HomeMy WebLinkAbout11-27-2018 | Regular MeetingCity Council
City of Hermosa Beach
Regular Meeting Agenda - Final
City Hall
1315 Valley Drive
Hermosa Beach, CA
90254
Mayor
Jeff Duclos
Mayor Pro Tem
Stacey Armato
Councilmembers
Mary Campbell
Hany S. Fangary
Justin Massey
Council Chambers6:00 PMTuesday, November 27, 2018
Closed Session - 6:00 P.M.
Regular Meeting - 7:00 P.M.
1
November 27, 2018City Council Regular Meeting Agenda - Final
6:00 P.M. - CLOSED SESSION
(LOCATION: Meetings convene in the Council Chambers and move to the Second Floor Conference
Room after Public Comment)
CALL TO ORDER IN COUNCIL CHAMBERS
ROLL CALL
PUBLIC COMMENT
RECESS TO CLOSED SESSION IN SECOND FLOOR CONFERENCE ROOM
1.18-0723 MINUTES: Approval of minutes of Closed Session held on November 13, 2018.
2.18-0724 CONFERENCE WITH LABOR NEGOTIATOR
Government Code Section 54957.6
City Negotiator:City Manager
Employee
Organizations:Hermosa Beach Police Officers’ Association
3.18-0725 CONFERENCE WITH REAL PROPERTY NEGOTIATOR
Government Code Section 54956.8
Property: Airspace at 51 Pier Avenue (Loreto Plaza)
City Negotiator: City Manager
Negotiating Party: Pierside Properties, LLC
Under Negotiation: Price and Terms of Payment for Lease of Airspace
4.18-0726 CONFERENCE WITH LEGAL COUNSEL: Initiation of Litigation
Government Code Section 54956.9(d)(4)
The City Council finds, based on advice from legal counsel, that discussion in open
session will prejudice the position of the City in the litigation.
Number of Potential Cases: 1
5.18-0731 CONFERENCE WITH LEGAL COUNSEL: Pending Litigation
Government Code Section 54956.9(d)(1)
The City Council finds, based on advice from legal counsel, that discussion in open
session will prejudice the position of the City in the litigation.
Name of Case: Hermosa Fitness LLC v. City of Hermosa Beach
Los Angeles County Superior Court, Case No. 18STCP02840
ADJOURNMENT OF CLOSED SESSION
Page 2 City of Hermosa Beach Printed on 4/3/2024
2
November 27, 2018City Council Regular Meeting Agenda - Final
7:00 P.M. - REGULAR AGENDA
All council meetings are open to the public. PLEASE ATTEND.
The Council receives a packet with detailed information and recommendations on nearly every agenda
item. City Council agenda packets are available for your review on the City's website located at
www.hermosabch.org. Complete agenda packets are also available for public inspection in the Police
Department, Hermosa Beach Public Library and the Office of the City Clerk.
During the meeting, a packet is also available in the Council Chambers foyer or you can access the
packet at our website, www.hermosabch.org, on your laptop, tablet or smartphone through the wireless
signal available in the City Council chambers - Network ID: CHB-Guest, Password: chbguest
Written materials pertaining to matters listed on the agenda of a regular City Council meeting must be
submitted by noon of the Tuesday, one week before the meeting in order to be included in the agenda
packet (tentative future agendas can be found as Item 8 in every regular agenda packet). However,
written materials received after that deadline will nonetheless be posted under the relevant agenda item
on the City's website at the same time as they are distributed to the City Council by email and provided
to the City Council and the public at the meeting.
Submit your comments via eComment in three easy steps:
Note: Your comments will become part of the official meeting record. You must provide your full name,
but please do not provide any other personal information (i.e. phone numbers, addresses, etc) that you
do not want to be published.
1. Go to the Agendas/Minutes/Video webpage and find the meeting you’d like to submit comments on.
Click on the eComment button for your selected meeting.
2. Find the agenda item for which you would like to provide a comment. You can select a specific
agenda item/project or provide general comments under the Oral/Written Communications item.
3. Sign in to your SpeakUp Hermosa Account or as a guest, enter your comment in the field provided,
provide your name, and if applicable, attach files before submitting your comment.
eComments can be submitted as soon as the meeting materials are published, but will only be
accepted until 12:00 pm on the date of the meeting to ensure Council and staff have the ability to review
comments prior to the meeting.
Persons who wish to address an issue of general nature (not pertaining to matters listed on the
agenda) to the City Council for the official record may submit written material to the Council in lieu of or
in addition to speaking under the Public Participation section of the meeting. Such written
correspondence must be delivered to the City Manager's office (anny@hermosabch.org) by noon of the
Tuesday, one week before the regular Council meeting in order to be included in the agenda packet.
To comply with the Americans with Disabilities Act of 1990, Assistive Listening Devices (ALD) will be
available for check out at the meeting. If you require special assistance to participate in this meeting,
you must call or submit your request in writing to the Office of the City Clerk at (310) 318-0203 at least
48 hours prior to the meeting.
Page 3 City of Hermosa Beach Printed on 4/3/2024
3
November 27, 2018City Council Regular Meeting Agenda - Final
CALL TO ORDER
PLEDGE OF ALLEGIANCE
ROLL CALL
CLOSED SESSION REPORT
ANNOUNCEMENTS
PROCLAMATIONS / PRESENTATIONS
MISCELLANEOUS ITEMS AND REPORTS - CITY MANAGER
a)18-0727 INFILTRATION PROJECT UPDATE
PUBLIC PARTICIPATION:
1. ORAL AND WRITTEN COMMUNICATIONS:
a)18-0721 LETTER FROM ANTHONY HIGGINS DATED
NOVEMBER 9, 2018 REGARDING AVP TRUCK ROUTE
Recommendation:Staff recommends that the City Council receive and file the written communication from
Anthony Higgins.
2. CONSENT CALENDAR:
a)REPORT
18-0718
CITY COUNCIL MEETING MINUTES
(Deputy City Clerk Linda Abbott)
Recommendation:Deputy City Clerk recommends that the City Council approve the following minutes:
1. Special Meeting of September 7, 2016
2. Adjourned Regular Meeting of December 7, 2016
3. Regular Meeting of December 12, 2017
4. Regular Meeting of November 13, 2018
b)REPORT
18-0708
CHECK REGISTERS
(Finance Director Viki Copeland)
Recommendation:Staff recommends that the City Council ratify the following check registers.
c)REPORT
18-0715
REVENUE REPORT, EXPENDITURE REPORT,
AND CIP REPORT BY PROJECT FOR OCTOBER 2018
(Finance Director Viki Copeland)
Recommendation:Staff recommends that the City Council receive and file the October 2018 Financial
Reports, including the CIP Report by Project.
Page 4 City of Hermosa Beach Printed on 4/3/2024
4
November 27, 2018City Council Regular Meeting Agenda - Final
d)REPORT
18-0714
CITY TREASURER’S REPORT AND CASH BALANCE REPORT
(City Treasurer Karen Nowicki)
Recommendation:City Treasurer recommends that the City Council receive and file the October 2018 City
Treasurer's Report and Cash Balance Report.
e)REPORT
18-0709
PROJECT STATUS REPORT AS OF OCTOBER 31, 2018
(Public Works Director Glen W.C. Kau)
Recommendation:Staff recommends that the City Council receive and file the Project Status Report as of
October 31, 2018.
f)REPORT
18-0728
PLANNING COMMISSION TENTATIVE FUTURE AGENDA ITEMS
(Community Development Director Ken Robertson)
Recommendation:Staff recommends that the City Council receive and file the December 10, 2018 Planning
Commission tentative future agenda item(s).
g)REPORT
18-0730
ACTION SHEET OF THE PLANNING COMMISSION
MEETING OF NOVEMBER 20, 2018
Recommendation:Staff recommends that the City Council receive and file the action sheet of the Planning
Commission meeting of November 20, 2018.
h)REPORT
18-0719
AWARD OF ASSESSMENT ENGINEER SERVICES FOR
UNDERGROUND UTILITIES ASSESSMENT DISTRICT ON
HERMOSA AVE FROM 27TH STREET TO NORTH OF
34TH STREET (GREENWICH VILLAGE NORTH)
(Public Works Director Glen W.C. Kau)
Recommendation:Staff recommends that the City Council:
1. Award a Professional Services Agreement (PSA) to NV5 for assessment engineer
services for Underground Utilities Assessment District on Hermosa Ave from 27th Street
to North of 34th Street. This will be a five-year contract in an amount not to exceed
$35,000 for services;
and,
2. Authorize the Mayor to execute and the City Clerk to attest the attached Professional
Services Agreement subject to approval by the City Attorney.
i)REPORT
18-0720
SOUTH BAY WORKFORCE INVESTMENT BOARD
QUARTERLY SUMMARY
Recommendation:Staff recommends that the City Council receive and file the Quarterly Summary from the
South Bay Workforce Investment Board (SBWIB).
Page 5 City of Hermosa Beach Printed on 4/3/2024
5
November 27, 2018City Council Regular Meeting Agenda - Final
j)REPORT
18-0704
STATE OF CALIFORNIA, CALIFORNIA GOVERNOR’S OFFICE
OF EMERGENCY SERVICES DESIGNATION OF APPLICANT’S
AGENT RESOLUTION FORM 130
(City Manager Suja Lowenthal)
Recommendation:Staff recommends that the City Council:
1. Approve the positions of City Manager, Finance Director and Chief of Police as the
City of Hermosa Beach's Designated Authorized Agents; and,
2. Approve Resolution XX-XXXX as the State of California, California Governor's Office of
Emergency Services (Cal OES) Designation of Authorized Agents Resolution Form 130.
k)REPORT
18-0712
RESOLUTION ESTABLISHING A POLICY AND
VOTING PROCEDURES FOR BOARD AND
COMMISSION APPOINTMENTS
(City Clerk Elaine Doerfling)
Recommendation:City Clerk recommends that the City Council adopt the attached resolution establishing a
policy and voting procedures for Board and Commission appointments using paper
ballots/voting sheets provided by the City Clerk.
l)REPORT
18-0711
LIST OF REGULAR AND ONGOING CITY BOARD
AND COMMISSION APPOINTIVE TERMS THAT WILL
EXPIRE DURING THE 2019 CALENDAR YEAR
(City Clerk Elaine Doerfling)
Recommendation:City Clerk recommends that the City Council receive and file the attached list, prepared
for posting by the City Clerk pursuant to State law, of all regular and ongoing Hermosa
Beach board, commission and committee appointive terms which will expire during the
2019 calendar year.
m)REPORT
18-0707
ADOPTION OF A RESOLUTION AUTHORIZING
THE SUBMISSION OF A GRANT APPLICATION TO
CALTRANS ADAPTATION PLANNING GRANT PROGRAM
(Environmental Analyst Leeanne Singleton)
Recommendation:Staff recommends that the City Council adopt a resolution approving submittal of a grant
application (for up to $250,000) to Caltrans for the Adaptation Planning Grant Program to
conduct preliminary/conceptual design and community outreach for multi-benefit
adaptation and transportation projects at Hermosa Beach entry corridors along Hermosa
Avenue and the Strand.
3. CONSENT ORDINANCES
NONE
4. ITEMS REMOVED FROM THE CONSENT CALENDAR FOR SEPARATE
DISCUSSION * Public comments on items removed from the Consent Calendar.
5. PUBLIC HEARINGS
Page 6 City of Hermosa Beach Printed on 4/3/2024
6
November 27, 2018City Council Regular Meeting Agenda - Final
a)REPORT
18-0713
CONSIDERATION OF AN ORDINANCE TO ALLOW
AND REGULATE WIRELESS COMMUNICATION FACILITIES
IN THE PUBLIC RIGHT-OF-WAY, AND UPDATE ON AT&T’S
PROPOSAL FOR MULTIPLE INSTALLATIONS OF SMALLER
WIRELESS COMMUNICATION FACILITIES TO PROVIDE
REPLACEMENT COVERAGE TO EXISTING SITES
LOCATED AT 20TH AND 29TH COURT
(Continued from meetings of
September 25, 2018 and October 23, 2018)
(Community Development Director Ken Robertson)
Recommendation:Staff recommends that the City Council continue the public hearing to consider an
ordinance to allow and regulate wireless communication facilities in the public
right-of-way, and, provide an update on AT&T's proposal for multiple installations of
smaller wireless communication facilities to provide replacement coverage to existing
sites located at 20th and 29th Court to an unspecified date for staff to complete the draft
ordinance for installation of wireless communication facilities in the public right-of-way.
6. MUNICIPAL MATTERS
a)REPORT
18-0716
REINSTATEMENT OF A PROFESSIONAL SERVICES AGREEMENT
WITH ACCELA INC. TO COMPLETE THE IMPLEMENTATION OF
THE “ACCELA AUTOMATION” SOFTWARE UPGRADE
(Community Development Director Ken Robertson)
Recommendation:Staff recommends that the City Council reinstate the expired Professional Services
Agreement with Accela Inc. for a three-year term.
b)REPORT
18-0717
REQUEST TO REMOVE DOWNTOWN HERMOSA AVENUE
CROSSWALK TREATMENTS FROM CURRENT CONTRACT
WITH ALL AMERICAN ASPHALT AND AUTHORIZE STAFF TO
RE-ISSUE SEPARATE BID FOR CROSSWALKS UNDER CAPITAL
IMPROVEMENT PROJECT (CIP) 16-174 STREET IMPROVEMENTS
(Public Works Director Glen W.C. Kau)
Recommendation:Staff recommends that the City Council:
1. Authorize staff to issue a change order for the deletion of the Duratherm and Decomark
line items from the contract with All American Asphalt for CIP 16-174 Hermosa Avenue
Resurfacing Improvements Contract;
2. Authorize staff to re-solicit bids to supply and install the Decomark and Duratherm
crosswalks for Hermosa Avenue under a separate contract; and
3. Reaffirm the previously selected color palette or select an alternate combination of
colors based on the availability of chip samples of the Duratherm material.
7. MISCELLANEOUS ITEMS AND MEETING ATTENDANCE REPORTS - CITY
COUNCIL
8. OTHER MATTERS - CITY COUNCIL
Page 7 City of Hermosa Beach Printed on 4/3/2024
7
November 27, 2018City Council Regular Meeting Agenda - Final
a)18-0722 TENTATIVE FUTURE AGENDA ITEMS
Recommendation:Staff recommends that the City Council receive and file the tentative future agenda items.
ADJOURNMENT
Page 8 City of Hermosa Beach Printed on 4/3/2024
8
November 27, 2018City Council Regular Meeting Agenda - Final
FUTURE MEETINGS AND CITY HOLIDAYS
CITY COUNCIL MEETINGS:
November 29, 2018 - Thursday - Adjourned Regular Meeting:
6:00 PM - Appointment of Mayor and Mayor Pro Tempore
December 11, 2018 - Tuesday - 6:00 PM - Closed Session,
7:00 PM - City Council Meeting
December 25, 2018 - Tuesday - No Regular Meeting
January 8, 2019 - Tuesday - 6:00 PM - Closed Session,
7:00 PM - City Council Meeting
January 14, 2019 - Monday - Adjourned Regular Meeting:
7:00 PM - Joint City Council and EPAC Study Session
January 22, 2019 - Tuesday - 6:00 PM - Closed Session,
7:00 PM - City Council Meeting
BOARDS, COMMISSIONS AND COMMITTEE MEETINGS:
November 28, 2018 - Wednesday - 7:00 PM - Public Works Commission Meeting
December 4, 2018 - Tuesday - 7:00 PM - Parks and Recreation Advisory Commission Meeting
December 10, 2018 - Tuesday - 7:00 PM - Planning Commission Meeting
December 19, 2018 - Wednesday - 5:00 PM - Civil Service Board Meeting
January 2, 2019 - Wednesday - 7:00 PM - Parks and Recreation Advisory Commission Meeting
January 7, 2019 - Monday - 7:00 PM - Emergency Preparedness Advisory Commission Meeting
January 14, 2019 - Monday - Adjourned Regular Meeting:
7:00 PM - Joint City Council and EPAC Study Session
January 15, 2019 - Tuesday - 7:00 PM - Planning Commission Meeting
January 16, 2019 - Wednesday - 7:00 PM - Public Works Commission Meeting
CITY OFFICES CLOSED FRIDAY-SUNDAY AND ON THE FOLLOWING DAYS:
November 22, 2018 - Thursday - Thanksgiving Day
December 25, 2018 - Tuesday - Christmas Day
January 1, 2019 - Tuesday - New Year's Day (2019)
January 21, 2019 - Monday - Martin Luther King, Jr. Birthday
February 18, 2019 - Monday - President's Day
May 27, 2019 - Monday - Memorial Day
July 4, 2019 - Thursday - Independence Day
September 2, 2019 - Monday - Labor Day
November 11, 2019 - Monday - Veteran's Day
November 28, 2019 - Thursday, Thanksgiving Day
December 25, 2019 - Wednesday - Christmas Day
January 1, 2020 - Wednesday - New Year's Day (2020)
Page 9 City of Hermosa Beach Printed on 4/3/2024
9
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
18-0723
Honorable Mayor and Members of the Hermosa Beach City Council
Closed Session of November 27, 2018
MINUTES:Approval of minutes of Closed Session held on November 13, 2018.
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™10
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
18-0724
Honorable Mayor and Members of the Hermosa Beach City Council
Closed Session of November 27, 2018
CONFERENCE WITH LABOR NEGOTIATOR
Government Code Section 54957.6
City Negotiator:City Manager
Employee
Organizations:Hermosa Beach Police Officers’ Association
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™11
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
18-0725
Honorable Mayor and Members of the Hermosa Beach City Council
Closed Session of November 27, 2018
CONFERENCE WITH REAL PROPERTY NEGOTIATOR
Government Code Section 54956.8
Property:Airspace at 51 Pier Avenue (Loreto Plaza)
City Negotiator:City Manager
Negotiating Party:Pierside Properties, LLC
Under Negotiation:Price and Terms of Payment for Lease of Airspace
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™12
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
18-0726
Honorable Mayor and Members of the Hermosa Beach City Council
Closed Session of November 27, 2018
CONFERENCE WITH LEGAL COUNSEL: Initiation of Litigation
Government Code Section 54956.9(d)(4)
The City Council finds, based on advice from legal counsel, that discussion in open session will prejudice the
position of the City in the litigation.
Number of Potential Cases:1
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™13
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
18-0731
Honorable Mayor and Members of the Hermosa Beach City Council
Closed Session of November 27, 2018
CONFERENCE WITH LEGAL COUNSEL: Pending Litigation
Government Code Section 54956.9(d)(1)
The City Council finds, based on advice from legal counsel, that discussion in open session will prejudice the
position of the City in the litigation.
Name of Case: Hermosa Fitness LLC v. City of Hermosa Beach
Los Angeles County Superior Court, Case No. 18STCP02840
City of Hermosa Beach Printed on 3/25/2024Page 1 of 1
powered by Legistar™14
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
18-0727
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
INFILTRATION PROJECT UPDATE
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™15
From: noreply@granicusideas.com <noreply@granicusideas.com>
Sent: Sunday, November 25, 2018 4:45 PM
To: Ann Yang <anny@hermosabch.org>
Subject: New eComment for City Council Meeting (Closed Session - 6:00 P.M. and Regular Meeting -
7:00 P.M.)
New eComment for City Council Meeting (Closed
Session - 6:00 P.M. and Regular Meeting - 7:00
P.M.)
maria haase submitted a new eComment.
Meeting: City Council Meeting (Closed Session - 6:00 P.M. and Regular Meeting - 7:00 P.M.)
MISCELLANEOUS ITEMS AND REPORTS – CITY MANAGER: Item a) INFILTRATION
PROJECT UPDATE
eComment: We appreciate the Redondo Beach City Council and Mayor Bill Brand for creating a
sub-committee in order to work with the Hermosa Beach City Council, Mayor Duclos and City
Manager Lowenthal to explore alternative sites for the Stormwater Infiltration Project. We are
looking forward to the results of this collaboration.
View and Analyze eComments
16
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
18-0721
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
LETTER FROM ANTHONY HIGGINS DATED
NOVEMBER 9, 2018 REGARDING AVP TRUCK ROUTE
Recommended Action:
Staff recommends that the City Council receive and file the written communication from Anthony
Higgins.
Attachments:
Letter from Anthony Higgins
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™17
November 9, 2018
Subj: AVP Tourney Truck Route
Dear Council Members,
Last week I wrote you about the Hermosa Fiesta and provided a detailed comparison of
the resident health, safety and quality of life impact of using 27th versus Herondo for the
Fiesta Bus Route.
In that same 10/23/2018 City Council meeting there was a Community Resources
Staff-debriefing covering the AVP Tourney, and once again 27th Street considerations
were pushed to the side.
There was no mention of 100+ heavy trucks it took to support the AVP Tourney that
used 27th as their primary route to the downtown business district.
Without a declaration allowing trucks to use 27th street, the use of 27th Street was
clearly illegal: The 27th Street route is not the most direct-route; its 33% longer than the
PCH/Pier route.
So, not only did the staff-presentation fail to mention citizen complaints about the illegal
truck-route, it failed to present any reasonable assessment of the total number of trucks
this tourney put on our local streets, and it failed to identify the route these trucks will
take in future AVP Tourneys.
The debriefing was clearly lacking.
The AVP Tourney sits squarely within the footprint of the downtown business district.
Pier Avenue is a truck route that sits in this footprint. PCH to Pier Avenue is the most
direct route.
27th is a road where heavy trucks run 5-6 feet from property lines and inches
from a steep narrow obstructed sidewalk. The road has already heavily damaged
by truck traffic and has been for at least the past 3 years. It is rapidly failing.
Routing 100+ heavy trucks down 27th during the course of this tourney was
simply unacceptable.
There is a heavily utilized park with excited children jumping in and out of cars.
There are near-roadway pollution effects since the trucks run 5-6 feet from
property lines and many older houses are set right up next to the sidewalk.
18
I have also provided the city with road noise measurements as part of my response to
the Hotel Plaza EIR project where the contractor wants to run 7,500 heavy truck trips
down 27th Street.
These noise measurements indicated that further study of the quality of life on 27th
related to road noise was warranted.
Specifically, the noise measurements were already in the 65-75dBA noise range; two to
four times as loud as the cities maximum recommended noise level for a R2 zoned
street.
Adding the AVP trucks only exacerbated the noise levels on an already too noisy street.
To make matters worse, information I gleaned from the Freedom of Information
request suggests that the city plans to use 27th Street again as its de facto truck
route for future AVP Tourneys and other Community Resources Sponsored
Special Events in the Central Business District.
Specifically, the Community Resources Department responded to my Freedom of
Information Request with the following:
Mr. Higgins,
Please see the following information for 5 b and 5 c of your request:
5 b - While the Community Development Department has no role in defining safe and
reasonable truck routes for any activity, we did reach out for the opinion of the traffic
engineer in Manhattan Beach (attached) and altered our Pre Demolition Hand Out (attached).
5 c - Truck routes utilized for the AVP event were not discussed in pre-plan meetings with
event organizers nor was this ever a topic discussed for other large events (or those utilizing
truck deliveries). We assumed trucks would use the appropriate routes since they do these
events in other cities, following similar code and traffic laws.
Looking ahead, we will be adding language related to truck routes into our Special Event
Policy Guide and will include discussions on this during pre-plan meetings to ensure the
“appropriate route” is taken.
But then the city went on to provide clarification of what they meant by “appropriate”
route” by attaching the following document:
19
20
The above opinion offered by the Manhattan Beach Traffic Engineer consulted by the
Community Resources Department was completely non-sequitur; it justified the use of
27th Street because it is the most direct route, when in-fact, using the 27th Street Route
to the AVP staging area is the longer route.
The most direct route to the AVP staging area is the PCH/Pier Route. And the tightest
turning radius in on Beach Drive that is common to both routes. So, the turning radius
argument is moot. What next, are you going to count left turns in the determination of
most-direct route?
The suggestion that 27th Street was the most direct route for the AVP tourney trucks
was inappropriate and non-factual.
From the Artesia/Sepulveda intersection the 27th route to the Hermosa/Pier intersection
is 33% longer than using the PCH/Pier route. Even allowing for a turn on 14th Street,
the 27th Street route is longer.
Going forward, why would the AVP heavy-trucks be given permission to use the 27th
Street; a route that is 98% on residential streets when they could use PCH to Pier, a
route that is 98% on existing truck-routes and far away from nearly all resident homes?
Council Members, please consider referring this written-communication to the HB
Community Resources Department along with instructions that they collect data on the
number and size of trucks needed to support the AVP Tourney; including not just AVP
owned trucks, but sub-contractor trucks, vendor supply trucks, city trash vehicles and
sanitation vehicles, etc.; and please clearly report the recommended truck-routes AND
make that report public well in advance of committing to the AVP contract.
Please also allow for time for public hearings on the truck route if PCH to Pier is not
selected.
Fredrick Douglas famously said, “Power Concedes Nothing Without a “Demand”.
It is in that spirit that I respectfully “demand” the City Council instruct the City
Administration take the following Common-Sense actions related to all future Special
Events:
1. With respect to all large special events, define the truck types, numbers and
routes that will be used and inform the public on the routes these trucks will take.
Allow time for public comment on the route before any contracts are signed.
21
2. Require Community Resources to define the specific truck routes for all large
special events in a manner that prioritizes Resident Health, Safety and Quality of
Life. If that means fewer events or requiring events use smaller trucks, then so
be it.
3. Please direct Community Resources to collect and publish statistics on the
number of residents that actually attend or participate in these events as a
function of the total population.
4. Given the near-roadway pollution effects of large events and the bumper to
bumper traffic on 27th street that at times can last for hours please issue a CEQA
Negative Finding or conduct the appropriate EIR for all large events including the
Fiesta.
5. Set Thresholds: Instruct Community Resources to define truck routes for any
special event requiring over 25 heavy trucks. Insure the number and type of
trucks are clearly identified and wherever possible limited to what is safe to use
on Pier Avenue can fit through the Herondo Avenue Island-Berms. Please note
that to be thorough, the truck analysis must include city refuse and sewage
trucks that are needed to support the event.
6. If requiring the Trucks to use Herondo or Pier is problematic because of the
systematic changes the city has made over the years to restrict truck size on
these streets, then require smaller trucks or smaller events. 27th simply does not
meet the minimum safety requirements for a truck-route and the city is fully
aware of this.
7. Require that Community Resources familiarize themselves with the relative
safety and health issues of using 27th Street vs Pier vs Herondo.
To this end I have included two attachments to this written communication:
Attachment A. (27th Street Safety Issues) and,
Attachment B. Comparison of 27th Street and Herondo Fiesta Bus Routes.
Attachment C. Pictures of Herondo Island berms restricting truck flow into the city.
CONCLUSION:
I also again respectfully demand the city conduct a study of the actual truck volume on
27th street by commissioning an EIR to determine if 27th street it meets minimum safety
standards as the PRIMARY TRUCK ROUTE for Hermosa Avenue & Plaza Area
22
businesses as well as for the large cranes, construction vehicles and even the 7,500
truck trucks associated with the Plaza Hotel project that can no longer easily enter via
Herondo because of the island-berm.
I believe CEQA requires an EIR before a truck-route is established.
The city has for all intents and purposes made 27th Street a Truck-Route by its own
actions to limit access on Pier and Herondo.
This cannot be denied.
A 27th Street Truck-Route EIR should have been done at the time the Herondo island-
berms were installed several years back. The impact to 27th was clear, direct and
foreseeable.
The city can no longer pretend that it has NOT turned 27th Street into a Truck Route.
I’m sorry to be so blunt but no other conclusion fits the facts.
It also explains why the city council refused to direct the HBPD to enforce the No Trucks
Laws on 27th for downtown deliveries when they knew full well trucks were breaking the
direct-route laws with impunity. The Hermosa Avenue & Plaza Area businesses were
already fully dependent on using 27th as a truck-route.
It also explains why the HBPD has never issued a single ticket, ever, despite being fully
aware of the illegal truck traffic, witnessing it, and ignoring the infractions.
A failure to immediately launch a 27th Street truck-route EIR would violate the spirit of
the CEQA statute if not the law itself.
It is my hope that once the facts are known, the residents of 27th will pull together and
file a lawsuit seeking to stop all downtown business development on Hermosa Ave and
the Pier Plaza until EIR safety studies are done and public hearings are held.
The cities actions have made 27th Street the only viable truck-route for Hermosa Ave
and the Plaza businesses and it is currently being used as a truck route with the full
knowledge and approval of the city.
But in my opinion, establishing 27th Street as a truck-route in this manner, without
resident input and public hearings, without CEQA mandated hazard, noise and air
pollution data; well that was reckless and possibly negligent and almost certainly illegal.
Please refer to Appendix G. of the CEQA statute that require an assessment of
hazards, air-quality and noise all of which are factors in creating a new truck route.
23
“Plan Hermosa” is founded on a truck-route-design that is a “house of cards” at its base.
Every day the city is rolling the dice with our health and safety and ultimately the city will
roll “snake-eyes”.
A child will be killed at Valley Park or a truck will pick-off a citizen walking on the steep
narrow, obstructed 27th street sidewalks, or a citizen will legally challenge the manner in
which the city has effected the 27th street truck-route and bring the downtown
renovation to a halt until the city has defined a safe truck route plan that can support it.
It’s as simple as that.
Thank You,
Anthony Higgins
24
ATTACHMENT A
27TH Street Safety Assessment
25
Category: SAFETY
Risk: Heavy Trucks on Narrow Road with Obstructed sidewalk
Comments: 1. Steep Hill with No Curbside Parking Buffer, Trucks Run at Curbside
2. Crest of Hill Creates Blind Spot.
3. Similar Blind spots do not exist on Herondo or Pier Ave
4. Blindspot endangers Pedestrians and Cyclists coming from Artesia.
5. 27th is a Heavily Damaged and Failing Road. (Safety Implications?)
6. Posted Signs - No Commercial Vehicles over 3 Tons
Risk: Narrow Obstructed Sidewalk Images
Comment: 1. 27th street’s narrow sidewalk obstructed by telephone poles
2. In places there is less than 19 inches clearance to curb
3. Baby Strollers have difficulty fitting by poles when trucks pass
Hardly Room for Small Dog much Less Baby Stroller
And the Plaza Hotel Contractor wants to add 7,500 Heavy Trucks!
26
ATTACHMENT B.
Comparison of Herondo and 27th Street
Bus and Truck Safety & Health Considerations
27
November 4, 2018
Dear Council Members:
Subject: 10/23/2018 Fiesta Subcommittee Briefing to City Council
I would to respond to the suggestion in the 10/23 Fiesta subcommittee presentation to the
City Council that bus route safety for 27 Street compared to Herondo are roughly equivalent.
This presumption was picked-up and reported in the Easy Reader by Ryan McDonald.
https://easyreadernews.com/fiesta-contract-negotiations-open/
For the record, the Health, Safety and Quality of Life consequences of using Herondo vs
27th are NOT roughly equal or even comparable.
Accordingly, I request this memorandum that spells out the risks of using 27thversus Herondo
as the Fiesta Bus-Route be entered into the Permanent Record and forwarded to all Fiesta
Subcommittee Members and involved Hermosa Beach Chamber of Commerce
representatives participating in this process.
1. 27th STREET VS HERONDO - FIESTA BUS ROUTE SAFTY COMPARISON
1A. Distance of Bus Traffic from Sidewalk
All it takes is a quick look at google satellite photos to realize the homes, apartments and
sidewalks on Herondo westbound appear to at least 5-8 times further from the bus and
vehicle traffic and sidewalks than the homes on 27th westbound.
On 27th Street buses run on a steep street less than 18 inches from a telephone pole
obstructed narrow sidewalk.
Herondo is flat wide road and its sidewalks are protected from the bus traffic by a large
curbside parking buffer and wider roads.
Herondo’s sidewalks are unobstructed.
1B. Herondo Eastbound has No Residential Structures
Herondo has no residential property eastbound for its entire length. Conversely, 27th is
densely packed both eastbound and westbound between Morningside Drive & Manhattan
Avenue.
There are also significant zoning differences between 27th Street and Herondo.
28
1C. Proximity to Heavily Utilized Park
Gould (aka 27th) borders Valley Park and Valley Park is heavily utilized by children, families
and seniors the entire Labor and Memorial Day weekend.
Herondo has no such park.
Buses, parks and children jumping in/out cars is a bad mix!
This is especially true on busy holiday weekends with the chaotic bumper to bumper traffic
conditions created by the during Fiesta’s Peak Traffic periods.
1F. Cyclists and Pedestrians in the Mix
On Herondo cars, buses and bicyclists all have clear visibility. It’s fairly flat so there are no
blind spots.
On the 27th route, bicyclists from Artesia are often traveling at a high rate of speed because of
a steep hill.
There is a very difficult intersection at Gould and Ardmore & Gould and Valley where cars and
trucks are turning in all directions.
Many of the festival visitors are not familiar with this complicated intersection, and the
sudden narrowing then widening at Ardmore often creates confusion and hesitation.
Festival visitors are often frustrated and even angry as the festival traffic overloads on 27th
Street
People are looking for parking that are simply not available. This frustration is readily
apparent, and mistakes are inevitable. Horns are blaring regularly during peak festival traffic
periods.
The Gould/Ardmore intersection has up to 8 vehicles simultaneously making decision on
whether to proceed. And that doesn’t even include the Valley/Gould intersection!
Pedestrian traffic near Valley Park is likely to be higher than on Herondo. This requires
verification but there is no doubt the meridians on Gould and Valley present more or a
challenge for pedestrians and cyclists than traffic and road conditions on Herondo.
Moreover, the Herondo intersection with Hermosa Ave is controlled by Traffic Lights and
Pedestrian Crossing lights that are much easier for a person to navigate than the double stop
sign quagmire at Ardmore and Valley at the North East corner of Valley Park.
29
Adding buses every 10 minutes all day long will only exacerbate the already existing risks in
the same way as trucks exacerbate freeway congestion during stop and go conditions.
Bicyclists may become more aggressive when they encounter the heavy festival traffic.
Buses on Gould and 27th would only make bicyclists harder to see at this already difficult
intersection.
2. NEAR ROADWAY POLLUTION CAUSED BY FIESTA TRAFFIC
Note 1:
I make no claims to be a pollution expert but unless the city has an expert that has studied the
Fiesta traffic on 27th and has hard data on the Near Roadway Pollution effects, I believe it is
prudent to err on the side of caution for the reasons I will present below.
Note 2:
I provide two URLs below that link to an analysis of Near Roadway Pollution effects. One link
focuses specifically on the risks to young children in strollers given their proximity to the auto
and truck exhaust on near roadway sidewalks.
I will make the case that in absence of proof to the contrary, formal notification to the
residents of 27th Street WARNING them to keep their doors and windows closed and to avoid
the sidewalks during peak fiesta traffic periods MUST BE given unless the city has data to
dismiss this concern.
This is especially so for households with young children or seniors, residents or holiday visitors
that have a predisposition to pollution sensitivity - e.g. asthma or other respiratory
vulnerability.
2A. Near Roadway Pollution Effect on 27th Street
On 27th, festival traffic reaches bumper to bumper conditions that sometimes last for a
couple of hours during both the morning and afternoon rush period.
The smell of exhaust is sometimes so thick on 27th between Morningside & Manhattan that
you really can’t be in your front yard, your porch, or walking the sidewalk for any length of
time without becoming acutely aware of the noxious pollution.
This pollution on 27th may well be exacerbated by a Street-Canyon effect; where pollutants
are either trapped on the street in low-wind conditions or are channeled up the street with
30
the prevailing winds and possibly dumped into the low-lying areas of Valley Park. The Kiddie
Park sits well below the traffic level.
Herondo has no such park nor is it susceptible to street-canyon effects that trap toxins.
To be a Healthy Hermosa you must DO THE WORK.
An informed decision needs to be made on the Near Roadway Pollution risks associated with
the festival traffic and considerations must be given to setting up monitors of PM2.5 DPM
particle mass measurements as well as VOC’s, CO and NOx particle count measurements.
• At the very least, in absence of evidence to the contrary, signs should be posted at the
Kiddie Park warning children with a sensitivity to these pollutants to avoid the area
during the Fiesta’s peak traffic periods.
• The Kiddie Park sits within the radius of Near Roadway Pollution effects per the
referenced studies AND the fact that it sits substantially below the roadway raises
concerns the heavier than air pollutants may pool in the Kiddie Park.
• Buses may only exacerbate the Near Roadway Pollution problem even if they are
“clean”, because they will delay traffic movement the same way heavy trucks stopping
and starting on the freeway do.
• Given the often-persistent smell of vehicle-exhaust on 27th during the Festivals peak
periods, letters should be sent to all residents formally warning them to keep their
doors and windows closed and avoid the sidewalks during peak traffic periods due to
the risk of pollution exposure.
The Near Pollution study cited below shows there is even a greater risk to children and
infants on the sidewalk near busy roadways. The pollution levels are likely to be high enough
to trigger an acute response especially if a child or a senior has a preexisting health condition.
This requires expert verification, but the city can no longer ignore this risk, especially as it
considers expanding the Fiesta footprint.
The study below shows the toxic concentrations at a height of 1 meter are significantly
greater than at 2 meters; meaning a greater risk to young children and babies in strollers.
Pollution effects must be mathematically modeled by the city assuming standing traffic for a
2-hour period in a street canyon with the same aspect ratio and dimensions of 27th Street and
the modeled pollution levels must be compared to the levels that would trigger an acute-
response in a senior or child with a predisposition to these effects. Mates IV may provide
useful guidance to the city when accessing these risks.
31
Without this analysis or actual near roadway measurements the city simply cannot in good
conscience set aside this risk and must err on the side of caution and issue warnings.
This analysis and an analysis of the actual truck traffic on 27th Street clearly falls on the Cities
Traffic Engineer according to City Ordnance N.S. 238 Section 2.6. This document was
provided to me as part of a Freedom-of-Information Request on the Traffic Engineer Duties
and Responsibilities.
If the Cities Traffic Engineer does not have the expertise to assess the Near Roadway
Pollution Effects caused by the bumper to bumper conditions on 27th during Fiesta Peak
Traffic periods, then I believe it is incumbent on the city to bring that expertise to bear before
the next Fiesta so that an informed decision can be made on whether to warn residents and
people with a sensitivity to near roadway pollution to take the appropriate protective
measures; both on 27th Street and at the Kiddie Park in Valley Park.
2D. Near Roadway Pollution on Herondo
The Near Roadway Pollution effects on Herondo would likely be significantly less than on
27th because of the wider roads, greater distances, and the open areas eastbound on
Herondo.
2E. References
https://www.ncbi.nlm.nih.gov/pmc/articles/PMC2673207/
https://cityofdavis.org/home/showdocument?id=4209
3. NOISE CONSIDERATIONS:
3A. Distance is a Controlling Factor in Noise Level
As previously stated, I estimate the homes and apartments on Herondo Westbound are on
average at least 5-8 times the distance from bus traffic as the homes on 27th Westbound.
• Roughly speaking Bus noise is cut in half by each doubling of the distance or every 10
meters.
• Herondo is a flat road. 27th is a steep road.
• Buses make one hell of a lot more noise and generate more pollution on a steep hill
than on a flat road.
• The failing road condition on 27th Street only exacerbates the tire noise. Conversely,
on Herondo the road is in much better condition.
• Buses on 27th will only accelerate the deterioration of the 27th Street roadway per the
Hermosa Beach Fugro Pavement Condition Study
32
Note: 3 The hill section of 27th between Manhattan and Morningside has a road surface that
is riddled with wide transverse cracks that extend the entire width of the road every 30 feet
for its entire length. 27th has many depressions and rough-areas where tire noise is greatly
amplified. 27th surface is rapidly failing per the Fugro Pavement analysis approved by the city
in 2017, and that means it is failing at an exponentially increasing rate. I’ve previously
provided the council a chart from the Fugro report that makes this point.
Accordingly, Buses and Heavy Construction should actually be diverted from 27th until the
end to end road repairs are done and not directed there to support the Fiesta or ANY other
special events.
In total, the safety, health and quality of life impact fiesta buses would have on Herondo are
significantly less than on 27th.
Finally, I would like to address the staff-suggestion that the city will receive complaints either
way no matter which bus route is selected.
This misguided statement spawned further discussion of perhaps having the bus route on
Herondo one year and 27 the next or perhaps splitting the bus traffic. This was totally
inappropriate given the risks and impacts of 27th versus Herondo are so obviously different.
I also suggest it’s the merits of the health, safety and quality of life considerations that
matter, not the fact that the city will get complaints either way.
Thank You,
Anthony Higgins
33
ATTACHMENT C.
