217.51 97520 6/3/2021 SOCAL GAS00170
97521 6/3/2021 SOUTH BAY FORD 327089 MAT REQ 435017/SPACERS (2)10532
715-2101-4311 17.07
FORD FUSION VEHICLE 36 AIR BAG LIGHT502449
715-2101-4311 772.44
FORD EXPLORER VEHICLE 28 WATER PUMP503586
715-2101-4311 1,882.97
715-2101-4311 178.88
Total : 2,851.3610532
97522 6/3/2021 SPCALA 2021-0430 ANIMAL SHELTERING SERVICES/APR2118821
001-3302-4201 875.00
Total : 875.0018821
97523 6/3/2021 SPECIALIZED ELEVATOR SERVICES 26928 CITY HALL ELEVATOR REPAIR21538
715-4204-4201 1,270.00
PARKING GARAGE ELEVATOR MAINT/MAY2127184
001-3304-4201 160.00
CITY HALL ELEVATOR MAINT/MAY2127185
001-4204-4201 160.00
CITY HALL ELEVATOR PHONE REPLACEMENT27868
001-4204-4201 1,270.00
Total : 2,860.0021538
97524 6/3/2021 SRK PROMOTIONAL ADVERTISING 4596 HATS FOR CITY YARD STAFF15398
001-4202-4314 805.00
001-4202-4314 76.48
Total : 881.4815398
97525 6/3/2021 STEVENS, LISA PO 36211 SIGNED-OFF CITATIONS 43013063/3401946522296
001-3302 56.00
Total : 56.0022296
97526 6/3/2021 STRAIGHTLINE BACKFLOW, INC.005256 ANNUAL CITYWIDE BACKFLOW TESTING21304
001-6101-4201 2,646.00
BACKFLOW DEVICE REPAIRS005257
001-6101-4201 570.40
Total : 3,216.4021304
92
06/03/2021
Check Register
CITY OF HERMOSA BEACH
7
5:40:07PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
97527 6/3/2021 TRIANGLE HARDWARE 30086 thru 30114 MAINTENANCE SUPPLIES/MAY2100123
001-3104-4309 2,610.75
001-3302-4309 13.87
001-4204-4309 1,405.16
001-6101-4309 292.64
105-2601-4309 474.66
715-4206-4309 75.20
001-2021 107.25
001-2022 -107.25
Total : 4,872.2800123
97528 6/3/2021 VCA HERMOSA ANIMAL HOSPITAL Mat Req 437831 EMERGENCY VET SRVCS/MAR20-JAN2100322
001-3302-4201 315.00
Total : 315.0000322
97529 6/3/2021 WHEELER, DANIELLE Receipt 2002670.003 CLASS 9307 WITHDRAWAL REFUND22321
001-2111 83.50
Total : 83.5022321
97530 6/3/2021 WITTMAN ENTERPRISES LLC 2103062 AMBULANCE TRANSPORT BILLING/MAR2113359
001-1202-4201 2,475.43
Total : 2,475.4313359
97531 6/3/2021 YASUI, YVETTE Receipt 2002673.003 CAMP WITHDRAWAL REFUND22318
001-2111 795.00
Total : 795.0022318
97532 6/3/2021 ZAMORA, VERONICA PO 36225 REFUND/2 PARKING PERMITS22307
001-3858 124.00
Total : 124.0022307
1154046900 5/24/2021 SOCAL GAS 11540469001 734 PIER/NATURAL GAS/APR2100170
001-4204-4303 112.88
Total : 112.8800170
Bank total : 94,521.47 53 Vouchers for bank code :boa
94,521.47Total vouchers :Vouchers in this report 53
93
06/03/2021
Check Register
CITY OF HERMOSA BEACH
8
5:40:07PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to inclusive, of the check register
for 6/3/2021 are accurate funds are available for payment,
and are in conformance to the budget."
By
Finance Director
Date 6/3/2021
94
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 21-0543
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of September 14, 2021
MEMORANDUM REGARDING REVENUE REPORT, EXPENDITURE
REPORT, COVID-19 REVENUE TRACKING REPORT, AND CIP
REPORT BY PROJECT FOR JUNE 2021
(Finance Director Viki Copeland)
The June 2021 Revenue and Expenditure Reports,COVID-19 Revenue Tracking Report,and the Capital
Improvement Program (CIP)Report by Project are not available at this time.The reports will be provided as
soon as they are available.