HERONDO ISLAND BERMS RESTRICTING TRUCK TRAFFIC
34
HERONDO ISLAND BERMS
35
11/27/18 AGENDA, ITEM 1a - LETTER FROM ANTHONY HIGGINS REGARDING AVP TRUCK ROUTESUPPLEMENTAL LETTER FROM CITY ATTORNEY'S OFFICE DATED 9/25/1836
37
38
39
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0718
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
CITY COUNCIL MEETING MINUTES
(Deputy City Clerk Linda Abbott)
Recommended Action:
Deputy City Clerk recommends that the City Council approve the following minutes:
1.Special Meeting of September 7, 2016
2.Adjourned Regular Meeting of December 7, 2016
3.Regular Meeting of December 12, 2017
4.Regular Meeting of November 13, 2018
Attachments:
1.Special Meeting of September 7, 2016
2.Adjourned Regular Meeting of December 7, 2016
3.Regular Meeting of December 12, 2017
4.Regular Meeting of November 13, 2018
Respectfully Submitted by: Linda Abbott, Deputy City Clerk
Noted: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 3/13/2024Page 1 of 1
powered by Legistar™40
Hermosa Beach
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Special Meeting Minutes-draft
Wednesday, September 7, 2016
6:00 PM
Closed Session - 6:00 PM
Open Session - 7:00 PM
Council Chambers
City Council
Mayor
Hany Fangary
Mayor Pro Tem
Justin Massey
Councilmembers
Jeff Duclos
Stacey Armato
Carolyn Petty
41
City Council Special Meeting Minutes September 7, 2016
City of Hermosa Beach Page 2 of 3 Approved on 11/27/2018
NOTICE OF SPECIAL MEETING AND AGENDA
PLEASE TAKE NOTICE that the Mayor of the City of Hermosa Beach has called a Special Meeting of
the City Council to take place at 6:00 p.m. on September 7, 2016, to consider and take action on only
those matters set forth on the agenda below.
6:00 P.M. - CLOSED SESSION
(LOCATION: Meetings convene in the Council Chambers and move to the Second Floor Conference
Room after Public Comment)
CALL TO ORDER IN COUNCIL CHAMBERS 6:00 p.m.
ROLL CALL
Present: Armato, Duclos, Massey, Petty, Mayor Fangary
Absent: None
PUBLIC COMMENT
Bill Hallett
Tracy Hopkins
RECESS TO CLOSED SESSION IN SECOND FLOOR CONFERENCE ROOM 6:07
p.m.
1.16-0517 MINUTES: Approval of minutes of Closed Sessions held on August 23, 2016.
2.16-0516 PUBLIC EMPLOYEE APPOINTMENT/EMPLOYMENT
Government Code Section 54957
Title: Interim City Manager/City Manager
Attachments:SUPPLEMENTAL Letter from Warren Barr 8-24-16 (added 9-7-16 at
4pm).pdf
SUPPLEMENTAL Letter from Getchel Wilson 9-3-16 (added 9-7-16 at
4pm).pdf
SUPPLEMENTAL Letter from Traudl 9-7-16 (added 9-7-16 at 4pm).pdf
RECESS TO OPEN SESSION IN COUNCIL CHAMBERS 7:05 p.m.
42
City Council Special Meeting Minutes September 7, 2016
City of Hermosa Beach Page 3 of 3 Approved on 11/27/2018
7:00 P.M. - OPEN SESSION
CALL TO ORDER 7:14 p.m.
ROLL CALL
Present: Armato, Duclos, Massey, Petty, Mayor Fangary
Absent: None
PLEDGE OF ALLEGIANCE Gila Katz
CLOSED SESSON REPORT
City Attorney Jenkins said two public comments were received prior to Closed Session.
3.16-0518 REVIEW OF PROPOSALS FROM RECRUITING FIRMS FOR CITY
MANAGER SEARCH
Attachments:Letters to Recruitment Firms 8-25-16.pdf
City Manager Scope of Work_RFP.pdf
SUPPLEMENTAL Alliance Proposal (added 9-7-16 at 4pm).pdf
SUPPLEMENTAL Avery Proposal (added 9-7-16 at 4pm).pdf
SUPPLEMENTAL Bob Murray & Associates Proposal (added 9-7-16 at
4pm).pdf
SUPPLEMENTAL CPS HR Consulting Proposal (added 9-7-16 at
4pm).pdf
SUPPLEMENTAL Ralph Andersen & Associates Proposal (added
9-7-16 at 4pm).pdf
SUPPLEMENTAL Teri Black Proposal (added 9-7-16 at 4pm).pdf
SUPPLEMENTAL Recruitment Agency RFP Summary (added 9-7-16
at 430pm).pdf
PUBLIC COMMENT
Tracy Hopkins
Gila Katz
ADJOURNMENT 8:15 p.m.
Elaine Doerfling
City Clerk
43
City of Hermosa Beach
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Adjourned Regular Meeting Minutes - draft
Wednesday, December 7, 2016
Council Chambers
City Council
Mayor
Hany Fangary
Mayor Pro Tem
Justin Massey
Councilmembers
Jeff Duclos
Stacey Armato
Carolyn Petty
44
City Council Adjourned Regular Meeting Minutes December 7, 2016
City of Hermosa Beach Page 2 of 2 Approved on 11/27/2018
7:00 P.M. – CLOSED SESSION
(LOCATION: Meetings convene in the Council Chambers and move to the Second Floor Conference
Room after Public Comment)
CALL TO ORDER IN COUNCIL CHAMBERS 7:00 p.m.
ROLL CALL
Present: Armato, Duclos, Petty, Mayor Fangary
Absent: Massey*
*Massey called in via phone
PUBLIC COMMENT None
RECESS TO CLOSED SESSION IN SECOND FLOOR CONFERENCE ROOM 7:01
p.m.
1.16-0730 MINUTES: Approval of minutes of Closed Session held on November 22, 2016.
2.16-0731 CONFERENCE WITH LEGAL COUNSEL: Threatened Litigation
Government Code Section 54956.9(d)(2)
The City Council finds, based on advice from legal counsel, that discussion in
open session will prejudice the position of the City in the litigation.
Number of Potential Cases: 1 (threat of litigation from E&B Natural Resources
Management Corporation)
ADJOURNMENT 8:55 p.m.
Elaine Doerfling
City Clerk
45
City of Hermosa Beach
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Regular Meeting Minutes - draft
Tuesday, December 12, 2017
Council Chambers
City Council
Mayor
Justin Massey
Mayor Pro Tem
Jeff Duclos
Councilmembers
Stacey Armato
Carolyn Petty
Hany Fangary
46
City Council Regular Meeting Minutes December 12, 2017
City of Hermosa Beach Page 2 of 2 Approved on 11/27/2018
7:00 P.M. - REGULAR AGENDA
CALL TO ORDER 7:00 p.m.
ROLL CALL
Present:None
Absent:Armato, Duclos, Fangary, Petty, Mayor Massey
PUBLIC COMMENT None
ANNOUNCEMENT
Noting that tonight’s Regular Meeting had been canceled, City Clerk Doerfling adjourned the
meeting due to the lack of a quorum.
ADJOURNMENT
The Regular Meeting of Tuesday, December 12, 2017 adjourned at the hour of 7:01 p.m.
Elaine Doerfling
City Clerk
47
Tuesday, November 13, 2018
6:00 PM
City of Hermosa Beach
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Council Chambers
City Council
Mayor
Jeff Duclos
Mayor Pro Tem
Stacey Armato
Councilmembers
Mary Campbell
Hany S. Fangary
Justin Massey
Meeting Minutes - Draft
Closed Session - 6:00 P.M.
Regular Meeting - 7:00 P.M.
48
November 13, 2018City Council Meeting Minutes - Draft
6:00 P.M. - CLOSED SESSION
(LOCATION: Meetings convene in the Council Chambers and move to the Second Floor Conference
Room after Public Comment)
CALL TO ORDER IN COUNCIL CHAMBERS
6:00 p.m.
ROLL CALL
Mayor Duclos, Mayor Pro Tempore Armato, Councilmember Campbell,
Councilmember Fangary, and Councilmember Massey
Present:5 -
Absent:0
PUBLIC COMMENT
None
RECESS TO CLOSED SESSION IN SECOND FLOOR CONFERENCE ROOM
6:01 p.m.
18-06761.MINUTES: Approval of minutes of Closed Session held on October 23, 2018.
18-06772.CONFERENCE WITH LABOR NEGOTIATOR
Government Code Section 54957.6
City Negotiator:City Manager
Employee
Organizations:Hermosa Beach Police Officers’ Association
Hermosa Beach Firefighters’ Association
Teamsters Union, Local 911
Professional and Administrative Employee Group
Hermosa Beach Management Association
Hermosa Beach Professional Engineers Bargaining Group
Unrepresented Employees
18-06783.CONFERENCE WITH LEGAL COUNSEL: Threatened Litigation
Government Code Section 54956.9(d)(2) and (e)(4)
The City Council finds, based on advice from legal counsel, that discussion in
open session will prejudice the position of the City in the litigation.
Number of Potential Cases: 1
Page 1City of Hermosa Beach Printed on 11/19/2018
49
November 13, 2018City Council Meeting Minutes - Draft
18-06864.CONFERENCE WITH LEGAL COUNSEL: Pending Litigation
Government Code Section 54956.9(d)(1)
The City Council finds, based on advice from legal counsel, that discussion in
open session will prejudice the position of the City in the litigation.
Name of Case: Mark Roth v. City of Hermosa Beach
Los Angeles County Superior Court, Case No. YC072628
ADJOURNMENT OF CLOSED SESSION
6:55 p.m.
7:00 P.M. - REGULAR AGENDA
CALL TO ORDER
7:01 p.m.
PLEDGE OF ALLEGIANCE
Al Benson
ROLL CALL
Mayor Duclos, Mayor Pro Tempore Armato, Councilmember Campbell,
Councilmember Fangary, and Councilmember Massey
Present:5 -
Absent:0
CLOSED SESSION REPORT
City Attorney Jenkins said no public comment was added prior to Closed
Session, nothing was added to the agenda, and there were no reportable
actions.
ANNOUNCEMENTS
Councilmember Campbell said the City and the Hermosa Beach School District
met recently regarding Measure S and the North School rebuild project.
Mayor Duclos invited everyone to the following upcoming events:
*Sidewalk Festival, throughout Hermosa, Friday, November 16-Sunday,
November 18, 11 a.m.-6 p.m.;
*Small Business Saturday, throughout Hermosa, Saturday, November 24;
*Free Holiday Parking (on all silver post meters within posted meter time
limits), Tuesday, November 27-Tuesday, December 25;
*Mayor Rotation Ceremony, Thursday, November 29 at 6 p.m., in Council
Chambers;
Page 2City of Hermosa Beach Printed on 11/19/2018
50
November 13, 2018City Council Meeting Minutes - Draft
*Community Open House & Annual Tree Lighting with “Rock for Tots” Toy
Drive Charity Concert, Saturday, December 1, 11 a.m.-8 p.m.;
*Annual Community Chanukah Celebration, Pier Plaza, Sunday, December
2, 3-5:30 p.m.; and
*Annual Sand Snowman Contest (15th Street at the Shoreline), Saturday,
December 8, 9 a.m.-noon.
PROCLAMATIONS / PRESENTATIONS
None
MISCELLANEOUS ITEMS AND REPORTS - CITY MANAGER
City Manager Lowenthal said an item regarding the CIty Clerk's Office will be
heard at the next meeting.
This was received and filed.
PUBLIC PARTICIPATION:
1. ORAL AND WRITTEN COMMUNICATIONS:
Coming forward to address the Council were:
Anthony Higgins
Bob Christiansen
Gila Katz
Al Benson
Maria Haase
a)18-0687 LETTER FROM ANTHONY HIGGINS DATED NOVEMBER 4, 2018
REGARDING FIESTA BUS ROUTE - COMPARISON OF
27TH STREET AND HERONDO IMPACT
11-04-18 Letter from Anthony Higgins.pdfAttachments:
Motion Massey and seconded by Armato to receive and file the written
communication.
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
2. CONSENT CALENDAR:
Motion Campbell and seconded by Massey to approve the Consent Calendar.
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Page 3City of Hermosa Beach Printed on 11/19/2018
51
November 13, 2018City Council Meeting Minutes - Draft
Absent:0
a)REPORT
18-0689
CITY COUNCIL MEETING MINUTES
(City Clerk Elaine Doerfling)
1. 011216 draft.docx
2. 012616 draft.docx
3. 020916 draft.docx
4. 030816 draft.docx
5. 060618 draft.docx
6. 061618 draft.docx
7. 061918 draft.docx
8. 071116-draft.docx
9. 091916 draft.docx
10. 101816 draft.docx
11. 110917 draft.docx
12. 122117 draft.docx
13. 102318 draft.docx
Attachments:
b)REPORT
18-0680
CHECK REGISTERS
(Finance Director Viki Copeland)
1. 10-18-18
2. 10-25-18
3. 11-01-18
Attachments:
c)REPORT
18-0660
ACTION MINUTES OF THE EMERGENCY PREPAREDNESS
ADVISORY COMMISSION MEETING OF SEPTEMBER 6, 2018
(Emergency Services Coordinator Brandy Villanueva)
September 6, 2018 Meeting MinutesAttachments:
d)REPORT
18-0699
ACTION MINUTES OF THE PARKS, RECREATION AND
COMMUNITY RESOURCES ADVISORY COMMISSION
MEETING OF OCTOBER 2, 2018
PR Minutes 10.02.2018.pdfAttachments:
e)REPORT
18-0669
2017 STATE HOMELAND SECURITY
PROGRAM SUBRECIPIENT AGREEMENT
(Acting Police Chief Milton McKinnon)
Page 4City of Hermosa Beach Printed on 11/19/2018
52
November 13, 2018City Council Meeting Minutes - Draft
1. 2017 State Homeland Security Program Subrecipient
Agreement-Hermosa Beach
2. LA County-Motorola Contract
Attachments:
f)REPORT
18-0681
APPROVE THIRD AMENDMENT TO THE PROFESSIONAL
SERVICES AGREEMENT WITH AMEC FOSTER WHEELER
ENVIRONMENT & INFRASTRUCTURE, INC., TO PREPARE
AN ENVIRONMENTAL IMPACT REPORT (EIR) AND
TO PROVIDE PLANNING SERVICES FOR THE
STRAND AND PIER HOTEL PROJECT
(Community Development Director Ken Robertson)
1. PSA 3rd Amendment Strand Hotel EIR - AMEC
2. Strand and Pier Hotel EIR Modification Request_102918
3. PSA 2nd Amendment Strand Hotel EIR - AMEC - signed copy
4. Attachment A to 2nd Amendment to PSA with AMEC for Strand
Hotel EIR
5. Original PSA dated 9-24-15
6. City's 3-6-18 response to developer's 2-13-18 letter.pdf
7. Developer's 2-13-18 letter to City
8. Link to City Council 9-24-15 Meeting
9. Link to City Council 1-10-17 Meeting
10. SUPPLEMENTAL Email from Peter Tucker (added 11-13-18 at
1pm).pdf
Attachments:
g)REPORT
18-0679
RESOLUTION ESTABLISHING A PERMIT APPLICATION FEE
FOR LIMITED LIVE ENTERTAINMENT
(Community Development Director Ken Robertson)
1. Resolution Establishing a Permit Application Fee for Limited Live
Entertainment.pdf
2. Ordinance 18-1388 Limited Live Entertainment.pdf
3. Link to 10-23-18 City Council Meeting
4. Link to 8-21-18 Planning Commission Meeting
5. Link to 6-25-18 Planning Commission Meeting
Attachments:
3. CONSENT ORDINANCES
a)REPORT
18-0675
ORDINANCE NO. 18-1388 - “AN ORDINANCE
OF THE CITY OF HERMOSA BEACH, CALIFORNIA,
REGARDING DEFINITIONS AND STANDARDS FOR
LIMITED LIVE ENTERTAINMENT AND AMENDING
THE HERMOSA BEACH MUNICIPAL CODE”
Page 5City of Hermosa Beach Printed on 11/19/2018
53
November 13, 2018City Council Meeting Minutes - Draft
(City Clerk Elaine Doerfling)
Ord 18-1388Attachments:
Public comment:
(Name indistinct)
Motion Massey and seconded by Armato to waive full reading and adopt by title
Ordinance No. 18-1388.
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
4. ITEMS REMOVED FROM THE CONSENT CALENDAR FOR SEPARATE DISCUSSION
* Public comments on items removed from the Consent Calendar.
None
5. PUBLIC HEARINGS
a)REPORT
18-0684
CONSIDER AMENDMENT OF THE MUNICIPAL CODE ADDING
CHAPTER 5.78 TO THE HERMOSA BEACH MUNICIPAL CODE
(TOBACCO RETAILERS) REQUIRING LICENSURE OF TOBACCO
RETAILERS AND LIMITING SALE OF ELECTRONIC SMOKING
DEVICES AND FLAVORED TOBACCO PRODUCTS TO REDUCE
THE ILLEGAL SALE OF TOBACCO TO YOUTH AND AMENDING
SECTION 1.10.040 TO MAKE VIOLATIONS OF CHAPTER 5.78
SUBJECT TO ADMINISTRATIVE PENALTY PROCEDURES
(Continued from meeting of August 25, 2015)
(Community Development Director Ken Robertson)
1. Link to August 25, 2015 Staff Report
2. Proposed Ordinance
3. City of Hermosa Beach Tobacco Retailer Map
4. List of Los Angeles County Cities with Tobacco Retailer Licenses
5. SUPPLEMENTAL Email from Philip Gardiner (added 11-13-18 at
1pm).pdf
6. SUPPLEMENTAL eComment from Primo Castro (submitted
11-12-18 at 9:38pm).pdf
Attachments:
Jacqueline Sun, Community Policy Analyst, Beach Cities Health District, was
invited forward to respond to Council questions.
The public hearing opened at 7:46 p.m. Coming forward:
Mark Warshaw
Heather Roth
Celina Douglas, Beach Market Owner
Page 6City of Hermosa Beach Printed on 11/19/2018
54
November 13, 2018City Council Meeting Minutes - Draft
Monty Messex, MPH, Los Angeles County Dep't. of Public Health Tobacco
Control & Prevention Program
Carol Almeda, Community Organizer, Asian American Drug Abuse Program
Craig Cadwallader, Surfrider Foundation South Bay Chapter
The public hearing closed at 8:02 p.m.
Motion Massey and seconded by Campbell to continue this item to the December
11, 2018 Regular meeting.
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
6. MUNICIPAL MATTERS
a)REPORT
18-0700
TEMPORARY HIRE RESOLUTION
(Acting Chief of Police Milton McKinnon)
1. Resolution 18-XXXX
2. 2018-19 Salary Schedule
3. Moe Personnel Action Form_Redacted
Attachments:
Motion Campbell and seconded by Armato to adopt Resolution #18-7152,
authorizing the temporary rehire of Georgia Moe as Community Services Division
Manager for a period of two (2) days, November 14, 2018, and November 15, 2018.
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
b)REPORT
18-0690
DOWNTOWN SAFETY AND LATE NIGHT
ESTABLISHMENT MEASURES UPDATE
(Acting Chief of Police Milton McKinnon)
1. Link to October 16, 2018 Report
2. PowerPoint Presentation PDF
Attachments:
Acting Chief McKinnon presented the staff report and responded to Council
questions.
Greg Newman, Baja Sharkeez/Palmilla owner, gave a PowerPoint presentation
of changes to be made by the establishments downtown, and responded to
Council questions.
Bob Rollins, Building and Code Enforcement Official, responded to Council
questions.
Page 7City of Hermosa Beach Printed on 11/19/2018
55
November 13, 2018City Council Meeting Minutes - Draft
Motion Massey and seconded by Campbell to receive and file the Downtown
Safety and Late Night Establishment Measures update report.
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
c)REPORT
18-0685
UPDATE FROM THE COMMUNITY THEATER SUBCOMMITTEE
AND RECOMMENDATION TO EXECUTE A FACILITY
NEEDS ASSESSMENT
(Community Resources Manager Kelly Orta)
Public comment:
Kurt Cassidy
David Grethen
Motion Massey and seconded by Armato to:
1. Approve the Community Theater Subcommittee's recommendation to give
authority to the City Manager to execute a facility needs assessment of the
Community Theater facility, including analysis and conceptual cost estimates of a
major renovation of the Community Theater to transform it into a regional
performing arts center; and, noting the City Manager's comments, this
assessment may also include a conservative renovation to upgrade the
Community Theater, taking into consideration its current users and maintaining
the community focus of the facility.
2. Appropriate $30,000 from the Capital Improvement Fund for a newly created
Community Theater Capital Improvement Project (CIP).
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
d)REPORT
18-0683
CAPITAL IMPROVEMENT PROJECT (CIP) 14-173
8TH STREET IMPROVEMENTS PROJECT UPDATE
(Public Works Director Glen W.C. Kau)
PowerPoint Presentation.pdfAttachments:
Councilmember Campbell recused herself and left the dais during discussion of
this item (at the recommendation of City Attorney Jenkins) due to the proximity
of her home to the project.
Director Kau gave a PowerPoint presentation and responded to Council
questions.
Public comment:
David Grethen, Public Works Commissioner
Page 8City of Hermosa Beach Printed on 11/19/2018
56
November 13, 2018City Council Meeting Minutes - Draft
Motion Armato and seconded by Massey to:
1. Receive and file the project status update, which includes information for
bringing the Plans, Specs and Estimates to 100% completion; and
2. Approve the recommendation to conduct a final project walk-through/field
review meeting with 8th Street residents, for those affected properties that are
interested, on November 28, 2018 in advance of solicitation for construction bids.
Aye:Mayor Duclos, Armato, Fangary, and Massey4 -
Absent:0
Recused:Campbell1 -
e)REPORT
18-0688
POLICY ON VOTING PROCEDURE FOR
BOARD/COMMISSION APPOINTMENTS
(Continued from meeting of October 13, 2018)
- Report has been Revised -
(City Clerk Elaine Doerfling)
1. Voting Sheet Sample #1 - 042418.P&R-7
2. Voting Sheet Sample #2 - 110216.PW-8 WV
Attachments:
Motion Fangary and seconded by Armato to approve the following policy:
*Paper voting procedure (developed in 2012 by Council subcommittee and staff).
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
7. MISCELLANEOUS ITEMS AND MEETING ATTENDANCE REPORTS - CITY COUNCIL
a)REPORT
18-0701
ROLE OF EMERGENCY PREPAREDNESS ADVISORY COMMISSION
(City Manager Suja Lowenthal)
1. Link to City Council Meeting of March 13, 2018 - Item 7a
Vacancies
2. July 19 2018 Joint City Council and Commissions Meeting - EPAC
Staff Report
3. SUPPLEMENTAL Email from Nadine Skye-Davis (added 11-13-18
at 1pm).pdf
Attachments:
Motion Armato and seconded by Campbell to:
1. Schedule a joint study session with the Emergency Preparedness Advisory
Commission in January of 2019, and
2. Direct staff to bring forward a formal recommendation at a subsequent City
Council meeting on the future roles, responsibilities and direction of the
Emergency Preparedness Advisory Commission.
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
Page 9City of Hermosa Beach Printed on 11/19/2018
57
November 13, 2018City Council Meeting Minutes - Draft
b)REPORT
18-0691
SELECTION OF DELEGATE AND ALTERNATE TO SERVE ON THE
LAX COMMUNITY NOISE ROUNDTABLE
(Assistant to the City Manager Nico De Anda-Scaia)
1. Draft City Letter of Interest and Notice of Delegates
2. LAX-Community Noise Roundtable Supplemental Information
3. Link to LAX/Community Noise Roundtable Meeting Details
4. Link to LAX Noise Management Information
5. SUPPLEMENTAL eComment from Peter Tucker (submitted
11-12-18 at 3:45pm).pdf
Attachments:
Motion Duclos and seconded by Fangary to:
1. Designate Armato as a Council delegate and Campbell as an alternate to serve
on the LAX Community Noise Roundtable; and
2. Authorize the Mayor to sign a letter addressed to Administrators of the LAX
Community Noise Roundtable and LAWA Noise Management Division, requesting
formal City membership and announcing the appointments of the City Council's
delegate and alternate.
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
c)REPORT
18-0682
REQUEST FOR APPROVAL OF SPONSORSHIP DONATION TO
THE BEACH CITIES HEALTH DISTRICT’S 20TH ANNUAL
HOLIDAY GIFT BAG PROJECT
(City Manager Suja Lowenthal)
1. 10-05-18 BCHD Letter.pdf
2. Holiday Gift Bag Project Flyer.pdf
3. Link to Holiday Gift Bag Program Webpage
Attachments:
Motion Campbell and seconded by Armato to approve the sponsorship donation.
Aye:Mayor Duclos, Armato, Campbell, Fangary, and Massey5 -
Absent:0
8. OTHER MATTERS - CITY COUNCIL
a)18-0692 TENTATIVE FUTURE AGENDA ITEMS
Tentative Future Agenda.pdfAttachments:
It was Council consensus to receive and file the Tentative Future Agenda Items.
ADJOURNMENT
10:29 p.m., in memory of Taylor Meyer, to the November 15 elected
Page 10City of Hermosa Beach Printed on 11/19/2018
58
November 13, 2018City Council Meeting Minutes - Draft
officials photo session at 9:15 a.m. on The Greenbelt across from City Hall.
Page 11City of Hermosa Beach Printed on 11/19/2018
59
MEMORANDUM
OFFICE OF THE CITY CLERK
TO: Mayor and Members of the City Council
FROM: City Clerk Elaine Doerfling
DATE: November 26, 2018
SUBJECT: Meeting of November 27, 2018 – Supplemental – Agenda Item 2(a)
Attached please find the revised Regular Meeting Minutes of December 12, 2017,
amended on both pages to correctly reflect Mary Campbell as a member of the City
Council (former Councilmember Petty stepped down on November 28). Please replace
the original submittal with this corrected version in your motion to approve the minutes
this evening. We’re sorry for any confusion or inconvenience this may have caused.
Thank you.
60
City of Hermosa Beach
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Regular Meeting Minutes - final
Tuesday, December 12, 2017
Council Chambers
City Council
Mayor
Justin Massey
Mayor Pro Tem
Jeff Duclos
Councilmembers
Stacey Armato
Mary Campbell
Hany Fangary
61
City Council Regular Meeting Minutes December 12, 2017
City of Hermosa Beach Page 2 of 2 Approved on 11/27/2018
7:00 P.M. - REGULAR AGENDA
CALL TO ORDER 7:00 p.m. ROLL CALL
Present: None
Absent: Armato, Campbell, Duclos, Fangary, Mayor Massey
PUBLIC COMMENT None
ANNOUNCEMENT
Noting that tonight’s Regular Meeting had been canceled, City Clerk Doerfling adjourned the
meeting due to the lack of a quorum.
ADJOURNMENT
The Regular Meeting of Tuesday, December 12, 2017 adjourned at the hour of 7:01 p.m.
Elaine Doerfling
City Clerk
62
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0708
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
CHECK REGISTERS
(Finance Director Viki Copeland)
Recommended Action:
Staff recommends that the City Council ratify the following check registers.
Attachments:
1.Check Register 11/5/18
2.Check Register 11/8/18
3.Check Register 11/15/18 a
4.Check Register 11/15/18 b
Approved: Viki Copeland, Finance Director
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™63
11/05/2018
Check Register
CITY OF HERMOSA BEACH
1
2:50:08PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90480 11/5/2018 SOUTH BAY REGIONAL PUBLIC COMM PO 14650 PD/REPLACEMENT MOBILE & PORTABLE RADIOS08812
715-2101-5405 616,316.30
Total : 616,316.3008812
Bank total : 616,316.30 1 Vouchers for bank code :boa
616,316.30Total vouchers :Vouchers in this report 1
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 1 inclusive, of the check
register for 11/5/18 are accurate funds are available for
payment, and are in conformance to the budget."
By
Finance Director
Date 11/15/18
2b (1)
64
11/08/2018
Check Register
CITY OF HERMOSA BEACH
1
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90481 11/8/2018 ABSOLUTE INTERNATIONAL SECURIT 2018032327/PO 14672 DOWNTOWN/PIER/SECURITY 10/5-10/6/1821086
001-2102-4201 2,035.20
DOWNTOWN/PIER/SECURITY 10/12-10/27/182018032433/PO 14672
001-2102-4201 5,814.85
Total : 7,850.0521086
90482 11/8/2018 ACTIVE NETWORK LLC CB2018Q2_0075 PO 14812/REIMB CHARGE DISPUTED IN ERROR06349
001-3406 350.00
Total : 350.0006349
90483 11/8/2018 ADAMS STREETER CIVIL ENGINEERS 183945 (PO 13272) PARKING LOT D IMPROVE DESIGN SRVCS/AUG1820825
150-8682-4201 5,516.63
Total : 5,516.6320825
90484 11/8/2018 ADMINISTRATIVE SERVICES CO OP 1912 (PO 14432)TAXI VOUCHER PROGRAM/SEP1811437
145-3404-4201 4,458.25
Total : 4,458.2511437
90485 11/8/2018 ADMINSURE, INC.11481 (PO 14125) GENERAL/AUTO LIABILITY CLAIM ADMIN/NOV1804715
705-1209-4201 1,300.00
Total : 1,300.0004715
90486 11/8/2018 ALKADIS, CHRISTOPHER PO 14840 REIMB/COMM POLICE ACADEMY FOOD/SEP-OCT1811359
001-3302-4201 289.45
Total : 289.4511359
90487 11/8/2018 ALL AMERICAN ASPHALT Progress Payment 3 PO 14189/STREET IMPROVEMENTS/SEP1816956
115-8174-4201 61,083.75
Total : 61,083.7516956
90488 11/8/2018 AMERICAN GUARD SERVICES, INC. 192060 (PO 14206) CROSSING GUARD SERVICES/SEP1820685
001-2102-4201 11,508.48
Total : 11,508.4820685
90489 11/8/2018 ASCENT ELEVATOR SERVICES, INC 13806 (PO 14268) ELEVATOR MAINTENANCE/OCT1818891
001-4204-4201 288.00
Total : 288.0018891
90490 11/8/2018 BRAUN LINEN SERVICE 1494515 to 1500375 PRISONER LAUNDRY/OCT1800163 2b (2)
65
11/08/2018
Check Register
CITY OF HERMOSA BEACH
2
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90490 11/8/2018 (Continued)BRAUN LINEN SERVICE00163
001-2101-4306 419.35
Total : 419.3500163
90491 11/8/2018 BUCKNAM INFRASTRUCTURE GROUP 332-02.01 (PO 14462)PROJECT MGMT/GIS INFRASTRUCTURE/OCT1819090
160-3102-4201 487.00
Total : 487.0019090
90492 11/8/2018 CALIFORNIA FENCE AND SUPPLY CO 7010 (PO 14635)FENCING/LOADER FOR STORM DRAIN CLEARING03621
161-3109-4309 1,838.00
Total : 1,838.0003621
90493 11/8/2018 COMPLETES PLUS 01YL4482 MAT REQ 773682/AUTO REPAIR PARTS09436
715-3104-4311 5.30
MAT REQ 773688/AUTO REPAIR/PRESSURE HOSE01YM6848
715-3104-4311 25.49
Total : 30.7909436
90494 11/8/2018 CONTINENTAL MAPPING SERVICE 100518 (PO 14208)PUBLIC NOTICES/821 & 1602 LOMA/OCT1820398
001-4101-4201 1,100.00
Total : 1,100.0020398
90495 11/8/2018 COPWARE, INC.PO 14853 PEACE OFFICER LEGAL SOURCEBOOK SUBSCRIP19593
001-2101-4305 85.00
Total : 85.0019593
90496 11/8/2018 COUNTY OF LOS ANGELES RE-PW-18100901775 ARTESIA BLVD TRAFFIC SIGNAL MAINT/SEP1800879
001-3104-4251 109.20
Total : 109.2000879
90497 11/8/2018 CPRS PO 14833 VINT/SHATTUCK/ORTA/ANNUAL MEMBERSHIP07700
001-4601-4315 775.00
Total : 775.0007700
90498 11/8/2018 DAVEY RESOURCE GROUP, INC.75018 (PO 14546)TREE INVENTORY COUNT AS OF 9/27/1821085
301-4202-4201 9,334.17
Total : 9,334.1721085
90499 11/8/2018 DEPARTMENT OF TRANSPORTATION SL190091 SIGNALS & LIGHTING MAINT/JUL18-SEP1800267
105-2601-4251 15,855.23
66
11/08/2018
Check Register
CITY OF HERMOSA BEACH
3
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 15,855.23 90499 11/8/2018 DEPARTMENT OF TRANSPORTATION00267
90500 11/8/2018 DEWEY PEST CONTROL Account 1233239 PO 14430/SEWER RAT ABATEMENT/OCT1811449
160-3102-4201 262.00
PO 14430/PEST CONTROL/OCT18Account 759408
001-4204-4201 694.00
Total : 956.0011449
90501 11/8/2018 DONALD WENTWORTH D18-18036/PO 14678 10,000 POLICE BADGE STICKERS13835
001-2101-4305 503.95
Total : 503.9513835
90502 11/8/2018 DUNCAN SOLUTIONS, INC.DS0000000831 PO 14494/PARKING CITATION FEES/SEP1820668
001-1204-4201 4,792.16
Total : 4,792.1620668
90503 11/8/2018 EASY READER HD18-063 & HD18-064 MAT REQ 973730/STMT 4638/LEGAL ADS/SEP1800181
001-1121-4323 375.38
Total : 375.3800181
90504 11/8/2018 EMBROIDME BEACH CITIES 72650 (PO 14728)YARD/SWEATSHIRTS/SHIRTS & HATS FOR ELLS11509
001-4202-4314 849.17
Total : 849.1711509
90505 11/8/2018 EMPLOYMENT DEVELOPMENT DEPT LetterID L0029773728 UNEMPLOYMENT CLAIMS/JUL18-SEP1801397
705-1215-4186 7,481.00
Total : 7,481.0001397
90506 11/8/2018 FILE KEEPERS, LLC 542975 (PO 12873)DOCUMENT SCANNING SERVICES/SEP1821096
715-1201-4201 2,027.72
Total : 2,027.7221096
90507 11/8/2018 GRAINGER 9935189101 MAT REQ 773697/MAINTENANCE SUPPLIES10836
715-4206-4309 35.22
Total : 35.2210836
90508 11/8/2018 GUERRERO, ROBERT J.PO 14357 BACKGROUND INVESTIGATION/SEP1820669
001-2101-4201 1,085.34
BACKGROUND INVESTIGATION/OCT18PO 14357
001-2101-4201 3,541.41
67
11/08/2018
Check Register
CITY OF HERMOSA BEACH
4
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 4,626.75 90508 11/8/2018 GUERRERO, ROBERT J.20669
90509 11/8/2018 HARRIS & ASSOCIATES 39117 (PO 7144)ENGINEERING/STREET IMPROVE/MAY-SEP1802102
122-8173-4201 39,506.25
Total : 39,506.2502102
90510 11/8/2018 HOME DEPOT CREDIT SERVICES 1011732 REQ 773509/EXTENSION POLE FOR CONCRETE03432
001-3104-4309 40.76
MAT REQ 532434/SOIL112573
001-6101-4309 39.48
REQ 863181/SCRW/NUT DRVR/VOLTAGE TESTERS2020035
001-4204-4309 143.16
MAT REQ 532432/DEWAULT SAW3091374
001-6101-4309 219.40
MAT REQ 863041/DEWAULT CHAINSAW3664096
001-6101-4309 360.26
MAT REQ 773510/WHEEL BARROW6092984
001-3104-4309 110.22
MAT REQ 863360/BATTERIES/CABLE TIES6570565
001-4601-4201 120.12
MAT REQ 773352/MAGNETS/VEHICLE HB171990
715-2101-4311 19.79
REQ 532433/DRILL BITS/MECHANIC TOOL SET73026
001-6101-4309 215.27
Total : 1,268.4603432
90511 11/8/2018 INTERNATIONAL SECURITY PRODUCT 223351 (PO 14762)BUS LIC CERT SECURITY PAPER 2500 SHEETS17474
001-1204-4305 368.30
Total : 368.3017474
90512 11/8/2018 IPS GROUP INC 37285 (PO 14142)200 PARKING METERS/UPGRADE PHASE 319314
715-3302-4201 109,029.00
Total : 109,029.0019314
90513 11/8/2018 JOBS AVAILABLE 1822013 (PO 14209)JOB AD/CREW SUPERVISOR/OCT1801165
001-1203-4201 234.00
Total : 234.0001165
90514 11/8/2018 JOHN M CRUIKSHANK, INC.000015478/PO 11088 DESIGN SRVCS/ADA CURB RAMPS ON PCH/SEP1813840
150-8185-4201 504.00
68
11/08/2018
Check Register
CITY OF HERMOSA BEACH
5
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 504.00 90514 11/8/2018 JOHN M CRUIKSHANK, INC.13840
90515 11/8/2018 KILMER, KEITH L.PO 13096 PERSONNEL/INVESTIGATIVE SERVICES/OCT1820772
001-1203-4201 1,765.33
Total : 1,765.3320772
90516 11/8/2018 LEARNED LUMBER B637919 MAT REQ 773507/MAINTENANCE SUPPLIES00167
001-3104-4309 26.90
MAT REQ 773511/MAINTENANCE SUPPLIESB639662
001-3104-4309 23.58
Total : 50.4800167
90517 11/8/2018 LOS ANGELES NEWS GROUP 0011167281 PO 14353/JOB AD/CREW SUPERVISOR/SEP1819623
001-1203-4201 250.00
Total : 250.0019623
90518 11/8/2018 MANHATTAN BEACH, CITY OF 18-02674 (PO 14794)ARTESIA BLVD MEDIAN MAINT/MAY17-MAY1800183
105-2601-4251 2,200.36
Total : 2,200.3600183
90519 11/8/2018 MARTIN CHEVROLET 768063 MAT REQ 773698/VEHICLE REPAIR PARTS15912
715-2101-4311 74.31
Total : 74.3115912
90520 11/8/2018 MCCORMICK AMBULANCE 222892 (PO 14429)AMBULANCE TRANSPORT SERVICES/SEP1820898
001-1201-4201 25,080.00
Total : 25,080.0020898
90521 11/8/2018 MICHAEL BAKER INTERNATIONAL 1028296 (PO 13709)HERMOSA AVE PAVEMENT RESURFACING/SEP1820916
146-8174-4201 10,173.22
Total : 10,173.2220916
90522 11/8/2018 MOST DEPENDABLE FOUNTAINS INV53556 PO 14759/DRINKING FOUNTAIN REPAIR PARTS11454
001-6101-4309 427.91
Total : 427.9111454
90523 11/8/2018 MURPHY, ANDREW PO 14851 DISMISSED CITATION NO. 3100519521145
001-3302 53.00
Total : 53.0021145
69
11/08/2018
Check Register
CITY OF HERMOSA BEACH
6
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90524 11/8/2018 PARTEK SOLUTIONS INC 22934 (PO 14591)30,000 PARKING CITATION ENVELOPES14694
001-3302-4309 1,437.00
Total : 1,437.0014694
90525 11/8/2018 PROSUM TECHNOLOGY SERVICES SIN017788 PO 14228/BODY CAMERAS/AUG1811539
153-2106-5401 1,280.00
EMAIL AUTHENTICATE (MFA) IMPLEMENT/SEP18SIN017802 (PO 14395)
715-1206-4201 2,750.00
PO 14224/IT SUPPORT SERVICES/NOV18SIN017892
715-1206-4201 14,830.42
Total : 18,860.4211539
90526 11/8/2018 PROVIDENCE MEDICAL INSTITUTE Guarantor 600000285 PRE-EMPLOYMENT PHYSICALS/SEP1801911
001-1203-4320 1,328.00
Total : 1,328.0001911
90527 11/8/2018 PRUDENTIAL OVERALL SUPPLY 42336968 to 42343534 YARD UNIFORMS, TOWELS, &/OR MATS/OCT1817676
001-2101-4309 66.16
001-3104-4309 48.36
001-3302-4309 59.56
001-4202-4314 324.23
001-4204-4309 159.92
715-4206-4309 39.36
Total : 697.5917676
90528 11/8/2018 RAIMI AND ASSOCIATES INC 18-2998 (PO 12876)GENERAL PLAN UPDATE/JUL18-AUG1818223
001-4104-4201 1,591.64
Total : 1,591.6418223
90529 11/8/2018 REDONDO BEACH, CITY OF 566366 (PO 14493)CITY PROSECUTOR SERVICES/SEP1803282
001-1132-4201 16,667.00
Total : 16,667.0003282
90530 11/8/2018 REISS, ROBERT A.Receipt 001-00679290 REFUND FOR PHOTOVOLTAIC INSTALLATION21143
001-6821 55.50
Total : 55.5021143
90531 11/8/2018 RICHARD A DEAN PO 14837 VELA/ASSERTIVE SUPERVISION TRAINING10768
001-2101-4313 300.00
70
11/08/2018
Check Register
CITY OF HERMOSA BEACH
7
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 300.00 90531 11/8/2018 RICHARD A DEAN10768
90532 11/8/2018 RICOTTA, TIM PO 14852 DISMISSED CITATION NOS. 34004467/821144
001-3302 76.00
Total : 76.0021144
90533 11/8/2018 ROBERTS, PHILIP DEAN 02.22.2019/PO 14783 SURFER'S WALK OF FAME ART 201913777
001-4601-4302 500.00
Total : 500.0013777
90534 11/8/2018 SIMS WELDING SUPPLY CO INC 18428574 & 18428575 WELDING SUPPLIES/GAS REFILLS/OCT18~00018
715-4206-4309 236.62
Total : 236.6200018
90535 11/8/2018 SITEONE LANDSCAPE SUPPLY 87236841-001 MAT REQ 532330/LANDSCAPING SUPPLIES19829
001-6101-4309 861.33
Total : 861.3319829
90536 11/8/2018 SMART AND FINAL IRIS COMPANY 3220630011410 MAT REQ 873442/COFFEE W/COP SUPPLIES00114
001-3302-4201 97.88
MAT REQ 863362/EXCURSION GOODY BAGS3220630017683
001-4601-4308 36.22
MAT REQ 863240/JAIL SUPPLIES3220630020325
001-2101-4306 38.75
MAT REQ 873443/RABIES CLINIC SUPPLIES3220630025894
001-3302-4201 118.99
MAT REQ 863237/JAIL SUPPLIES3220630026751
001-2101-4306 127.98
MAT REQ 863327/PARK PROGRAM SNACKS3220630026790
001-4601-4308 271.76
MAT REQ 863243/JAIL SUPPLIES3220630029003
001-2101-4306 101.44
NEW SECURITY CO. MEETING REFRESHMENTS3220630041608
001-2101-4305 13.73
COMM POLICE ADVISORY BOARD/PLATES/FORKS3220630054625
001-3302-4201 19.14
REQ 863431/SENIOR CENTER COFFEE SUPPLIES3220630055735
001-4601-4328 109.06
MAT REQ 863432/CUPS/PAPER TOWELS3220630055741
71
11/08/2018
Check Register
CITY OF HERMOSA BEACH
8
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90536 11/8/2018 (Continued)SMART AND FINAL IRIS COMPANY00114
001-4601-4305 74.67
Total : 1,009.6200114
90537 11/8/2018 SOUTHERN CALIFORNIA EDISON CO 2-01-414-2152 ELECTRICITY/OCT1800159
001-6101-4303 1,563.67
ELECTRICITY/OCT182-01-414-3747
105-2601-4303 46.89
ELECTRICITY/OCT182-01-414-4281
105-2601-4303 217.90
ELECTRICITY/OCT182-01-414-5106
001-3104-4303 571.09
ELECTRICITY/OCT182-08-629-3669
001-4204-4303 64.83
ELECTRICITY/OCT182-20-128-4825
001-3304-4303 1,272.84
ELECTRICITY/OCT182-20-128-5475
001-4204-4303 200.55
ELECTRICITY/OCT182-20-984-6369
105-2601-4303 52.75
ELECTRICITY/OCT182-23-687-8021
001-3104-4303 47.72
ELECTRICITY/OCT182-23-725-4420
001-4204-4303 3,737.73
ELECTRICITY/OCT182-31-250-3303
001-4204-4303 41.12
ELECTRICITY/OCT182-36-722-1322
105-2601-4303 41.08
ELECTRICITY/OCT182-37-909-1838
001-4204-4303 535.89
ELECTRICITY/OCT182-39-985-7812
001-4204-4303 1,319.00
Total : 9,713.0600159
90538 11/8/2018 SPCALA 2018-0930 PO 14433/ANIMAL SERVICES/SEP1818821
001-3302-4201 400.00
Total : 400.0018821
90539 11/8/2018 SRK PROMOTIONAL ADVERTISING 4122 (PO 14717)COMMUNITY OUTREACH/750 HALLOWEEN BAGS15398
72
11/08/2018
Check Register
CITY OF HERMOSA BEACH
9
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90539 11/8/2018 (Continued)SRK PROMOTIONAL ADVERTISING15398
001-3302-4201 999.95
COMMUNITY OUTREACH/350 HALLOWEEN BAGS4123 (PO 14719)
001-3302-4201 467.08
COMMUNITY OUTREACH/1500 GLOW STICKS4124 (PO 14715)
001-3302-4201 713.33
Total : 2,180.3615398
90540 11/8/2018 THAYER'S DIST. & ELECTRICAL 6745 (PO 14808)BARD ST. GATE REPAIR21075
301-8673-4201 541.33
Total : 541.3321075
90541 11/8/2018 TIREHUB LLC 4893551 MAT REQ 773683/VEHICLE 35 TIRES21146
715-2101-4311 683.54
Total : 683.5421146
90542 11/8/2018 T-MOBILE Account 946625962 PD/CSOS/CELL PHONES/OCT1819082
001-2101-4304 214.88
001-3302-4304 40.29
YARD/CELL PHONES/MOBILE INTERNET/OCT18Account 954297746
001-4202-4304 678.10
Total : 933.2719082
90543 11/8/2018 T-MOBILE 9335503495/PO 14854 CELL PHONE TRACKING FOR INVESTIGATION19082
001-2101-4201 408.00
Total : 408.0019082
90544 11/8/2018 TURBODATA SYSTEMS, INC.28949 (PO 14431)CITATION WRITER WIRELESS FEES/NOV1820670
001-3302-4201 1,250.00
Total : 1,250.0020670
90545 11/8/2018 VELA, DIOCELINDA PO 14838 PER DIEM/ASSERTIVE SUPERVISION TRAINING19540
001-2101-4313 45.00
Total : 45.0019540
90546 11/8/2018 VERIZON WIRELESS LA 9816620782 PD TRUNK MODEMS/OCT1803209
001-2101-4304 418.11
Total : 418.1103209
90547 11/8/2018 VLASICH, DENNIS STS-00035 (PO 14456)RFP FOR IT SERVICE PROVIDERS/OCT1821063
73
11/08/2018
Check Register
CITY OF HERMOSA BEACH
10
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90547 11/8/2018 (Continued)VLASICH, DENNIS21063
715-1206-4201 110.00
Total : 110.0021063
90548 11/8/2018 VORTEX INDUSTRIES, INC.07-1286334/PO 14711 YARD/ROLLING STEEL DOORS/PREVENT MAINT15597
001-4204-4201 268.00
YARD BAY DOOR REPAIRS07-1290146/PO 14782
001-4204-4201 2,134.96
Total : 2,402.9615597
90549 11/8/2018 WESTCHESTER MEDICAL GROUP CH026-8363/PO 14846 PRE-EMPLOYMENT PHYSICAL/SEP1811219
001-1203-4320 350.00
Total : 350.0011219
90550 11/8/2018 WITTMAN ENTERPRISES LLC 1808062 (PO 14587)AMBULANCE TRANSPORT BILLING/AUG1813359
001-1202-4201 2,995.08
Total : 2,995.0813359
90551 11/8/2018 WOOD ENVIRONMENT & INFRASTRUCT S23732111 (PO 8512)STRAND/PIER HOTEL ENVIRON IMPACT/SEP1819757
001-2105 5,453.85
Total : 5,453.8519757
1860149188 11/6/2018 ADMINSURE AS AGENT FOR THE 11/8/18 Check Run WORK COMP CLAIMS REIMB/OCT18-NOV1814691
705-1217-4324 19,470.62
Total : 19,470.6214691
1873855001 11/7/2018 ADMINSURE AS AGENT FOR THE 11/8/18 Check Run WORK COMP/SETTLEMENT REIMB/NOV1814691
705-1217-4324 80,000.00
Total : 80,000.0014691
Bank total : 506,286.22 73 Vouchers for bank code :boa
506,286.22Total vouchers :Vouchers in this report 73
74
11/08/2018
Check Register
CITY OF HERMOSA BEACH
11
5:13:21PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 11 inclusive, of the check
register for 11/8/18 are accurate funds are available for
payment, and are in conformance to the budget."
By
Finance Director
Date 11/15/18
75
11/15/2018
Check Register
CITY OF HERMOSA BEACH
1
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90552 11/15/2018 3V SIGNS AND GRAPHICS LLC 9686 (PO 14738)STAGE BANNER FOR LA LA LAND EVENT17339
001-1101-4319 210.24
Total : 210.2417339
90553 11/15/2018 ACCELA INC INV-ACC42710 CITIZEN RELATIONSHIP MGMT/MAY18-APR1905817
715-4202-4201 5,600.00
Total : 5,600.0005817
90554 11/15/2018 ANGULO, ANSELMO 2018/1 (PO 14881) POLYGRAPH EXAM/OCT1808741
001-2101-4201 175.00
Total : 175.0008741
90555 11/15/2018 ASCENT ELEVATOR SERVICES, INC 14061 (PO 14268) ELEVATOR MAINTENANCE/NOV1818891
001-4204-4201 288.00
Total : 288.0018891
90556 11/15/2018 AT&T 248 134-9454 462 8 PD COMPUTER CIRCUITS/NOV1800321
001-2101-4304 13.98
PD COMPUTER CIRCUITS/NOV18960 461-1985 555 7
001-2101-4304 108.62
Total : 122.6000321
90557 11/15/2018 BENDER, ROSALIND Parcel 4185-004-012 STREET LIGHT & SEWER TAX REBATE17706
001-6871 121.69
105-3105 24.61
Total : 146.3017706
90558 11/15/2018 CA PEACE OFFICERS ASSOCIATION 146890 (PO 14869) SCHEID/MEMBERSHIP RENEWAL00261
001-2101-4315 125.00
Total : 125.0000261
90559 11/15/2018 CALIFORNIA WATER SERVICE Account 4286211111 WATER USAGE/SEP1800016
001-6101-4303 34,044.34
001-4204-4303 1,187.56
001-3304-4303 286.82
105-2601-4303 5,929.00
Total : 41,447.7200016
90560 11/15/2018 CDWG PSN0578 MAT REQ 549649/PRINTER TONER/INK09632 2b (3)76
11/15/2018
Check Register
CITY OF HERMOSA BEACH
2
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90560 11/15/2018 (Continued)CDWG09632
001-2101-4305 220.23
MAT REQ 649682/PRINTER TONER/INKPVV8910
715-1206-4305 1,414.88
UNINTERUPPTED POWER SOURCEPVW9077 (PO 14814)
715-1206-5402 1,813.80
Total : 3,448.9109632
90561 11/15/2018 CODE PUBLISHING INC 61573 (PO 14466)MUNICIPAL CODE ELECTRONIC UPDATE/OCT1818570
001-1121-4201 469.50
Total : 469.5018570
90562 11/15/2018 DAMBROS, JOHN A.Parcel 4184-015-051 SEWER & STREET LIGHT TAX REBATE20802
001-6871 121.69
105-3105 24.61
Total : 146.3020802
90563 11/15/2018 EMPIRE PIPE CLEANING AND EQUIP 11400 (PO 14845)CLEAN & VIDEO INSPECT SEWERS/OCT1807853
160-3102-4201 24,569.34
Total : 24,569.3407853
90564 11/15/2018 FEDERAL EXPRESS CORP 6-357-79060 REQ 549593/DELIVERY TO DONNOE (VENDOR)01962
001-1203-4305 38.52
Total : 38.5201962
90565 11/15/2018 FITZGERALD, JON PO 14872 SOUTH BAY FILM & MUSIC FESTIVAL SUPPORT19232
001-1201-4201 1,500.00
Total : 1,500.0019232
90566 11/15/2018 FREDERICK, ARTHUR C Parcel 4184-027-093 STREET LIGHT & SEWER TAX REBATE16891
001-6871 121.69
105-3105 24.61
Total : 146.3016891
90567 11/15/2018 FRONTIER 209-188-4669-0714985 LANDLINES/COMPUTER LINKS/NOV1819884
001-3302-4304 66.73
001-2101-4304 793.71
001-4204-4321 205.08
001-4202-4304 52.10
001-4201-4304 150.62
77
11/15/2018
Check Register
CITY OF HERMOSA BEACH
3
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90567 11/15/2018 (Continued)FRONTIER19884
001-3304-4304 57.16
001-1204-4304 49.55
PD COMPUTER CIRCUITS/NOV18209-190-0013-1206175
001-2101-4304 879.53
EOC ANALOG LINES/NOV18310-318-0113-1203155
715-1206-4304 1,763.49
CASHIER TAPS LINE/NOV18310-318-8751-0128095
001-1204-4304 51.78
DUI BREATH TESTER/NOV18310-318-9210-0821785
001-2101-4304 61.75
PERSONNEL FAX LINE/NOV18310-372-6373-0311045
001-1203-4304 49.42
EOC CABLE & INTERNET/NOV18323-159-2268-0924145
001-1201-4304 286.57
Total : 4,467.4919884
90568 11/15/2018 GFOA 2903799 (PO 14864)NEWKIRK/GAAP UPDATE WEBINAR 12/5/1800427
001-1202-4317 135.00
Total : 135.0000427
90569 11/15/2018 GOLDEN TOUCH CLEANING, INC.65665 (PO 14468)JANITORIAL/CITY-OWNED BLDGS/OCT1820627
001-4204-4201 9,111.00
Total : 9,111.0020627
90570 11/15/2018 GRAINGER 9951840967 MAT REQ 773362/TRAILER JACK10836
715-3104-4311 60.40
Total : 60.4010836
90571 11/15/2018 HAJOCA CORP S153752736.001 MAT REQ 863196/PLUMBING SUPPLIES13330
001-4204-4309 340.85
MAT REQ 863182/PLUMBING SUPPLIESS154198634.001
001-4204-4309 435.83
Total : 776.6813330
90572 11/15/2018 HOST COMPLIANCE LLC 1358 (PO 14830)COMPLIANCE/ADDRESS IDENTIFY SUBSCRIPTION20038
001-4201-4201 8,447.00
Total : 8,447.0020038
90573 11/15/2018 INGLEWOOD WHOLESALE ELECTRIC 259013-00 MAT REQ 863194/ELECTRICAL SUPPLIES02458
78
11/15/2018
Check Register
CITY OF HERMOSA BEACH
4
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90573 11/15/2018 (Continued)INGLEWOOD WHOLESALE ELECTRIC02458
105-2601-4309 239.69
MAT REQ 863195/LA LA LAND SUPPLIES259044-00
001-1101-4319 531.63
Total : 771.3202458
90574 11/15/2018 JOHNSON, LESLIE PO 14787 INSTRUCTOR PAYMENT/CLASS NOS. 7838-4218132
001-4601-4221 4,620.00
Total : 4,620.0018132
90575 11/15/2018 LAURA MECOY COMMUNICATIONS LLC 9-2018 (PO 14465)PUBLIC INFORMATION OFFICER/OCT1820347
001-1101-4201 6,000.00
Total : 6,000.0020347
90576 11/15/2018 LEWIS, ANNIE G.PO 14788 INSTRUCTOR PAYMENT/CLASS NOS. 7782/420732
001-4601-4221 1,176.00
Total : 1,176.0020732
90577 11/15/2018 LEXISNEXIS RISK DATA MGMT INC 1114400-20181031 INFORMATION SERVICES/OCT1812482
001-2101-4201 75.90
Total : 75.9012482
90578 11/15/2018 LOS ANGELES NEWS GROUP Statement No. 408853 JOB AD/PD RECRUIT/CREW SUPERVISOR/OCT1819623
001-1203-4201 1,115.00
Total : 1,115.0019623
90579 11/15/2018 M6 CONSULTING INC 982-18 (PO 9142)ENCROACHMENT PERMIT REVIEW/SEP1819487
001-4202-4201 4,095.00
Total : 4,095.0019487
90580 11/15/2018 MAGNUM VENTURE PARTNERS PO 14825 INSTRUCTOR PAYMENT/CLASS NOS. 7796/718274
001-4601-4221 1,081.10
Total : 1,081.1018274
90581 11/15/2018 MAIN STREET TOURS 9509C/Mat Req 863363 EXCURSION TRANSPORT/BIG BEAR OKTOBERFEST10045
145-3409-4201 1,620.00
EXCURSION TRANSPORT/BIG BEAR OKTOBERFEST9509C/Mat Req 863364
001-4601-4201 1,145.00
Total : 2,765.0010045
79
11/15/2018
Check Register
CITY OF HERMOSA BEACH
5
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90582 11/15/2018 MANIACI INSURANCE SERVICES 913 (PO 14354)BENEFITS CONNECT ADMINISTRATION/OCT1818312
001-1203-4201 569.16
Total : 569.1618312
90583 11/15/2018 MCGOWAN CONSULTING LLC HB-MS4-1819-02 STORM WATER MGMT/NPDES PERMITS/SEP1814041
161-3109-4201 2,586.60
Total : 2,586.6014041
90584 11/15/2018 MERCHANTS LANDSCAPE SERVICES 52959 (PO 14377) CITYWIDE LANDSCAPING SERVICES/OCT1818071
001-6101-4201 19,200.00
CITYWIDE LANDSCAPING SERVICES/OCT1852960 (PO 14377)
105-2601-4201 3,700.00
Total : 22,900.0018071
90585 11/15/2018 MONOSMITH, LINDA Parcel 4161-026-019 STREET LIGHT & SEWER TAX REBATE09899
001-6871 119.30
105-3105 24.61
Total : 143.9109899
90586 11/15/2018 MONTROSE AND ASSOCIATES INC 25725 (PO 14889) CHAMBERS DVD RECORDING TROUBLESHOOTING13791
715-4204-4201 270.00
Total : 270.0013791
90587 11/15/2018 MOST DEPENDABLE FOUNTAINS INV53500 (PO 14679) E. RODAWAY PARK/DRINKING WATER FOUNTAIN11454
125-8546-4201 4,613.37
Total : 4,613.3711454
90588 11/15/2018 OFFICE DEPOT 216752186001 MAT REQ 549818/STORAGE BOXES/FOOTREST13114
001-1201-4305 89.51
MAT REQ 549585/KEYBOARD TRAY217045870001
001-1203-4305 90.57
MAT REQ 649640/OFFICE SUPPLIES220069057001
001-1208-4305 132.82
MAT REQ 863361/HOOKS/PRINTER STAND220452400001
001-4601-4305 91.59
MAT REQ 669900/OFFICE SUPPLIES221889381001
001-4202-4305 84.81
MAT REQ 863433/OFFICE SUPPLIES222400308001
001-4601-4305 65.75
MAT REQ 549648/AUDIO CABLES (2)222867705001
80
11/15/2018
Check Register
CITY OF HERMOSA BEACH
6
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90588 11/15/2018 (Continued)OFFICE DEPOT13114
001-2101-4305 31.47
MAT REQ 549648/OFFICE SUPPLIES222868551001
001-2101-4305 51.80
MAT REQ 863059/PRINTER INK/MASKING TAPE224671106001
001-4201-4305 90.60
MAT REQ 863244/OFFICE SUPPLIES225428479001
001-2101-4305 54.16
Total : 783.0813114
90589 11/15/2018 PLANIT POLICE/RAGNASOFT RSI-0003438 SCHEDULING SOFTWARE 1 YEAR SUBSCRIPTION20748
153-2106-4201 2,500.00
Total : 2,500.0020748
90590 11/15/2018 PROSUM TECHNOLOGY SERVICES SIN017873 (PO 14395)EMAIL MFA AUTHENTICATION IMPLEMENT/OCT1811539
715-1206-4201 2,000.00
Total : 2,000.0011539
90591 11/15/2018 PSOMAS 145024 (PO 14107)SEWER IMPROVEMENT DESIGN SRVCS/SEP1813608
160-8416-4201 11,970.00
Total : 11,970.0013608
90592 11/15/2018 RED SECURITY GROUP, LLC 54176/Mat Req 649512 THEATRE EMERGENCY EXIT DOOR REPAIRS13255
001-4204-4309 192.50
MAT REQ 863193/CAM LOCKS (8)55655
001-4204-4309 131.40
Total : 323.9013255
90593 11/15/2018 ROCK N ROLL CAR WASH LLC 214 CITY VEHICLE CAR WASHES/OCT1818596
715-2101-4311 125.00
715-3302-4311 55.00
715-4201-4311 10.00
715-4202-4311 10.00
Total : 200.0018596
90594 11/15/2018 SAFEWAY INC VONS 431587-101618-2110 PARK PROGRAM CRAFT/100 MINI PUMPKINS~16425
001-4601-4308 97.46
SURFER WALK OF FAME/JUDGE MEETING/DRINKS432379-092818-2110
001-4601-4308 7.58
MAT REQ 863366/VETERANS DAY EVENT/DRINKS724699-110618-2110
81
11/15/2018
Check Register
CITY OF HERMOSA BEACH
7
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90594 11/15/2018 (Continued)SAFEWAY INC VONS16425
001-2120 110.17
MAT REQ 863365/VETERANS DAY EVENT/SNACKS803298-110618-2110
001-2120 5.98
Total : 221.1916425
90595 11/15/2018 SBCU VISA 08J0034513168 CC PD WATER DELIVERY 9/13/18-10/12/1803353
001-2101-4305 220.43
PO 14821/WHITE ARCHIVAL PAPER9430030 CC
001-1121-4305 218.00
SENIOR CENTER MOVIES/MUSIC/SEP18-OCT18Email Receipts CC
001-4601-4328 39.96
OSBORNE/CRIME ANALYSTS CONF/CANCELLATIONFolio 930781 CC
001-2101-4317 -195.49
BINS/DESKTOP ORGANIZER/CASH BOXMat Req 863236 CC
001-2101-4305 97.42
RESTROOM SIGNS/REFUND OF DOUBLE-CHARGEPO 14584 CC
001-4601-4201 -85.34
KHANG/ERGONOMIC CHAIRPO 14609 CC
001-4101-4305 524.30
PD RECRUIT BUSINESS CARDSPO 14618 CC
001-1203-4201 46.50
COFFEE WITH A COP AD BOOSTPO 14621 CC
001-2101-4305 19.79
COMM THEATRE CAMERA/WALL MOUNT BRACKETPO 14630 CC
001-4601-4201 74.93
WATER BROOM TO CLEAN TENNIS COURTSPO 14638 CC
001-6101-4309 465.46
ERGONOMIC WIRLESS KEYBOARD & MOUSEPO 14663 CC
001-1203-4305 98.54
CORDOVA/BLUEPRINT READING CLASSPO 14667 CC
001-4202-4317 595.00
RESISTANCE BANDS/DUMBBELLS/STEP STOOLSPO 14673 CC
001-4601-4328 304.63
COMMUNITY MOVIE NIGHT PROPS/DECORPO 14677 CC
001-4601-4308 95.03
STAFF MEETING/TRAINING DINNERPO 14701 CC
001-4601-4317 160.71
LA LA LAND EVENT/PLAQUE FRAMEPO 14739 CC
82
11/15/2018
Check Register
CITY OF HERMOSA BEACH
8
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90595 11/15/2018 (Continued)SBCU VISA03353
001-1101-4319 301.12
LA LA LAND PLAQUE EASEL/TO BE REFUNDEDPO 14748 CC
001-1101-4319 90.95
STRING LIGHTS FOR LA LA LAND EVENTPO 14761 CC
001-1101-4319 11.99
COMMUNITY MOVIE NIGHT/TABLECLOTHSPO 14780 CC
001-4601-4308 68.97
ORAL BOARD REFRESHMENTSReceipt CC
001-1203-4201 23.96
ORAL BOARD REFRESHMENTSReceipt CC
001-1203-4201 28.65
COMMUNITY POLICE ADVISORY BOARD DINNERReceipt CC
001-3302-4201 67.24
COMMUNITY POLICE ACADEMY REFRESHMENTSReceipt CC
001-3302-4201 133.10
ELLIS/2018 APA CALIFORNIA CONFERENCETR 726 CC
001-4101-4317 96.75
SCHEID/POST MANAGEMENT COURSETR 745 CC
001-2101-4312 726.20
Total : 4,228.8003353
90596 11/15/2018 SIGNVERTISE 8233/Mat Req 549852 2 PD HIRING BANNERS INSTALL/REMOVE09491
001-4202-4305 461.32
Total : 461.3209491
90597 11/15/2018 SOUTHERN CALIFORNIA EDISON CO 2-00-989-6911 ELECTRICITY/OCT1800159
105-2601-4303 88.66
ELECTRICITY/OCT182-01-836-7458
105-2601-4303 14.50
ELECTRICITY/OCT182-02-274-0542
001-6101-4303 23.81
ELECTRICITY/OCT182-09-076-5850
105-2601-4303 64.22
ELECTRICITY/OCT182-19-024-1604
001-4204-4303 1,150.85
ELECTRICITY/OCT182-21-400-7684
105-2601-4303 32.23
ELECTRICITY/OCT182-26-686-5930
83
11/15/2018
Check Register
CITY OF HERMOSA BEACH
9
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90597 11/15/2018 (Continued)SOUTHERN CALIFORNIA EDISON CO00159
105-2601-4303 262.19
Total : 1,636.4600159
90598 11/15/2018 SPECTRUM BUSINESS 0049969110118 PD/CABLE/NOV1820236
001-2101-4201 72.09
PW YARD/CABLE 11/16/18-12/15/180088884110418
001-4202-4201 114.06
Total : 186.1520236
90599 11/15/2018 STERICYCLE 3004441117/PO 14095 PD/MEDICAL WASTE DISPOSAL/NOV1810412
001-2101-4201 85.00
Total : 85.0010412
90600 11/15/2018 STUDIO 637 1170 (PO 14849)VETERANS DAY CEREMONY FILMING SERVICES18156
001-2120 300.00
Total : 300.0018156
90601 11/15/2018 TETRA TECH, INC.51363430 (PO 13019)GREENBELT INFILTRATION DESIGN/SEP1820755
301-8542-4201 674.56
150-8542-4201 4,285.44
GREENBELT INFILTRATION DESIGN/OCT1851373137 (PO 13019)
301-8542-4201 888.08
150-8542-4201 5,641.92
Total : 11,490.0020755
90602 11/15/2018 THE BANK OF NEW YORK MELLON 252-2143850 INVESTMENT SAFEKEEPING SERVICES/1ST QTR13270
001-1141-4201 875.00
Total : 875.0013270
90603 11/15/2018 UNDERGROUND SERVICE ALERT 1020180319 UNDERGROUND SERVICE ALERTS/OCT1808207
160-3102-4201 113.95
Total : 113.9508207
90604 11/15/2018 UNITED SITE SERVICES 114-7587176 PO 14655/LA LA LAND EVENT/RESTROOMS18753
001-3301-4201 665.35
Total : 665.3518753
90605 11/15/2018 UPTIME COMPUTER SERVICE 31175 PRINTER MAINTENANCE/NOV1804768
715-1206-4201 943.00
84
11/15/2018
Check Register
CITY OF HERMOSA BEACH
10
3:33:42PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
(Continued)Total : 943.00 90605 11/15/2018 UPTIME COMPUTER SERVICE04768
90606 11/15/2018 WESTERN GRAPHIX 51054/Mat Req 863251 PD/CSO/VIP ID CARDS02873
001-2101-4201 137.69
001-3302-4201 52.27
EMPLOYEE ID CARDS/PHOTOBOOK51055/Mat Req 549589
001-1203-4305 248.93
Total : 438.8902873
183514103 11/14/2018 ADMINSURE AS AGENT FOR THE 11/15/18 Check Run WORK COMP CLAIMS REIMB/NOV1814691
705-1217-4324 7,706.10
Total : 7,706.1014691
Bank total : 201,341.85 56 Vouchers for bank code :boa
201,341.85Total vouchers :Vouchers in this report 56
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 10 inclusive, of the check
register for 11/15/18 are accurate funds are available for
payment, and are in conformance to the budget."
By
Finance Director
Date 11/15/18
85
11/15/2018
Check Register
CITY OF HERMOSA BEACH
1
4:28:47PM
Page:
Bank code :boa
Voucher Date Vendor Invoice Description/Account Amount
90607 11/15/2018 SOUTHERN CALIFORNIA EDISON CO 2-41-090-1755 ELECTRICITY/JUL18-OCT1800159
001-4204-4303 134.19
Total : 134.1900159
Bank total : 134.19 1 Vouchers for bank code :boa
134.19Total vouchers :Vouchers in this report 1
"I hereby certify that the demands or claims covered by the
checks listed on pages 1 to 1 inclusive, of the check
register for 11/15/18 are accurate funds are available for
payment, and are in conformance to the budget."
By
Finance Director
Date 11/15/18
2b (4)
86
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0715
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
REVENUE REPORT, EXPENDITURE REPORT,
AND CIP REPORT BY PROJECT FOR OCTOBER 2018
(Finance Director Viki Copeland)
Recommended Action:
Staff recommends that the City Council receive and file the October 2018 Financial Reports,
including the CIP Report by Project.
Summary:
Attached are the October 2018 Revenue and Expenditure reports.The reports provide detail by
revenue account and by department for expenditures,with summaries by fund at the end of each
report.
General Fund revenue is 18.1%received for 33.3%of the fiscal year.The General Fund revenue,
particularly tax revenue,is not received incrementally.Adjusting for tax revenue would bring the total
to 34.0%.
General Fund expenditures are 30.6%expended for 33.3%of the fiscal year.Expenditures do not
necessarily occur on an incremental basis.
This CIP Report groups the funding for each project together,which is similar to how the projects are
shown in the budget.In the regular Expenditure Report,the CIPs appear at the end of each fund,
therefore, the total funding is not displayed in one place.
Attachments:
1.Oct 18 Revenue Report
2.Oct 18 Expenditure Report
3.Oct 18 CIP Report by Project
Respectfully Submitted by: Viki Copeland, Finance Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™87
11/19/2018
CITY OF HERMOSA BEACH
1
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3100 Taxes
3101 Current Year Secured 14,149,469.00 0.00 0.00 14,149,469.00 0.00
3102 Current Year Unsecured 553,090.00 407,491.62 407,491.62 145,598.38 73.68
3103 Prior Year Collections 0.00 5,444.77 5,444.77 -5,444.77 0.00
3104 In-lieu Sales Tax 0.00 0.00 0.00 0.00 0.00
3106 Supplemental Roll SB813 366,471.00 54,807.59 54,807.59 311,663.41 14.96
3107 Transfer Tax 300,181.00 55,468.60 55,468.60 244,712.40 18.48
3108 Sales Tax 3,034,000.00 827,237.20 827,237.20 2,206,762.80 27.27
3109 1/2 Cent Sales Tx Ext 254,433.00 37,998.39 37,998.39 216,434.61 14.93
3110 Spectrum Cable TV Franchise 171,585.00 0.00 0.00 171,585.00 0.00
3111 Electric Franchise 82,259.00 0.00 0.00 82,259.00 0.00
3112 Gas Franchise 38,596.00 0.00 0.00 38,596.00 0.00
3113 Refuse Franchise 227,797.00 59,999.45 59,999.45 167,797.55 26.34
3114 Transient Occupancy Tax 3,260,078.00 844,464.17 844,464.17 2,415,613.83 25.90
3115 Business License 1,070,000.00 271,436.06 271,436.06 798,563.94 25.37
3120 Utility User Tax 2,250,177.00 595,602.36 595,602.36 1,654,574.64 26.47
3122 Property tax In-lieu of Veh Lic Fees 2,659,922.00 0.00 0.00 2,659,922.00 0.00
3123 Frontier Cable Franchise Fee 204,555.00 0.00 0.00 204,555.00 0.00
Total Taxes 11.04 28,622,613.00 3,159,950.21 3,159,950.21 25,462,662.79
3200 Licenses And Permits
3202 Dog Licenses 12,600.00 8,287.00 8,287.00 4,313.00 65.77
3203 Bicycle Licenses 0.00 0.00 0.00 0.00 0.00
1Page:
88
11/19/2018
CITY OF HERMOSA BEACH
2
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3204 Building Permits 857,000.00 261,257.19 261,257.19 595,742.81 30.49
3205 Electric Permits 96,530.00 31,656.50 31,656.50 64,873.50 32.79
3206 Plumbing Permits 65,000.00 32,418.00 32,418.00 32,582.00 49.87
3207 Occupancy Permits 11,065.00 6,486.00 6,486.00 4,579.00 58.62
3208 Grease Trap Permits 1,280.00 792.00 792.00 488.00 61.88
3209 Garage Sales 0.00 77.00 77.00 -77.00 0.00
3211 Banner Permits 1,250.00 52.00 52.00 1,198.00 4.16
3212 Animal/Fowl Permits 0.00 0.00 0.00 0.00 0.00
3213 Animal Redemption Fee 0.00 293.00 293.00 -293.00 0.00
3214 Amplified Sound Permit 17,637.00 4,681.00 4,681.00 12,956.00 26.54
3215 Temporary Sign Permit 1,312.00 1,142.00 1,142.00 170.00 87.04
3216 Spray Booth Permit 0.00 0.00 0.00 0.00 0.00
3217 Open Fire Permit 0.00 315.00 315.00 -315.00 0.00
3218 Auto Repair Permit 0.00 0.00 0.00 0.00 0.00
3219 Newsrack Permits 1,400.00 0.00 0.00 1,400.00 0.00
3220 Commercial St Light Banner Program 0.00 0.00 0.00 0.00 0.00
3225 Taxicab Franchise Fees 26,332.00 356.00 356.00 25,976.00 1.35
3226 Admin Permit - Limited Outdoor Seating 958.00 479.00 479.00 479.00 50.00
3227 Mechanical Permits 44,800.00 16,765.00 16,765.00 28,035.00 37.42
3228 Concealed Weapons Permit 100.00 0.00 0.00 100.00 0.00
3229 Private Special Event Permit 0.00 0.00 0.00 0.00 0.00
3230 Temporary Minor Special Event Permit 2,395.00 1,916.00 1,916.00 479.00 80.00
3232 Second-Single Family Dweling Permit 0.00 0.00 0.00 0.00 0.00
3233 Emergency Shelters Permit 0.00 0.00 0.00 0.00 0.00
2Page:
89
11/19/2018
CITY OF HERMOSA BEACH
3
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3234 Single-Room Occupancy Permit 0.00 0.00 0.00 0.00 0.00
3235 Outdor Fitness Permit 0.00 0.00 0.00 0.00 0.00
3236 Drone Permit Fee 2,900.00 585.00 585.00 2,315.00 20.17
3239 A-Frame sign Permit 500.00 395.00 395.00 105.00 79.00
Total Licenses And Permits 32.19 1,143,059.00 367,952.69 367,952.69 775,106.31
3300 Fines & Forfeitures
3301 Municipal Court Fines 96,439.00 27,302.90 27,302.90 69,136.10 28.31
3302 Court Fines /Parking 1,981,749.00 810,597.33 810,597.33 1,171,151.67 40.90
3305 Administrative Fines 15,650.00 3,100.00 3,100.00 12,550.00 19.81
3306 Nuisance Abatement- Restrooms 33,000.00 13,950.00 13,950.00 19,050.00 42.27
Total Fines & Forfeitures 40.20 2,126,838.00 854,950.23 854,950.23 1,271,887.77
3400 Use Of Money & Property
3401 Interest Income 187,508.00 35,740.05 35,740.05 151,767.95 19.06
3402 Rents & Concessions 1,500.00 406.41 406.41 1,093.59 27.09
3403 Pier Revenue 0.00 0.00 0.00 0.00 0.00
3404 Community Center Leases 25,500.00 10,584.00 10,584.00 14,916.00 41.51
3405 Community Center Rentals 180,000.00 42,921.00 42,921.00 137,079.00 23.85
3406 Community Center Theatre 65,000.00 44,905.75 44,905.75 20,094.25 69.09
3411 Other Facilities 0.00 0.00 0.00 0.00 0.00
3412 Tennis Courts 0.00 0.00 0.00 0.00 0.00
3414 Fund Exchange 0.00 0.00 0.00 0.00 0.00
3418 Special Events 100,000.00 24,889.00 24,889.00 75,111.00 24.89
3Page:
90
11/19/2018
CITY OF HERMOSA BEACH
4
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3419 Revenue-Centennial Celeb 0.00 0.00 0.00 0.00 0.00
3422 Beach/Plaza Promotions 30,000.00 0.00 0.00 30,000.00 0.00
3425 Ground Lease 39,382.00 13,127.20 13,127.20 26,254.80 33.33
3427 Cell Site License- Sprint 38,754.00 12,755.60 12,755.60 25,998.40 32.91
3428 Cell Site License - Verizon 32,754.00 10,804.88 10,804.88 21,949.12 32.99
3429 Inmate Phone Services 780.00 432.30 432.30 347.70 55.42
3431 Storage Facility Operating Lease 180,000.00 60,000.00 60,000.00 120,000.00 33.33
3432 Film Permits 60,000.00 19,342.00 19,342.00 40,658.00 32.24
3450 Investment Discount 1,035.00 138.15 138.15 896.85 13.35
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
3476 Solid Waste Lease Space 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 29.30 942,213.00 276,046.34 276,046.34 666,166.66
3500 Intergovernmental/State
3505 In Lieu Motor Vehicle 0.00 0.00 0.00 0.00 0.00
3507 Highway Maintenance 3,100.00 0.00 0.00 3,100.00 0.00
3508 Mandated Costs 7,088.00 7,539.00 7,539.00 -451.00 106.36
3509 Homeowner Property Tax Relief 84,000.00 0.00 0.00 84,000.00 0.00
3510 POST 22,365.00 1,268.04 1,268.04 21,096.96 5.67
3511 STC-Service Officer Training 4,730.00 0.00 0.00 4,730.00 0.00
3575 VLF Coll Excess of $14m-Rev code 11001.5 10,326.00 0.00 0.00 10,326.00 0.00
Total Intergovernmental/State 6.69 131,609.00 8,807.04 8,807.04 122,801.96
3800 Current Service Charges
4Page:
91
11/19/2018
CITY OF HERMOSA BEACH
5
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3801 Residential Inspection 57,591.00 16,353.00 16,353.00 41,238.00 28.40
3802 Planning Sign Permit/Master Sign Program 16,484.00 6,898.00 6,898.00 9,586.00 41.85
3803 Negative Declaration 0.00 0.00 0.00 0.00 0.00
3804 General Plan Maintenance Fees 217,000.00 56,901.00 56,901.00 160,099.00 26.22
3805 Amendment to Planning Entitlement 20,620.00 4,124.00 4,124.00 16,496.00 20.00
3806 Board Of Appeals 0.00 0.00 0.00 0.00 0.00
3807 Refuse Lien Fees/Consolidated 0.00 0.00 0.00 0.00 0.00
3808 Zone Variance Review 0.00 0.00 0.00 0.00 0.00
3809 Tentative Map Review 9,010.00 6,757.50 6,757.50 2,252.50 75.00
3810 Final Map Review 8,100.00 2,700.00 2,700.00 5,400.00 33.33
3811 Zone Change 3,902.00 3,902.00 3,902.00 0.00 100.00
3812 Conditional Use Permit - Comm/Other 9,362.00 0.00 0.00 9,362.00 0.00
3813 Plan Check Fees 408,000.00 130,884.00 130,884.00 277,116.00 32.08
3814 Appeal to City Council From Staff 0.00 0.00 0.00 0.00 0.00
3815 Public Works Services 130,000.00 34,663.00 34,663.00 95,337.00 26.66
3816 Utility Trench Service Connect Permit 100,000.00 11,771.00 11,771.00 88,229.00 11.77
3817 Address Change Request Fee 4,640.00 696.00 696.00 3,944.00 15.00
3818 Police Services 1,500.00 370.00 370.00 1,130.00 24.67
3819 Jail Services 15,300.00 5,865.00 5,865.00 9,435.00 38.33
3821 Daily Permit Lot A/Parking Structure 50,136.00 17,422.00 17,422.00 32,714.00 34.75
3823 Special Event Security/Police 39,000.00 11,083.30 11,083.30 27,916.70 28.42
3824 500' Noticing 11,646.00 1,294.00 1,294.00 10,352.00 11.11
3825 Public Notice Posting 3,825.00 1,225.00 1,225.00 2,600.00 32.03
3827 Library Grounds Maintenance 18,527.00 0.00 0.00 18,527.00 0.00
5Page:
92
11/19/2018
CITY OF HERMOSA BEACH
6
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3831 Non-Utility Street Excavation Permit 49,533.00 17,787.00 17,787.00 31,746.00 35.91
3833 Recreation Service Charges 0.00 0.00 0.00 0.00 0.00
3834 Encroachment Permit 312,400.00 124,504.98 124,504.98 187,895.02 39.85
3835 Youth Sports Admin Fee 0.00 0.00 0.00 0.00 0.00
3836 Refund Transaction Fee 800.00 540.00 540.00 260.00 67.50
3837 Returned Check Charge 300.00 141.00 141.00 159.00 47.00
3838 Sale Of Maps/Publications 0.00 0.00 0.00 0.00 0.00
3839 Photocopy Charges 400.00 136.80 136.80 263.20 34.20
3840 Ambulance Transport 457,945.00 179,063.45 179,063.45 278,881.55 39.10
3841 Police Towing 73,850.00 24,054.00 24,054.00 49,796.00 32.57
3842 Parking Meters 2,000,000.00 786,621.45 786,621.45 1,213,378.55 39.33
3843 Parking Permits-Annual 443,423.00 22,057.67 22,057.67 421,365.33 4.97
3844 Daily Parking Permits 1,820.00 767.87 767.87 1,052.13 42.19
3845 Lot A Revenue 564,607.00 199,307.50 199,307.50 365,299.50 35.30
3846 No Pier Pkg Structure Revenue 715,604.00 283,322.00 283,322.00 432,282.00 39.59
3847 In Lieu Fee / Parking Facility 57,800.00 0.00 0.00 57,800.00 0.00
3848 Driveway Permits 1,348.00 1,402.00 1,402.00 -54.00 104.01
3849 Guest Permits 1,736.00 801.00 801.00 935.00 46.14
3850 Contractors Permits 40,000.00 15,436.00 15,436.00 24,564.00 38.59
3851 Cash Key Revenue -554.00 49.50 49.50 -603.50 -8.94
3852 Recreation Program Transaction Fee 40,000.00 17,390.00 17,390.00 22,610.00 43.48
3855 Bus Passes 2,000.00 573.00 573.00 1,427.00 28.65
3856 500' - 2nd Noticing 515.00 0.00 0.00 515.00 0.00
3857 Parking Plan Application 8,640.00 0.00 0.00 8,640.00 0.00
6Page:
93
11/19/2018
CITY OF HERMOSA BEACH
7
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3858 Monthly Permit Lot A/Parking Structure 82,929.00 33,852.00 33,852.00 49,077.00 40.82
3859 Admin Permit - Abandon CUP 0.00 619.00 619.00 -619.00 0.00
3860 Car2Go Parking Fee 0.00 0.00 0.00 0.00 0.00
3861 Fire Alarm Sys Insp - New Installation 0.00 382.00 382.00 -382.00 0.00
3862 Alarm Permit Fee 5,415.00 949.00 949.00 4,466.00 17.53
3863 False Alarm Fee 423.00 0.00 0.00 423.00 0.00
3864 C.U.P./Fences/Walls 0.00 0.00 0.00 0.00 0.00
3865 Lot B Revenue 102,226.00 33,086.75 33,086.75 69,139.25 32.37
3867 Precise Development Plans 5,114.00 2,557.00 2,557.00 2,557.00 50.00
3868 Public Noticing/300 Ft Radius 5,446.00 3,890.00 3,890.00 1,556.00 71.43
3869 2nd Party Response 0.00 0.00 0.00 0.00 0.00
3870 Legal Determination Hearing 0.00 0.00 0.00 0.00 0.00
3871 Passport Processing Fee 0.00 0.00 0.00 0.00 0.00
3872 Passport Photo Fee 0.00 0.00 0.00 0.00 0.00
3876 Spec Fire Protectn Sys Insp-New Install 0.00 0.00 0.00 0.00 0.00
3877 Business License Registration 7,000.00 4,340.00 4,340.00 2,660.00 62.00
3878 Fire Re-Inspections 0.00 0.00 0.00 0.00 0.00
3879 Business License Renewal Fee 30,000.00 11,964.00 11,964.00 18,036.00 39.88
3882 Special Event Fire Code Permit 0.00 0.00 0.00 0.00 0.00
3883 Final/Tentative Map Extension 949.00 0.00 0.00 949.00 0.00
3884 Lot Line Adjustment 1,176.00 0.00 0.00 1,176.00 0.00
3886 Text Amendment/Private 0.00 0.00 0.00 0.00 0.00
3888 Slope/Grade Height Determination 5,444.00 2,252.50 2,252.50 3,191.50 41.38
3890 300 Ft Radius Noticing/Appeal to CC 474.00 232.00 232.00 242.00 48.95
7Page:
94
11/19/2018
CITY OF HERMOSA BEACH
8
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3891 Appeal of Plng Comm Action to Council 1,681.00 0.00 0.00 1,681.00 0.00
3892 Underground Tank Install/Removal 0.00 0.00 0.00 0.00 0.00
3893 Contract Recreation Classes 375,000.00 160,189.70 160,189.70 214,810.30 42.72
3894 Other Recreation Programs 225,000.00 65,094.34 65,094.34 159,905.66 28.93
3895 Zoning Information Letters 0.00 186.00 186.00 -186.00 0.00
3896 Mailing Fee 12.00 0.00 0.00 12.00 0.00
3897 Admin Fee/TULIP Ins Certificate 500.00 1,181.80 1,181.80 -681.80 236.36
3898 Height Limit Exception 0.00 0.00 0.00 0.00 0.00
3899 Condo - CUP/PDP 20,344.00 19,444.00 19,444.00 900.00 95.58
Total Current Service Charges 34.39 6,765,943.00 2,327,084.11 2,327,084.11 4,438,858.89
3900 Other Revenue
3901 Sale of Real/Personal Property 0.00 0.00 0.00 0.00 0.00
3902 Refunds/Reimb Previous Years 0.00 116.34 116.34 -116.34 0.00
3903 Contributions Non Govt 0.00 4,872.00 4,872.00 -4,872.00 0.00
3904 General Miscellaneous 0.00 1,930.00 1,930.00 -1,930.00 0.00
3905 Cable Franchise Acceptance Fee 0.00 0.00 0.00 0.00 0.00
3907 Pkg Str Utility Reimb From Beach House 3,300.00 431.53 431.53 2,868.47 13.08
3908 Hermosa Sr Ctr Donations/Memberships 10,000.00 2,499.40 2,499.40 7,500.60 24.99
3914 Planning EIR Admin Reimbursement 30,000.00 0.00 0.00 30,000.00 0.00
3920 BCHD Healthy Cities Fund 0.00 0.00 0.00 0.00 0.00
3938 Solid Waste Contract Admin Fee 52,707.00 13,725.33 13,725.33 38,981.67 26.04
3945 In-Serv Firefighter Trng Prog/El Camino 0.00 0.00 0.00 0.00 0.00
3955 Operating Transfers In 0.00 134,685.00 134,685.00 -134,685.00 0.00
8Page:
95
11/19/2018
CITY OF HERMOSA BEACH
9
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3960 Verizon PEG Grant 15,663.00 0.00 0.00 15,663.00 0.00
3961 Chamber Funding Econ Dev 0.00 0.00 0.00 0.00 0.00
3962 Election Reimbursement 0.00 0.00 0.00 0.00 0.00
3963 HB Youth Enrichment Program Fee 0.00 0.00 0.00 0.00 0.00
3964 South Park Donations 0.00 0.00 0.00 0.00 0.00
3967 Athens Reimbursement 0.00 0.00 0.00 0.00 0.00
Total Other Revenue 141.72 111,670.00 158,259.60 158,259.60 -46,589.60
6800 Current Service Charges Continued
6801 Mural Review 1,500.00 1,500.00 1,500.00 0.00 100.00
6802 Sign Variance 0.00 0.00 0.00 0.00 0.00
6803 General Plan Amendment/ Map or Text 0.00 0.00 0.00 0.00 0.00
6804 Temporary Use Permit 0.00 0.00 0.00 0.00 0.00
6805 Unusual Architectural/Building Rev 0.00 0.00 0.00 0.00 0.00
6806 Determination of Similar Use 0.00 0.00 0.00 0.00 0.00
6807 Planning Commission Interpretation 0.00 0.00 0.00 0.00 0.00
6808 Request for Reasonable Accomodation 0.00 0.00 0.00 0.00 0.00
6809 Categorical Exemption 1,800.00 900.00 900.00 900.00 50.00
6810 Deed Restriction/Covenant Review 1,300.00 4,620.00 4,620.00 -3,320.00 355.38
6811 Landscape Plan Review 8,520.00 5,396.00 5,396.00 3,124.00 63.33
6812 Planning Landscape Doc Package Review 0.00 0.00 0.00 0.00 0.00
6813 Preliminary Plan Review 372.00 496.00 496.00 -124.00 133.33
6814 Extra Meeting 0.00 0.00 0.00 0.00 0.00
6815 Special Meeting 0.00 0.00 0.00 0.00 0.00
9Page:
96
11/19/2018
CITY OF HERMOSA BEACH
10
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
6816 Traffic/Special Study Review 0.00 0.00 0.00 0.00 0.00
6818 New/Modified Business Zoning Review 0.00 0.00 0.00 0.00 0.00
6819 Historic Resource Review 0.00 0.00 0.00 0.00 0.00
6820 Appeal to the Planning Commission 0.00 0.00 0.00 0.00 0.00
6821 Solar Plan Check/Inspection 834.00 2,780.00 2,780.00 -1,946.00 333.33
6822 Temporary Certificate of Occupancy 0.00 0.00 0.00 0.00 0.00
6823 Damaged Building Inspection 0.00 0.00 0.00 0.00 0.00
6824 Extended Construction Hours Review 0.00 0.00 0.00 0.00 0.00
6825 Clean Bay Restaurant - NPDES Inspection 20,600.00 200.00 200.00 20,400.00 0.97
6826 Light Industry - NPDES Inspection 0.00 0.00 0.00 0.00 0.00
6827 Stormwater Mitigation Plan Review 0.00 0.00 0.00 0.00 0.00
6828 Public Improvement Plan Check 56,912.00 20,514.00 20,514.00 36,398.00 36.05
6829 Street/Row Vacation Review 0.00 0.00 0.00 0.00 0.00
6830 Engineering Study Review 0.00 0.00 0.00 0.00 0.00
6831 Assessment District Formation Research 0.00 0.00 0.00 0.00 0.00
6832 DUI Collision Response 581.00 0.00 0.00 581.00 0.00
6833 Vehicle Identification Verification 0.00 0.00 0.00 0.00 0.00
6834 Citation Sign-off 460.00 231.00 231.00 229.00 50.22
6835 Taxicab Inspection 104.00 0.00 0.00 104.00 0.00
6836 Police Business Background Check 263.00 0.00 0.00 263.00 0.00
6837 Deceased Animal Pickup 114.00 57.00 57.00 57.00 50.00
6838 Animal Trap Rental 0.00 0.00 0.00 0.00 0.00
6839 Pet Home Quarantine Review 57.00 0.00 0.00 57.00 0.00
6840 Multiple Dog Review 216.00 0.00 0.00 216.00 0.00
10Page:
97
11/19/2018
CITY OF HERMOSA BEACH
11
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
6841 Fire Sprinkler System Insp - New Install 0.00 375.00 375.00 -375.00 0.00
6842 Miscellaneous Fire Code Permit 0.00 0.00 0.00 0.00 0.00
6843 State Mandated Fire Inspection 0.00 0.00 0.00 0.00 0.00
6844 Fire False Alarm Response 0.00 0.00 0.00 0.00 0.00
6845 Hazardous Materials Spill Response 0.00 0.00 0.00 0.00 0.00
6846 Parking Cash Key Processing 0.00 0.00 0.00 0.00 0.00
6847 Document Certification 10.00 0.00 0.00 10.00 0.00
6848 Fire Standby Services 0.00 0.00 0.00 0.00 0.00
6849 Traffic Plan Review 0.00 0.00 0.00 0.00 0.00
6850 Annual Business Fire Inspection 0.00 0.00 0.00 0.00 0.00
6851 Busines Licenses State Mandated Fee 0.00 3,218.30 3,218.30 -3,218.30 0.00
6852 Centennial Sweatshir 0.00 0.00 0.00 0.00 0.00
6860 Refuse Lien Fees/Athens 350.00 0.00 0.00 350.00 0.00
6861 Oversized Vehicle Permit 738.00 246.00 246.00 492.00 33.33
6862 Athens Reimbursement 0.00 0.00 0.00 0.00 0.00
6866 Records Technology Fee 0.00 0.00 0.00 0.00 0.00
6867 Credit Card Processing Fee 34,352.00 22,441.86 22,441.86 11,910.14 65.33
6868 Alternate Materials/Methods Review 0.00 0.00 0.00 0.00 0.00
6869 Disabled Parking Space Install 0.00 0.00 0.00 0.00 0.00
6870 Public Tree Install Review 0.00 0.00 0.00 0.00 0.00
6871 Sewer Service Charge Rebate -9,000.00 -3,327.53 -3,327.53 -5,672.47 36.97
6872 PY Sewer Service Charge Rebate 0.00 0.00 0.00 0.00 0.00
Total Current Service Charges Continued 49.67 120,083.00 59,647.63 59,647.63 60,435.37
32,751,330.15 7,212,697.85 7,212,697.85 39,964,028.00 18.05Total General Fund
11Page:
98
11/19/2018
CITY OF HERMOSA BEACH
12
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Lightg/Landscapg Dist Fund105
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3100 Taxes
3101 Current Year Secured 454,988.00 0.00 0.00 454,988.00 0.00
3103 Prior Year Collections 5,122.00 416.32 416.32 4,705.68 8.13
3105 Assessment Rebates -4,184.00 -836.74 -836.74 -3,347.26 20.00
Total Taxes -0.09 455,926.00 -420.42 -420.42 456,346.42
3400 Use Of Money & Property
3401 Interest Income 0.00 137.91 137.91 -137.91 0.00
3450 Investment Discount 0.00 0.57 0.57 -0.57 0.00
3460 Unrealized Gain(Loss) On Inv 0.00 0.00 0.00 0.00 0.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 0.00 0.00 138.48 138.48 -138.48
3900 Other Revenue
3902 Refunds/Reimb Previous Years 0.00 0.00 0.00 0.00 0.00
3904 General Miscellaneous 0.00 0.00 0.00 0.00 0.00
3955 Operating Transfers In 0.00 52,617.00 52,617.00 -52,617.00 0.00
Total Other Revenue 0.00 0.00 52,617.00 52,617.00 -52,617.00
403,590.94 52,335.06 52,335.06 455,926.00 11.48Total Lightg/Landscapg Dist Fund
12Page:
99
11/19/2018
CITY OF HERMOSA BEACH
13
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
State Gas Tax Fund115
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 2,179.00 1,788.97 1,788.97 390.03 82.10
3450 Investment Discount 7.00 7.07 7.07 -0.07 101.00
3460 Unrealized Gain(Loss) On Inv 0.00 0.00 0.00 0.00 0.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 82.16 2,186.00 1,796.04 1,796.04 389.96
3500 Intergovernmental/State
3501 Section 2106 Allocation 71,348.00 23,385.78 23,385.78 47,962.22 32.78
3502 Section 2107 Allocation 142,485.00 39,396.21 39,396.21 103,088.79 27.65
3503 Section 2107.5 Allocation 4,000.00 4,000.00 4,000.00 0.00 100.00
3512 Section 2105 (Prop 111) 114,779.00 35,766.05 35,766.05 79,012.95 31.16
3513 Sec 2103 Higher Mtr Veh Excise Tax(HUTA) 75,071.00 28,672.68 28,672.68 46,398.32 38.19
3522 TDA Article 3/Local 0.00 0.00 0.00 0.00 0.00
3566 Loan Repayment- HUTA Transportation Fds 22,300.00 0.00 0.00 22,300.00 0.00