Respectfully Submitted by: Viki Copeland, Finance Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 3/26/2024Page 1 of 1
powered by Legistar™95
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 21-0565
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of September 28, 2021
CAPITAL IMPROVEMENT PROGRAM STATUS REPORT
AS OF SEPTEMBER 16, 2021
(Public Works Director Joe SanClemente)
Recommended Action:
Staff recommends City Council receive and file the Capital Improvement Program Status Report as
of September 16, 2021.
Background:
In order to provide greater clarity of the City’s ongoing efforts to make accessibility improvements,the
Capital Improvement Program Status Report was revised.The report now contains a column titled
“ADA Component”to indicate projects that include an Americans with Disabilities Act (ADA)
improvement.In addition,the “Project Description”column was expanded to contain a description of
the ADA improvements.
Analysis:
Number of Projects/Studies by Phase # of Projects/Studies
Study/Conceptual Planning 9
Preliminary Design 14
Final Engineering Design 12
Project Approvals/ Bidding 2
Construction 6
Closeout 1
Total Projects 36
Total Studies 8
Number of Projects/Studies by Completion Timeline # of Projects/Studies
1 - Complete by end of FY 21-22 16
2 - Complete in FY 22-23 3
3 - 3 years to completion 0
4 - 5 years to completion 0
5 - TBD 24
Projects/Studies Complete 1
Total Projects 36
Total Studies 8
City of Hermosa Beach Printed on 3/26/2024Page 1 of 2
powered by Legistar™96
Staff Report
REPORT 21-0565
Number of Projects/Studies by Completion Timeline # of Projects/Studies
1 - Complete by end of FY 21-22 16
2 - Complete in FY 22-23 3
3 - 3 years to completion 0
4 - 5 years to completion 0
5 - TBD 24
Projects/Studies Complete 1
Total Projects 36
Total Studies 8
Number of Projects/Studies by Category # of Projects/Studies
Street & Highway Improvements 14
Sewer & Storm Drain Improvements 6
Park Improvements 3
Public Building & Ground Improvements 21
Total Projects 36
Total Studies 8
# of Projects/Studies
Number of Projects/Studies by ManagerLeadSupport Total
Lucho Rodriguez 4 3 7
Romany Basilyous6 0 6
Andrew Nguyen 7 1 8
Michelle Licata 3 1 4
Jonathan Pascual3 2 5
Doug Krauss 4 1 5
Kelly Orta 2 0 2
TBD 15 0 15
Total Projects/Studies44
Attachments:
Capital Improvement Program Status Report as of September 16, 2021.
Respectfully Submitted by: Joe SanClemente, Public Works Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 3/26/2024Page 2 of 2
powered by Legistar™97
City of Hermosa Beach
Updated 9-16-21 UPDATED FY 2021-22 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryADA ComponentCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
SH
X
102 Bus Stops Improvements 900,000$ Romany
Basilyous X
Complete Preliminary
Design -
12/21
09/22
Preliminary Design.This project will improve bus stops throughout the City.
These improvements will include Americans with Disabilities Act (ADA) accessible curb ramps, concrete bus pads, crosswalk,
striping improvements, furnishing, and other general improvements within direct vicinity of the bus stops.
SH 108 Pay-By-App Parking Signage (NEW)75,000$ TBD
X TBD TBD
Final Engineering Design. Pending staff availability.The implementation of a pay by app system will require the installation of signs that will provide instructions for users and zone
numbers necessary to use the system. The industry recommendation is that at least two signs be installed per block. At this
time, most vendors providing pay by app systems will provide the signs at no additional cost to the City but require City staff to
install them and any additional poles. It is estimated that the City will need approximately 375 signs installed, and 30 new poles
installed in some locations due to a lack of existing poles. The installation would occur in areas of the City where paid parking
is currently provided.
SH
X
143 PCH Mobility Improvement Project 148,243$ Lucho
Rodriguez
X TBD TBD
On Hold. Study/Conceptual Planning. Metro Approved funding of $1.8 million for the City for
the project development phases - PA&ED (Project Approval and Environmental Document) as
a result of Public Work's Measure M application in 2020. Metro is procuring the services of
their on-call consultants to assist with this phase. Estimated date of kick-off meeting,
December 2021.