3567 Road Maintenance Rehab Account 328,215.00 61,497.34 61,497.34 266,717.66 18.74
Total Intergovernmental/State 25.42 758,198.00 192,718.06 192,718.06 565,479.94
565,869.90 194,514.10 194,514.10 760,384.00 25.58Total State Gas Tax Fund
13Page:
100
11/19/2018
CITY OF HERMOSA BEACH
14
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
AB939 Fund117
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 939.00 374.63 374.63 564.37 39.90
3450 Investment Discount 3.00 1.45 1.45 1.55 48.33
3460 Unrealized Gain(Loss) On Inv 0.00 0.00 0.00 0.00 0.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 39.92 942.00 376.08 376.08 565.92
3800 Current Service Charges
3860 AB939 Surcharge 58,632.00 14,949.92 14,949.92 43,682.08 25.50
3874 Compost/Worm Bin 0.00 0.00 0.00 0.00 0.00
Total Current Service Charges 25.50 58,632.00 14,949.92 14,949.92 43,682.08
3900 Other Revenue
3902 Refunds/Reimb Previous Years 0.00 0.00 0.00 0.00 0.00
Total Other Revenue 0.00 0.00 0.00 0.00 0.00
6800 Current Service Charges Continued
6853 Solid Waste Contracting Fee 0.00 0.00 0.00 0.00 0.00
Total Current Service Charges Continued 0.00 0.00 0.00 0.00 0.00
44,248.00 15,326.00 15,326.00 59,574.00 25.73Total AB939 Fund
14Page:
101
11/19/2018
CITY OF HERMOSA BEACH
15
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Prop A Open Space Fund121
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3600 Intergovernmental/County
3608 Maintenance Allocation 20,557.00 0.00 0.00 20,557.00 0.00
3613 Beach Restroom Rehab/Co Share 0.00 0.00 0.00 0.00 0.00
3630 Maint Allocation-Pier Structural Repairs 0.00 0.00 0.00 0.00 0.00
3631 South Park Phase I Improvements Grant 0.00 0.00 0.00 0.00 0.00
20,557.00 0.00 0.00 20,557.00 0.00Total Prop A Open Space Fund
15Page:
102
11/19/2018
CITY OF HERMOSA BEACH
16
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 17,010.00 7,121.32 7,121.32 9,888.68 41.87
3426 Easement Agreement 318,845.00 163,678.86 163,678.86 155,166.14 51.33
3450 Investment Discount 52.00 27.57 27.57 24.43 53.02
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
165,079.25 170,827.75 170,827.75 335,907.00 50.86Total Tyco Fund
16Page:
103
11/19/2018
CITY OF HERMOSA BEACH
17
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Tidelands123
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 0.00 0.00 0.00 0.00 0.00
3450 Investment Discount 0.00 0.00 0.00 0.00 0.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00Total Tyco Tidelands
17Page:
104
11/19/2018
CITY OF HERMOSA BEACH
18
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Park/Rec Facility Tax Fund125
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3100 Taxes
3116 Parks & Recreation Facility Tax 0.00 14,986.00 14,986.00 -14,986.00 0.00
Total Taxes 0.00 0.00 14,986.00 14,986.00 -14,986.00
3400 Use Of Money & Property
3401 Interest Income 4,169.00 1,636.54 1,636.54 2,532.46 39.25
3450 Investment Discount 15.00 6.45 6.45 8.55 43.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 39.27 4,184.00 1,642.99 1,642.99 2,541.01
3900 Other Revenue
3903 Contributions Non Govt 0.00 0.00 0.00 0.00 0.00
3910 Park/Recreation In Lieu Fee 157,361.00 129,907.00 129,907.00 27,454.00 82.55
Total Other Revenue 82.55 157,361.00 129,907.00 129,907.00 27,454.00
15,009.01 146,535.99 146,535.99 161,545.00 90.71Total Park/Rec Facility Tax Fund
18Page:
105
11/19/2018
CITY OF HERMOSA BEACH
19
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Bayview Dr Dist Admin Exp Fund135
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 53.00 12.58 12.58 40.42 23.74
Total Use Of Money & Property 23.74 53.00 12.58 12.58 40.42
3900 Other Revenue
3925 Spec Assessment Admin Fees 4,500.00 0.00 0.00 4,500.00 0.00
Total Other Revenue 0.00 4,500.00 0.00 0.00 4,500.00
4,540.42 12.58 12.58 4,553.00 0.28Total Bayview Dr Dist Admin Exp Fund
19Page:
106
11/19/2018
CITY OF HERMOSA BEACH
20
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Lower Pier Admin Exp Fund136
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3900 Other Revenue
3925 Special Assessment Admin Fees 2,600.00 0.00 0.00 2,600.00 0.00
2,600.00 0.00 0.00 2,600.00 0.00Total Lower Pier Admin Exp Fund
20Page:
107
11/19/2018
CITY OF HERMOSA BEACH
21
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Myrtle Dist Admin Exp Fund137
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 233.00 42.23 42.23 190.77 18.12
Total Use Of Money & Property 18.12 233.00 42.23 42.23 190.77
3900 Other Revenue
3925 Special Assessment Admin Fees 9,000.00 0.00 0.00 9,000.00 0.00
Total Other Revenue 0.00 9,000.00 0.00 0.00 9,000.00
9,190.77 42.23 42.23 9,233.00 0.46Total Myrtle Dist Admin Exp Fund
21Page:
108
11/19/2018
CITY OF HERMOSA BEACH
22
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Loma Dist Admin Exp Fund138
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 420.00 106.43 106.43 313.57 25.34
Total Use Of Money & Property 25.34 420.00 106.43 106.43 313.57
3900 Other Revenue
3925 Special Assessment Admin Fees 10,000.00 0.00 0.00 10,000.00 0.00
Total Other Revenue 0.00 10,000.00 0.00 0.00 10,000.00
10,313.57 106.43 106.43 10,420.00 1.02Total Loma Dist Admin Exp Fund
22Page:
109
11/19/2018
CITY OF HERMOSA BEACH
23
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Beach Dr Assmnt Dist Admin Exp Fund139
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 69.00 15.59 15.59 53.41 22.59
Total Use Of Money & Property 22.59 69.00 15.59 15.59 53.41
3900 Other Revenue
3925 Special Assessment Admin Fees 3,500.00 0.00 0.00 3,500.00 0.00
Total Other Revenue 0.00 3,500.00 0.00 0.00 3,500.00
3,553.41 15.59 15.59 3,569.00 0.44Total Beach Dr Assmnt Dist Admin Exp Fund
23Page:
110
11/19/2018
CITY OF HERMOSA BEACH
24
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Community Dev Block Grant140
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3700 Intergovernmental/Federal
3715 CDBG Administration 0.00 0.00 0.00 0.00 0.00
3720 Americans with Disabilities Act 120,000.00 0.00 0.00 120,000.00 0.00
120,000.00 0.00 0.00 120,000.00 0.00Total Community Dev Block Grant
24Page:
111
11/19/2018
CITY OF HERMOSA BEACH
25
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3100 Taxes
3117 Proposition A Transit 383,939.00 140,440.31 140,440.31 243,498.69 36.58
Total Taxes 36.58 383,939.00 140,440.31 140,440.31 243,498.69
3400 Use Of Money & Property
3401 Interest Income 28,160.00 9,924.38 9,924.38 18,235.62 35.24
3450 Investment Discount 106.00 38.20 38.20 67.80 36.04
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 35.25 28,266.00 9,962.58 9,962.58 18,303.42
3800 Current Service Charges
3853 Dial-A-Taxi Program 4,600.00 1,780.00 1,780.00 2,820.00 38.70
3855 Bus Passes 800.00 165.00 165.00 635.00 20.63
Total Current Service Charges 36.02 5,400.00 1,945.00 1,945.00 3,455.00
265,257.11 152,347.89 152,347.89 417,605.00 36.48Total Proposition A Fund
25Page:
112
11/19/2018
CITY OF HERMOSA BEACH
26
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition C Fund146
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3100 Taxes
3118 Proposition C Local Return 318,467.00 116,486.64 116,486.64 201,980.36 36.58
Total Taxes 36.58 318,467.00 116,486.64 116,486.64 201,980.36
3400 Use Of Money & Property
3401 Interest Income 30,918.00 8,089.27 8,089.27 22,828.73 26.16
3450 Investment Discount 111.00 31.24 31.24 79.76 28.14
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 26.17 31,029.00 8,120.51 8,120.51 22,908.49
224,888.85 124,607.15 124,607.15 349,496.00 35.65Total Proposition C Fund
26Page:
113
11/19/2018
CITY OF HERMOSA BEACH
27
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure R Fund147
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3100 Taxes
3119 Measure R Local Return Funds 238,856.00 87,442.59 87,442.59 151,413.41 36.61
Total Taxes 36.61 238,856.00 87,442.59 87,442.59 151,413.41
3400 Use Of Money & Property
3401 Interest Income 18,086.00 7,077.83 7,077.83 11,008.17 39.13
3450 Investment Discount 64.00 27.19 27.19 36.81 42.48
3460 Unrealized Gain(Loss) On Inv 0.00 0.00 0.00 0.00 0.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 39.15 18,150.00 7,105.02 7,105.02 11,044.98
3900 Other Revenue
3970 Measure R SBCCOG South Bay Highway Pr 399,922.00 15,596.66 15,596.66 384,325.34 3.90
Total Other Revenue 3.90 399,922.00 15,596.66 15,596.66 384,325.34
546,783.73 110,144.27 110,144.27 656,928.00 16.77Total Measure R Fund
27Page:
114
11/19/2018
CITY OF HERMOSA BEACH
28
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure M148
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3100 Taxes
3118 Local Returns 0.00 0.00 0.00 0.00 0.00
3119 Measure R Local Return Funds 0.00 0.00 0.00 0.00 0.00
3131 Measure M Local Return Funds 270,697.00 99,385.39 99,385.39 171,311.61 36.71
Total Taxes 36.71 270,697.00 99,385.39 99,385.39 171,311.61
3400 Use Of Money & Property
3401 Interest Income 701.00 1,794.46 1,794.46 -1,093.46 255.99
3450 Investment Discount 0.00 6.94 6.94 -6.94 0.00
3460 Unrealized Gain(Loss) On Inv 0.00 0.00 0.00 0.00 0.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 256.98 701.00 1,801.40 1,801.40 -1,100.40
3900 Other Revenue
3970 Measure R SBCCOG South Bay Highway Pr 0.00 0.00 0.00 0.00 0.00
Total Other Revenue 0.00 0.00 0.00 0.00 0.00
170,211.21 101,186.79 101,186.79 271,398.00 37.28Total Measure M
28Page:
115
11/19/2018
CITY OF HERMOSA BEACH
29
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3500 Intergovernmental/State
3558 Beverage Recycling Grant 31,881.00 0.00 0.00 31,881.00 0.00
3562 State Homeland Security Grant Program 77,526.00 0.00 0.00 77,526.00 0.00
3566 Coastal Conservancy Grant 0.00 0.00 0.00 0.00 0.00
3571 Local Coastal Assistance Grant 0.00 0.00 0.00 0.00 0.00
3572 Local Coastal Assistance Grant 2017 82,812.00 0.00 0.00 82,812.00 0.00
3573 Alcoholic Beverage Control Grant (ABC) 0.00 0.00 0.00 0.00 0.00
3580 BSCC- Mental Health Evaluation Team 21,854.00 0.00 0.00 21,854.00 0.00
3581 SWRCB- Storm Water Grant Program 1,349,700.00 0.00 0.00 1,349,700.00 0.00
Total Intergovernmental/State 0.00 1,563,773.00 0.00 0.00 1,563,773.00
3700 Intergovernmental/Federal
3732 STPL Street Improvement Reimb 0.00 0.00 0.00 0.00 0.00
3734 Solar Grant TBD/Energy Upgrades 0.00 0.00 0.00 0.00 0.00
3736 Bulletproof Vest Partnership 2,700.00 0.00 0.00 2,700.00 0.00
3740 SWRCB (ARRA)/Strand Infiltration Trench 0.00 0.00 0.00 0.00 0.00
3741 SWRCB (ARRA)/Pier Ave Impr Project 0.00 0.00 0.00 0.00 0.00
3742 STPL Pier St Impr Grant CIP 129 (ARRA) 0.00 0.00 0.00 0.00 0.00
3745 Energy Eff & Conserv Block Grant (ARRA) 0.00 0.00 0.00 0.00 0.00
3746 State Safe Routes to School (SR2S) 0.00 0.00 0.00 0.00 0.00
3747 Fed HSIP Grnt-Valley School Signal 0.00 0.00 0.00 0.00 0.00
3748 Gen Plan/Coastal/Strat Growth Council 23,013.00 0.00 0.00 23,013.00 0.00
3749 SCE Rule 20A Funds/PCH Beautification 0.00 0.00 0.00 0.00 0.00
29Page:
116
11/19/2018
CITY OF HERMOSA BEACH
30
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3750 Dept of Justice- Body Worn Cameras 41,681.00 0.00 0.00 41,681.00 0.00
Total Intergovernmental/Federal 0.00 67,394.00 0.00 0.00 67,394.00
3900 Other Revenue
3965 Fireman's Fund Emerg Prep Prog Grant 0.00 0.00 0.00 0.00 0.00
3966 West Basin WD Grant- Reclaimed Waterline 0.00 0.00 0.00 0.00 0.00
3970 Melchione Trust- Surf Memorial 0.00 0.00 0.00 0.00 0.00
3971 LA Country Library 43,308.00 0.00 0.00 43,308.00 0.00
3972 Caltrans Reimbursement 0.00 0.00 0.00 0.00 0.00
3973 Caltrans Cooperative Agreement PCH&2nd 134,000.00 134,000.00 134,000.00 0.00 100.00
3974 South Park- Prop A Open Space Grant 0.00 0.00 0.00 0.00 0.00
3980 SWGP- Manhattan Beach Reimb 36,996.00 0.00 0.00 36,996.00 0.00
3981 SWGP- Redondo Beach Reimb 751,771.00 0.00 0.00 751,771.00 0.00
3982 SWGP- Torrance Reimb 489,834.00 0.00 0.00 489,834.00 0.00
3983 City Homelessness Planning Grant 2,364.00 15,000.00 15,000.00 -12,636.00 634.52
3984 Systemic Safety Analysis Report Program 84,150.00 0.00 0.00 84,150.00 0.00
3985 California Green Business Program 30,000.00 15,000.00 15,000.00 15,000.00 50.00
Total Other Revenue 10.43 1,572,423.00 164,000.00 164,000.00 1,408,423.00
3,039,590.00 164,000.00 164,000.00 3,203,590.00 5.12Total Grants Fund
30Page:
117
11/19/2018
CITY OF HERMOSA BEACH
31
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Air Quality Mgmt Dist Fund152
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 1,554.00 26.15 26.15 1,527.85 1.68
3450 Investment Discount 5.00 0.09 0.09 4.91 1.80
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 1.68 1,559.00 26.24 26.24 1,532.76
3500 Intergovernmental/State
3538 AQMD Emission Control AB2766 25,000.00 0.00 0.00 25,000.00 0.00
3551 MSRC Discretionary Matching Funds 0.00 0.00 0.00 0.00 0.00
Total Intergovernmental/State 0.00 25,000.00 0.00 0.00 25,000.00
26,532.76 26.24 26.24 26,559.00 0.10Total Air Quality Mgmt Dist Fund
31Page:
118
11/19/2018
CITY OF HERMOSA BEACH
32
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Supp Law Enf Serv Fund (SLESF)153
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3100 Taxes
3135 C.O.P.S. Allocation 100,000.00 68,028.91 68,028.91 31,971.09 68.03
Total Taxes 68.03 100,000.00 68,028.91 68,028.91 31,971.09
3400 Use Of Money & Property
3401 Interest Income 4,470.00 1,332.42 1,332.42 3,137.58 29.81
3450 Investment Discount 10.00 5.37 5.37 4.63 53.70
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 29.86 4,480.00 1,337.79 1,337.79 3,142.21
35,113.30 69,366.70 69,366.70 104,480.00 66.39Total Supp Law Enf Serv Fund (SLESF)
32Page:
119
11/19/2018
CITY OF HERMOSA BEACH
33
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Sewer Fund160
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 123,380.00 40,555.57 40,555.57 82,824.43 32.87
3450 Investment Discount 483.00 155.74 155.74 327.26 32.24
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 32.87 123,863.00 40,711.31 40,711.31 83,151.69
3500 Intergovernmental/State
3550 CA Waste Oil Recycling Grant 5,400.00 0.00 0.00 5,400.00 0.00
Total Intergovernmental/State 0.00 5,400.00 0.00 0.00 5,400.00
3600 Intergovernmental/County
3602 Beach Outlet Maintenance 8,000.00 0.00 0.00 8,000.00 0.00
Total Intergovernmental/County 0.00 8,000.00 0.00 0.00 8,000.00
3800 Current Service Charges
3828 Sewer Connection Fee 55,000.00 20,058.00 20,058.00 34,942.00 36.47
3829 Sewer Demolition Fee 2,600.00 1,364.00 1,364.00 1,236.00 52.46
3832 Sewer Lateral Installation 22,346.00 10,008.00 10,008.00 12,338.00 44.79
Total Current Service Charges 39.31 79,946.00 31,430.00 31,430.00 48,516.00
3900 Other Revenue
3902 Refunds/Reimb Previous Years 0.00 0.00 0.00 0.00 0.00
3922 Other Financing Source- Debt Issuance 0.00 0.00 0.00 0.00 0.00
3955 Operating Transfers In 0.00 0.00 0.00 0.00 0.00
33Page:
120
11/19/2018
CITY OF HERMOSA BEACH
34
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Sewer Fund160
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
Total Other Revenue 0.00 0.00 0.00 0.00 0.00
6800 Current Service Charges Continued
6861 Sewer Service Charge 1,050,155.00 577.94 577.94 1,049,577.06 0.06
Total Current Service Charges Continued 0.06 1,050,155.00 577.94 577.94 1,049,577.06
1,194,644.75 72,719.25 72,719.25 1,267,364.00 5.74Total Sewer Fund
34Page:
121
11/19/2018
CITY OF HERMOSA BEACH
35
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Storm Drains Fund161
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3900 Other Revenue
3955 Operating Transfers In 0.00 174,999.00 174,999.00 -174,999.00 0.00
-174,999.00 174,999.00 174,999.00 0.00 0.00Total Storm Drains Fund
35Page:
122
11/19/2018
CITY OF HERMOSA BEACH
36
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Asset Seizure/Forft Fund170
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3300 Fines & Forfeitures
3304 State Forfeited Funds 0.00 0.00 0.00 0.00 0.00
3307 Department of Justice Forfeited Funds 0.00 11,528.74 11,528.74 -11,528.74 0.00
3308 Department of Treasury Forfeited Funds 0.00 0.00 0.00 0.00 0.00
Total Fines & Forfeitures 0.00 0.00 11,528.74 11,528.74 -11,528.74
3400 Use Of Money & Property
3401 Interest Income 9,200.00 3,553.69 3,553.69 5,646.31 38.63
3450 Investment Discount 21.00 13.62 13.62 7.38 64.86
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 38.69 9,221.00 3,567.31 3,567.31 5,653.69
3900 Other Revenue
3903 Contributions Non Govt 0.00 0.00 0.00 0.00 0.00
Total Other Revenue 0.00 0.00 0.00 0.00 0.00
-5,875.05 15,096.05 15,096.05 9,221.00 163.71Total Asset Seizure/Forft Fund
36Page:
123
11/19/2018
CITY OF HERMOSA BEACH
37
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Fire Protection Fund180
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 2,205.00 594.96 594.96 1,610.04 26.98
3450 Investment Discount 8.00 2.33 2.33 5.67 29.13
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 26.99 2,213.00 597.29 597.29 1,615.71
3900 Other Revenue
3912 Fire Flow Fee 48,751.00 8,477.01 8,477.01 40,273.99 17.39
Total Other Revenue 17.39 48,751.00 8,477.01 8,477.01 40,273.99
41,889.70 9,074.30 9,074.30 50,964.00 17.81Total Fire Protection Fund
37Page:
124
11/19/2018
CITY OF HERMOSA BEACH
38
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
RTI Undersea Cable190
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 0.00 2,259.11 2,259.11 -2,259.11 0.00
3426 Easement Agreement 45,000.00 0.00 0.00 45,000.00 0.00
3450 Investment Discount 0.00 8.68 8.68 -8.68 0.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
42,732.21 2,267.79 2,267.79 45,000.00 5.04Total RTI Undersea Cable
38Page:
125
11/19/2018
CITY OF HERMOSA BEACH
39
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
RTI Tidelands191
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 0.00 1,642.98 1,642.98 -1,642.98 0.00
3426 Easement Agreement 0.00 0.00 0.00 0.00 0.00
3450 Investment Discount 0.00 6.29 6.29 -6.29 0.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
-1,649.27 1,649.27 1,649.27 0.00 0.00Total RTI Tidelands
39Page:
126
11/19/2018
CITY OF HERMOSA BEACH
40
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
2015 Lease Revenue Bonds201
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3900 Other Revenue
3922 Other Financing Sources- Debt Issuance 0.00 0.00 0.00 0.00 0.00
3955 Operating Transfers In 632,432.00 632,431.79 632,431.79 0.21 100.00
0.21 632,431.79 632,431.79 632,432.00 100.00Total 2015 Lease Revenue Bonds
40Page:
127
11/19/2018
CITY OF HERMOSA BEACH
41
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 156,066.00 50,065.02 50,065.02 106,000.98 32.08
3414 Fund Exchange 0.00 0.00 0.00 0.00 0.00
3450 Investment Discount 664.00 192.03 192.03 471.97 28.92
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
Total Use Of Money & Property 32.07 156,730.00 50,257.05 50,257.05 106,472.95
3900 Other Revenue
3902 Refunds/Reimb Previous Years 0.00 0.00 0.00 0.00 0.00
3913 In-Lieu Fee/Street Pavement 0.00 0.00 0.00 0.00 0.00
3955 Operating Transfers In 0.00 0.00 0.00 0.00 0.00
3962 SCE Reimbursement 0.00 0.00 0.00 0.00 0.00
Total Other Revenue 0.00 0.00 0.00 0.00 0.00
106,472.95 50,257.05 50,257.05 156,730.00 32.07Total Capital Improvement Fund
41Page:
128
11/19/2018
CITY OF HERMOSA BEACH
42
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Artesia Blvd Relinquishment302
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 0.00 0.00 0.00 0.00 0.00
3450 Investment Discount 0.00 0.00 0.00 0.00 0.00
3475 Investment Premium 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00Total Artesia Blvd Relinquishment
42Page:
129
11/19/2018
CITY OF HERMOSA BEACH
43
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Bayview Dr Redemption Fund 2004-2609
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 2,734.00 678.94 678.94 2,055.06 24.83
2,055.06 678.94 678.94 2,734.00 24.83Total Bayview Dr Redemption Fund 2004-2
43Page:
130
11/19/2018
CITY OF HERMOSA BEACH
44
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Lwr Pier Dist Redemption Fund610
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 407.00 20.24 20.24 386.76 4.97
386.76 20.24 20.24 407.00 4.97Total Lwr Pier Dist Redemption Fund
44Page:
131
11/19/2018
CITY OF HERMOSA BEACH
45
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Beach Dr Assessment Dist Redemption Fund611
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 1,440.00 342.48 342.48 1,097.52 23.78
1,097.52 342.48 342.48 1,440.00 23.78Total Beach Dr Assessment Dist Redemption Fund
45Page:
132
11/19/2018
CITY OF HERMOSA BEACH
46
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Beach Dr Assessment Dist Reserve Fund612
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 100.00 29.72 29.72 70.28 29.72
70.28 29.72 29.72 100.00 29.72Total Beach Dr Assessment Dist Reserve Fund
46Page:
133
11/19/2018
CITY OF HERMOSA BEACH
47
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Myrtle Ave Assessment Fund617
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 2,285.00 403.01 403.01 1,881.99 17.64
1,881.99 403.01 403.01 2,285.00 17.64Total Myrtle Ave Assessment Fund
47Page:
134
11/19/2018
CITY OF HERMOSA BEACH
48
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Loma Drive Assessment Fund618
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 2,788.00 666.92 666.92 2,121.08 23.92
2,121.08 666.92 666.92 2,788.00 23.92Total Loma Drive Assessment Fund
48Page:
135
11/19/2018
CITY OF HERMOSA BEACH
49
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Bayview Dr Reserve Fund 2004-2619
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 327.00 97.58 97.58 229.42 29.84
229.42 97.58 97.58 327.00 29.84Total Bayview Dr Reserve Fund 2004-2
49Page:
136
11/19/2018
CITY OF HERMOSA BEACH
50
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Insurance Fund705
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3800 Current Service Charges
3880 Insurance Service Charges 2,610,232.00 652,563.00 652,563.00 1,957,669.00 25.00
Total Current Service Charges 25.00 2,610,232.00 652,563.00 652,563.00 1,957,669.00
3900 Other Revenue
3902 Refunds/Reimb Previous Years 0.00 0.00 0.00 0.00 0.00
3904 General Miscellaneous 0.00 0.00 0.00 0.00 0.00
3955 Operating Transfers In 0.00 0.00 0.00 0.00 0.00
Total Other Revenue 0.00 0.00 0.00 0.00 0.00
1,957,669.00 652,563.00 652,563.00 2,610,232.00 25.00Total Insurance Fund
50Page:
137
11/19/2018
CITY OF HERMOSA BEACH
51
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3800 Current Service Charges
3822 Building Maintenance Service Charges 101,555.00 25,386.00 25,386.00 76,169.00 25.00
3885 Comm Equip/Business Mach Charges 698,486.00 174,621.00 174,621.00 523,865.00 25.00
3889 Vehicle/Equip Replacement Charges 818,135.00 204,533.76 204,533.76 613,601.24 25.00
Total Current Service Charges 25.00 1,618,176.00 404,540.76 404,540.76 1,213,635.24
3900 Other Revenue
3901 Sale of Real/Personal Property 0.00 5,194.00 5,194.00 -5,194.00 0.00
3902 Refunds/Reimb Previous Years 0.00 0.00 0.00 0.00 0.00
3903 Contributions Non Govt 0.00 0.00 0.00 0.00 0.00
3904 General Miscellaneous 0.00 14,034.09 14,034.09 -14,034.09 0.00
3911 Gain on Sale of Fixed Assets 0.00 0.00 0.00 0.00 0.00
3955 Operating Transfers In 0.00 0.00 0.00 0.00 0.00
3962 SCE Reimbursement 100,000.00 0.00 0.00 100,000.00 0.00
Total Other Revenue 19.23 100,000.00 19,228.09 19,228.09 80,771.91
6800 Current Service Charges Continued
6866 Records Technology Fee 122,581.00 42,108.74 42,108.74 80,472.26 34.35
Total Current Service Charges Continued 34.35 122,581.00 42,108.74 42,108.74 80,472.26
1,374,879.41 465,877.59 465,877.59 1,840,757.00 25.31Total Equipment Replacement Fund
51Page:
138
11/19/2018
CITY OF HERMOSA BEACH
52
9:58AM
Page:revstat.rpt Revenue Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Investment Fund900
Account Number
Adjusted
Estimate Revenues
Year-to-date
Revenues Balance
Prct
Rcvd
3400 Use Of Money & Property
3401 Interest Income 0.00 0.00 0.00 0.00 0.00
0.00 0.00 0.00 0.00 0.00Total Investment Fund
Grand Total 53,561,133.00 10,593,266.60 10,593,266.60 42,967,866.40 19.78
52Page:
139
11/19/2018
CITY OF HERMOSA BEACH
1
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Council1101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1101-4100 Personal Services
45,150.00 15,050.03 15,050.03 33.331101-4102 Regular Salaries 0.00 30,099.97
50.00 374.44 374.44 748.881101-4106 Regular Overtime 0.00 -324.44
2,045.00 0.00 0.00 0.001101-4111 Accrual Cash In 0.00 2,045.00
31,800.00 10,600.00 10,600.00 33.331101-4112 Part Time/Temporary 0.00 21,200.00
21,451.00 3,407.39 3,407.39 15.881101-4180 Retirement 0.00 18,043.61
65.00 30.16 30.16 46.401101-4185 Alternative Retirement System-Parttime 0.00 34.84
75,328.00 34,069.76 34,069.76 45.231101-4188 Employee Benefits 0.00 41,258.24
1,116.00 377.27 377.27 33.811101-4189 Medicare Benefits 0.00 738.73
1,625.00 541.68 541.68 33.331101-4190 Other Post Employment Benefits (OPEB) 0.00 1,083.32
Total Personal Services 178,630.00 64,450.73 64,450.73 0.00 114,179.27 36.08
1101-4200 Contract Services
47,000.00 24,066.34 24,066.34 51.201101-4201 Contract Serv/Private 0.00 22,933.66
0.00 0.00 0.00 0.001101-4251 Contract Services/Gov't 0.00 0.00
Total Contract Services 47,000.00 24,066.34 24,066.34 0.00 22,933.66 51.20
1101-4300 Materials/Supplies/Other
6,000.00 76.42 76.42 1.271101-4304 Telephone 0.00 5,923.58
15,000.00 4,192.37 4,192.37 27.951101-4305 Office Oper Supplies 0.00 10,807.63
28,403.00 21,391.33 21,391.33 75.311101-4315 Membership 0.00 7,011.67
25,000.00 2,103.45 2,103.45 8.411101-4317 Conference/Training 0.00 22,896.55
50,520.00 8,776.77 8,776.77 17.371101-4319 Special Events 0.00 41,743.23
3,620.00 906.00 906.00 25.031101-4394 Building Maintenance Charges 0.00 2,714.00
4,834.00 1,209.00 1,209.00 25.011101-4396 Insurance User Charges 0.00 3,625.00
Total Materials/Supplies/Other 133,377.00 38,655.34 38,655.34 0.00 94,721.66 28.98
1101-4900 Depreciation
0.00 0.00 0.00 0.001101-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
1Page:
140
11/19/2018
CITY OF HERMOSA BEACH
2
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Council1101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1101-5600 Buildings/Improvements
0.00 0.00 0.00 0.001101-5601 Buildings 0.00 0.00
0.00 0.00 0.00 0.001101-5602 Imprvmnts Other Than Bldgs 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total City Council 359,007.00 127,172.41 127,172.41 0.00 231,834.59 35.42
2Page:
141
11/19/2018
CITY OF HERMOSA BEACH
3
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Clerk1121
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1121-4100 Personal Services
122,456.00 42,023.71 42,023.71 34.321121-4102 Regular Salaries 0.00 80,432.29
0.00 0.00 0.00 0.001121-4106 Regular Overtime 0.00 0.00
6,449.00 0.00 0.00 0.001121-4111 Accrual Cash In 0.00 6,449.00
76,080.00 25,872.00 25,872.00 34.011121-4112 Part Time/Temporary 0.00 50,208.00
27,871.00 5,799.16 5,799.16 20.811121-4180 Retirement 0.00 22,071.84
30,467.00 11,300.08 11,300.08 37.091121-4188 Employee Benefits 0.00 19,166.92
2,881.00 985.06 985.06 34.191121-4189 Medicare Benefits 0.00 1,895.94
7,206.00 2,402.00 2,402.00 33.331121-4190 Other Post Employment Benefits (OPEB) 0.00 4,804.00
Total Personal Services 273,410.00 88,382.01 88,382.01 0.00 185,027.99 32.33
1121-4200 Contract Services
35,750.00 1,144.50 1,144.50 3.201121-4201 Contract Serv/Private 0.00 34,605.50
0.00 0.00 0.00 0.001121-4251 Contract Services/Govt 0.00 0.00
Total Contract Services 35,750.00 1,144.50 1,144.50 0.00 34,605.50 3.20
1121-4300 Materials/Supplies/Other
900.00 176.99 176.99 19.671121-4304 Telephone 0.00 723.01
4,300.00 405.40 405.40 9.431121-4305 Office Oper Supplies 0.00 3,894.60
750.00 367.00 367.00 48.931121-4315 Membership 0.00 383.00
7,200.00 0.00 0.00 0.001121-4317 Conference/Training 0.00 7,200.00
20,000.00 2,751.65 2,751.65 13.761121-4323 Public Noticing 0.00 17,248.35
7,257.00 1,815.00 1,815.00 25.011121-4390 Communications Equipment Chrgs 0.00 5,442.00
612.00 153.00 153.00 25.001121-4394 Building Maintenance Charges 0.00 459.00
12,543.00 3,135.00 3,135.00 24.991121-4396 Insurance User Charges 0.00 9,408.00
Total Materials/Supplies/Other 53,562.00 8,804.04 8,804.04 0.00 44,757.96 16.44
1121-4900 Depreciation
0.00 0.00 0.00 0.001121-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
3Page:
142
11/19/2018
CITY OF HERMOSA BEACH
4
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Clerk1121
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1121-5400 Equipment/Furniture
0.00 0.00 0.00 0.001121-5401 Equip-Less Than $1,000 0.00 0.00
0.00 0.00 0.00 0.001121-5402 Equip-More Than $1,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total City Clerk 362,722.00 98,330.55 98,330.55 0.00 264,391.45 27.11
4Page:
143
11/19/2018
CITY OF HERMOSA BEACH
5
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Attorney1131
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1131-4200 Contract Services
300,000.00 100,464.50 100,464.50 33.491131-4201 Contract Serv/Private 0.00 199,535.50
Total City Attorney 300,000.00 100,464.50 100,464.50 0.00 199,535.50 33.49
5Page:
144
11/19/2018
CITY OF HERMOSA BEACH
6
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Prosecutor1132
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1132-4200 Contract Services
227,380.00 41,561.10 41,561.10 18.281132-4201 Contract Serv/Private 0.00 185,818.90
Total Contract Services 227,380.00 41,561.10 41,561.10 0.00 185,818.90 18.28
1132-4300 Materials/Supplies/Other
252.00 42.05 42.05 16.691132-4304 Telephone 0.00 209.95
100.00 0.00 0.00 0.001132-4305 Office Oper Supplies 0.00 100.00
0.00 0.00 0.00 0.001132-4315 Membership 0.00 0.00
0.00 0.00 0.00 0.001132-4317 Conference/Training 0.00 0.00
Total Materials/Supplies/Other 352.00 42.05 42.05 0.00 309.95 11.95
Total City Prosecutor 227,732.00 41,603.15 41,603.15 0.00 186,128.85 18.27
6Page:
145
11/19/2018
CITY OF HERMOSA BEACH
7
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Treasurer1141
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1141-4100 Personal Services
0.00 0.00 0.00 0.001141-4102 Regular Salaries 0.00 0.00
0.00 0.00 0.00 0.001141-4106 Regular Overtime 0.00 0.00
0.00 0.00 0.00 0.001141-4111 Accrual Cash In 0.00 0.00
6,360.00 2,120.00 2,120.00 33.331141-4112 Part Time/Temporary 0.00 4,240.00
415.00 145.29 145.29 35.011141-4180 Retirement 0.00 269.71
12,802.00 4,039.12 4,039.12 31.551141-4188 Employee Benefits 0.00 8,762.88
92.00 30.72 30.72 33.391141-4189 Medicare Benefits 0.00 61.28
0.00 0.00 0.00 0.001141-4190 Other Post Employment Benefits (OPEB) 0.00 0.00
Total Personal Services 19,669.00 6,335.13 6,335.13 0.00 13,333.87 32.21
1141-4200 Contract Services
14,000.00 1,340.11 1,340.11 9.571141-4201 Contract Serv/Private 0.00 12,659.89
Total Contract Services 14,000.00 1,340.11 1,340.11 0.00 12,659.89 9.57
1141-4300 Materials/Supplies/Other
500.00 120.11 120.11 24.021141-4304 Telephone 0.00 379.89
1,300.00 384.16 384.16 29.551141-4305 Office Oper Supplies 0.00 915.84
105.00 65.00 65.00 61.901141-4315 Membership 0.00 40.00
2,405.00 0.00 0.00 0.001141-4317 Conference/Training 0.00 2,405.00
3,762.00 939.00 939.00 24.961141-4390 Communications Equipment Chrgs 0.00 2,823.00
609.00 153.00 153.00 25.121141-4394 Building Maintenance Charges 0.00 456.00
450.00 114.00 114.00 25.331141-4396 Insurance User Charges 0.00 336.00
Total Materials/Supplies/Other 9,131.00 1,775.27 1,775.27 0.00 7,355.73 19.44
1141-4900 Depreciation
0.00 0.00 0.00 0.001141-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
1141-5400 Equipment/Furniture
7Page:
146
11/19/2018
CITY OF HERMOSA BEACH
8
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Treasurer1141
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
0.00 0.00 0.00 0.001141-5401 Equip-Less Than $1,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total City Treasurer 42,800.00 9,450.51 9,450.51 0.00 33,349.49 22.08
8Page:
147
11/19/2018
CITY OF HERMOSA BEACH
9
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Manager1201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1201-4100 Personal Services
779,672.00 249,412.80 249,412.80 31.991201-4102 Regular Salaries 0.00 530,259.20
100.00 374.44 374.44 374.441201-4106 Regular Overtime 0.00 -274.44
32,394.00 0.00 0.00 0.001201-4111 Accrual Cash In 0.00 32,394.00
12,480.00 0.00 0.00 0.001201-4112 Part Time/Temporary 0.00 12,480.00
69,973.00 16,394.27 16,394.27 23.431201-4180 Retirement 0.00 53,578.73
0.00 0.00 0.00 0.001201-4185 Alternative Retirement System-Parttime 0.00 0.00
107,267.00 31,179.93 31,179.93 29.071201-4188 Employee Benefits 0.00 76,087.07
11,858.00 3,724.88 3,724.88 31.411201-4189 Medicare Benefits 0.00 8,133.12
26,302.00 8,767.32 8,767.32 33.331201-4190 Other Post Employment Benefits (OPEB) 0.00 17,534.68
Total Personal Services 1,040,046.00 309,853.64 309,853.64 0.00 730,192.36 29.79
1201-4200 Contract Services
525,750.00 94,030.84 94,030.84 17.891201-4201 Contract Serv/Private 0.00 431,719.16
9,240.00 0.00 0.00 0.001201-4251 Contract Services/Gov't 0.00 9,240.00
Total Contract Services 534,990.00 94,030.84 94,030.84 0.00 440,959.16 17.58
1201-4300 Materials/Supplies/Other
7,600.00 1,844.08 1,844.08 24.261201-4304 Telephone 0.00 5,755.92
10,500.00 1,999.57 1,999.57 19.041201-4305 Office Oper Supplies 0.00 8,500.43
6,492.00 3,282.00 3,282.00 50.551201-4315 Membership 0.00 3,210.00
27,537.00 6,596.88 6,596.88 23.961201-4317 Conference/Training 0.00 20,940.12
9,852.00 2,463.00 2,463.00 25.001201-4390 Communications Equipment Chrgs 0.00 7,389.00
3,406.00 852.00 852.00 25.011201-4394 Building Maintenance Charges 0.00 2,554.00
37,650.00 9,412.50 9,412.50 25.001201-4395 Equip Replacement Chrgs 0.00 28,237.50
53,687.00 13,422.00 13,422.00 25.001201-4396 Insurance User Charges 0.00 40,265.00
Total Materials/Supplies/Other 156,724.00 39,872.03 39,872.03 0.00 116,851.97 25.44
1201-4900 Depreciation
0.00 0.00 0.00 0.001201-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
9Page:
148
11/19/2018
CITY OF HERMOSA BEACH
10
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Manager1201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1201-5400 Equipment/Furniture
12,396.00 12,095.56 12,095.56 97.581201-5401 Equip-Less Than $1,000 0.00 300.44
13,500.00 0.00 0.00 0.001201-5402 Equip-More Than $1,000 0.00 13,500.00
0.00 0.00 0.00 0.001201-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 25,896.00 12,095.56 12,095.56 0.00 13,800.44 46.71
Total City Manager 1,757,656.00 455,852.07 455,852.07 0.00 1,301,803.93 25.94
10Page:
149
11/19/2018
CITY OF HERMOSA BEACH
11
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Finance Administration1202
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1202-4100 Personal Services
548,406.00 187,178.45 187,178.45 34.131202-4102 Regular Salaries 0.00 361,227.55
486.00 702.22 702.22 144.491202-4106 Regular Overtime 0.00 -216.22
46,939.00 16,932.77 16,932.77 36.071202-4111 Accrual Cash In 0.00 30,006.23
28,848.00 0.00 0.00 0.001202-4112 Part Time/Temporary 0.00 28,848.00
141,659.00 22,265.77 22,265.77 15.721202-4180 Retirement 0.00 119,393.23
0.00 0.00 0.00 0.001202-4185 Alternative Retirement System-Parttime 0.00 0.00
76,765.00 24,897.75 24,897.75 32.431202-4188 Employee Benefits 0.00 51,867.25
6,325.00 2,161.85 2,161.85 34.181202-4189 Medicare Benefits 0.00 4,163.15
26,398.00 8,799.32 8,799.32 33.331202-4190 Other Post Employment Benefits (OPEB) 0.00 17,598.68
Total Personal Services 875,826.00 262,938.13 262,938.13 0.00 612,887.87 30.02
1202-4200 Contract Services
134,027.00 22,272.01 22,272.01 16.621202-4201 Contract Serv/Private 0.00 111,754.99
Total Contract Services 134,027.00 22,272.01 22,272.01 0.00 111,754.99 16.62
1202-4300 Materials/Supplies/Other
1,400.00 262.50 262.50 18.751202-4304 Telephone 0.00 1,137.50
7,020.00 1,428.81 1,428.81 20.351202-4305 Office Oper Supplies 0.00 5,591.19
610.00 470.00 470.00 77.051202-4315 Membership 0.00 140.00
7,165.00 370.00 370.00 5.161202-4317 Conference/Training 0.00 6,795.00
20,986.00 5,247.00 5,247.00 25.001202-4390 Communications Equipment Chrgs 0.00 15,739.00
2,113.00 528.00 528.00 24.991202-4394 Building Maintenance Charges 0.00 1,585.00
33,049.00 8,262.00 8,262.00 25.001202-4396 Insurance User Charges 0.00 24,787.00
Total Materials/Supplies/Other 72,343.00 16,568.31 16,568.31 0.00 55,774.69 22.90
1202-4900 Depreciation
0.00 0.00 0.00 0.001202-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.001202-4902 Depreciation/Vehicles 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
11Page:
150
11/19/2018
CITY OF HERMOSA BEACH
12
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Finance Administration1202
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1202-5400 Equipment/Furniture
0.00 0.00 0.00 0.001202-5401 Equip-Less Than $1,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total Finance Administration 1,082,196.00 301,778.45 301,778.45 0.00 780,417.55 27.89
12Page:
151
11/19/2018
CITY OF HERMOSA BEACH
13
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Human Resources1203
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1203-4100 Personal Services
160,356.00 50,004.00 50,004.00 31.181203-4102 Regular Salaries 0.00 110,352.00
0.00 0.00 0.00 0.001203-4106 Regular Overtime 0.00 0.00
5,171.00 455.85 455.85 8.821203-4111 Accrual Cash In 0.00 4,715.15
28,143.00 5,223.51 5,223.51 18.561203-4180 Retirement 0.00 22,919.49
124,305.00 43,137.71 43,137.71 34.701203-4188 Employee Benefits 0.00 81,167.29
2,534.00 801.24 801.24 31.621203-4189 Medicare Benefits 0.00 1,732.76
7,052.00 2,350.68 2,350.68 33.331203-4190 Other Post Employment Benefits (OPEB) 0.00 4,701.32
2,000.00 202.94 202.94 10.151203-4191 Instant Bonuses 0.00 1,797.06
Total Personal Services 329,561.00 102,175.93 102,175.93 0.00 227,385.07 31.00
1203-4200 Contract Services
226,793.00 32,150.52 32,150.52 14.181203-4201 Contract Serv/Private 0.00 194,642.48
11,000.00 800.00 800.00 7.271203-4251 Contract Service/Govt 0.00 10,200.00
Total Contract Services 237,793.00 32,950.52 32,950.52 0.00 204,842.48 13.86
1203-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.001203-4300 Employee recognition instant bonus 0.00 0.00
1,900.00 425.07 425.07 22.371203-4304 Telephone 0.00 1,474.93
4,000.00 1,093.52 1,093.52 27.341203-4305 Office Oper Supplies 0.00 2,906.48
1,450.00 149.00 149.00 10.281203-4315 Membership 0.00 1,301.00
13,500.00 3,837.00 3,837.00 28.421203-4317 Conference/Training 0.00 9,663.00
12,000.00 3,316.00 3,316.00 27.631203-4320 Medical Exams 0.00 8,684.00
6,752.00 1,689.00 1,689.00 25.011203-4390 Communications Equipment Chrgs 0.00 5,063.00
612.00 153.00 153.00 25.001203-4394 Building Maintenance Charges 0.00 459.00
14,413.00 3,603.00 3,603.00 25.001203-4396 Insurance User Charges 0.00 10,810.00
Total Materials/Supplies/Other 54,627.00 14,265.59 14,265.59 0.00 40,361.41 26.11
1203-4900 Depreciation
0.00 0.00 0.00 0.001203-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
13Page:
152
11/19/2018
CITY OF HERMOSA BEACH
14
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Human Resources1203
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1203-5400 Equipment/Furniture
0.00 0.00 0.00 0.001203-5401 Equip-Less Than $1,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total Human Resources 621,981.00 149,392.04 149,392.04 0.00 472,588.96 24.02
14Page:
153
11/19/2018
CITY OF HERMOSA BEACH
15
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Finance Cashier1204
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1204-4100 Personal Services
359,088.00 101,621.50 101,621.50 28.301204-4102 Regular Salaries 0.00 257,466.50
1,500.00 0.00 0.00 0.001204-4106 Regular Overtime 0.00 1,500.00
6,006.00 2,668.47 2,668.47 44.431204-4111 Accrual Cash In 0.00 3,337.53
40,438.00 15,770.63 15,770.63 39.001204-4112 Part Time Temporary 0.00 24,667.37
40,308.00 10,234.55 10,234.55 25.391204-4180 Retirement 0.00 30,073.45
10.00 2.84 2.84 28.401204-4185 Alternative Retirement System-Parttime 0.00 7.16
93,815.00 28,251.30 28,251.30 30.111204-4188 Employee Benefits 0.00 65,563.70
4,135.00 1,604.12 1,604.12 38.791204-4189 Medicare Benefits 0.00 2,530.88
25,688.00 8,562.68 8,562.68 33.331204-4190 Other Post Employment Benefits (OPEB) 0.00 17,125.32
Total Personal Services 570,988.00 168,716.09 168,716.09 0.00 402,271.91 29.55
1204-4200 Contract Services
165,914.00 30,376.41 30,376.41 18.311204-4201 Contract Serv/Private 0.00 135,537.59
2,000.00 272.00 272.00 13.601204-4251 Contract Services/Gov't 0.00 1,728.00
Total Contract Services 167,914.00 30,648.41 30,648.41 0.00 137,265.59 18.25
1204-4300 Materials/Supplies/Other
2,690.00 660.21 660.21 24.541204-4304 Telephone 0.00 2,029.79
48,005.00 7,716.78 7,716.78 16.071204-4305 Office Operating Supplies 0.00 40,288.22
235.00 235.00 235.00 100.001204-4315 Membership 0.00 0.00
4,266.00 2,246.66 2,246.66 52.661204-4317 Conference/Training 0.00 2,019.34
24,158.00 6,039.00 6,039.00 25.001204-4390 Communications Equipment Chrgs 0.00 18,119.00
1,828.00 456.00 456.00 24.951204-4394 Building Maintenance Charges 0.00 1,372.00
23,116.00 5,778.00 5,778.00 25.001204-4396 Insurance User Charges 0.00 17,338.00
Total Materials/Supplies/Other 104,298.00 23,131.65 23,131.65 0.00 81,166.35 22.18
1204-5400 Equipment/Furniture
0.00 0.00 0.00 0.001204-5401 Equip-Less Than $1,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
15Page:
154
11/19/2018
CITY OF HERMOSA BEACH
16
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Total Finance Cashier 843,200.00 222,496.15 222,496.15 0.00 620,703.85 26.39
General Appropriations1208
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1208-4100 Personal Services
65,616.00 0.00 0.00 0.001208-4102 Regular Salaries 0.00 65,616.00
0.00 0.00 0.00 0.001208-4106 Regular Overtime 0.00 0.00
380.00 0.00 0.00 0.001208-4111 Accrual Cash In 0.00 380.00
4,537.00 17.44 17.44 0.381208-4180 Retirement 0.00 4,519.56
18,431.00 0.00 0.00 0.001208-4188 Employee Benefits 0.00 18,431.00
951.00 0.00 0.00 0.001208-4189 Medicare Benefits 0.00 951.00
5,774.00 1,924.68 1,924.68 33.331208-4190 Other Post Employment Benefits (OPEB) 0.00 3,849.32
Total Personal Services 95,689.00 1,942.12 1,942.12 0.00 93,746.88 2.03
1208-4200 Contract Services
0.00 0.00 0.00 0.001208-4201 Contract Serv/Private 0.00 0.00
Total Contract Services 0.00 0.00 0.00 0.00 0.00 0.00
1208-4300 Materials/Supplies/Other
140.00 15.01 15.01 10.721208-4304 Telephone 0.00 124.99
-10,000.00 -2,835.82 -2,835.82 28.361208-4305 Office Oper Supplies 0.00 -7,164.18
18,396.00 4,599.00 4,599.00 25.001208-4390 Communications Equipment Chrgs 0.00 13,797.00
306.00 75.00 75.00 24.511208-4394 Building Maintenance Charges 0.00 231.00
2,036.00 510.00 510.00 25.051208-4396 Insurance User Charges 0.00 1,526.00
Total Materials/Supplies/Other 10,878.00 2,363.19 2,363.19 0.00 8,514.81 21.72
1208-4900 Depreciation
0.00 0.00 0.00 0.001208-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
Total General Appropriations 106,567.00 4,305.31 4,305.31 0.00 102,261.69 4.04
16Page:
155
11/19/2018
CITY OF HERMOSA BEACH
17
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Prospective Expenditures1214
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1214-4300 Materials/Supplies/Other
107,801.00 0.00 0.00 0.001214-4322 Unclassified 0.00 107,801.00
Total Prospective Expenditures 107,801.00 0.00 0.00 0.00 107,801.00 0.00
17Page:
156
11/19/2018
CITY OF HERMOSA BEACH
18
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Legal Settlement- E&B Resources1220
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1220-4200 Contract Services
0.00 0.00 0.00 0.001220-4201 Contract Serv/Private 0.00 0.00
Total Legal Settlement- E&B Resources 0.00 0.00 0.00 0.00 0.00 0.00
18Page:
157
11/19/2018
CITY OF HERMOSA BEACH
19
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
632,432.00 860,047.79 860,047.79 135.991299-4399 OperatingTransfers Out 0.00 -227,615.79
Total Interfund Transfers Out 632,432.00 860,047.79 860,047.79 0.00 -227,615.79 135.99
19Page:
158
11/19/2018
CITY OF HERMOSA BEACH
20
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Police2101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2101-4100 Personal Services
5,069,227.00 1,509,452.03 1,509,452.03 29.782101-4102 Regular Salaries 0.00 3,559,774.97
80,793.00 27,050.60 27,050.60 33.482101-4105 Special Duty Pay 0.00 53,742.40
360,000.00 102,277.32 102,277.32 28.412101-4106 Regular Overtime 0.00 257,722.68
871,159.00 116,994.89 116,994.89 13.432101-4111 Accrual Cash In 0.00 754,164.11
18,252.00 1,895.33 1,895.33 10.382101-4112 Part Time Temporary 0.00 16,356.67
6,000.00 2,067.98 2,067.98 34.472101-4117 Shift Differential 0.00 3,932.02
9,000.00 0.00 0.00 0.002101-4118 Training Officer 0.00 9,000.00
3,645,645.00 902,925.69 902,925.69 24.772101-4180 Retirement 0.00 2,742,719.31
17,000.00 0.00 0.00 0.002101-4184 IRC 415(B) Retirement 0.00 17,000.00
0.00 0.00 0.00 0.002101-4185 Alternative Retirement System-Parttime 0.00 0.00
28,922.00 9,454.35 9,454.35 32.692101-4187 Uniform Allowance 0.00 19,467.65
887,617.00 270,030.03 270,030.03 30.422101-4188 Employee Benefits 0.00 617,586.97
74,527.00 25,351.51 25,351.51 34.022101-4189 Medicare Benefits 0.00 49,175.49
446,236.00 148,745.32 148,745.32 33.332101-4190 Other Post Employment Benefits (OPEB) 0.00 297,490.68
Total Personal Services 11,514,378.00 3,116,245.05 3,116,245.05 0.00 8,398,132.95 27.06
2101-4200 Contract Services
210,900.00 85,774.92 85,774.92 40.672101-4201 Contract Serv/Private 0.00 125,125.08
860,807.00 406,900.90 406,900.90 47.272101-4251 Contract Service/Govt 0.00 453,906.10
Total Contract Services 1,071,707.00 492,675.82 492,675.82 0.00 579,031.18 45.97
2101-4300 Materials/Supplies/Other
56,760.00 13,181.52 13,181.52 23.222101-4304 Telephone 0.00 43,578.48
55,000.00 4,684.76 4,684.76 8.522101-4305 Office Oper Supplies 0.00 50,315.24
13,000.00 3,233.49 3,233.49 24.872101-4306 Prisoner Maintenance 0.00 9,766.51
775.00 0.00 0.00 0.002101-4307 Radio Maintenance 0.00 775.00
10,500.00 287.36 287.36 2.742101-4309 Maintenance Materials 0.00 10,212.64
22,365.00 1,573.00 1,573.00 7.032101-4312 Travel Expense , POST 0.00 20,792.00
4,730.00 0.00 0.00 0.002101-4313 Travel Expense, STC 0.00 4,730.00
19,500.00 4,130.69 4,130.69 21.182101-4314 Uniforms 0.00 15,369.31
20Page:
159
11/19/2018
CITY OF HERMOSA BEACH
21
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Police2101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4,579.00 1,245.00 1,245.00 27.192101-4315 Membership 0.00 3,334.00
67,145.00 20,621.23 20,621.23 30.712101-4317 Conference/Training 0.00 46,523.77
0.00 0.00 0.00 0.002101-4326 Prior Yr Expense 0.00 0.00
4,524.00 402.39 402.39 8.892101-4350 Safety Gear 0.00 4,121.61
360,146.00 90,036.00 90,036.00 25.002101-4390 Communications Equipment Chrgs 0.00 270,110.00
11,250.00 2,814.00 2,814.00 25.012101-4394 Building Maintenance Charges 0.00 8,436.00
391,640.00 97,910.01 97,910.01 25.002101-4395 Equip Replacement Charges 0.00 293,729.99
1,300,118.00 325,029.00 325,029.00 25.002101-4396 Insurance User Charges 0.00 975,089.00
Total Materials/Supplies/Other 2,322,032.00 565,148.45 565,148.45 0.00 1,756,883.55 24.34
2101-4900 Depreciation
0.00 0.00 0.00 0.002101-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.002101-4904 Depreciation/Improvements 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
2101-5400 Equipment/Furniture
3,075.00 3,074.76 3,074.76 99.992101-5401 Equip-Less Than $1,000 0.00 0.24
4,140.00 0.00 0.00 0.002101-5402 Equip-More Than $1,000 0.00 4,140.00
0.00 0.00 0.00 0.002101-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 7,215.00 3,074.76 3,074.76 0.00 4,140.24 42.62
2101-5600 Buildings/Improvements
0.00 0.00 0.00 0.002101-5601 Buildings 0.00 0.00
0.00 0.00 0.00 0.002101-5602 Imprvmnts Other Than Bldgs 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Police 14,915,332.00 4,177,144.08 4,177,144.08 0.00 10,738,187.92 28.01
21Page:
160
11/19/2018
CITY OF HERMOSA BEACH
22
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Crossing Guard2102
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2102-4200 Contract Services
115,085.00 473.60 473.60 0.412102-4201 Contract Serv/Private 0.00 114,611.40
Total Crossing Guard 115,085.00 473.60 473.60 0.00 114,611.40 0.41
22Page:
161
11/19/2018
CITY OF HERMOSA BEACH
23
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Fire2201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2201-4100 Personal Services
0.00 0.00 0.00 0.002201-4102 Regular Salaries 0.00 0.00
0.00 0.00 0.00 0.002201-4106 Regular Overtime 0.00 0.00
0.00 0.00 0.00 0.002201-4108 FLSA Overtime 0.00 0.00
0.00 0.00 0.00 0.002201-4111 Accrual Cash In 0.00 0.00
0.00 0.00 0.00 0.002201-4112 Part Time/Temporary 0.00 0.00
0.00 0.00 0.00 0.002201-4119 Fitness Incentive 0.00 0.00
0.00 0.00 0.00 0.002201-4180 Retirement 0.00 0.00
0.00 0.00 0.00 0.002201-4185 Alternative Retirement System-Parttime 0.00 0.00
0.00 0.00 0.00 0.002201-4187 Uniform Allowance 0.00 0.00
0.00 0.00 0.00 0.002201-4188 Employee Benefits 0.00 0.00
0.00 0.00 0.00 0.002201-4189 Medicare Benefits 0.00 0.00
0.00 0.00 0.00 0.002201-4190 Other Post Employment Benefits (OPEB) 0.00 0.00
Total Personal Services 0.00 0.00 0.00 0.00 0.00 0.00
2201-4200 Contract Services
0.00 0.00 0.00 0.002201-4201 Contract Serv/Private 0.00 0.00
0.00 0.00 0.00 0.002201-4251 Contract Service/Govt 0.00 0.00
Total Contract Services 0.00 0.00 0.00 0.00 0.00 0.00
2201-4300 Materials/Supplies/Other
0.00 144.76 144.76 0.002201-4304 Telephone 0.00 -144.76
0.00 0.00 0.00 0.002201-4305 Office Oper Supplies 0.00 0.00
0.00 0.00 0.00 0.002201-4309 Maintenance Materials 0.00 0.00
0.00 0.00 0.00 0.002201-4314 Uniforms 0.00 0.00
0.00 0.00 0.00 0.002201-4315 Membership 0.00 0.00
0.00 0.00 0.00 0.002201-4317 Conference/Training 0.00 0.00
0.00 0.00 0.00 0.002201-4326 Prior Yr Expense 0.00 0.00
0.00 0.00 0.00 0.002201-4350 Safety Gear 0.00 0.00
0.00 0.00 0.00 0.002201-4390 Communications Equipment Chrgs 0.00 0.00
0.00 0.00 0.00 0.002201-4394 Building Maintenance Charges 0.00 0.00
23Page:
162
11/19/2018
CITY OF HERMOSA BEACH
24
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Fire2201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
0.00 0.00 0.00 0.002201-4395 Equip Replacement Charges 0.00 0.00
0.00 0.00 0.00 0.002201-4396 Insurance User Charges 0.00 0.00
Total Materials/Supplies/Other 0.00 144.76 144.76 0.00 -144.76 0.00
2201-4900 Depreciation
0.00 0.00 0.00 0.002201-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.002201-4903 Depreciation/Bldgs 0.00 0.00
0.00 0.00 0.00 0.002201-4904 Depreciation/Improvements 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
2201-5400 Equipment/Furniture
0.00 0.00 0.00 0.002201-5401 Equip-Less Than $1,000 0.00 0.00
0.00 0.00 0.00 0.002201-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.002201-5403 Vehicles 0.00 0.00
0.00 0.00 0.00 0.002201-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
2201-5600 Buildings/Improvements
0.00 0.00 0.00 0.002201-5602 Improvements Other Than Bldgs 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Fire 0.00 144.76 144.76 0.00 -144.76 0.00
24Page:
163
11/19/2018
CITY OF HERMOSA BEACH
25
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
County Fire District Costs2202
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2202-4200 Contract Services
4,727,878.00 1,980,939.19 1,980,939.19 41.902202-4251 Contract Services/Gov't 0.00 2,746,938.81
Total Contract Services 4,727,878.00 1,980,939.19 1,980,939.19 0.00 2,746,938.81 41.90
2202-5600 Buildings/Improvements
418,223.00 0.00 0.00 0.002202-5601 Buildings and Improvements 0.00 418,223.00
Total Buildings/Improvements 418,223.00 0.00 0.00 0.00 418,223.00 0.00
Total County Fire District Costs 5,146,101.00 1,980,939.19 1,980,939.19 0.00 3,165,161.81 38.49
25Page:
164
11/19/2018
CITY OF HERMOSA BEACH
26
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Fire Department Legacy Costs2203
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2203-4100 Personal Services
0.00 0.00 0.00 0.002203-4102 Regular Salaries 0.00 0.00
612,000.00 590,425.00 590,425.00 96.472203-4180 Retirement 0.00 21,575.00
0.00 0.00 0.00 0.002203-4188 Employee Benefits 0.00 0.00
0.00 0.00 0.00 0.002203-4189 Medicare Benefits 0.00 0.00
130,974.00 43,658.00 43,658.00 33.332203-4190 Other Post Employment Benefits/OPEB 0.00 87,316.00
Total Personal Services 742,974.00 634,083.00 634,083.00 0.00 108,891.00 85.34
2203-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.002203-4396 Insurance User Charges 0.00 0.00
Total Materials/Supplies/Other 0.00 0.00 0.00 0.00 0.00 0.00
Total Fire Department Legacy Costs 742,974.00 634,083.00 634,083.00 0.00 108,891.00 85.34
26Page:
165
11/19/2018
CITY OF HERMOSA BEACH
27
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Sewers/Storm Drains3102
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3102-4900 Depreciation
0.00 0.00 0.00 0.003102-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Sewers/Storm Drains 0.00 0.00 0.00 0.00 0.00 0.00
27Page:
166
11/19/2018
CITY OF HERMOSA BEACH
28
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Street Maint/Traffic Safety3104
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3104-4100 Personal Services
309,438.00 102,813.89 102,813.89 33.233104-4102 Regular Salaries 0.00 206,624.11
16,651.00 0.00 0.00 0.003104-4106 Regular Overtime 0.00 16,651.00
20,713.00 3,031.75 3,031.75 14.643104-4111 Accrual Cash In 0.00 17,681.25
44,013.00 8,688.72 8,688.72 19.743104-4112 Part Time/Temporary 0.00 35,324.28
114,389.00 17,242.08 17,242.08 15.073104-4180 Retirement 0.00 97,146.92
58,809.00 17,616.97 17,616.97 29.963104-4188 Employee Benefits 0.00 41,192.03
2,174.00 613.81 613.81 28.233104-4189 Medicare Benefits 0.00 1,560.19
22,221.00 7,407.00 7,407.00 33.333104-4190 Other Post Employment Benefits (OPEB) 0.00 14,814.00
Total Personal Services 588,408.00 157,414.22 157,414.22 0.00 430,993.78 26.75
3104-4200 Contract Services
381,423.00 52,340.74 52,340.74 13.723104-4201 Contract Serv/Private 0.00 329,082.26
10,294.00 3,845.74 3,845.74 37.363104-4251 Contract Service/Govt 0.00 6,448.26
Total Contract Services 391,717.00 56,186.48 56,186.48 0.00 335,530.52 14.34
3104-4300 Materials/Supplies/Other
6,066.00 2,091.91 2,091.91 34.493104-4303 Utilities 0.00 3,974.09
115,000.00 19,244.50 19,244.50 16.733104-4309 Maintenance Materials 0.00 95,755.50
0.00 0.00 0.00 0.003104-4326 Prior Yr Expense 0.00 0.00
666.00 165.00 165.00 24.773104-4394 Building Maintenance Charges 0.00 501.00
55,595.00 13,898.76 13,898.76 25.003104-4395 Equip Replacement Charges 0.00 41,696.24
425,162.00 106,290.00 106,290.00 25.003104-4396 Insurance User Charges 0.00 318,872.00
Total Materials/Supplies/Other 602,489.00 141,690.17 141,690.17 0.00 460,798.83 23.52
3104-5400 Equipment/Furniture
0.00 0.00 0.00 0.003104-5401 Equip-Less Than $1,000 0.00 0.00
0.00 0.00 0.00 0.003104-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.003104-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
28Page:
167
11/19/2018
CITY OF HERMOSA BEACH
29
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Total Street Maint/Traffic Safety 1,582,614.00 355,290.87 355,290.87 0.00 1,227,323.13 22.45
Downtown Enhancement3301
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3301-4100 Personal Services
47,337.00 15,235.69 15,235.69 32.193301-4102 Regular Salaries 0.00 32,101.31
1,200.00 0.00 0.00 0.003301-4106 Regular Overtime 0.00 1,200.00
4,773.00 0.00 0.00 0.003301-4111 Accrual Cash In 0.00 4,773.00
13,338.00 2,097.52 2,097.52 15.733301-4180 Retirement 0.00 11,240.48
7,009.00 2,251.19 2,251.19 32.123301-4188 Employee Benefits 0.00 4,757.81
705.00 227.80 227.80 32.313301-4189 Medicare Benefits 0.00 477.20
1,661.00 553.68 553.68 33.333301-4190 Other Post Employment Benefits/OPEB 0.00 1,107.32
Total Personal Services 76,023.00 20,365.88 20,365.88 0.00 55,657.12 26.79
3301-4200 Contract Services
267,170.00 68,201.32 68,201.32 25.533301-4201 Contract Serv/Private 0.00 198,968.68
Total Contract Services 267,170.00 68,201.32 68,201.32 0.00 198,968.68 25.53
3301-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.003301-4303 Utilities 0.00 0.00
3,000.00 1,849.14 1,849.14 61.643301-4309 Maintenance Materials 0.00 1,150.86
0.00 0.00 0.00 0.003301-4319 Special Events 0.00 0.00
221.00 54.00 54.00 24.433301-4394 Building Maintenance Charges 0.00 167.00
557.00 139.26 139.26 25.003301-4395 Equip Replacement Chrgs 0.00 417.74
5,940.00 1,485.00 1,485.00 25.003301-4396 Insurance User Charges 0.00 4,455.00
Total Materials/Supplies/Other 9,718.00 3,527.40 3,527.40 0.00 6,190.60 36.30
3301-4900 Depreciation
0.00 0.00 0.00 0.003301-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.003301-4903 Depreciation/Bldgs 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
3301-5400 Equipment/Furniture
29Page:
168
11/19/2018
CITY OF HERMOSA BEACH
30
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Downtown Enhancement3301
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
0.00 0.00 0.00 0.003301-5401 Equip-Less Than $1,000 0.00 0.00
0.00 0.00 0.00 0.003301-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.003301-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total Downtown Enhancement 352,911.00 92,094.60 92,094.60 0.00 260,816.40 26.10
30Page:
169
11/19/2018
CITY OF HERMOSA BEACH
31
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Services3302
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3302-4100 Personal Services
1,029,655.00 269,925.89 269,925.89 26.223302-4102 Regular Salaries 0.00 759,729.11
40,800.00 24,086.74 24,086.74 59.043302-4106 Regular Overtime 0.00 16,713.26
47,044.00 26,233.04 26,233.04 55.763302-4111 Accrual Cash In 0.00 20,810.96
42,890.00 38,618.79 38,618.79 90.043302-4112 Part Time Temporary 0.00 4,271.21
7,525.00 1,698.56 1,698.56 22.573302-4117 Shift Differential 0.00 5,826.44
602.00 80.00 80.00 13.293302-4118 Field Training Officer 0.00 522.00
285,240.00 43,088.39 43,088.39 15.113302-4180 Retirement 0.00 242,151.61
380.00 13.98 13.98 3.683302-4185 Alternative Retirement System-Parttime 0.00 366.02
4,800.00 1,546.72 1,546.72 32.223302-4187 Uniform Allowance 0.00 3,253.28
264,289.00 78,404.48 78,404.48 29.673302-4188 Employee Benefits 0.00 185,884.52
15,307.00 5,253.60 5,253.60 34.323302-4189 Medicare Benefits 0.00 10,053.40
81,109.00 27,036.32 27,036.32 33.333302-4190 Other Post Employment Benefits (OPEB) 0.00 54,072.68
Total Personal Services 1,819,641.00 515,986.51 515,986.51 0.00 1,303,654.49 28.36
3302-4200 Contract Services
233,824.00 68,229.85 68,229.85 29.183302-4201 Contract Serv/Private 0.00 165,594.15
83,969.00 41,422.23 41,422.23 49.333302-4251 Contract Services/Govt 0.00 42,546.77
Total Contract Services 317,793.00 109,652.08 109,652.08 0.00 208,140.92 34.50
3302-4300 Materials/Supplies/Other
3,500.00 746.09 746.09 21.323302-4304 Telephone 0.00 2,753.91
20,000.00 916.69 916.69 4.583302-4305 Office Operating Supplies 0.00 19,083.31
775.00 0.00 0.00 0.003302-4307 Radio Maintenance 0.00 775.00
33,372.00 2,110.62 2,110.62 6.323302-4309 Maintenance Materials 0.00 31,261.38
3,000.00 0.00 0.00 0.003302-4314 Uniforms 0.00 3,000.00
540.00 0.00 0.00 0.003302-4315 Membership 0.00 540.00
7,865.00 1,886.24 1,886.24 23.983302-4317 Conference/Training 0.00 5,978.76
101,235.00 25,308.00 25,308.00 25.003302-4390 Communications Equipment Chrgs 0.00 75,927.00
7,088.00 1,773.00 1,773.00 25.013302-4394 Building Maintenance Charges 0.00 5,315.00
110,061.00 27,515.25 27,515.25 25.003302-4395 Equip Replacement Chrgs 0.00 82,545.75
31Page:
170
11/19/2018
CITY OF HERMOSA BEACH
32
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Services3302
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
153,515.00 38,379.00 38,379.00 25.003302-4396 Insurance User Charges 0.00 115,136.00
Total Materials/Supplies/Other 440,951.00 98,634.89 98,634.89 0.00 342,316.11 22.37
3302-4900 Depreciation
0.00 0.00 0.00 0.003302-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.003302-4903 Depreciation/Bldgs 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
3302-5400 Equipment/Furniture
2,575.00 5,623.48 5,623.48 218.393302-5401 Equip-Less Than $1,000 0.00 -3,048.48
0.00 0.00 0.00 0.003302-5402 Equip-More Than $1,000 0.00 0.00
Total Equipment/Furniture 2,575.00 5,623.48 5,623.48 0.00 -3,048.48 218.39
3302-5600 Buildings/Improvements
0.00 0.00 0.00 0.003302-5601 Buildings 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Community Services 2,580,960.00 729,896.96 729,896.96 0.00 1,851,063.04 28.28
32Page:
171
11/19/2018
CITY OF HERMOSA BEACH
33
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
North Pier Parking Structure3304
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3304-4200 Contract Services
140,946.00 23,053.09 23,053.09 16.363304-4201 Contract Serv/Private 0.00 117,892.91
225.00 0.00 0.00 0.003304-4251 Contract Services/Gov't 0.00 225.00
Total Contract Services 141,171.00 23,053.09 23,053.09 0.00 118,117.91 16.33
3304-4300 Materials/Supplies/Other
17,837.00 5,863.06 5,863.06 32.873304-4303 Utilities 0.00 11,973.94
689.00 228.37 228.37 33.153304-4304 Telephone 0.00 460.63
4,500.00 0.00 0.00 0.003304-4309 Maintenance Materials 0.00 4,500.00
Total Materials/Supplies/Other 23,026.00 6,091.43 6,091.43 0.00 16,934.57 26.45
3304-4900 Depreciation
0.00 0.00 0.00 0.003304-4903 Depreciation/Bldgs 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
Total North Pier Parking Structure 164,197.00 29,144.52 29,144.52 0.00 135,052.48 17.75
33Page:
172
11/19/2018
CITY OF HERMOSA BEACH
34
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Downtown Parking Lot A3305
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3305-4200 Contract Services
61,443.00 13,428.80 13,428.80 21.863305-4201 Contract Serv/Private 0.00 48,014.20
Total Contract Services 61,443.00 13,428.80 13,428.80 0.00 48,014.20 21.86
3305-4300 Materials/Supplies/Other
2,000.00 0.00 0.00 0.003305-4309 Maintenance Materials 0.00 2,000.00
Total Materials/Supplies/Other 2,000.00 0.00 0.00 0.00 2,000.00 0.00
3305-4900 Depreciation
0.00 0.00 0.00 0.003305-4904 Depreciation/Improvements 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
Total Downtown Parking Lot A 63,443.00 13,428.80 13,428.80 0.00 50,014.20 21.17
34Page:
173
11/19/2018
CITY OF HERMOSA BEACH
35
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Co. Share Pkg Structure Rev.3306
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3306-4200 Contract Services
329,845.00 0.00 0.00 0.003306-4251 Contract Services/Gov't 0.00 329,845.00
Total Co. Share Pkg Structure Rev. 329,845.00 0.00 0.00 0.00 329,845.00 0.00
35Page:
174
11/19/2018
CITY OF HERMOSA BEACH
36
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
After School Program Shuttle3411
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3411-4200 Contract Services
0.00 0.00 0.00 0.003411-4201 Contract Serv/Private 0.00 0.00
Total After School Program Shuttle 0.00 0.00 0.00 0.00 0.00 0.00
36Page:
175
11/19/2018
CITY OF HERMOSA BEACH
37
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Dev/Planning4101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4101-4100 Personal Services
643,087.00 204,053.82 204,053.82 31.734101-4102 Regular Salaries 0.00 439,033.18
674.00 223.19 223.19 33.114101-4106 Regular Overtime 0.00 450.81
30,174.00 583.10 583.10 1.934101-4111 Accrual Cash In 0.00 29,590.90
81,219.00 19,452.44 19,452.44 23.954101-4112 Part Time/Temporary 0.00 61,766.56
0.00 208.64 208.64 0.004101-4117 Shift Differential 0.00 -208.64
105,813.00 19,046.28 19,046.28 18.004101-4180 Retirement 0.00 86,766.72
0.00 29.22 29.22 0.004101-4185 Alternative Retirement System-Parttime 0.00 -29.22
0.00 0.00 0.00 0.004101-4187 Uniform Allowance 0.00 0.00
104,241.00 34,273.52 34,273.52 32.884101-4188 Employee Benefits 0.00 69,967.48
10,572.00 3,317.17 3,317.17 31.384101-4189 Medicare Benefits 0.00 7,254.83
30,346.00 10,115.32 10,115.32 33.334101-4190 Other Post Employment Benefits (OPEB) 0.00 20,230.68
Total Personal Services 1,006,126.00 291,302.70 291,302.70 0.00 714,823.30 28.95
4101-4200 Contract Services
47,090.00 -706.85 -706.85 1.504101-4201 Contract Serv/Private 0.00 47,796.85
Total Contract Services 47,090.00 -706.85 -706.85 0.00 47,796.85 0.00
4101-4300 Materials/Supplies/Other
3,000.00 289.67 289.67 9.664101-4304 Telephone 0.00 2,710.33
5,000.00 1,706.11 1,706.11 34.124101-4305 Office Oper Supplies 0.00 3,293.89
241.00 0.00 0.00 0.004101-4314 Uniforms 0.00 241.00
4,408.00 252.00 252.00 5.724101-4315 Membership 0.00 4,156.00
13,307.00 3,506.23 3,506.23 26.354101-4317 Conference/Training 0.00 9,800.77
13,636.00 3,408.00 3,408.00 24.994101-4390 Communications Equipment Chrgs 0.00 10,228.00
2,234.00 558.00 558.00 24.984101-4394 Building Maintenance Charges 0.00 1,676.00
43,240.00 10,809.00 10,809.00 25.004101-4396 Insurance User Charges 0.00 32,431.00
Total Materials/Supplies/Other 85,066.00 20,529.01 20,529.01 0.00 64,536.99 24.13
Total Community Dev/Planning 1,138,282.00 311,124.86 311,124.86 0.00 827,157.14 27.33
37Page:
176
11/19/2018
CITY OF HERMOSA BEACH
38
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Coastal Permit Auth Grant4104
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4104-4100 Personal Services
0.00 0.00 0.00 0.004104-4106 Regular Overtime 0.00 0.00
Total Personal Services 0.00 0.00 0.00 0.00 0.00 0.00
4104-4200 Contract Services
62,576.00 2,170.00 2,170.00 3.474104-4201 Contract Serv/Private 0.00 60,406.00
Total Contract Services 62,576.00 2,170.00 2,170.00 0.00 60,406.00 3.47
4104-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.004104-4305 Office Operating Supplies 0.00 0.00
Total Materials/Supplies/Other 0.00 0.00 0.00 0.00 0.00 0.00
Total Coastal Permit Auth Grant 62,576.00 2,170.00 2,170.00 0.00 60,406.00 3.47
38Page:
177
11/19/2018
CITY OF HERMOSA BEACH
39
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Zoning Ordinance Update4105
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4105-4200 Contract Services
250,000.00 0.00 0.00 0.004105-4201 Contract Serv/Private 0.00 250,000.00
Total Zoning Ordinance Update 250,000.00 0.00 0.00 0.00 250,000.00 0.00
39Page:
178
11/19/2018
CITY OF HERMOSA BEACH
40
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Dev/Building4201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4201-4100 Personal Services
485,622.00 160,885.41 160,885.41 33.134201-4102 Regular Salaries 0.00 324,736.59
434.00 223.18 223.18 51.424201-4106 Regular Overtime 0.00 210.82
20,420.00 3,926.47 3,926.47 19.234201-4111 Accrual Cash In 0.00 16,493.53
0.00 0.00 0.00 0.004201-4112 Part Time/Temporary 0.00 0.00
0.00 208.64 208.64 0.004201-4117 Shift Differential 0.00 -208.64
164,409.00 21,085.98 21,085.98 12.834201-4180 Retirement 0.00 143,323.02
0.00 29.22 29.22 0.004201-4185 Alternative Retirement System-Parttime 0.00 -29.22
0.00 0.00 0.00 0.004201-4187 Uniform Allowance 0.00 0.00
71,755.00 20,811.83 20,811.83 29.004201-4188 Employee Benefits 0.00 50,943.17
7,187.00 2,446.88 2,446.88 34.054201-4189 Medicare Benefits 0.00 4,740.12
30,675.00 10,225.00 10,225.00 33.334201-4190 Other Post Employment Benefits (OPEB) 0.00 20,450.00
Total Personal Services 780,502.00 219,842.61 219,842.61 0.00 560,659.39 28.17
4201-4200 Contract Services
262,068.00 33,217.90 33,217.90 12.684201-4201 Contract Serv/Private 0.00 228,850.10
Total Contract Services 262,068.00 33,217.90 33,217.90 0.00 228,850.10 12.68
4201-4300 Materials/Supplies/Other
5,500.00 1,027.12 1,027.12 18.674201-4304 Telephone 0.00 4,472.88
5,000.00 1,131.80 1,131.80 22.644201-4305 Office Oper Supplies 0.00 3,868.20
1,246.00 413.24 413.24 33.174201-4314 Uniforms 0.00 832.76
5,290.00 0.00 0.00 0.004201-4315 Membership 0.00 5,290.00
10,336.00 3,035.00 3,035.00 29.364201-4317 Conference/Training 0.00 7,301.00
18,432.00 4,608.00 4,608.00 25.004201-4390 Communications Equipment Chrgs 0.00 13,824.00
1,409.00 351.00 351.00 24.914201-4394 Building Maintenance Charges 0.00 1,058.00
24,774.00 6,193.50 6,193.50 25.004201-4395 Equip Replacement Charges 0.00 18,580.50
54,211.00 13,554.00 13,554.00 25.004201-4396 Insurance User Charges 0.00 40,657.00
Total Materials/Supplies/Other 126,198.00 30,313.66 30,313.66 0.00 95,884.34 24.02
4201-4900 Depreciation
40Page:
179
11/19/2018
CITY OF HERMOSA BEACH
41
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Dev/Building4201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
0.00 0.00 0.00 0.004201-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.004201-4902 Depreciation/Vehicles 0.00 0.00
0.00 0.00 0.00 0.004201-4903 Depreciation/Bldgs 0.00 0.00
0.00 0.00 0.00 0.004201-4904 Depreciation/Improvements 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
4201-5600 Buildings/Improvements
0.00 0.00 0.00 0.004201-5602 Imprvmnts Other Than Bldgs 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Community Dev/Building 1,168,768.00 283,374.17 283,374.17 0.00 885,393.83 24.25
41Page:
180
11/19/2018
CITY OF HERMOSA BEACH
42
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Public Works Administration4202
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4202-4100 Personal Services
616,696.00 161,280.92 161,280.92 26.154202-4102 Regular Salaries 0.00 455,415.08
2,000.00 727.17 727.17 36.364202-4106 Regular Overtime 0.00 1,272.83
21,417.00 642.26 642.26 3.004202-4111 Accrual Cash In 0.00 20,774.74
12,480.00 45,392.87 45,392.87 363.724202-4112 Part Time/Temporary 0.00 -32,912.87
148,108.00 25,849.07 25,849.07 17.454202-4180 Retirement 0.00 122,258.93
0.00 0.00 0.00 0.004202-4185 Alternative Retirement System-Parttime 0.00 0.00
100,698.00 24,015.91 24,015.91 23.854202-4188 Employee Benefits 0.00 76,682.09
9,771.00 3,129.73 3,129.73 32.034202-4189 Medicare Benefits 0.00 6,641.27
26,442.00 8,814.00 8,814.00 33.334202-4190 Other Post Employment Benefits (OPEB) 0.00 17,628.00
Total Personal Services 937,612.00 269,851.93 269,851.93 0.00 667,760.07 28.78
4202-4200 Contract Services
112,929.00 17,104.32 17,104.32 15.154202-4201 Contract Serv/Private 0.00 95,824.68
0.00 0.00 0.00 0.004202-4251 Contract Service/Govt 0.00 0.00
Total Contract Services 112,929.00 17,104.32 17,104.32 0.00 95,824.68 15.15
4202-4300 Materials/Supplies/Other
19,980.00 3,578.54 3,578.54 17.914202-4304 Telephone 0.00 16,401.46
14,998.00 3,659.78 3,659.78 24.404202-4305 Office Oper Supplies 0.00 11,338.22
6,678.00 1,010.19 1,010.19 15.134202-4314 Uniforms 0.00 5,667.81
1,775.00 1,443.75 1,443.75 81.344202-4315 Membership 0.00 331.25