This project would retain the existing number of lanes including north and south bound flex lanes and maintain lane widths of
ten (10) feet, and flex lanes of twelve (12) feet with zero (0) feet shoulders. Collectively, the improvements will address existing,
near-term, and long-range future traffic conditions along this corridor by improving intersection operations, reducing instances
of unsafe turning movements, create a safe and more comfortable environment for pedestrians and transit riders, and
improving the efficient movement of vehicles along the corridor.
Improvements will include ADA components to be determined during design.
SH 164 Hermosa Avenue Green Street 159,500$ Doug Krauss
Michelle Licata X
Complete Preliminary
Design -
10/21
TBD
Preliminary Design. Preparation of plans and specifications by consultant (CWE) through
grant managed by City of Torrance. This project is also part of Study 103. Consultant selected
and preparing report.
The project will design and implement Low Impact Development (LID) and green infrastructure on Hermosa Ave from 4th
Street to Herondo Avenue, which will include a variety of green street design elements. This project is part of Study 103 Sea
Level Rise Risk Assessment Grant recipient for preliminary design. This project is also part of a multicity green street project
lead by City of Torrance.
SH 186 Street Improvements - Various Locations 1,485,095$ Romany
Basilyous
X Complete Construction -
11/21 12/21
Construction. Final paving and clean up.This project provides for pavement rehabilitation of streets at various locations. The project will also repair/replace deteriorated
portions of sidewalk, curb and gutter, and curb ramps. This project also includes the resurfacing of 24th Street between Valley
Drive and Park Avenue. The scope of work includes the construction of curb and gutter as needed to correct street drainage
deficiencies as well as lowering of public utilities (by utility companies) to standard depth to permit the proper street
construction. This work will be performed following the sewer and storm drain repairs identified in the Sewer and Drainage
Master Plans. Project will be bided out together with Project 190.
SH
X
188 Strand Bikeway and Walkway Improvements at 35th Street 10,000$ TBD
X TBD TBD
Part of Study 103 Sea Level Rise Risk Assessment Grant. Consultant selected and preparing
report.
This project would provide improved accessibility and connectivity for bicyclists travelling between the Cities of Hermosa
Beach and Manhattan Beach via The Strand at 35th Street. This project is part of Study 103 Sea Level Rise Risk Assessment
Grant recipient for preliminary design.
The project will also consider the addition of a dedicated ADA path to provide greater ADA accessibility to The Strand.
SH
X
190 Annual Street Improvements 200,000$ Romany
Basilyous X Complete Construction -
11/21 12/21
Construction. Final paving and clean up.This project provides for pavement rehabilitation of streets at various locations. The project will also repair/replace deteriorated
portions of sidewalk, curb and gutter, and curb ramps. This work will be performed following the sewer and storm drain repairs
identified in the Sewer and Drainage Master Plans. Project will be combined with Project 186.
Project will construct new ADA curb ramps. Estimated cost of ADA improvements is $170,000
SH
X
191 Annual Street Improvements 45,000$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project provides for pavement rehabilitation of streets at various locations. The project will also repair/replace deteriorated
portions of sidewalk, curb and gutter, and curb ramps. This work will be performed following the sewer and storm drain repairs
identified in the Sewer and Drainage Master Plans.
Improvements will include ADA components to be determined during design.
SH
X
192 Annual Striping Improvements 100,000$ Michelle Licata
X Complete Construction -
10/21 12/21
Construction started 9/20.This project provides traffic striping, markings, and signage improvements and modifications throughout the City at various
locations to improve safety and visibility. This project will help address needed thermoplastic striping which the City is not
capable of installing directly.
Project includes restriping and new signage to bring City ADA parking spots in City lots to comply with current ADA standards.
Estimated cost of ADA improvements is $32,000
SH 193 Pedestrian Crossing Safety Improvements 500,000$ Andrew
Nguyen X
Complete Final
Engineering Design -
11/21
TBD
Final Engineering Design. On-call design firm finalizing plans and specifications.This project will implement rectangular rapid flashing beacons and other measures at several uncontrolled pedestrian
crossings on Hermosa Avenue at 4th, 6th, 19th, 24th, 25th Streets and the crossing in front of Clark Building on Valley Drive.
SH
X
194 Annual Striping Improvements (NEW)200,000$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project provides traffic striping, markings, and signage improvements and modifications throughout the City at various
locations to improve safety and visibility. This project will help address needed thermoplastic striping which the City is not
capable of installing directly.