24,807.00 4,551.03 4,551.03 18.354202-4317 Conference/Training 0.00 20,255.97
74,882.00 18,720.00 18,720.00 25.004202-4390 Communications Equipment Chrgs 0.00 56,162.00
6,478.00 1,620.00 1,620.00 25.014202-4394 Building Maintenance Charges 0.00 4,858.00
17,100.00 4,275.00 4,275.00 25.004202-4395 Equip Replacement Charges 0.00 12,825.00
64,163.00 16,041.00 16,041.00 25.004202-4396 Insurance User Charges 0.00 48,122.00
Total Materials/Supplies/Other 230,861.00 54,899.29 54,899.29 0.00 175,961.71 23.78
4202-4900 Depreciation
0.00 0.00 0.00 0.004202-4901 Depreciation/Mach/Equipment 0.00 0.00
42Page:
181
11/19/2018
CITY OF HERMOSA BEACH
43
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Public Works Administration4202
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
0.00 0.00 0.00 0.004202-4902 Depreciation/Vehicles 0.00 0.00
0.00 0.00 0.00 0.004202-4903 Depreciation/Bldgs 0.00 0.00
0.00 0.00 0.00 0.004202-4904 Depreciation/Improvements 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
4202-5400 Equipment/Furniture
850.00 0.00 0.00 0.004202-5401 Equip-Less Than $1,000 0.00 850.00
0.00 0.00 0.00 0.004202-5402 Equip-More Than $1,000 0.00 0.00
Total Equipment/Furniture 850.00 0.00 0.00 0.00 850.00 0.00
4202-5600 Buildings/Improvements
0.00 0.00 0.00 0.004202-5602 Imprvmts Other Than Bldg 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Public Works Administration 1,282,252.00 341,855.54 341,855.54 0.00 940,396.46 26.66
43Page:
182
11/19/2018
CITY OF HERMOSA BEACH
44
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Building Maintenance4204
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4204-4100 Personal Services
274,917.00 80,416.15 80,416.15 29.254204-4102 Regular Salaries 0.00 194,500.85
14,575.00 5,882.01 5,882.01 40.364204-4106 Regular Overtime 0.00 8,692.99
22,070.00 3,263.47 3,263.47 14.794204-4111 Accrual Cash In 0.00 18,806.53
0.00 0.00 0.00 0.004204-4112 Part Time Temporary 0.00 0.00
82,103.00 11,066.76 11,066.76 13.484204-4180 Retirement 0.00 71,036.24
0.00 26.18 26.18 0.004204-4185 Alternative Retirement System-Parttime 0.00 -26.18
61,617.00 17,208.78 17,208.78 27.934204-4188 Employee Benefits 0.00 44,408.22
3,861.00 1,266.10 1,266.10 32.794204-4189 Medicare Benefits 0.00 2,594.90
17,490.00 5,830.00 5,830.00 33.334204-4190 Other Post Employment Benefits (OPEB) 0.00 11,660.00
Total Personal Services 476,633.00 124,959.45 124,959.45 0.00 351,673.55 26.22
4204-4200 Contract Services
139,544.00 36,176.95 36,176.95 25.934204-4201 Contract Serv/Private 0.00 103,367.05
225.00 0.00 0.00 0.004204-4251 Contract Service/Govt 0.00 225.00
Total Contract Services 139,769.00 36,176.95 36,176.95 0.00 103,592.05 25.88
4204-4300 Materials/Supplies/Other
142,755.00 43,666.78 43,666.78 30.594204-4303 Utilities 0.00 99,088.22
43,500.00 15,807.35 15,807.35 36.344204-4309 Maintenance Materials 0.00 27,692.65
6,000.00 1,308.50 1,308.50 21.814204-4321 Building Sfty/Security 0.00 4,691.50
5,444.00 1,362.00 1,362.00 25.024204-4390 Communications Equipment Chrgs 0.00 4,082.00
667.00 168.00 168.00 25.194204-4394 Building Maintenance Charges 0.00 499.00
15,071.00 3,767.76 3,767.76 25.004204-4395 Equip Replacement Charges 0.00 11,303.24
81,237.00 20,310.00 20,310.00 25.004204-4396 Insurance User Charges 0.00 60,927.00
Total Materials/Supplies/Other 294,674.00 86,390.39 86,390.39 0.00 208,283.61 29.32
4204-4900 Depreciation
0.00 0.00 0.00 0.004204-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
44Page:
183
11/19/2018
CITY OF HERMOSA BEACH
45
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Building Maintenance4204
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4204-5400 Equipment/Furniture
0.00 0.00 0.00 0.004204-5401 Equip-Less Than $1,000 0.00 0.00
0.00 0.00 0.00 0.004204-5402 Equip-More Than $1,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
4204-5600 Buildings/Improvements
0.00 0.00 0.00 0.004204-5601 Buildings 0.00 0.00
0.00 0.00 0.00 0.004204-5602 Imprvmnts Other Than Bldgs 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Building Maintenance 911,076.00 247,526.79 247,526.79 0.00 663,549.21 27.17
45Page:
184
11/19/2018
CITY OF HERMOSA BEACH
46
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Systemic Safety Analysis Report Program4210
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4210-4200 Contract Services
9,350.00 0.00 0.00 0.004210-4201 Contract Serv/Private 0.00 9,350.00
Total Systemic Safety Analysis Report Program 9,350.00 0.00 0.00 0.00 9,350.00 0.00
46Page:
185
11/19/2018
CITY OF HERMOSA BEACH
47
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Resources4601
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4601-4100 Personal Services
332,642.00 103,671.20 103,671.20 31.174601-4102 Regular Salaries 0.00 228,970.80
5,007.00 3,481.81 3,481.81 69.544601-4106 Regular Overtime 0.00 1,525.19
9,209.00 0.00 0.00 0.004601-4111 Accrual Cash In 0.00 9,209.00
310,294.00 108,133.34 108,133.34 34.854601-4112 Part Time/Temporary 0.00 202,160.66
105,564.00 23,607.21 23,607.21 22.364601-4180 Retirement 0.00 81,956.79
1,300.00 468.40 468.40 36.034601-4185 Alternative Retirement System-Parttime 0.00 831.60
48,989.00 19,142.56 19,142.56 39.084601-4188 Employee Benefits 0.00 29,846.44
5,106.00 3,587.83 3,587.83 70.274601-4189 Medicare Benefits 0.00 1,518.17
16,353.00 5,451.00 5,451.00 33.334601-4190 Other Post Employment Benefits (OPEB) 0.00 10,902.00
Total Personal Services 834,464.00 267,543.35 267,543.35 0.00 566,920.65 32.06
4601-4200 Contract Services
92,000.00 37,574.75 37,574.75 40.844601-4201 Contract Serv/Private 0.00 54,425.25
285,000.00 129,048.84 129,048.84 45.284601-4221 Contract Rec Classes/Programs 0.00 155,951.16
Total Contract Services 377,000.00 166,623.59 166,623.59 0.00 210,376.41 44.20
4601-4300 Materials/Supplies/Other
16,800.00 200.00 200.00 1.194601-4302 Advertising 0.00 16,600.00
5,000.00 887.55 887.55 17.754601-4304 Telephone 0.00 4,112.45
13,000.00 3,880.82 3,880.82 29.854601-4305 Office Oper Supplies 0.00 9,119.18
20,000.00 3,133.03 3,133.03 15.674601-4308 Program Materials 0.00 16,866.97
0.00 0.00 0.00 0.004601-4309 Maintenance Materials 0.00 0.00
2,850.00 156.22 156.22 5.484601-4315 Membership 0.00 2,693.78
15,000.00 1,608.30 1,608.30 10.724601-4317 Conference/Training 0.00 13,391.70
6,000.00 810.75 810.75 13.514601-4328 Hermosa Senior Center Programs 0.00 5,189.25
33,551.00 8,388.00 8,388.00 25.004601-4390 Communications Equipment Chrgs 0.00 25,163.00
35,237.00 8,808.00 8,808.00 25.004601-4394 Building Maintenance Charges 0.00 26,429.00
19,740.00 4,935.00 4,935.00 25.004601-4395 Equip Replacement Charges 0.00 14,805.00
56,120.00 14,031.00 14,031.00 25.004601-4396 Insurance User Charges 0.00 42,089.00
Total Materials/Supplies/Other 223,298.00 46,838.67 46,838.67 0.00 176,459.33 20.98
47Page:
186
11/19/2018
CITY OF HERMOSA BEACH
48
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Resources4601
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4601-4900 Depreciation
0.00 0.00 0.00 0.004601-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.004601-4904 Depreciation/Improvements 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
4601-5400 Equipment/Furniture
0.00 0.00 0.00 0.004601-5401 Equip-Less Than $1,000 0.00 0.00
0.00 0.00 0.00 0.004601-5402 Equip-More Than $1,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
4601-5600 Buildings/Improvements
0.00 0.00 0.00 0.004601-5601 Buildings 0.00 0.00
0.00 0.00 0.00 0.004601-5602 Imprvmts Other Than Bldg 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Community Resources 1,434,762.00 481,005.61 481,005.61 0.00 953,756.39 33.53
48Page:
187
11/19/2018
CITY OF HERMOSA BEACH
49
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Parks6101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
6101-4100 Personal Services
320,676.00 104,541.34 104,541.34 32.606101-4102 Regular Salaries 0.00 216,134.66
4,500.00 1,575.00 1,575.00 35.006101-4106 Regular Overtime 0.00 2,925.00
17,188.00 4,564.18 4,564.18 26.556101-4111 Accrual Cash In 0.00 12,623.82
58,235.00 10,985.78 10,985.78 18.866101-4180 Retirement 0.00 47,249.22
480.00 160.00 160.00 33.336101-4187 Uniform Allowance 0.00 320.00
70,726.00 25,491.40 25,491.40 36.046101-4188 Employee Benefits 0.00 45,234.60
4,699.00 1,630.44 1,630.44 34.706101-4189 Medicare Benefits 0.00 3,068.56
22,986.00 7,662.00 7,662.00 33.336101-4190 Other Post Employment Benefits (OPEB) 0.00 15,324.00
Total Personal Services 499,490.00 156,610.14 156,610.14 0.00 342,879.86 31.35
6101-4200 Contract Services
260,512.00 62,761.29 62,761.29 24.096101-4201 Contract Serv/Private 0.00 197,750.71
198.00 0.00 0.00 0.006101-4251 Contract Service/Govt 0.00 198.00
Total Contract Services 260,710.00 62,761.29 62,761.29 0.00 197,948.71 24.07
6101-4300 Materials/Supplies/Other
263,108.00 73,794.95 73,794.95 28.056101-4303 Utilities 0.00 189,313.05
0.00 0.00 0.00 0.006101-4304 Telephone 0.00 0.00
25,938.00 10,752.57 10,752.57 41.456101-4309 Maintenance Materials 0.00 15,185.43
21,867.00 5,466.00 5,466.00 25.006101-4394 Building Maintenance Charges 0.00 16,401.00
28,633.00 7,158.24 7,158.24 25.006101-4395 Equip Replacement Chrgs 0.00 21,474.76
109,542.00 27,387.00 27,387.00 25.006101-4396 Insurance User Charges 0.00 82,155.00
Total Materials/Supplies/Other 449,088.00 124,558.76 124,558.76 0.00 324,529.24 27.74
6101-4900 Depreciation
0.00 0.00 0.00 0.006101-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
6101-5400 Equipment/Furniture
49Page:
188
11/19/2018
CITY OF HERMOSA BEACH
50
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Parks6101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
0.00 0.00 0.00 0.006101-5401 Equip-Less Than $1,000 0.00 0.00
0.00 -1,313.68 -1,313.68 0.006101-5402 Equip-More Than $1,000 0.00 1,313.68
0.00 0.00 0.00 0.006101-5499 Non-Capitalized Assets 0.00 0.00
Total Equipment/Furniture 0.00 -1,313.68 -1,313.68 0.00 1,313.68 0.00
6101-5600 Buildings/Improvements
0.00 0.00 0.00 0.006101-5602 Imprvmnts Other Than Bldgs 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Parks 1,209,288.00 342,616.51 342,616.51 0.00 866,671.49 28.33
50Page:
189
11/19/2018
CITY OF HERMOSA BEACH
51
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Choice Aggregation7301
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
7301-4200 Contract Services
0.00 0.00 0.00 0.007301-4201 Contract Serv/Private 0.00 0.00
Total Community Choice Aggregation 0.00 0.00 0.00 0.00 0.00 0.00
51Page:
190
11/19/2018
CITY OF HERMOSA BEACH
52
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
PCH Mobility Improvement Project8143
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8143-4200 Contract Services
94,454.00 0.00 0.00 0.008143-4201 Contract Serv/Private 0.00 94,454.00
Total PCH Mobility Improvement Project 94,454.00 0.00 0.00 0.00 94,454.00 0.00
52Page:
191
11/19/2018
CITY OF HERMOSA BEACH
53
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Protective Bollards Along the Strand8163
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8163-4200 Contract Services
0.00 0.00 0.00 0.008163-4201 Contract Serv/Private 0.00 0.00
Total Protective Bollards Along the Strand 0.00 0.00 0.00 0.00 0.00 0.00
53Page:
192
11/19/2018
CITY OF HERMOSA BEACH
54
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Valley Drive Sharrows8168
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8168-4200 Contract Services
0.00 0.00 0.00 0.008168-4201 Contract Serv/Private 0.00 0.00
Total Valley Drive Sharrows 0.00 0.00 0.00 0.00 0.00 0.00
54Page:
193
11/19/2018
CITY OF HERMOSA BEACH
55
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
8th Street Improvements8173
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8173-4200 Contract Services
0.00 0.00 0.00 0.008173-4201 Contract Serv/Private 0.00 0.00
Total 8th Street Improvements 0.00 0.00 0.00 0.00 0.00 0.00
55Page:
194
11/19/2018
CITY OF HERMOSA BEACH
56
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Street Improvements- Various Locations8174
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8174-4100 Personal Services
0.00 0.00 0.00 0.008174-4102 Regular Salaries 0.00 0.00
0.00 0.00 0.00 0.008174-4106 Regular Overtime 0.00 0.00
0.00 0.00 0.00 0.008174-4112 Part Time Temporary 0.00 0.00
0.00 0.00 0.00 0.008174-4180 Retirement 0.00 0.00
0.00 0.00 0.00 0.008174-4189 Medicare Benefits 0.00 0.00
Total Personal Services 0.00 0.00 0.00 0.00 0.00 0.00
8174-4200 Contract Services
0.00 0.00 0.00 0.008174-4201 Contract Serv/Private 0.00 0.00
Total Street Improvements- Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
56Page:
195
11/19/2018
CITY OF HERMOSA BEACH
57
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Street Improvement Various Locations8186
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8186-4200 Contract Services
0.00 0.00 0.00 0.008186-4201 Contract Serv/Private 0.00 0.00
Total Street Improvement Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
57Page:
196
11/19/2018
CITY OF HERMOSA BEACH
58
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
South Park Phase I Improvements8537
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8537-4200 Contract Services
0.00 0.00 0.00 0.008537-4201 Contract Serv/Private 0.00 0.00
Total South Park Phase I Improvements 0.00 0.00 0.00 0.00 0.00 0.00
58Page:
197
11/19/2018
CITY OF HERMOSA BEACH
59
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Citywide Park Master Plan8538
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8538-4200 Contract Services
42,065.00 0.00 0.00 0.008538-4201 Contract Serv/Private 0.00 42,065.00
Total Citywide Park Master Plan 42,065.00 0.00 0.00 0.00 42,065.00 0.00
59Page:
198
11/19/2018
CITY OF HERMOSA BEACH
60
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
South Park Phase II8540
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8540-4200 Contract Services
0.00 0.00 0.00 0.008540-4201 Contract Serv/Private 0.00 0.00
Total South Park Phase II 0.00 0.00 0.00 0.00 0.00 0.00
60Page:
199
11/19/2018
CITY OF HERMOSA BEACH
61
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Fire Station Renovation & Upgrades8606
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8606-4200 Contract Services
0.00 0.00 0.00 0.008606-4201 Contract Serv/Private 0.00 0.00
Total Fire Station Renovation & Upgrades 0.00 0.00 0.00 0.00 0.00 0.00
61Page:
200
11/19/2018
CITY OF HERMOSA BEACH
62
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Downtown Strategic Plan Implementation8609
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8609-4200 Contract Services
103,610.00 0.00 0.00 0.008609-4201 Contract Serv/Private 0.00 103,610.00
Total Downtown Strategic Plan Implementation 103,610.00 0.00 0.00 0.00 103,610.00 0.00
62Page:
201
11/19/2018
CITY OF HERMOSA BEACH
63
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Police Facilities Impovements8614
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8614-4200 Contract Services
2,972.00 902.80 902.80 30.388614-4201 Contract Serv/Private 0.00 2,069.20
Total Police Facilities Impovements 2,972.00 902.80 902.80 0.00 2,069.20 30.38
63Page:
202
11/19/2018
CITY OF HERMOSA BEACH
64
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
New Corporate Yard Facility8615
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8615-4200 Contract Services
56,102.00 787.50 787.50 1.408615-4201 Contract Serv/Private 0.00 55,314.50
Total New Corporate Yard Facility 56,102.00 787.50 787.50 0.00 55,314.50 1.40
64Page:
203
11/19/2018
CITY OF HERMOSA BEACH
65
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Fire Department Tower Demolition8632
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8632-4200 Contract Services
0.00 0.00 0.00 0.008632-4201 Contract Serv/Private 0.00 0.00
Total Fire Department Tower Demolition 0.00 0.00 0.00 0.00 0.00 0.00
65Page:
204
11/19/2018
CITY OF HERMOSA BEACH
66
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Municipal Solar Facility Plan/Install8634
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8634-4200 Contract Services
0.00 0.00 0.00 0.008634-4201 Contract Serv/Private 0.00 0.00
Total Municipal Solar Facility Plan/Install 0.00 0.00 0.00 0.00 0.00 0.00
66Page:
205
11/19/2018
CITY OF HERMOSA BEACH
67
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Center Gen Improvement Phase 38650
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8650-4200 Contract Services
261,640.00 1,250.00 1,250.00 0.488650-4201 Contract Serv/Private 0.00 260,390.00
Total Community Center Gen Improvement Phase 3 261,640.00 1,250.00 1,250.00 0.00 260,390.00 0.48
67Page:
206
11/19/2018
CITY OF HERMOSA BEACH
68
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Citywide Energy Conservation Upgrades8656
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8656-4200 Contract Services
0.00 0.00 0.00 0.008656-4201 Contract Serv/Private 0.00 0.00
Total Citywide Energy Conservation Upgrades 0.00 0.00 0.00 0.00 0.00 0.00
68Page:
207
11/19/2018
CITY OF HERMOSA BEACH
69
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
City Fac. Condition Assessm.& Asbesto Rp8664
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8664-4200 Contract Services
0.00 0.00 0.00 0.008664-4201 Contract Serv/Private 0.00 0.00
Total City Fac. Condition Assessm.& Asbesto Rp 0.00 0.00 0.00 0.00 0.00 0.00
69Page:
208
11/19/2018
CITY OF HERMOSA BEACH
70
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Community Center, Plaza, and Park Improv8667
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8667-4200 Contract Services
0.00 0.00 0.00 0.008667-4201 Contract Serv/Private 0.00 0.00
Total Community Center, Plaza, and Park Improv 0.00 0.00 0.00 0.00 0.00 0.00
70Page:
209
11/19/2018
CITY OF HERMOSA BEACH
71
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Council Chambers Improvements8672
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8672-4200 Contract Services
106,209.00 0.00 0.00 0.008672-4201 Contract Serv/Private 0.00 106,209.00
Total Council Chambers Improvements 106,209.00 0.00 0.00 0.00 106,209.00 0.00
71Page:
210
11/19/2018
CITY OF HERMOSA BEACH
72
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
General Fund001
Police Dept Substation Facility Improvem8674
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8674-4200 Contract Services
5,755.00 902.81 902.81 15.698674-4201 Contract Serv/Private 0.00 4,852.19
Total Police Dept Substation Facility Improvem 5,755.00 902.81 902.81 0.00 4,852.19 15.69
Total General Fund 40,576,717.00 12,397,049.90 12,397,049.90 0.00 28,179,667.10 30.55
72Page:
211
11/19/2018
CITY OF HERMOSA BEACH
73
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Lightg/Landscapg Dist Fund105
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 2,763.00 2,763.00 0.001299-4399 Operating Transfers Out 0.00 -2,763.00
Total Interfund Transfers Out 0.00 2,763.00 2,763.00 0.00 -2,763.00 0.00
73Page:
212
11/19/2018
CITY OF HERMOSA BEACH
74
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Lightg/Landscapg Dist Fund105
Lighting/Landscaping/Medians2601
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2601-4100 Personal Services
113,688.00 31,596.72 31,596.72 27.792601-4102 Regular Salaries 0.00 82,091.28
3,000.00 2,191.92 2,191.92 73.062601-4106 Regular Overtime 0.00 808.08
6,244.00 362.61 362.61 5.812601-4111 Accrual Cash In 0.00 5,881.39
0.00 0.00 0.00 0.002601-4112 Part Time/Temporary 0.00 0.00
37,577.00 4,460.92 4,460.92 11.872601-4180 Retirement 0.00 33,116.08
31,067.00 8,003.26 8,003.26 25.762601-4188 Employee Benefits 0.00 23,063.74
1,658.00 499.83 499.83 30.152601-4189 Medicare Benefits 0.00 1,158.17
8,605.00 2,868.32 2,868.32 33.332601-4190 Other Post Employment Benefits (OPEB) 0.00 5,736.68
Total Personal Services 201,839.00 49,983.58 49,983.58 0.00 151,855.42 24.76
2601-4200 Contract Services
51,200.00 11,100.00 11,100.00 21.682601-4201 Contract Serv/Private 0.00 40,100.00
18,493.00 0.00 0.00 0.002601-4251 Contract Service/Govt 0.00 18,493.00
Total Contract Services 69,693.00 11,100.00 11,100.00 0.00 58,593.00 15.93
2601-4300 Materials/Supplies/Other
244,574.00 63,280.84 63,280.84 25.872601-4303 Utilities 0.00 181,293.16
29,100.00 5,211.09 5,211.09 17.912601-4309 Maintenance Materials 0.00 23,888.91
0.00 0.00 0.00 0.002601-4326 Prior Yr Expense 0.00 0.00
667.00 168.00 168.00 25.192601-4394 Building Maintenance Charges 0.00 499.00
47,542.00 11,885.49 11,885.49 25.002601-4395 Equip Replacement Charges 0.00 35,656.51
73,475.00 18,369.00 18,369.00 25.002601-4396 Insurance User Charges 0.00 55,106.00
Total Materials/Supplies/Other 395,358.00 98,914.42 98,914.42 0.00 296,443.58 25.02
Total Lighting/Landscaping/Medians 666,890.00 159,998.00 159,998.00 0.00 506,892.00 23.99
Total Lightg/Landscapg Dist Fund 666,890.00 162,761.00 162,761.00 0.00 504,129.00 24.41
74Page:
213
11/19/2018
CITY OF HERMOSA BEACH
75
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
State Gas Tax Fund115
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 122,427.00 122,427.00 0.001299-4399 Operating Transfers Out 0.00 -122,427.00
Total Interfund Transfers Out 0.00 122,427.00 122,427.00 0.00 -122,427.00 0.00
75Page:
214
11/19/2018
CITY OF HERMOSA BEACH
76
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
State Gas Tax Fund115
Street Maint/Traffic Safety3104
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3104-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.003104-4309 Maintenance Materials 0.00 0.00
Total Materials/Supplies/Other 0.00 0.00 0.00 0.00 0.00 0.00
3104-5400 Equipment/Furniture
0.00 0.00 0.00 0.003104-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.003104-5405 Equipment more than $5,000 0.00 0.00
Total Street Maint/Traffic Safety 0.00 0.00 0.00 0.00 0.00 0.00
76Page:
215
11/19/2018
CITY OF HERMOSA BEACH
77
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
State Gas Tax Fund115
PCH Mobility Improvement Project8143
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8143-4200 Contract Services
34,581.00 0.00 0.00 0.008143-4201 Contract Serv/Private 0.00 34,581.00
Total PCH Mobility Improvement Project 34,581.00 0.00 0.00 0.00 34,581.00 0.00
77Page:
216
11/19/2018
CITY OF HERMOSA BEACH
78
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
State Gas Tax Fund115
8th Street Improvements8173
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8173-4200 Contract Services
325,744.00 22,310.75 22,310.75 6.858173-4201 Contract Serv/Private 0.00 303,433.25
Total 8th Street Improvements 325,744.00 22,310.75 22,310.75 0.00 303,433.25 6.85
78Page:
217
11/19/2018
CITY OF HERMOSA BEACH
79
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
State Gas Tax Fund115
Street Improvements Various Locations8174
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8174-4200 Contract Services
144,021.00 64,000.00 64,000.00 44.448174-4201 Contract Serv/Private 0.00 80,021.00
Total Street Improvements Various Locations 144,021.00 64,000.00 64,000.00 0.00 80,021.00 44.44
79Page:
218
11/19/2018
CITY OF HERMOSA BEACH
80
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
State Gas Tax Fund115
Street Improvement Various Locations8186
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8186-4200 Contract Services
144,995.00 0.00 0.00 0.008186-4201 Contract Serv/Private 0.00 144,995.00
Total Street Improvement Various Locations 144,995.00 0.00 0.00 0.00 144,995.00 0.00
Total State Gas Tax Fund 649,341.00 208,737.75 208,737.75 0.00 440,603.25 32.15
80Page:
219
11/19/2018
CITY OF HERMOSA BEACH
81
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
AB939 Fund117
Source Redctn/Recycle Element5301
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
5301-4100 Personal Services
10,419.00 3,307.58 3,307.58 31.755301-4102 Regular Salaries 0.00 7,111.42
0.00 0.00 0.00 0.005301-4106 Regular Overtime 0.00 0.00
1,587.00 0.00 0.00 0.005301-4111 Accrual Cash In 0.00 1,587.00
0.00 0.00 0.00 0.005301-4112 Part Time Temporary 0.00 0.00
720.00 226.32 226.32 31.435301-4180 Retirement 0.00 493.68
935.00 309.55 309.55 33.115301-4188 Employee Benefits 0.00 625.45
163.00 51.96 51.96 31.885301-4189 Medicare Benefits 0.00 111.04
0.00 0.00 0.00 0.005301-4190 Other Post Employment Benefits/OPEB 0.00 0.00
Total Personal Services 13,824.00 3,895.41 3,895.41 0.00 9,928.59 28.18
5301-4200 Contract Services
19,500.00 0.00 0.00 0.005301-4201 Contract Serv/Private 0.00 19,500.00
Total Contract Services 19,500.00 0.00 0.00 0.00 19,500.00 0.00
5301-4300 Materials/Supplies/Other
2,350.00 2,339.29 2,339.29 99.545301-4315 Membership 0.00 10.71
0.00 0.00 0.00 0.005301-4317 Conference/Training 0.00 0.00
Total Materials/Supplies/Other 2,350.00 2,339.29 2,339.29 0.00 10.71 99.54
Total AB939 Fund 35,674.00 6,234.70 6,234.70 0.00 29,439.30 17.48
81Page:
220
11/19/2018
CITY OF HERMOSA BEACH
82
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Prop A Open Space Fund121
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 5,139.00 5,139.00 0.001299-4399 Operating Transfers Out 0.00 -5,139.00
Total Prop A Open Space Fund 0.00 5,139.00 5,139.00 0.00 -5,139.00 0.00
82Page:
221
11/19/2018
CITY OF HERMOSA BEACH
83
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
Parks6101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
6101-5400 Equipment/Furniture
0.00 0.00 0.00 0.006101-5405 Equipment more than $5,000 0.00 0.00
Total Parks 0.00 0.00 0.00 0.00 0.00 0.00
83Page:
222
11/19/2018
CITY OF HERMOSA BEACH
84
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
8th Street Improvements8173
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8173-4200 Contract Services
67,825.00 0.00 0.00 0.008173-4201 Contract Serv/Private 0.00 67,825.00
Total 8th Street Improvements 67,825.00 0.00 0.00 0.00 67,825.00 0.00
84Page:
223
11/19/2018
CITY OF HERMOSA BEACH
85
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
Street Improvements Various Locations8174
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8174-4200 Contract Services
0.00 0.00 0.00 0.008174-4201 Contract Serv/Private 0.00 0.00
Total Street Improvements Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
85Page:
224
11/19/2018
CITY OF HERMOSA BEACH
86
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
Street Improvement Various Locations8186
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8186-4200 Contract Services
0.00 0.00 0.00 0.008186-4201 Contract Serv/Private 0.00 0.00
Total Street Improvement Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
86Page:
225
11/19/2018
CITY OF HERMOSA BEACH
87
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
Municipal Pier Structural Assess/Repair8629
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8629-4200 Contract Services
177,380.00 0.00 0.00 0.008629-4201 Contract Serv/Private 0.00 177,380.00
Total Municipal Pier Structural Assess /Repair 177,380.00 0.00 0.00 0.00 177,380.00 0.00
87Page:
226
11/19/2018
CITY OF HERMOSA BEACH
88
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
14Th. St. Beach Restroom Rehabilitation8631
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8631-4200 Contract Services
0.00 0.00 0.00 0.008631-4201 Contract Serv/Private 0.00 0.00
Total 14Th. St. Beach Restroom Rehabilitation 0.00 0.00 0.00 0.00 0.00 0.00
88Page:
227
11/19/2018
CITY OF HERMOSA BEACH
89
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
Municipal Pier Structural Repairs Phase38660
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8660-4200 Contract Services
275,473.00 0.00 0.00 0.008660-4201 Contract Serv/Private 0.00 275,473.00
Total Municipal Pier Structural Repairs Phase3 275,473.00 0.00 0.00 0.00 275,473.00 0.00
89Page:
228
11/19/2018
CITY OF HERMOSA BEACH
90
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
Municipal Pier Use Options & Feasibility8678
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8678-4200 Contract Services
0.00 0.00 0.00 0.008678-4201 Contract Serv/Private 0.00 0.00
Total Municipal Pier Use Options & Feasibility 0.00 0.00 0.00 0.00 0.00 0.00
90Page:
229
11/19/2018
CITY OF HERMOSA BEACH
91
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Fund122
Pier Restroom Rehabilitation8679
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8679-4200 Contract Services
0.00 0.00 0.00 0.008679-4201 Contract Serv/Private 0.00 0.00
Total Pier Restroom Rehabilitation 0.00 0.00 0.00 0.00 0.00 0.00
Total Tyco Fund 520,678.00 0.00 0.00 0.00 520,678.00 0.00
91Page:
230
11/19/2018
CITY OF HERMOSA BEACH
92
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Tidelands123
Municipal Pier Structural Assess/Repair8629
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8629-4200 Contract Services
0.00 0.00 0.00 0.008629-4201 Contract Serv/Private 0.00 0.00
Total Municipal Pier Structural Assess /Repair 0.00 0.00 0.00 0.00 0.00 0.00
92Page:
231
11/19/2018
CITY OF HERMOSA BEACH
93
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Tyco Tidelands123
Municipal Pier Use Option & Feasibility8678
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8678-4200 Contract Services
0.00 0.00 0.00 0.008678-4201 Contract Serv/Private 0.00 0.00
Total Tyco Tidelands 0.00 0.00 0.00 0.00 0.00 0.00
93Page:
232
11/19/2018
CITY OF HERMOSA BEACH
94
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Park/Rec Facility Tax Fund125
Community Resources4601
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4601-4200 Contract Services
0.00 0.00 0.00 0.004601-4201 Contract Serv/Private 0.00 0.00
Total Community Resources 0.00 0.00 0.00 0.00 0.00 0.00
94Page:
233
11/19/2018
CITY OF HERMOSA BEACH
95
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Park/Rec Facility Tax Fund125
Parks6101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
6101-4200 Contract Services
0.00 0.00 0.00 0.006101-4201 Contract Serv/Private 0.00 0.00
Total Parks 0.00 0.00 0.00 0.00 0.00 0.00
95Page:
234
11/19/2018
CITY OF HERMOSA BEACH
96
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Park/Rec Facility Tax Fund125
Citywide Park Master Plan8538
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8538-4100 Personal Services
0.00 0.00 0.00 0.008538-4102 Regular Salaries 0.00 0.00
0.00 0.00 0.00 0.008538-4111 Accrual Cash In 0.00 0.00
0.00 0.00 0.00 0.008538-4180 Retirement 0.00 0.00
0.00 0.00 0.00 0.008538-4188 Employee Benefits 0.00 0.00
0.00 0.00 0.00 0.008538-4189 Medicare Benefits 0.00 0.00
Total Personal Services 0.00 0.00 0.00 0.00 0.00 0.00
8538-4200 Contract Services
173,410.00 0.00 0.00 0.008538-4201 Contract Serv/Private 0.00 173,410.00
Total Citywide Park Master Plan 173,410.00 0.00 0.00 0.00 173,410.00 0.00
96Page:
235
11/19/2018
CITY OF HERMOSA BEACH
97
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Park/Rec Facility Tax Fund125
Clark Stadium Bleachers8545
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8545-4200 Contract Services
30,000.00 0.00 0.00 0.008545-4201 Contract Serv/Private 0.00 30,000.00
Total Clark Stadium Bleachers 30,000.00 0.00 0.00 0.00 30,000.00 0.00
97Page:
236
11/19/2018
CITY OF HERMOSA BEACH
98
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Park/Rec Facility Tax Fund125
Citywide Park Improvements8546
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8546-4200 Contract Services
56,359.00 26,118.94 26,118.94 46.348546-4201 Contract Serv/Private 0.00 30,240.06
Total Citywide Park Improvements 56,359.00 26,118.94 26,118.94 0.00 30,240.06 46.34
98Page:
237
11/19/2018
CITY OF HERMOSA BEACH
99
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Park/Rec Facility Tax Fund125
Citywide Energy Conservation Upgrades8656
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8656-4200 Contract Services
0.00 0.00 0.00 0.008656-4201 Contract Serv/Private 0.00 0.00
Total Citywide Energy Conservation Upgrades 0.00 0.00 0.00 0.00 0.00 0.00
99Page:
238
11/19/2018
CITY OF HERMOSA BEACH
100
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Park/Rec Facility Tax Fund125
Community Center, Plaza, and Park Improv8667
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8667-4200 Contract Services
0.00 0.00 0.00 0.008667-4201 Contract Serv/Private 0.00 0.00
Total Community Center, Plaza, and Park Improv 0.00 0.00 0.00 0.00 0.00 0.00
Total Park/Rec Facility Tax Fund 259,769.00 26,118.94 26,118.94 0.00 233,650.06 10.05
100Page:
239
11/19/2018
CITY OF HERMOSA BEACH
101
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Bayview Dr Dist Admin Exp Fund135
Administrative Charges1219
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1219-4200 Contract Services
1,350.00 366.21 366.21 27.131219-4201 Contract Serv/Private 0.00 983.79
Total Administrative Charges 1,350.00 366.21 366.21 0.00 983.79 27.13
101Page:
240
11/19/2018
CITY OF HERMOSA BEACH
102
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Bayview Dr Dist Admin Exp Fund135
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 576.00 576.00 0.001299-4399 Operating Trsfr Out 0.00 -576.00
Total Interfund Transfers Out 0.00 576.00 576.00 0.00 -576.00 0.00
Total Bayview Dr Dist Admin Exp Fund 1,350.00 942.21 942.21 0.00 407.79 69.79
102Page:
241
11/19/2018
CITY OF HERMOSA BEACH
103
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Lower Pier Admin Exp Fund136
Administrative Charges1219
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1219-4200 Contract Services
1,200.00 0.00 0.00 0.001219-4201 Contract Serv/Private 0.00 1,200.00
Total Administrative Charges 1,200.00 0.00 0.00 0.00 1,200.00 0.00
103Page:
242
11/19/2018
CITY OF HERMOSA BEACH
104
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Lower Pier Admin Exp Fund136
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 561.00 561.00 0.001299-4399 Operating Transfers Out 0.00 -561.00
Total Interfund Transfers Out 0.00 561.00 561.00 0.00 -561.00 0.00
Total Lower Pier Admin Exp Fund 1,200.00 561.00 561.00 0.00 639.00 46.75
104Page:
243
11/19/2018
CITY OF HERMOSA BEACH
105
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Myrtle Dist Admin Exp Fund137
Administrative Charges1219
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1219-4200 Contract Services
5,585.00 2,659.47 2,659.47 47.621219-4201 Contract Serv/Private 0.00 2,925.53
Total Administrative Charges 5,585.00 2,659.47 2,659.47 0.00 2,925.53 47.62
105Page:
244
11/19/2018
CITY OF HERMOSA BEACH
106
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Myrtle Dist Admin Exp Fund137
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 1,317.00 1,317.00 0.001299-4399 Operating Transfers Out 0.00 -1,317.00
Total Interfund Transfers Out 0.00 1,317.00 1,317.00 0.00 -1,317.00 0.00
Total Myrtle Dist Admin Exp Fund 5,585.00 3,976.47 3,976.47 0.00 1,608.53 71.20
106Page:
245
11/19/2018
CITY OF HERMOSA BEACH
107
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Loma Dist Admin Exp Fund138
Administrative Charges1219
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1219-4200 Contract Services
5,740.00 2,832.77 2,832.77 49.351219-4201 Contract Serv/Private 0.00 2,907.23
Total Administrative Charges 5,740.00 2,832.77 2,832.77 0.00 2,907.23 49.35
107Page:
246
11/19/2018
CITY OF HERMOSA BEACH
108
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Loma Dist Admin Exp Fund138
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 1,428.00 1,428.00 0.001299-4399 Operating Transfers Out 0.00 -1,428.00