Improvements will include ADA components to be determined during design.
SH
X
195 City Sidewalk Improvements (NEW)50,000$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project provides repairs, replacements, and improvements to sidewalks throughout the City at various locations to
maintain and improve safety.
Improvements will include ADA components by increasing sidewalk accessibility to be determined during design.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 1 of 4
98
City of Hermosa Beach
Updated 9-16-21 UPDATED FY 2021-22 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryADA ComponentCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
SSD 417 Annual Storm Drain Improvements - Various Locations 2,044,966$ Romany
Basilyous X
Complete Final
Engineering Design -
10/21
06/22
Final Engineering Design. On-call design firm finalizing plans and specifications.Storm drain improvements throughout the City. Locations will be as identified and prioritized per the Storm Drain Master Plan.
Projects will address deficiencies, ponding, and repairs as well as where new storm drains are needed citywide. This project
will also address operational deficiencies at the outfall structures at 18th Street and 19th Street. Improvements include for
design and construction activities on an annual basis. Project to be bided out together with Project 422.
SSD 419 Storm Drain Pipe Screens 150,000$ Romany
Basilyous
Doug Krauss X Closeout Closeout
Closeout.The City has revised its strategy for addressing the Santa Monica Bay Debris Total Maximum Daily Load (TMDL) using State
Board-approved full capture devices or systems to achieve 100% reduction of trash from the Municipal Separate Storm Sewer
System (MS4). The City will install approximately 160 screen assemblies inside various storm drain catch basins throughout
the City, in front of the outlet pipe, preventing debris from entering the storm drain system. They City has installed
approximately 120 screens previously.
SSD 421 Annual Sewer Improvements 2,414,774$ Andrew
Nguyen X Complete Construction -
11/21 12/21
Construction. Begin Construction October , 2021. Project consists of 2 phases. Phase 1
includes lining work and point repairs. Phase 2 includes point repairs, pipe replacement, and
maintenance access hole rehabilitation. Phase 2 to start after completion of Phase 1.
This project includes design and construction of sewer improvements and repairs based on the Sewer Master Plan.
SSD 422 Annual Storm Drain Improvements 500,000$ Romany
Basilyous X
Complete Final
Engineering Design -
11/21
06/22
Final Engineering Design. On-call design firm finalizing plans and specifications.Storm drain improvements throughout the City. Locations will be as identified and prioritized per the Storm Drain Master Plan.
Projects will address deficiencies, ponding, and repairs as well as where new storm drains are needed citywide. This project
will also address operational deficiencies at the outfall structures at 18th Street and 19th Street. Improvements include for
design and construction activities on an annual basis. Project will be bid out together with Project 417.
SSD 423 Annual Sewer Improvements 250,000$ Andrew
Nguyen X TBD TBD Preliminary Design.This project includes design and construction of sewer improvements and repairs based on the Sewer Master Plan.
SSD 424 Annual Storm Drain Improvements 250,000$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.Storm drain improvements throughout the City. Locations will be as identified and prioritized per the Storm Drain Master Plan.
Projects will address deficiencies, ponding, and repairs as well as where new storm drains are needed citywide. This project
will also address operational deficiencies at the outfall structures at various locations. Improvements include for design and
construction activities on an annual basis.
PI 548 Park Planting Improvements (NEW)50,000$ TBD X TBD TBD Preliminary Design. Pending staff availability.This project provides new plantings needed throughout the City's parks.
PBG
X
601 Prospect Avenue Curb Ramps 63,710$ Andrew
Nguyen
Jonathan
Pascual
X
Complete Project
Approvals/Bidding -
10/21
04/22
Project Approvals/Bidding. Preparing to bid project in October.This project provides improvements and relocation of sidewalks, curb ramps and obstructions along Prospect Avenue in order
to comply with the Americans with Disabilities Act (ADA) and meet the latest Federal Standards. Project to be bided out
together with Project 698.
ADA improvements are integral to the project.
PBG 603 South Park slope and Irrigation Repairs (NEW)275,000$ Jonathan
Pascual
Lucho
Rodriguez
X
Complete Final
Engineering Design -
10/21
06/22
Final Engineering Design. Finalizing irrigation and landscaping plans and specifications for
phase 1.
This project will address sloped areas around the playground area at South Park. Funding would be utilized to install interim
measures in order to open up the area to the public while the City pursues more permanent measures for repairs required of
the entire park, including irrigation and landscaping.
PBG
X
604 City Wide ADA Improvements (NEW)50,000$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project provides improvements city wide in order to comply with the American with Disabilities Act (ADA) and meet the
latest Federal Standards along with the City's Transition Plan being developed.
ADA improvements are integral to the project.
PBG 608 Downtown Lighting Improvements 58,519$ TBD X TBD TBD Final Design - Secure services for Plans and Specifications.This project will improve safety, security and ambiance in the downtown area through lighting improvements as determined by
the Downtown Security Assessment Report.
PBG 609 Downtown Strategic Plan Implementation 460,166$ Andrew
Nguyen X
Complete Final
Engineering Design -
10/21
03/22
Final Engineering Design. Preparing plans and specifications for Pier Plaza catenary lights
and light dimming units. Preparing assessment of Hermosa Ave and Pier Ave median electric
system.
The purpose of this project is to mitigate safety concerns with lighting improvements for the City’s downtown area. This project
will install catenary lights and dimming units on Pier Plaza.
PBG 615 New Corporate Yard Facilities 1,291,891$ Doug Krauss
Lucho
Rodriguez X TBD TBD
Preliminary Design.This project is for the design and construction of a new city yard.
Construction will be done in two phases. Phase 1 to include one metal prefabricated building to house a new mechanic,
paint/sign shop and contracted services. New wash down station area. Phase 2 to include demolition of existing buildings.
Construction of new administration building. General yard improvements (fencing, landscaping, drainage).
PBG 629 Municipal Pier Structural Assessment and Repairs 413,075$ Michelle Licata
X
Complete Final
Engineering Design -
10/21
06/22
Final Engineering Design. Next steps are to submit to Costal Commission for approval in
conjunction with CIP 660
Repairs of the municipal pier structural elements including the piles, pile caps, deck and the lifeguard storage room.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 2 of 4
99
City of Hermosa Beach
Updated 9-16-21 UPDATED FY 2021-22 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryADA ComponentCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
PBG 660 Municipal Pier Electrical Repairs 520,284$ Michelle Licata
X
Complete Final
Engineering Design -
10/21
06/22
Final Engineering Design. Next steps are to submit to Costal Commission for approval in
conjunction with CIP 629
The pier electrical repairs will involve the replacement of existing conduit, junction boxes, connections and wiring so that the
lights can be functional. The project will also eliminate the service box towards the end of the pier and create a new service
connection point for the foghorn at the end of the pier. This project will also include the replacement of the bollard lighting at the
pier with new LED lighting fixtures.
PBG
X
669 City Park Restrooms and Renovation 2,450,925$ Lucho
Rodriguez X Complete Construction -
3/22 06/22
Construction started 9/20.This project consists of construction of new ADA compliant restrooms at Forts Lots-of-Fun, Seaview Parkette, South Park, and
Clark Field. This project also plans to renovate existing restrooms at South Park and Clark Field.
ADA improvements are integral to the project.
PBG
X
682 Parking Lot D Improvements 480,836$ Doug Krauss
X
Complete Final
Engineering Design -
12/21
12/22
Final Engineering Design. Coastal Conservancy Board grant approved in April 2021. Pending
application for construction funds with Measure W grant. Finalizing plans.
The project will install a rapid electric vehicle charging station, expand bicycle parking and capture and treat storm water run-off
from road and parking surfaces.
Project will include new ADA ramp to the parking lot and new ADA parking spots. Estimated cost of ADA improvements is
$15,000
PBG 684 Emergency Operations Center (EOC) Renovations 192,880$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project will add restrooms to the EOC and renovate the adjacent room for future EOC uses. The EOC is located within a
building designated as a historical building, which will require a Certificate of Appropriateness to complete the repairs. This
project will be completed in two phases. Phase 1 includes restroom construction including flooring, lighting, wall and ceiling
repairs, painting, new plumbing, and installing fixtures. Phase 2 includes complete room renovation including new flooring,
ceiling, lighting, furnishings, and relocation of Emergency System IT equipment, including a new switch, 2 UPC batteries, and
firewall to support the EOC. Security Improvements to include new key fob locking systems.