Total Interfund Transfers Out 0.00 1,428.00 1,428.00 0.00 -1,428.00 0.00
Total Loma Dist Admin Exp Fund 5,740.00 4,260.77 4,260.77 0.00 1,479.23 74.23
108Page:
247
11/19/2018
CITY OF HERMOSA BEACH
109
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Beach Dr Assmnt Dist Admin Exp Fund139
Administrative Charges1219
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1219-4200 Contract Services
1,453.00 340.53 340.53 23.441219-4201 Contract Serv/Private 0.00 1,112.47
Total Administrative Charges 1,453.00 340.53 340.53 0.00 1,112.47 23.44
109Page:
248
11/19/2018
CITY OF HERMOSA BEACH
110
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Beach Dr Assmnt Dist Admin Exp Fund139
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 474.00 474.00 0.001299-4399 Operating Transfers Out 0.00 -474.00
Total Interfund Transfers Out 0.00 474.00 474.00 0.00 -474.00 0.00
Total Beach Dr Assmnt Dist Admin Exp Fund 1,453.00 814.53 814.53 0.00 638.47 56.06
110Page:
249
11/19/2018
CITY OF HERMOSA BEACH
111
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Community Dev Block Grant140
CDBG Program General Admin4707
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4707-4200 Contract Services
0.00 0.00 0.00 0.004707-4201 Contract Serv/Private 0.00 0.00
Total CDBG Program General Admin 0.00 0.00 0.00 0.00 0.00 0.00
111Page:
250
11/19/2018
CITY OF HERMOSA BEACH
112
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Community Dev Block Grant140
City Right of Way ADA Improvements8657
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8657-4200 Contract Services
0.00 0.00 0.00 0.008657-4201 Contract Serv/Private 0.00 0.00
Total City Right of Way ADA Improvements 0.00 0.00 0.00 0.00 0.00 0.00
112Page:
251
11/19/2018
CITY OF HERMOSA BEACH
113
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Community Dev Block Grant140
ADA Improvements at Various Locations8687
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8687-4200 Contract Services
150,000.00 0.00 0.00 0.008687-4201 Contract Serv/Private 0.00 150,000.00
Total ADA Improvements at Various Locations 150,000.00 0.00 0.00 0.00 150,000.00 0.00
113Page:
252
11/19/2018
CITY OF HERMOSA BEACH
114
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Community Dev Block Grant140
ADA Improvements at Various Locations8691
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8691-4200 Contract Services
120,000.00 0.00 0.00 0.008691-4201 Contract Serv/Private 0.00 120,000.00
Total ADA Improvements at Various Locations 120,000.00 0.00 0.00 0.00 120,000.00 0.00
Total Community Dev Block Grant 270,000.00 0.00 0.00 0.00 270,000.00 0.00
114Page:
253
11/19/2018
CITY OF HERMOSA BEACH
115
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.001299-4399 Operating Transfers Out 0.00 0.00
Total Interfund Transfers Out 0.00 0.00 0.00 0.00 0.00 0.00
115Page:
254
11/19/2018
CITY OF HERMOSA BEACH
116
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Bus Pass Subsidy3403
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3403-4200 Contract Services
3,500.00 212.00 212.00 6.063403-4251 Contract Service/Govt 0.00 3,288.00
Total Bus Pass Subsidy 3,500.00 212.00 212.00 0.00 3,288.00 6.06
116Page:
255
11/19/2018
CITY OF HERMOSA BEACH
117
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Dial-A-Taxi Program3404
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3404-4200 Contract Services
76,000.00 9,296.50 9,296.50 12.233404-4201 Contract Serv/Private 0.00 66,703.50
Total Dial-A-Taxi Program 76,000.00 9,296.50 9,296.50 0.00 66,703.50 12.23
117Page:
256
11/19/2018
CITY OF HERMOSA BEACH
118
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Commuter Express3408
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3408-4100 Personal Services
5,050.00 682.73 682.73 13.523408-4102 Regular Salaries 0.00 4,367.27
Total Personal Services 5,050.00 682.73 682.73 0.00 4,367.27 13.52
3408-4200 Contract Services
33,664.00 0.00 0.00 0.003408-4251 Contract Service/Govt 0.00 33,664.00
Total Contract Services 33,664.00 0.00 0.00 0.00 33,664.00 0.00
Total Commuter Express 38,714.00 682.73 682.73 0.00 38,031.27 1.76
118Page:
257
11/19/2018
CITY OF HERMOSA BEACH
119
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Recreation Transportation3409
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3409-4200 Contract Services
40,000.00 24,533.03 24,533.03 61.333409-4201 Contract Serv/Private 0.00 15,466.97
Total Recreation Transportation 40,000.00 24,533.03 24,533.03 0.00 15,466.97 61.33
119Page:
258
11/19/2018
CITY OF HERMOSA BEACH
120
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Special Event Shuttle3410
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3410-4200 Contract Services
6,000.00 0.00 0.00 0.003410-4201 Contract Serv/Private 0.00 6,000.00
Total Special Event Shuttle 6,000.00 0.00 0.00 0.00 6,000.00 0.00
120Page:
259
11/19/2018
CITY OF HERMOSA BEACH
121
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
After School Program Shuttle3411
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3411-4200 Contract Services
43,200.00 0.00 0.00 0.003411-4201 Contract Serv/Private 0.00 43,200.00
Total After School Program Shuttle 43,200.00 0.00 0.00 0.00 43,200.00 0.00
121Page:
260
11/19/2018
CITY OF HERMOSA BEACH
122
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Beach Cities Transit Line 1093412
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3412-4200 Contract Services
13,000.00 0.00 0.00 0.003412-4251 Contract Services/Gov't 0.00 13,000.00
Total Beach Cities Transit Line 109 13,000.00 0.00 0.00 0.00 13,000.00 0.00
122Page:
261
11/19/2018
CITY OF HERMOSA BEACH
123
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
PCH Mobility Improvement Project8143
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8143-4200 Contract Services
0.00 0.00 0.00 0.008143-4201 Contract Serv/Private 0.00 0.00
Total PCH Mobility Improvement Project 0.00 0.00 0.00 0.00 0.00 0.00
123Page:
262
11/19/2018
CITY OF HERMOSA BEACH
124
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Street Improvements Various Locations8174
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8174-4200 Contract Services
274,892.00 0.00 0.00 0.008174-4201 Contract Serv/Private 0.00 274,892.00
Total Street Improvements Various Locations 274,892.00 0.00 0.00 0.00 274,892.00 0.00
124Page:
263
11/19/2018
CITY OF HERMOSA BEACH
125
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition A Fund145
Street Improvement Various Locations8186
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8186-4200 Contract Services
59,000.00 0.00 0.00 0.008186-4201 Contract Serv/Private 0.00 59,000.00
Total Street Improvement Various Locations 59,000.00 0.00 0.00 0.00 59,000.00 0.00
Total Proposition A Fund 554,306.00 34,724.26 34,724.26 0.00 519,581.74 6.26
125Page:
264
11/19/2018
CITY OF HERMOSA BEACH
126
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition C Fund146
Pavement Management Study4208
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4208-4200 Contract Services
0.00 0.00 0.00 0.004208-4201 Contract Serv/Private 0.00 0.00
Total Pavement Management Study 0.00 0.00 0.00 0.00 0.00 0.00
126Page:
265
11/19/2018
CITY OF HERMOSA BEACH
127
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition C Fund146
PCH Mobility Improvement Project8143
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8143-4200 Contract Services
0.00 0.00 0.00 0.008143-4201 Contract Serv/Private 0.00 0.00
Total PCH Mobility Improvement Project 0.00 0.00 0.00 0.00 0.00 0.00
127Page:
266
11/19/2018
CITY OF HERMOSA BEACH
128
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition C Fund146
Street Improvements Various Locations8174
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8174-4100 Personal Services
0.00 3,130.80 3,130.80 0.008174-4102 Regular Salaries 0.00 -3,130.80
0.00 100.00 100.00 0.008174-4112 Part Time Temporary 0.00 -100.00
Total Personal Services 0.00 3,230.80 3,230.80 0.00 -3,230.80 0.00
8174-4200 Contract Services
799,333.00 123,543.32 123,543.32 15.468174-4201 Contract Serv/Private 0.00 675,789.68
Total Contract Services 799,333.00 123,543.32 123,543.32 0.00 675,789.68 15.46
Total Street Improvements Various Locations 799,333.00 126,774.12 126,774.12 0.00 672,558.88 15.86
128Page:
267
11/19/2018
CITY OF HERMOSA BEACH
129
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Proposition C Fund146
Street Improvement Various Locations8186
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8186-4200 Contract Services
0.00 0.00 0.00 0.008186-4201 Contract Serv/Private 0.00 0.00
Total Street Improvement Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
Total Proposition C Fund 799,333.00 126,774.12 126,774.12 0.00 672,558.88 15.86
129Page:
268
11/19/2018
CITY OF HERMOSA BEACH
130
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure R Fund147
PCH Mobility Improvement Project8143
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8143-4200 Contract Services
255,509.00 0.00 0.00 0.008143-4201 Contract Serv/Private 0.00 255,509.00
Total PCH Mobility Improvement Project 255,509.00 0.00 0.00 0.00 255,509.00 0.00
130Page:
269
11/19/2018
CITY OF HERMOSA BEACH
131
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure R Fund147
PCH Traffic Improvements8160
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8160-4200 Contract Services
399,922.00 0.00 0.00 0.008160-4201 Contract Serv/Private 0.00 399,922.00
Total PCH Traffic Improvements 399,922.00 0.00 0.00 0.00 399,922.00 0.00
131Page:
270
11/19/2018
CITY OF HERMOSA BEACH
132
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure R Fund147
Bike Friendly Street Improvements8168
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8168-4200 Contract Services
20,000.00 0.00 0.00 0.008168-4201 Contract Serv/Private 0.00 20,000.00
Total Bike Friendly Street Improvements 20,000.00 0.00 0.00 0.00 20,000.00 0.00
132Page:
271
11/19/2018
CITY OF HERMOSA BEACH
133
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure R Fund147
Street Improvements Various Locations8174
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8174-4200 Contract Services
766,885.00 0.00 0.00 0.008174-4201 Contract Serv/Private 0.00 766,885.00
Total Street Improvements Various Locations 766,885.00 0.00 0.00 0.00 766,885.00 0.00
133Page:
272
11/19/2018
CITY OF HERMOSA BEACH
134
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure R Fund147
Street Improvement Various Locations8186
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8186-4200 Contract Services
89,551.00 0.00 0.00 0.008186-4201 Contract Serv/Private 0.00 89,551.00
Total Street Improvement Various Locations 89,551.00 0.00 0.00 0.00 89,551.00 0.00
134Page:
273
11/19/2018
CITY OF HERMOSA BEACH
135
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure R Fund147
Strand Bikeway/Walkway Improvments- 35th8188
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8188-4200 Contract Services
115,000.00 0.00 0.00 0.008188-4201 Contract Serv/Private 0.00 115,000.00
Total Strand Bikeway/Walkway Improvments - 35th 115,000.00 0.00 0.00 0.00 115,000.00 0.00
Total Measure R Fund 1,646,867.00 0.00 0.00 0.00 1,646,867.00 0.00
135Page:
274
11/19/2018
CITY OF HERMOSA BEACH
136
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure M148
PCH Mobility Improvement Project8143
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8143-4200 Contract Services
0.00 0.00 0.00 0.008143-4201 Contract Serv/Private 0.00 0.00
Total PCH Mobility Improvement Project 0.00 0.00 0.00 0.00 0.00 0.00
136Page:
275
11/19/2018
CITY OF HERMOSA BEACH
137
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure M148
PCH Traffic Improvements8160
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8160-4200 Contract Services
0.00 0.00 0.00 0.008160-4201 Contract Serv/Private 0.00 0.00
Total PCH Traffic Improvements 0.00 0.00 0.00 0.00 0.00 0.00
137Page:
276
11/19/2018
CITY OF HERMOSA BEACH
138
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure M148
Street Improvements Various Locations8174
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8174-4200 Contract Services
282,875.00 0.00 0.00 0.008174-4201 Contract Serv/Private 0.00 282,875.00
Total Street Improvements Various Locations 282,875.00 0.00 0.00 0.00 282,875.00 0.00
138Page:
277
11/19/2018
CITY OF HERMOSA BEACH
139
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Measure M148
Street Improvement Various Locations8186
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8186-4200 Contract Services
221,468.00 0.00 0.00 0.008186-4201 Contract Serv/Private 0.00 221,468.00
Total Street Improvement Various Locations 221,468.00 0.00 0.00 0.00 221,468.00 0.00
Total Measure M 504,343.00 0.00 0.00 0.00 504,343.00 0.00
139Page:
278
11/19/2018
CITY OF HERMOSA BEACH
140
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
City Homeless Planning Grant1220
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1220-4200 Contract Services
2,364.00 0.00 0.00 0.001220-4201 Contract Serv/Private 0.00 2,364.00
Total City Homeless Planning Grant 2,364.00 0.00 0.00 0.00 2,364.00 0.00
140Page:
279
11/19/2018
CITY OF HERMOSA BEACH
141
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Green Business Program1221
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1221-4200 Contract Services
30,000.00 0.00 0.00 0.001221-4201 Contract Serv/Private 0.00 30,000.00
Total Green Business Program 30,000.00 0.00 0.00 0.00 30,000.00 0.00
141Page:
280
11/19/2018
CITY OF HERMOSA BEACH
142
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Bulletproof Vest Partnership2111
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2111-4200 Contract Services
786.00 0.00 0.00 0.002111-4201 Contract Serv/Private 0.00 786.00
Total Contract Services 786.00 0.00 0.00 0.00 786.00 0.00
2111-4300 Materials/Supplies/Other
2,700.00 765.40 765.40 28.352111-4350 Safety Gear 0.00 1,934.60
Total Materials/Supplies/Other 2,700.00 765.40 765.40 0.00 1,934.60 28.35
Total Bulletproof Vest Partnership 3,486.00 765.40 765.40 0.00 2,720.60 21.96
142Page:
281
11/19/2018
CITY OF HERMOSA BEACH
143
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Mental Health Evaluation Team (MET)2118
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2118-4200 Contract Services
21,854.00 0.00 0.00 0.002118-4201 Contract Serv/Private 0.00 21,854.00
Total Mental Health Evaluation Team (MET) 21,854.00 0.00 0.00 0.00 21,854.00 0.00
143Page:
282
11/19/2018
CITY OF HERMOSA BEACH
144
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Body Worn Camera2119
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2119-4200 Contract Services
41,681.00 23,354.40 23,354.40 56.032119-4201 Contract Serv/Private 0.00 18,326.60
Total Body Worn Camera 41,681.00 23,354.40 23,354.40 0.00 18,326.60 56.03
144Page:
283
11/19/2018
CITY OF HERMOSA BEACH
145
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Fireman's Fund Emerg Prep Prog Grant2225
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2225-5400 Equipment/Furniture
0.00 0.00 0.00 0.002225-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.002225-5405 Equipment more than $5,000 0.00 0.00
Total Fireman's Fund Emerg Prep Prog Grant 0.00 0.00 0.00 0.00 0.00 0.00
145Page:
284
11/19/2018
CITY OF HERMOSA BEACH
146
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Beverage Recycle Grant3102
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3102-4200 Contract Services
31,881.00 54.87 54.87 0.173102-4201 Contract Serv/Private 0.00 31,826.13
Total Beverage Recycle Grant 31,881.00 54.87 54.87 0.00 31,826.13 0.17
146Page:
285
11/19/2018
CITY OF HERMOSA BEACH
147
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Sea Level Rise Study/Coastal Conservancy3106
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3106-4200 Contract Services
0.00 0.00 0.00 0.003106-4201 Contract Serv/Private 0.00 0.00
Total Sea Level Rise Study/Coastal Conservancy 0.00 0.00 0.00 0.00 0.00 0.00
147Page:
286
11/19/2018
CITY OF HERMOSA BEACH
148
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Coastal Permit Auth Grant4104
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4104-4200 Contract Services
23,013.00 0.00 0.00 0.004104-4201 Contract Serv/Private 0.00 23,013.00
Total Contract Services 23,013.00 0.00 0.00 0.00 23,013.00 0.00
4104-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.004104-4305 Office Operating Supplies 0.00 0.00
Total Materials/Supplies/Other 0.00 0.00 0.00 0.00 0.00 0.00
Total Coastal Permit Auth Grant 23,013.00 0.00 0.00 0.00 23,013.00 0.00
148Page:
287
11/19/2018
CITY OF HERMOSA BEACH
149
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Zoning Ordinance Update4105
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4105-4200 Contract Services
0.00 0.00 0.00 0.004105-4201 Contract Serv/Private 0.00 0.00
Total Zoning Ordinance Update 0.00 0.00 0.00 0.00 0.00 0.00
149Page:
288
11/19/2018
CITY OF HERMOSA BEACH
150
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Local Coastal Assistance Grant4107
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4107-4200 Contract Services
82,812.00 0.00 0.00 0.004107-4201 Contract Serv/Private 0.00 82,812.00
Total Local Coastal Assistance Grant 82,812.00 0.00 0.00 0.00 82,812.00 0.00
150Page:
289
11/19/2018
CITY OF HERMOSA BEACH
151
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Systemic Safety Analysis Report Program4210
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4210-4200 Contract Services
84,150.00 0.00 0.00 0.004210-4201 Contract Serv/Private 0.00 84,150.00
Total Systemic Safety Analysis Report Program 84,150.00 0.00 0.00 0.00 84,150.00 0.00
151Page:
290
11/19/2018
CITY OF HERMOSA BEACH
152
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
8th Street Improvements8173
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8173-4200 Contract Services
354,535.00 0.00 0.00 0.008173-4201 Contract Serv/Private 0.00 354,535.00
Total 8th Street Improvements 354,535.00 0.00 0.00 0.00 354,535.00 0.00
152Page:
291
11/19/2018
CITY OF HERMOSA BEACH
153
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
St Imp/21st Btwn PCH/Ardmore8184
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8184-4200 Contract Services
98,152.00 0.00 0.00 0.008184-4201 Contract Serv/Private 0.00 98,152.00
Total St Imp/21st Btwn PCH/Ardmore 98,152.00 0.00 0.00 0.00 98,152.00 0.00
153Page:
292
11/19/2018
CITY OF HERMOSA BEACH
154
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
ADA Improvements- PCH between 2nd & 21st8185
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8185-4200 Contract Services
287,260.00 0.00 0.00 0.008185-4201 Contract Serv/Private 0.00 287,260.00
Total ADA Improvements- PCH between 2nd & 21st 287,260.00 0.00 0.00 0.00 287,260.00 0.00
154Page:
293
11/19/2018
CITY OF HERMOSA BEACH
155
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
South Park Phase II8540
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8540-4200 Contract Services
0.00 0.00 0.00 0.008540-4201 Contract Serv/Private 0.00 0.00
Total South Park Phase II 0.00 0.00 0.00 0.00 0.00 0.00
155Page:
294
11/19/2018
CITY OF HERMOSA BEACH
156
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Stormwater/Urban Run-off Diversion Proj8542
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8542-4200 Contract Services
3,762,387.00 6,133.19 6,133.19 0.168542-4201 Contract Serv/Private 0.00 3,756,253.81
Total Stormwater/Urban Run-off Diversion Proj 3,762,387.00 6,133.19 6,133.19 0.00 3,756,253.81 0.16
156Page:
295
11/19/2018
CITY OF HERMOSA BEACH
157
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Library Community Needs Assessment8668
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8668-4200 Contract Services
42,522.00 0.00 0.00 0.008668-4201 Contract Serv/Private 0.00 42,522.00
Total Library Community Needs Assessment 42,522.00 0.00 0.00 0.00 42,522.00 0.00
157Page:
296
11/19/2018
CITY OF HERMOSA BEACH
158
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Grants Fund150
Electric Vehicle, Bicycle Transportation8682
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8682-4200 Contract Services
162,977.00 1,410.57 1,410.57 0.878682-4201 Contract Serv/Private 0.00 161,566.43
Total Electric Vehicle, Bicycle Transportation 162,977.00 1,410.57 1,410.57 0.00 161,566.43 0.87
Total Grants Fund 5,029,074.00 31,718.43 31,718.43 0.00 4,997,355.57 0.63
158Page:
297
11/19/2018
CITY OF HERMOSA BEACH
159
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Air Quality Mgmt Dist Fund152
Emission Control3701
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3701-4200 Contract Services
0.00 0.00 0.00 0.003701-4201 Contract Serv/Private 0.00 0.00
Total Contract Services 0.00 0.00 0.00 0.00 0.00 0.00
3701-4300 Materials/Supplies/Other
28,000.00 1,560.00 1,560.00 5.573701-4327 AQMD Incentives 0.00 26,440.00
Total Materials/Supplies/Other 28,000.00 1,560.00 1,560.00 0.00 26,440.00 5.57
3701-4900 Depreciation
0.00 0.00 0.00 0.003701-4902 Depreciation/Vehicles 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
3701-5400 Equipment/Furniture
35,000.00 0.00 0.00 0.003701-5403 Vehicles 0.00 35,000.00
Total Equipment/Furniture 35,000.00 0.00 0.00 0.00 35,000.00 0.00
Total Air Quality Mgmt Dist Fund 63,000.00 1,560.00 1,560.00 0.00 61,440.00 2.48
159Page:
298
11/19/2018
CITY OF HERMOSA BEACH
160
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Supp Law Enf Serv Fund (SLESF)153
C.O.P.S. Program2106
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2106-4200 Contract Services
58,456.00 13,951.07 13,951.07 23.872106-4201 Contract Serv/Private 0.00 44,504.93
0.00 0.00 0.00 0.002106-4251 Contract Services/Govt 0.00 0.00
Total Contract Services 58,456.00 13,951.07 13,951.07 0.00 44,504.93 23.87
2106-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.002106-4311 Auto Maintenance 0.00 0.00
0.00 0.00 0.00 0.002106-4314 Uniforms 0.00 0.00
0.00 0.00 0.00 0.002106-4315 Membership 0.00 0.00
0.00 0.00 0.00 0.002106-4317 Conference/Training 0.00 0.00
0.00 0.00 0.00 0.002106-4350 Safety Gear 0.00 0.00
Total Materials/Supplies/Other 0.00 0.00 0.00 0.00 0.00 0.00
2106-4900 Depreciation
0.00 0.00 0.00 0.002106-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
2106-5400 Equipment/Furniture
0.00 1,880.00 1,880.00 0.002106-5401 Equip-Less Than $1,000 0.00 -1,880.00
0.00 0.00 0.00 0.002106-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.002106-5403 Vehicles 0.00 0.00
182,192.00 59,342.94 59,342.94 32.572106-5405 Equipment more than $5,000 0.00 122,849.06
Total Equipment/Furniture 182,192.00 61,222.94 61,222.94 0.00 120,969.06 33.60
2106-5600 Buildings/Improvements
0.00 0.00 0.00 0.002106-5601 Buildings 0.00 0.00
0.00 0.00 0.00 0.002106-5602 Imprvmnts Other Than Bldgs 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Supp Law Enf Serv Fund (SLESF) 240,648.00 75,174.01 75,174.01 0.00 165,473.99 31.24
160Page:
299
11/19/2018
CITY OF HERMOSA BEACH
161
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Sewer Fund160
Administrative Charges1219
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1219-4200 Contract Services
0.00 0.00 0.00 0.001219-4201 Contract Serv/Private 0.00 0.00
Total Administrative Charges 0.00 0.00 0.00 0.00 0.00 0.00
161Page:
300
11/19/2018
CITY OF HERMOSA BEACH
162
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Sewer Fund160
Sewers/Storm Drains3102
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3102-4100 Personal Services
75,768.00 24,847.25 24,847.25 32.793102-4102 Regular Salaries 0.00 50,920.75
410.00 87.50 87.50 21.343102-4106 Regular Overtime 0.00 322.50
7,125.00 253.57 253.57 3.563102-4111 Accrual Cash In 0.00 6,871.43
0.00 620.64 620.64 0.003102-4112 Part Time/Temporary 0.00 -620.64
16,733.00 2,945.67 2,945.67 17.603102-4180 Retirement 0.00 13,787.33
0.00 0.00 0.00 0.003102-4187 Uniform Allowance 0.00 0.00
11,982.00 3,852.85 3,852.85 32.163102-4188 Employee Benefits 0.00 8,129.15
1,115.00 384.72 384.72 34.503102-4189 Medicare Benefits 0.00 730.28
3,626.00 1,208.68 1,208.68 33.333102-4190 Other Post Employment Benefits (OPEB) 0.00 2,417.32
Total Personal Services 116,759.00 34,200.88 34,200.88 0.00 82,558.12 29.29
3102-4200 Contract Services
255,910.00 16,650.45 16,650.45 6.513102-4201 Contract Serv/Private 0.00 239,259.55
4,231.00 0.00 0.00 0.003102-4251 Contract Service/Govt 0.00 4,231.00
Total Contract Services 260,141.00 16,650.45 16,650.45 0.00 243,490.55 6.40
3102-4300 Materials/Supplies/Other
695.00 0.00 0.00 0.003102-4303 Utilities 0.00 695.00
7,600.00 367.88 367.88 4.843102-4309 Maintenance Materials 0.00 7,232.12
267.00 66.00 66.00 24.723102-4394 Building Maintenance Charges 0.00 201.00
34,371.00 8,592.75 8,592.75 25.003102-4395 Equip Replacement Charges 0.00 25,778.25
23,110.00 5,778.00 5,778.00 25.003102-4396 Insurance User Charges 0.00 17,332.00
Total Materials/Supplies/Other 66,043.00 14,804.63 14,804.63 0.00 51,238.37 22.42
3102-4900 Depreciation
0.00 0.00 0.00 0.003102-4901 Depreciation/Mach/Equipment 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
3102-5400 Equipment/Furniture
162Page:
301
11/19/2018
CITY OF HERMOSA BEACH
163
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Sewer Fund160
Sewers/Storm Drains3102
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
0.00 0.00 0.00 0.003102-5402 Equip-More Than $1,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total Sewers/Storm Drains 442,943.00 65,655.96 65,655.96 0.00 377,287.04 14.82
163Page:
302
11/19/2018
CITY OF HERMOSA BEACH
164
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Sewer Fund160
Used Oil Block Grant3105
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3105-4200 Contract Services
12,181.00 537.08 537.08 4.413105-4201 Contract Serv/Private 0.00 11,643.92
Total Used Oil Block Grant 12,181.00 537.08 537.08 0.00 11,643.92 4.41
164Page:
303
11/19/2018
CITY OF HERMOSA BEACH
165
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Sewer Fund160
Sewer Improvements Various Locations8403
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8403-4100 Personal Services
0.00 0.00 0.00 0.008403-4102 Regular Salaries 0.00 0.00
0.00 0.00 0.00 0.008403-4106 Regular Overtime 0.00 0.00
0.00 0.00 0.00 0.008403-4112 Part Time Temporary 0.00 0.00
0.00 0.00 0.00 0.008403-4180 Retirement 0.00 0.00
0.00 0.00 0.00 0.008403-4189 Medicare Benefits 0.00 0.00
Total Personal Services 0.00 0.00 0.00 0.00 0.00 0.00
8403-4200 Contract Services
20,377.00 0.00 0.00 0.008403-4201 Contract Serv/Private 0.00 20,377.00
Total Sewer Improvements Various Locations 20,377.00 0.00 0.00 0.00 20,377.00 0.00
165Page:
304
11/19/2018
CITY OF HERMOSA BEACH
166
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Sewer Fund160
Sewer Improvements Various Locations8416
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8416-4200 Contract Services
1,260,000.00 90,149.15 90,149.15 7.158416-4201 Contract Serv/Private 0.00 1,169,850.85
Total Sewer Improvements Various Locations 1,260,000.00 90,149.15 90,149.15 0.00 1,169,850.85 7.15
166Page:
305
11/19/2018
CITY OF HERMOSA BEACH
167
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Sewer Fund160
14th Street Beach Restroom Rehab8692
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8692-4200 Contract Services
110,000.00 0.00 0.00 0.008692-4201 Contract Serv/Private 0.00 110,000.00
Total 14th Street Beach Restroom Rehab 110,000.00 0.00 0.00 0.00 110,000.00 0.00
Total Sewer Fund 1,845,501.00 156,342.19 156,342.19 0.00 1,689,158.81 8.47
167Page:
306
11/19/2018
CITY OF HERMOSA BEACH
168
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Storm Drains Fund161
Storm Drain3109
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3109-4100 Personal Services
69,416.00 22,991.12 22,991.12 33.123109-4102 Regular Salaries 0.00 46,424.88
1,500.00 87.50 87.50 5.833109-4106 Regular Overtime 0.00 1,412.50
5,464.00 253.55 253.55 4.643109-4111 Accrual Cash In 0.00 5,210.45
0.00 3,103.10 3,103.10 0.003109-4112 Part Time Temporary 0.00 -3,103.10
13,884.00 2,753.97 2,753.97 19.843109-4180 Retirement 0.00 11,130.03
0.00 0.00 0.00 0.003109-4187 Uniform Allowance 0.00 0.00
10,398.00 3,511.78 3,511.78 33.773109-4188 Employee Benefits 0.00 6,886.22
1,022.00 393.68 393.68 38.523109-4189 Medicare Benefits 0.00 628.32
3,065.00 1,021.68 1,021.68 33.333109-4190 Other Post Employment Benefits/OPEB 0.00 2,043.32
Total Personal Services 104,749.00 34,116.38 34,116.38 0.00 70,632.62 32.57
3109-4200 Contract Services
154,100.00 10,857.30 10,857.30 7.053109-4201 Contract Serv/Private 0.00 143,242.70
9,594.00 0.00 0.00 0.003109-4251 Contract Services/Gov't 0.00 9,594.00
Total Contract Services 163,694.00 10,857.30 10,857.30 0.00 152,836.70 6.63
3109-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.003109-4303 Utilities 0.00 0.00
3,800.00 586.55 586.55 15.443109-4309 Maintenance Materials 0.00 3,213.45
400.00 99.00 99.00 24.753109-4394 Building Maintenance Charges 0.00 301.00
35,401.00 8,850.24 8,850.24 25.003109-4395 Equip Replacement Chrgs 0.00 26,550.76
11,079.00 2,769.00 2,769.00 24.993109-4396 Insurance User Charges 0.00 8,310.00
Total Materials/Supplies/Other 50,680.00 12,304.79 12,304.79 0.00 38,375.21 24.28
Total Storm Drain 319,123.00 57,278.47 57,278.47 0.00 261,844.53 17.95
168Page:
307
11/19/2018
CITY OF HERMOSA BEACH
169
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Storm Drains Fund161
Storm Drain Master Plan8415
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8415-4100 Personal Services
0.00 0.00 0.00 0.008415-4102 Regular Salaries 0.00 0.00
0.00 0.00 0.00 0.008415-4106 Regular Overtime 0.00 0.00
0.00 0.00 0.00 0.008415-4112 Part Time Temporary 0.00 0.00
0.00 0.00 0.00 0.008415-4180 Retirement 0.00 0.00
0.00 0.00 0.00 0.008415-4189 Medicare Benefits 0.00 0.00
Total Personal Services 0.00 0.00 0.00 0.00 0.00 0.00
8415-4200 Contract Services
21,827.00 0.00 0.00 0.008415-4201 Contract Serv/Private 0.00 21,827.00
Total Storm Drain Master Plan 21,827.00 0.00 0.00 0.00 21,827.00 0.00
169Page:
308
11/19/2018
CITY OF HERMOSA BEACH
170
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Storm Drains Fund161
Storm Drain Improvements- Various Locati8417
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8417-4200 Contract Services
645,090.00 0.00 0.00 0.008417-4201 Contract Serv/Private 0.00 645,090.00
Total Storm Drain Improvements- Various Locati 645,090.00 0.00 0.00 0.00 645,090.00 0.00
Total Storm Drains Fund 986,040.00 57,278.47 57,278.47 0.00 928,761.53 5.81
170Page:
309
11/19/2018
CITY OF HERMOSA BEACH
171
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Asset Seizure/Forft Fund170
Special Investigations2103
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2103-4900 Depreciation
0.00 0.00 0.00 0.002103-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.002103-4902 Depreciation/Vehicles 0.00 0.00
0.00 0.00 0.00 0.002103-4904 Depreciation/Improvements 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
2103-5400 Equipment/Furniture
0.00 0.00 0.00 0.002103-5403 Vehicles 0.00 0.00
0.00 0.00 0.00 0.002103-5405 Equipment more than $5,000 0.00 0.00
Total Special Investigations 0.00 0.00 0.00 0.00 0.00 0.00
171Page:
310
11/19/2018
CITY OF HERMOSA BEACH
172
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Asset Seizure/Forft Fund170
Police K-9 Program2105
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2105-4200 Contract Services
2,500.00 0.00 0.00 0.002105-4201 Contract Serv/Private 0.00 2,500.00
Total Contract Services 2,500.00 0.00 0.00 0.00 2,500.00 0.00
2105-4300 Materials/Supplies/Other
722.00 0.00 0.00 0.002105-4309 Maintenance Materials 0.00 722.00
3,000.00 0.00 0.00 0.002105-4317 Conference/Training 0.00 3,000.00
Total Materials/Supplies/Other 3,722.00 0.00 0.00 0.00 3,722.00 0.00
2105-4900 Depreciation
0.00 0.00 0.00 0.002105-4902 Depreciation/Vehicles 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
2105-5400 Equipment/Furniture
600.00 0.00 0.00 0.002105-5401 Equip-Less Than $1,000 0.00 600.00
0.00 0.00 0.00 0.002105-5403 Vehicles 0.00 0.00
0.00 0.00 0.00 0.002105-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 600.00 0.00 0.00 0.00 600.00 0.00
Total Police K-9 Program 6,822.00 0.00 0.00 0.00 6,822.00 0.00
172Page:
311
11/19/2018
CITY OF HERMOSA BEACH
173
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Asset Seizure/Forft Fund170
Mounted Patrol Unit2116
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2116-4200 Contract Services
4,000.00 0.00 0.00 0.002116-4201 Contract Serv/Private 0.00 4,000.00
Total Mounted Patrol Unit 4,000.00 0.00 0.00 0.00 4,000.00 0.00
Total Asset Seizure/Forft Fund 10,822.00 0.00 0.00 0.00 10,822.00 0.00
173Page:
312
11/19/2018
CITY OF HERMOSA BEACH
174
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Fire Protection Fund180
Fire Protection2202
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2202-4200 Contract Services
56,596.00 18,865.36 18,865.36 33.332202-4251 Contract Services/Gov't 0.00 37,730.64
Total Fire Protection Fund 56,596.00 18,865.36 18,865.36 0.00 37,730.64 33.33
174Page:
313
11/19/2018
CITY OF HERMOSA BEACH
175
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
RTI Undersea Cable190
Parks6101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
6101-5400 Equipment/Furniture
0.00 0.00 0.00 0.006101-5405 Equipment more than $5,000 0.00 0.00
Total Parks 0.00 0.00 0.00 0.00 0.00 0.00
175Page:
314
11/19/2018
CITY OF HERMOSA BEACH
176
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
RTI Undersea Cable190
8th Street Improvements8173
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8173-4200 Contract Services
0.00 0.00 0.00 0.008173-4201 Contract Serv/Private 0.00 0.00
Total 8th Street Improvements 0.00 0.00 0.00 0.00 0.00 0.00
176Page:
315
11/19/2018
CITY OF HERMOSA BEACH
177
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
RTI Undersea Cable190
Street Improvements Various Locations8174
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8174-4200 Contract Services
0.00 0.00 0.00 0.008174-4201 Contract Serv/Private 0.00 0.00
Total Street Improvements Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
177Page:
316
11/19/2018
CITY OF HERMOSA BEACH
178
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
RTI Undersea Cable190
Street Improvement Various Locations8186
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8186-4200 Contract Services
0.00 0.00 0.00 0.008186-4201 Contract Serv/Private 0.00 0.00
Total Street Improvement Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
178Page:
317
11/19/2018
CITY OF HERMOSA BEACH
179
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
RTI Undersea Cable190
Municipal Pier Structural Assess/Repair8629
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8629-4200 Contract Services
0.00 0.00 0.00 0.008629-4201 Contract Serv/Private 0.00 0.00
Total Municipal Pier Structural Assess /Repair 0.00 0.00 0.00 0.00 0.00 0.00
179Page:
318
11/19/2018
CITY OF HERMOSA BEACH
180
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
RTI Undersea Cable190
14Th. St. Beach Restroom Rehabilitation8631
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8631-4200 Contract Services
0.00 0.00 0.00 0.008631-4201 Contract Serv/Private 0.00 0.00