PBG
X
689 Clark Building Renovations 399,889$ Jonathan
Pascual
Lucho
Rodriguez
X
Complete Final
Engineering Design -
11/21
08/22
Final Engineering Design. On-call design firm finalizing plans and specifications. Will Present
to Parks and Rec and Public Works Commissions.
The project proposes:
1. Design, Operational Review
2. Kitchen Remodel - including new commercial appliances, sinks, countertops, lighting, tile, flooring, doors and ADA upgrades.
3. Restrooms Remodel - including new flooring, fixtures, stalls, sinks, toilets, lighting, and ADA upgrades. Electrical, plumbing,
sewer line upgrades.
4. Install new Heating, ventilation, and air conditioning.
5. Acoustic panels and new lighting throughout ballroom area.
6. ADA upgrades to entrance building entrance points.
ADA improvements are integral to the project.
PBG
X
692 14th Street Beach Restroom Rehabilitation 530,000$ TBD
X TBD TBD
Study/Conceptual Planning. Pending staff availability.This project proposes to construct a new restroom facility which includes replacement of the entire building; restrooms;
appurtenant plumbing; ADA improvements for compliance. This project will also include the replacement of the existing sewer
lift station components which includes 2 submersible pumps; motor control panel; associated plumbing; addition of telemetry
for condition/outage notifications.
New restrooms will be ADA compliant.
PBG
X
695 Parking Lot A Improvements 592,260$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.This project will consist of upgrading Parking Lot A to meet ADA standards, with improvements including:
• New layout to maximize parking capacity and improve circulation.
• Consideration of the layout of parking spaces on 11th Street and explore incorporating 11th Street parking spaces into the Lot
A pay station system.
• New surfacing and lighting.
• New trash enclosures adjacent to commercial buildings and removal of the trash enclosure and joint compactor.
• Low impact development elements including permeable pavers and landscaping.
Coastal Commission permits will be required.
Improvements will include ADA components to be determined during design.
PBG 696 Police Station Improvements 28,500$ TBD
X TBD TBD
Preliminary Design. Pending staff availability.The Police Station is in need of improvements including increased security measures and improvements to report writing room
and evidence and property room. The restrooms in the basement of the Police Station are in need of improvements.
PBG
X
698 ADA improvements 71,298$ Andrew
Nguyen
Jonathan
Pascual
X
Complete Project
Approvals/Bidding -
10/21
04/22
Project Approvals/Bidding. Preparing to bid project in October.The project proposes: Improvements and relocation of sidewalks, curb ramps and obstructions along Prospect Avenue in order
to follow the Americans with Disabilities Act (ADA) and meet the latest Federal Standards. Project to be bided out together with
Project 601.
ADA improvements are integral to the project.
PBG
X
699 Parking Structure (Lot C) Improvements (NEW)1,200,000$ Jonathan
Pascual
Andrew Nguyen X
Complete Preliminary
Design -
10/21
TBD
Preliminary Design.This project provides repairs and improvements to the City's parking structure (Lot C) based on the assessment report from
Study 694 Parking Structure (Lot C) Structural Assessment including structural, elevator, and electrical repairs.
Improvements will include ADA components to be determined during design.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 3 of 4
100
City of Hermosa Beach
Updated 9-16-21 UPDATED FY 2021-22 CAPITAL IMPROVEMENT PROGRAM Grey indicates projects on hold.
Light Blue indicates projects milestone updates. Project CategoryADA ComponentCIP No.Project Name Project Budget Project Manager
Study/Conceptual PlanningPreliminary DesignFinal Engineering DesignProject Approvals/BiddingConstructionCloseoutTentative Date to Next
Milestone/ Update
Estimated Project Completion
Date Current Project Status Project Description
SH
X
101 Hermosa Avenue Greenwich Village Street Realignment
(STUDY)
10,000$ TBD
X TBD TBD
Part of Study 103 Sea Level Rise Risk Assessment Grant. Consultant selected and preparing
report.
This study will evaluate potential improvements at the intersections of:
• Hermosa Avenue and Greenwich Village; and
• Manhattan Avenue and Greenwich Village/27th Street
The study will evaluate opportunities improve the flow and visibility for pedestrian, bikes, and vehicles at the two intersections.
This study is part of Study 103 Sea Level Rise Risk Assessment Grant recipient for preliminary design.
Study will also evaluate potential ADA improvements.
PBG 103 Sea Level Rise Risk Assessment
(STUDY)
279,058$ Doug Krauss
X
Complete
Study/Conceptual
Planning - 2/22
02/22
Study/Conceptual Planning. Consultant selected and preparing report.This study will assess the risk of sea level rise in three areas along Hermosa Avenue, 35th Street, Greenwich Village, and 4th
Street to Herondo Avenue. It incorporates three other projects. Project 164 Hermosa Avenue Green Street, Project 188 Strand
Bikeway and Walkway Improvements at 35th Street, and Study 101 Hermosa Avenue Greenwich Village Street Realignment.
PI 538 Citywide Park Master Plan
(STUDY)
193,368$ Kelly Orta
X TBD TBD
Study/Conceptual Planning.The City is seeking to prepare a Parks Master Plan that achieves the following goals:
• Engages the community and local recreational organizations in a dialogue about parks and open space resources in Hermosa
Beach;
• Identifies the current demand/utilization and the future/evolving parks and recreational facility needs for the Hermosa Beach
community;
• Leverages the vision and goals of the recently adopted General Plan and the Community Decision-Making Tool;
• Identifies an appropriate balance between organized and informal recreational activities at the City’s parks and open spaces;
• Serves as a dynamic useful planning and implementation document that enjoys broad community and political support;
• Provides a comprehensive strategy to maintain, rehabilitate and improve the City’s network of parks, facilities, and open
space assets, including current unfunded park and recreational opportunities;
• Evaluates the effective use of the City’s financial and physical resources and opportunities to fund implementation of the
recommendations in the Master Plan.
PI
X
544 Greenbelt Accessible Path Assessment
(STUDY)
10,000$ Lucho
Rodriguez X
Complete
Study/Conceptual
Planning - 10/21
12/21
Study/Conceptual Planning. Consultant studying feasibility of an accessible path on the
Greenbelt.
Determine the feasibility of installing an ADA surface path on the Greenbelt to provide a firm, natural looking and permeable
path that increases accessibility for the disabled and boosts accessibility for all.
PBG 605 City Facilities Condition and Needs Assessment (NEW)
(STUDY)
175,000$ TBD X TBD TBD Study/Conceptual Planning. Pending staff availability.Prepare condition assessment reports for City facilities throughout the City to understand the infrastructure improvement
needs.
PBG 668 Library Community Needs Assessment
(STUDY)
60,000$ Kelly Orta
X TBD TBD
On Hold. On hold until funding opportunities become available for a new or renovated library
facility.
Phase II consists of preparation of conceptual designs and estimates for:
• Keeping the city’s library at its current location, to include: Renovation and expansion of existing building or adding a second
floor to the existing building (before preparation of renovation schemes for the existing building, the structural condition must be
assessed to make sure that the building is not beyond its useful life); Construction of a two (2) story library building at the
existing location; or
• Construction of a new library at a new site
• Relocation of “Friends of the Library” from Bard Street to a more appropriate location. Funding is reimbursed to the City
through the Library’s Excess Operating Funds through agreement with the LA County Library. Other funding options will be
explored.
SH 160 PCH Traffic Improvements
(RECONCILIATION)
160,000$ Lucho
Rodriguez
X Complete Construction -
12/21 03/22
Project was to be closed out in FY 19-20 but delayed due to modifications requiring Caltrans
approval. Funding approved by Council during Midyear budget. Project to be completed and
closed out by FY 21-22.
The purpose of this project is to improve operational mobility along State Route 1 (Pacific Coast Highway) which also provides
operational relief to I-405 by improving operations in a parallel route. The proposed project also includes improvements
including but not restricted to truck turning radius, ADA curb ramps, striping and pedestrian signal improvements of the
segment on PCH between Anita Street and Artesia Boulevard.
Pedestrian signal, crosswalks and ADA curb ramps improvements at the intersections of PCH and Pier Avenue and PCH and
Aviation Boulevard including improvements at intersection to aid trucks turning onto Aviation.
PBG 760 Tree Well Grates
(RECONCILIATION)
51,068$ Andrew
Nguyen X TBD TBD Project has been under dispute resolution. Funds to be used to purchase and install tree well
grates on Hermosa Ave.
This project will install iron tree grates in existing tree wells on Hermosa Ave.
Categories:
SH = Street/Highway
SSD = Sewer/Storm Drain
PI = Parks
PBG = Public Building and Ground 4 of 4
101