Total RTI Undersea Cable 0.00 0.00 0.00 0.00 0.00 0.00
180Page:
319
11/19/2018
CITY OF HERMOSA BEACH
181
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
RTI Tidelands191
Municipal Pier Structural Assess/Repair8629
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8629-4200 Contract Services
240,000.00 0.00 0.00 0.008629-4201 Contract Serv/Private 0.00 240,000.00
Total RTI Tidelands 240,000.00 0.00 0.00 0.00 240,000.00 0.00
181Page:
320
11/19/2018
CITY OF HERMOSA BEACH
182
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
2015 Lease Revenue Bonds201
Legal Settlements- E&B Resources1220
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1220-4200 Contract Services
0.00 0.00 0.00 0.001220-4201 Contract Serv/Private 0.00 0.00
Total Contract Services 0.00 0.00 0.00 0.00 0.00 0.00
1220-6700 Interest
333,712.00 172,606.29 172,606.29 51.721220-6701 Interest 0.00 161,105.71
Total Interest 333,712.00 172,606.29 172,606.29 0.00 161,105.71 51.72
1220-6800 Principal
460,000.00 459,825.50 459,825.50 99.961220-6801 Principal Payment 0.00 174.50
Total Principal 460,000.00 459,825.50 459,825.50 0.00 174.50 99.96
Total 2015 Lease Revenue Bonds 793,712.00 632,431.79 632,431.79 0.00 161,280.21 79.68
182Page:
321
11/19/2018
CITY OF HERMOSA BEACH
183
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
City Manager1201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1201-4200 Contract Services
0.00 0.00 0.00 0.001201-4201 Contract Serv/Private 0.00 0.00
Total Contract Services 0.00 0.00 0.00 0.00 0.00 0.00
1201-5400 Equipment/Furniture
0.00 0.00 0.00 0.001201-5405 Equipment more than $5,000 0.00 0.00
Total City Manager 0.00 0.00 0.00 0.00 0.00 0.00
183Page:
322
11/19/2018
CITY OF HERMOSA BEACH
184
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Storm Drains3109
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3109-4200 Contract Services
80,000.00 0.00 0.00 0.003109-4201 Contract Serv/Private 0.00 80,000.00
Total Storm Drains 80,000.00 0.00 0.00 0.00 80,000.00 0.00
184Page:
323
11/19/2018
CITY OF HERMOSA BEACH
185
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Public Works Administration4202
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4202-4200 Contract Services
75,672.00 0.00 0.00 0.004202-4201 Contract Serv/Private 0.00 75,672.00
Total Contract Services 75,672.00 0.00 0.00 0.00 75,672.00 0.00
4202-5400 Equipment/Furniture
0.00 0.00 0.00 0.004202-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total Public Works Administration 75,672.00 0.00 0.00 0.00 75,672.00 0.00
185Page:
324
11/19/2018
CITY OF HERMOSA BEACH
186
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Pier Ave/Hermosa Ave to PCH8116
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8116-4200 Contract Services
0.00 0.00 0.00 0.008116-4201 Contract Serv/Private 0.00 0.00
Total Pier Ave/Hermosa Ave to PCH 0.00 0.00 0.00 0.00 0.00 0.00
186Page:
325
11/19/2018
CITY OF HERMOSA BEACH
187
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Pier Avenue/PCH to Ardmore8129
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8129-4200 Contract Services
0.00 0.00 0.00 0.008129-4201 Contract Serv/Private 0.00 0.00
Total Pier Avenue/PCH to Ardmore 0.00 0.00 0.00 0.00 0.00 0.00
187Page:
326
11/19/2018
CITY OF HERMOSA BEACH
188
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Gould Avenue Street Improvements8141
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8141-4200 Contract Services
0.00 0.00 0.00 0.008141-4201 Contract Serv/Private 0.00 0.00
Total Gould Avenue Street Improvements 0.00 0.00 0.00 0.00 0.00 0.00
188Page:
327
11/19/2018
CITY OF HERMOSA BEACH
189
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
PCH Mobility Improvement Project8143
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8143-4200 Contract Services
263,437.00 0.00 0.00 0.008143-4201 Contract Serv/Private 0.00 263,437.00
Total PCH Mobility Improvement Project 263,437.00 0.00 0.00 0.00 263,437.00 0.00
189Page:
328
11/19/2018
CITY OF HERMOSA BEACH
190
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
St Imprv/Hillcrest & Rhodes8159
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8159-4200 Contract Services
0.00 0.00 0.00 0.008159-4201 Contract Serv/Private 0.00 0.00
Total St Imprv/Hillcrest & Rhodes 0.00 0.00 0.00 0.00 0.00 0.00
190Page:
329
11/19/2018
CITY OF HERMOSA BEACH
191
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
PCH Traffic Improvements8160
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8160-4200 Contract Services
0.00 0.00 0.00 0.008160-4201 Contract Serv/Private 0.00 0.00
Total PCH Traffic Improvements 0.00 0.00 0.00 0.00 0.00 0.00
191Page:
330
11/19/2018
CITY OF HERMOSA BEACH
192
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Green Ally and Beach Quality Improvement8162
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8162-4200 Contract Services
187,500.00 0.00 0.00 0.008162-4201 Contract Serv/Private 0.00 187,500.00
Total Green Ally and Beach Quality Improvement 187,500.00 0.00 0.00 0.00 187,500.00 0.00
192Page:
331
11/19/2018
CITY OF HERMOSA BEACH
193
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
8th Street Improvements8173
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8173-4200 Contract Services
308,438.00 0.00 0.00 0.008173-4201 Contract Serv/Private 0.00 308,438.00
Total 8th Street Improvements 308,438.00 0.00 0.00 0.00 308,438.00 0.00
193Page:
332
11/19/2018
CITY OF HERMOSA BEACH
194
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Street Improvements Various Locations8174
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8174-4200 Contract Services
0.00 0.00 0.00 0.008174-4201 Contract Serv/Private 0.00 0.00
Total Street Improvements Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
194Page:
333
11/19/2018
CITY OF HERMOSA BEACH
195
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Street Improvement Various Locations8186
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8186-4200 Contract Services
0.00 0.00 0.00 0.008186-4201 Contract Serv/Private 0.00 0.00
Total Street Improvement Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
195Page:
334
11/19/2018
CITY OF HERMOSA BEACH
196
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Stamped Concrete Replacement -Strand8187
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8187-4200 Contract Services
140,000.00 0.00 0.00 0.008187-4201 Contract Serv/Private 0.00 140,000.00
Total Stamped Concrete Replacement -Strand 140,000.00 0.00 0.00 0.00 140,000.00 0.00
196Page:
335
11/19/2018
CITY OF HERMOSA BEACH
197
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Strand Bikeway/Walkway Improvments- 35th8188
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8188-4200 Contract Services
0.00 0.00 0.00 0.008188-4201 Contract Serv/Private 0.00 0.00
Total Strand Bikeway/Walkway Improvments - 35th 0.00 0.00 0.00 0.00 0.00 0.00
197Page:
336
11/19/2018
CITY OF HERMOSA BEACH
198
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
St Improvements/Myrtle Area8189
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8189-4200 Contract Services
0.00 0.00 0.00 0.008189-4201 Contract Serv/Private 0.00 0.00
Total St Improvements/Myrtle Area 0.00 0.00 0.00 0.00 0.00 0.00
198Page:
337
11/19/2018
CITY OF HERMOSA BEACH
199
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Sewer Improvements- Various Locations8402
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8402-4200 Contract Services
0.00 0.00 0.00 0.008402-4201 Contract Serv/Private 0.00 0.00
Total Sewer Improvements- Various Locations 0.00 0.00 0.00 0.00 0.00 0.00
199Page:
338
11/19/2018
CITY OF HERMOSA BEACH
200
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Greenbelt Root Barrier System8504
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8504-4200 Contract Services
0.00 0.00 0.00 0.008504-4201 Contract Serv/Private 0.00 0.00
Total Greenbelt Root Barrier System 0.00 0.00 0.00 0.00 0.00 0.00
200Page:
339
11/19/2018
CITY OF HERMOSA BEACH
201
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Stormwater/Urban Run-Off Diversion Proj8542
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8542-4200 Contract Services
421,618.00 965.41 965.41 0.238542-4201 Contract Serv/Private 0.00 420,652.59
Total Stormwater/Urban Run-Off Diversion Proj 421,618.00 965.41 965.41 0.00 420,652.59 0.23
201Page:
340
11/19/2018
CITY OF HERMOSA BEACH
202
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Feasibility. Greenbelt Path8544
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8544-4200 Contract Services
10,000.00 0.00 0.00 0.008544-4201 Contract Serv/Private 0.00 10,000.00
Total Feasibility. Greenbelt Path 10,000.00 0.00 0.00 0.00 10,000.00 0.00
202Page:
341
11/19/2018
CITY OF HERMOSA BEACH
203
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Pkg Lot Paving-75-14Th St8605
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8605-4200 Contract Services
0.00 0.00 0.00 0.008605-4201 Contract Serv/Private 0.00 0.00
Total Pkg Lot Paving-75-14Th St 0.00 0.00 0.00 0.00 0.00 0.00
203Page:
342
11/19/2018
CITY OF HERMOSA BEACH
204
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Downtown Strategic Plan Implementation8609
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8609-4200 Contract Services
559,055.00 0.00 0.00 0.008609-4201 Contract Serv/Private 0.00 559,055.00
Total Downtown Strategic Plan Implementation 559,055.00 0.00 0.00 0.00 559,055.00 0.00
204Page:
343
11/19/2018
CITY OF HERMOSA BEACH
205
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
City Hall Replacement8611
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8611-4200 Contract Services
0.00 0.00 0.00 0.008611-4201 Contract Serv/Private 0.00 0.00
Total City Hall Replacement 0.00 0.00 0.00 0.00 0.00 0.00
205Page:
344
11/19/2018
CITY OF HERMOSA BEACH
206
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Police Facilities Improvements8614
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8614-4200 Contract Services
95,280.00 23,076.76 23,076.76 24.228614-4201 Contract Serv/Private 0.00 72,203.24
Total Police Facilities Improvements 95,280.00 23,076.76 23,076.76 0.00 72,203.24 24.22
206Page:
345
11/19/2018
CITY OF HERMOSA BEACH
207
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
New Corporate Yard Facility8615
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8615-4200 Contract Services
173,142.00 0.00 0.00 0.008615-4201 Contract Serv/Private 0.00 173,142.00
Total New Corporate Yard Facility 173,142.00 0.00 0.00 0.00 173,142.00 0.00
207Page:
346
11/19/2018
CITY OF HERMOSA BEACH
208
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Police Building Replacement8618
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8618-4200 Contract Services
0.00 0.00 0.00 0.008618-4201 Contract Serv/Private 0.00 0.00
Total Police Building Replacement 0.00 0.00 0.00 0.00 0.00 0.00
208Page:
347
11/19/2018
CITY OF HERMOSA BEACH
209
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Fire Department Tower Demolition8632
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8632-4200 Contract Services
0.00 0.00 0.00 0.008632-4201 Contract Serv/Private 0.00 0.00
Total Fire Department Tower Demolition 0.00 0.00 0.00 0.00 0.00 0.00
209Page:
348
11/19/2018
CITY OF HERMOSA BEACH
210
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Community Center Gen Improv- Phase III8650
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8650-4200 Contract Services
149,039.00 535.32 535.32 0.368650-4201 Contract Serv/Private 0.00 148,503.68
Total Community Center Gen Improv- Phase III 149,039.00 535.32 535.32 0.00 148,503.68 0.36
210Page:
349
11/19/2018
CITY OF HERMOSA BEACH
211
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Lawn Bowling Lighting8657
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8657-4200 Contract Services
0.00 0.00 0.00 0.008657-4201 Contract Serv/Private 0.00 0.00
Total Lawn Bowling Lighting 0.00 0.00 0.00 0.00 0.00 0.00
211Page:
350
11/19/2018
CITY OF HERMOSA BEACH
212
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Municipal Pier Electrical Repairs8660
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8660-4200 Contract Services
259,711.00 0.00 0.00 0.008660-4201 Contract Serv/Private 0.00 259,711.00
Total Municipal Pier Electrical Repairs 259,711.00 0.00 0.00 0.00 259,711.00 0.00
212Page:
351
11/19/2018
CITY OF HERMOSA BEACH
213
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
City Fac. Condition Assessm.& Asbesto Rp8664
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8664-4200 Contract Services
0.00 0.00 0.00 0.008664-4201 Contract Serv/Private 0.00 0.00
Total City Fac. Condition Assessm.& Asbesto Rp 0.00 0.00 0.00 0.00 0.00 0.00
213Page:
352
11/19/2018
CITY OF HERMOSA BEACH
214
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
City Park Restroom Renovations8669
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8669-4200 Contract Services
1,055,994.00 54,312.00 54,312.00 5.148669-4201 Contract Serv/Private 0.00 1,001,682.00
Total City Park Restroom Renovations 1,055,994.00 54,312.00 54,312.00 0.00 1,001,682.00 5.14
214Page:
353
11/19/2018
CITY OF HERMOSA BEACH
215
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Tree Well Grates8670
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8670-4200 Contract Services
67,220.00 0.00 0.00 0.008670-4201 Contract Serv/Private 0.00 67,220.00
Total Tree Well Grates 67,220.00 0.00 0.00 0.00 67,220.00 0.00
215Page:
354
11/19/2018
CITY OF HERMOSA BEACH
216
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Clark Field Restrooms8671
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8671-4200 Contract Services
0.00 0.00 0.00 0.008671-4201 Contract Serv/Private 0.00 0.00
Total Clark Field Restrooms 0.00 0.00 0.00 0.00 0.00 0.00
216Page:
355
11/19/2018
CITY OF HERMOSA BEACH
217
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Breakroom Improvements City Hall/Yard8673
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8673-4200 Contract Services
11,227.00 8,456.30 8,456.30 75.328673-4201 Contract Serv/Private 0.00 2,770.70
Total Breakroom Improvements City Hall/Yard 11,227.00 8,456.30 8,456.30 0.00 2,770.70 75.32
217Page:
356
11/19/2018
CITY OF HERMOSA BEACH
218
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Pier Plaza Lamp Post Replacement8675
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8675-4200 Contract Services
71,922.00 0.00 0.00 0.008675-4201 Contract Serv/Private 0.00 71,922.00
Total Pier Plaza Lamp Post Replacement 71,922.00 0.00 0.00 0.00 71,922.00 0.00
218Page:
357
11/19/2018
CITY OF HERMOSA BEACH
219
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
South Park Restroom Renovations8677
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8677-4200 Contract Services
0.00 0.00 0.00 0.008677-4201 Contract Serv/Private 0.00 0.00
Total South Park Restroom Renovations 0.00 0.00 0.00 0.00 0.00 0.00
219Page:
358
11/19/2018
CITY OF HERMOSA BEACH
220
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
CNG Slow-Fill Station8680
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8680-4200 Contract Services
0.00 0.00 0.00 0.008680-4201 Contract Serv/Private 0.00 0.00
Total CNG Slow-Fill Station 0.00 0.00 0.00 0.00 0.00 0.00
220Page:
359
11/19/2018
CITY OF HERMOSA BEACH
221
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Facilities for Opportunities Study/Imp8681
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8681-4200 Contract Services
0.00 0.00 0.00 0.008681-4201 Contract Serv/Private 0.00 0.00
Total Facilities for Opportunities Study/Imp 0.00 0.00 0.00 0.00 0.00 0.00
221Page:
360
11/19/2018
CITY OF HERMOSA BEACH
222
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Electrical Vehicle & Bicycle Transportat8682
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8682-4200 Contract Services
47,186.00 0.00 0.00 0.008682-4201 Contract Serv/Private 0.00 47,186.00
Total Electrical Vehicle & Bicycle Transportat 47,186.00 0.00 0.00 0.00 47,186.00 0.00
222Page:
361
11/19/2018
CITY OF HERMOSA BEACH
223
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Bard Street Closure8683
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8683-4200 Contract Services
55,000.00 150.00 150.00 0.278683-4201 Contract Serv/Private 0.00 54,850.00
Total Bard Street Closure 55,000.00 150.00 150.00 0.00 54,850.00 0.27
223Page:
362
11/19/2018
CITY OF HERMOSA BEACH
224
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Emergency Op Center Renovations8684
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8684-4200 Contract Services
193,500.00 0.00 0.00 0.008684-4201 Contract Serv/Private 0.00 193,500.00
Total Emergency Op Center Renovations 193,500.00 0.00 0.00 0.00 193,500.00 0.00
224Page:
363
11/19/2018
CITY OF HERMOSA BEACH
225
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Police Dept Report Writing Room8686
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8686-4200 Contract Services
0.00 0.00 0.00 0.008686-4201 Contract Serv/Private 0.00 0.00
Total Police Dept Report Writing Room 0.00 0.00 0.00 0.00 0.00 0.00
225Page:
364
11/19/2018
CITY OF HERMOSA BEACH
226
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Police Department Records & Jail Upgrade8688
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8688-4200 Contract Services
0.00 0.00 0.00 0.008688-4201 Contract Serv/Private 0.00 0.00
Total Police Department Records & Jail Upgrade 0.00 0.00 0.00 0.00 0.00 0.00
226Page:
365
11/19/2018
CITY OF HERMOSA BEACH
227
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Capital Improvement Fund301
Clark Building Renovations8689
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8689-4200 Contract Services
423,554.00 0.00 0.00 0.008689-4201 Contract Serv/Private 0.00 423,554.00
Total Clark Building Renovations 423,554.00 0.00 0.00 0.00 423,554.00 0.00
Total Capital Improvement Fund 4,648,495.00 87,495.79 87,495.79 0.00 4,560,999.21 1.88
227Page:
366
11/19/2018
CITY OF HERMOSA BEACH
228
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Insurance Fund705
Liability Insurance1209
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1209-4100 Personal Services
42,268.00 13,515.96 13,515.96 31.981209-4102 Regular Salaries 0.00 28,752.04
1,685.00 227.92 227.92 13.531209-4111 Accrual Cash In 0.00 1,457.08
11,740.00 1,824.51 1,824.51 15.541209-4180 Retirement 0.00 9,915.49
8,581.00 2,685.71 2,685.71 31.301209-4188 Employee Benefits 0.00 5,895.29
648.00 210.90 210.90 32.551209-4189 Medicare Benefits 0.00 437.10
Total Personal Services 64,922.00 18,465.00 18,465.00 0.00 46,457.00 28.44
1209-4200 Contract Services
680,830.00 688,273.83 688,273.83 101.091209-4201 Contract Serv/Private 0.00 -7,443.83
Total Contract Services 680,830.00 688,273.83 688,273.83 0.00 -7,443.83 101.09
1209-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.001209-4305 Office Oper Supplies 0.00 0.00
0.00 0.00 0.00 0.001209-4315 Membership 0.00 0.00
0.00 0.00 0.00 0.001209-4317 Conference/Training 0.00 0.00
400,000.00 132,740.58 132,740.58 33.191209-4324 Claims/Settlements 0.00 267,259.42
Total Materials/Supplies/Other 400,000.00 132,740.58 132,740.58 0.00 267,259.42 33.19
Total Liability Insurance 1,145,752.00 839,479.41 839,479.41 0.00 306,272.59 73.27
228Page:
367
11/19/2018
CITY OF HERMOSA BEACH
229
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Insurance Fund705
Auto/Property/Bonds1210
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1210-4200 Contract Services
65,330.00 62,173.80 62,173.80 95.171210-4201 Contract Serv/Private 0.00 3,156.20
Total Contract Services 65,330.00 62,173.80 62,173.80 0.00 3,156.20 95.17
1210-4300 Materials/Supplies/Other
10,000.00 0.00 0.00 0.001210-4324 Claims/Settlements 0.00 10,000.00
Total Materials/Supplies/Other 10,000.00 0.00 0.00 0.00 10,000.00 0.00
Total Auto/Property/Bonds 75,330.00 62,173.80 62,173.80 0.00 13,156.20 82.54
229Page:
368
11/19/2018
CITY OF HERMOSA BEACH
230
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Insurance Fund705
Unemployment1215
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1215-4100 Personal Services
10,000.00 0.00 0.00 0.001215-4186 Unemployment Claims 0.00 10,000.00
Total Unemployment 10,000.00 0.00 0.00 0.00 10,000.00 0.00
230Page:
369
11/19/2018
CITY OF HERMOSA BEACH
231
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Insurance Fund705
Workers' Compensation1217
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1217-4100 Personal Services
42,268.00 13,516.04 13,516.04 31.981217-4102 Regular Salaries 0.00 28,751.96
1,685.00 227.92 227.92 13.531217-4111 Accrual Cash In 0.00 1,457.08
11,740.00 1,824.49 1,824.49 15.541217-4180 Retirement 0.00 9,915.51
8,582.00 2,685.56 2,685.56 31.291217-4188 Employee Benefits 0.00 5,896.44
648.00 210.85 210.85 32.541217-4189 Medicare Benefits 0.00 437.15
Total Personal Services 64,923.00 18,464.86 18,464.86 0.00 46,458.14 28.44
1217-4200 Contract Services
332,129.00 253,606.00 253,606.00 76.361217-4201 Contract Serv/Private 0.00 78,523.00
0.00 0.00 0.00 0.001217-4251 Contract Service/Govt 0.00 0.00
Total Contract Services 332,129.00 253,606.00 253,606.00 0.00 78,523.00 76.36
1217-4300 Materials/Supplies/Other
100.00 2.77 2.77 2.771217-4305 Office Oper Supplies 0.00 97.23
1,000.00 0.00 0.00 0.001217-4317 Conference/Training 0.00 1,000.00
981,000.00 190,875.32 190,875.32 19.461217-4324 Claims/Settlements 0.00 790,124.68
Total Materials/Supplies/Other 982,100.00 190,878.09 190,878.09 0.00 791,221.91 19.44
Total Workers' Compensation 1,379,152.00 462,948.95 462,948.95 0.00 916,203.05 33.57
231Page:
370
11/19/2018
CITY OF HERMOSA BEACH
232
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Insurance Fund705
Interfund Transfers Out1299
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1299-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.001299-4399 Operating Transfers Out 0.00 0.00
Total Interfund Transfers Out 0.00 0.00 0.00 0.00 0.00 0.00
Total Insurance Fund 2,610,234.00 1,364,602.16 1,364,602.16 0.00 1,245,631.84 52.28
232Page:
371
11/19/2018
CITY OF HERMOSA BEACH
233
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
City Council1101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1101-4900 Depreciation
0.00 0.00 0.00 0.001101-4901 Depreciation/Mach/Equipment 0.00 0.00
5,437.00 0.00 0.00 0.001101-4903 Depreciation/Bldgs 0.00 5,437.00
Total Depreciation 5,437.00 0.00 0.00 0.00 5,437.00 0.00
1101-5400 Equipment/Furniture
0.00 0.00 0.00 0.001101-5402 Equip-More Than $1,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
1101-5600 Buildings/Improvements
0.00 0.00 0.00 0.001101-5601 Buildings 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total City Council 5,437.00 0.00 0.00 0.00 5,437.00 0.00
233Page:
372
11/19/2018
CITY OF HERMOSA BEACH
234
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
City Clerk1121
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1121-5400 Equipment/Furniture
0.00 0.00 0.00 0.001121-5401 Equip-Less Than $1,000 0.00 0.00
Total City Clerk 0.00 0.00 0.00 0.00 0.00 0.00
234Page:
373
11/19/2018
CITY OF HERMOSA BEACH
235
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
City Treasurer1141
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1141-5400 Equipment/Furniture
0.00 0.00 0.00 0.001141-5401 Equip-Less Than $1,000 0.00 0.00
Total City Treasurer 0.00 0.00 0.00 0.00 0.00 0.00
235Page:
374
11/19/2018
CITY OF HERMOSA BEACH
236
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
City Manager1201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1201-4200 Contract Services
147,385.00 37,216.46 37,216.46 25.251201-4201 Contract Serv/Private 0.00 110,168.54
Total Contract Services 147,385.00 37,216.46 37,216.46 0.00 110,168.54 25.25
1201-5400 Equipment/Furniture
672.00 0.00 0.00 0.001201-5401 Equip-Less Than $1,000 0.00 672.00
0.00 0.00 0.00 0.001201-5403 Vehicles 0.00 0.00
Total Equipment/Furniture 672.00 0.00 0.00 0.00 672.00 0.00
Total City Manager 148,057.00 37,216.46 37,216.46 0.00 110,840.54 25.14
236Page:
375
11/19/2018
CITY OF HERMOSA BEACH
237
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Finance Administration1202
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1202-5400 Equipment/Furniture
1,350.00 0.00 0.00 0.001202-5402 Equip-More Than $1,000 0.00 1,350.00
Total Finance Administration 1,350.00 0.00 0.00 0.00 1,350.00 0.00
237Page:
376
11/19/2018
CITY OF HERMOSA BEACH
238
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Human Resources1203
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1203-5400 Equipment/Furniture
1,558.00 0.00 0.00 0.001203-5401 Equip-Less Than $1,000 0.00 1,558.00
Total Human Resources 1,558.00 0.00 0.00 0.00 1,558.00 0.00
238Page:
377
11/19/2018
CITY OF HERMOSA BEACH
239
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Finance Cashier1204
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1204-4200 Contract Services
0.00 0.00 0.00 0.001204-4201 Contract Serv/Private 0.00 0.00
Total Contract Services 0.00 0.00 0.00 0.00 0.00 0.00
1204-5400 Equipment/Furniture
1,747.00 0.00 0.00 0.001204-5401 Equip-Less Than $1,000 0.00 1,747.00
Total Finance Cashier 1,747.00 0.00 0.00 0.00 1,747.00 0.00
239Page:
378
11/19/2018
CITY OF HERMOSA BEACH
240
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Information Technology1206
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1206-4200 Contract Services
550,979.00 118,394.87 118,394.87 21.491206-4201 Contract Serv/Private 0.00 432,584.13
Total Contract Services 550,979.00 118,394.87 118,394.87 0.00 432,584.13 21.49
1206-4300 Materials/Supplies/Other
30,200.00 12,919.55 12,919.55 42.781206-4304 Telephone 0.00 17,280.45
15,000.00 4,684.90 4,684.90 31.231206-4305 Office Oper Supplies 0.00 10,315.10
71.00 18.00 18.00 25.351206-4396 Insurance User Charges 0.00 53.00
Total Materials/Supplies/Other 45,271.00 17,622.45 17,622.45 0.00 27,648.55 38.93
1206-4900 Depreciation
65,060.00 0.00 0.00 0.001206-4901 Depreciation/Mach/Equipment 0.00 65,060.00
Total Depreciation 65,060.00 0.00 0.00 0.00 65,060.00 0.00
1206-5400 Equipment/Furniture
1,633.00 0.00 0.00 0.001206-5401 Equip-Less Than $1,000 0.00 1,633.00
54,966.00 -9,027.39 -9,027.39 16.421206-5402 Equip-More Than $1,000 0.00 63,993.39
88,419.00 0.00 0.00 0.001206-5405 Equipment more than $5,000 0.00 88,419.00
Total Equipment/Furniture 145,018.00 -9,027.39 -9,027.39 0.00 154,045.39 0.00
Total Information Technology 806,328.00 126,989.93 126,989.93 0.00 679,338.07 15.75
240Page:
379
11/19/2018
CITY OF HERMOSA BEACH
241
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
General Appropriations1208
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1208-4200 Contract Services
12,108.00 910.27 910.27 7.521208-4201 Contract Serv/Private 0.00 11,197.73
Total Contract Services 12,108.00 910.27 910.27 0.00 11,197.73 7.52
1208-4900 Depreciation
6,956.00 0.00 0.00 0.001208-4901 Depreciation/Mach/Equipment 0.00 6,956.00
Total Depreciation 6,956.00 0.00 0.00 0.00 6,956.00 0.00
1208-5400 Equipment/Furniture
0.00 0.00 0.00 0.001208-5401 Equip-Less Than $1,000 0.00 0.00
0.00 0.00 0.00 0.001208-5402 Equip-More Than $1,000 0.00 0.00
28,380.00 0.00 0.00 0.001208-5405 Equipment more than $5,000 0.00 28,380.00
Total Equipment/Furniture 28,380.00 0.00 0.00 0.00 28,380.00 0.00
Total General Appropriations 47,444.00 910.27 910.27 0.00 46,533.73 1.92
241Page:
380
11/19/2018
CITY OF HERMOSA BEACH
242
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Police2101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2101-4200 Contract Services
24,923.00 30,844.59 30,844.59 123.762101-4201 Contract Serv/Private 0.00 -5,921.59
Total Contract Services 24,923.00 30,844.59 30,844.59 0.00 -5,921.59 123.76
2101-4300 Materials/Supplies/Other
81,402.00 12,888.89 12,888.89 15.832101-4310 Motor Fuels And Lubes 0.00 68,513.11
50,418.00 11,837.73 11,837.73 23.482101-4311 Auto Maintenance 0.00 38,580.27
0.00 0.00 0.00 0.002101-4350 Safety Gear 0.00 0.00
Total Materials/Supplies/Other 131,820.00 24,726.62 24,726.62 0.00 107,093.38 18.76
2101-4900 Depreciation
82,821.00 0.00 0.00 0.002101-4901 Depreciation/Mach/Equipment 0.00 82,821.00
125,932.00 0.00 0.00 0.002101-4902 Depreciation/Vehicles 0.00 125,932.00
Total Depreciation 208,753.00 0.00 0.00 0.00 208,753.00 0.00
2101-5400 Equipment/Furniture
25,835.00 365.92 365.92 1.422101-5401 Equip-Less Than $1,000 0.00 25,469.08
19,615.00 0.00 0.00 0.002101-5402 Equip-More Than $1,000 0.00 19,615.00
332,690.00 273.18 273.18 0.082101-5403 Vehicles 0.00 332,416.82
1,069,811.00 72,456.99 72,456.99 6.772101-5405 Equipment more than $5,000 0.00 997,354.01
Total Equipment/Furniture 1,447,951.00 73,096.09 73,096.09 0.00 1,374,854.91 5.05
2101-5600 Buildings/Improvements
0.00 0.00 0.00 0.002101-5601 Buildings 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Police 1,813,447.00 128,667.30 128,667.30 0.00 1,684,779.70 7.10
242Page:
381
11/19/2018
CITY OF HERMOSA BEACH
243
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Fire2201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2201-4200 Contract Services
0.00 8,500.00 8,500.00 0.002201-4201 Contract Serv/Private 0.00 -8,500.00
Total Contract Services 0.00 8,500.00 8,500.00 0.00 -8,500.00 0.00
2201-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.002201-4310 Motor Fuels And Lubes 0.00 0.00
0.00 0.00 0.00 0.002201-4311 Auto Maintenance 0.00 0.00
Total Materials/Supplies/Other 0.00 0.00 0.00 0.00 0.00 0.00
2201-4900 Depreciation
0.00 0.00 0.00 0.002201-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.002201-4902 Depreciation/Vehicles 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
2201-5400 Equipment/Furniture
0.00 0.00 0.00 0.002201-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.002201-5403 Vehicles 0.00 0.00
0.00 0.00 0.00 0.002201-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total Fire 0.00 8,500.00 8,500.00 0.00 -8,500.00 0.00
243Page:
382
11/19/2018
CITY OF HERMOSA BEACH
244
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Lighting/Landscaping/Medians2601
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
2601-4200 Contract Services
5,400.00 0.00 0.00 0.002601-4201 Contract Serv/Private 0.00 5,400.00
Total Contract Services 5,400.00 0.00 0.00 0.00 5,400.00 0.00
2601-4300 Materials/Supplies/Other
5,400.00 421.79 421.79 7.812601-4310 Motor Fuels And Lubes 0.00 4,978.21
1,300.00 16.34 16.34 1.262601-4311 Auto Maintenance 0.00 1,283.66
Total Materials/Supplies/Other 6,700.00 438.13 438.13 0.00 6,261.87 6.54
2601-4900 Depreciation
7,942.00 0.00 0.00 0.002601-4901 Depreciation/Mach/Equipment 0.00 7,942.00
10,036.00 0.00 0.00 0.002601-4902 Depreciation/Vehicles 0.00 10,036.00
Total Depreciation 17,978.00 0.00 0.00 0.00 17,978.00 0.00
2601-5400 Equipment/Furniture
0.00 0.00 0.00 0.002601-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.002601-5403 Vehicles 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total Lighting/Landscaping/Medians 30,078.00 438.13 438.13 0.00 29,639.87 1.46
244Page:
383
11/19/2018
CITY OF HERMOSA BEACH
245
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Sewers/Storm Drains3102
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3102-4200 Contract Services
0.00 0.00 0.00 0.003102-4201 Contract Serv/Private 0.00 0.00
Total Contract Services 0.00 0.00 0.00 0.00 0.00 0.00
3102-4300 Materials/Supplies/Other
1,000.00 0.00 0.00 0.003102-4309 Maintenance Materials 0.00 1,000.00
4,500.00 108.88 108.88 2.423102-4310 Motor Fuels And Lubes 0.00 4,391.12
1,500.00 27,344.12 27,344.12 1,822.943102-4311 Auto Maintenance 0.00 -25,844.12
Total Materials/Supplies/Other 7,000.00 27,453.00 27,453.00 0.00 -20,453.00 392.19
3102-4900 Depreciation
14,052.00 0.00 0.00 0.003102-4901 Depreciation/Mach/Equipment 0.00 14,052.00
9,539.00 0.00 0.00 0.003102-4902 Depreciation/Vehicles 0.00 9,539.00
Total Depreciation 23,591.00 0.00 0.00 0.00 23,591.00 0.00
3102-5400 Equipment/Furniture
0.00 0.00 0.00 0.003102-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.003102-5403 Vehicles 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total Sewers/Storm Drains 30,591.00 27,453.00 27,453.00 0.00 3,138.00 89.74
245Page:
384
11/19/2018
CITY OF HERMOSA BEACH
246
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Street Maint/Traffic Safety3104
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3104-4300 Materials/Supplies/Other
7,520.00 1,396.08 1,396.08 18.563104-4310 Motor Fuels And Lubes 0.00 6,123.92
5,977.00 455.59 455.59 7.623104-4311 Auto Maintenance 0.00 5,521.41
Total Materials/Supplies/Other 13,497.00 1,851.67 1,851.67 0.00 11,645.33 13.72
3104-4900 Depreciation
5,370.00 0.00 0.00 0.003104-4901 Depreciation/Mach/Equipment 0.00 5,370.00
6,742.00 0.00 0.00 0.003104-4902 Depreciation/Vehicles 0.00 6,742.00
Total Depreciation 12,112.00 0.00 0.00 0.00 12,112.00 0.00
3104-5400 Equipment/Furniture
0.00 0.00 0.00 0.003104-5402 Equip-More Than $1,000 0.00 0.00
46,000.00 9.78 9.78 0.023104-5403 Vehicles 0.00 45,990.22
0.00 0.00 0.00 0.003104-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 46,000.00 9.78 9.78 0.00 45,990.22 0.02
Total Street Maint/Traffic Safety 71,609.00 1,861.45 1,861.45 0.00 69,747.55 2.60
246Page:
385
11/19/2018
CITY OF HERMOSA BEACH
247
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Storm Drains3109
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3109-4200 Contract Services
5,000.00 0.00 0.00 0.003109-4201 Contract Serv/Private 0.00 5,000.00
Total Contract Services 5,000.00 0.00 0.00 0.00 5,000.00 0.00
3109-4300 Materials/Supplies/Other
600.00 0.00 0.00 0.003109-4309 Maintenance Materials 0.00 600.00
6,000.00 238.98 238.98 3.983109-4310 Motor Fuels And Lubes 0.00 5,761.02
1,430.00 0.00 0.00 0.003109-4311 Auto Maintenance 0.00 1,430.00
Total Materials/Supplies/Other 8,030.00 238.98 238.98 0.00 7,791.02 2.98
3109-4900 Depreciation
0.00 0.00 0.00 0.003109-4901 Depreciation/Mach/Equipment 0.00 0.00
0.00 0.00 0.00 0.003109-4902 Depreciation/Vehicles 0.00 0.00
Total Depreciation 0.00 0.00 0.00 0.00 0.00 0.00
3109-5400 Equipment/Furniture
0.00 0.00 0.00 0.003109-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.003109-5403 Vehicles 0.00 0.00
Total Equipment/Furniture 0.00 0.00 0.00 0.00 0.00 0.00
Total Storm Drains 13,030.00 238.98 238.98 0.00 12,791.02 1.83
247Page:
386
11/19/2018
CITY OF HERMOSA BEACH
248
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Downtown Enhancement3301
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3301-5400 Equipment/Furniture
22,000.00 0.00 0.00 0.003301-5405 Equipment more than $5,000 0.00 22,000.00
Total Downtown Enhancement 22,000.00 0.00 0.00 0.00 22,000.00 0.00
248Page:
387
11/19/2018
CITY OF HERMOSA BEACH
249
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Community Services3302
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
3302-4200 Contract Services
3,036.00 0.00 0.00 0.003302-4201 Contract Serv/Private 0.00 3,036.00
Total Contract Services 3,036.00 0.00 0.00 0.00 3,036.00 0.00
3302-4300 Materials/Supplies/Other
22,592.00 3,685.84 3,685.84 16.313302-4310 Motor Fuels And Lubes 0.00 18,906.16
8,000.00 609.98 609.98 7.623302-4311 Auto Maintenance 0.00 7,390.02
Total Materials/Supplies/Other 30,592.00 4,295.82 4,295.82 0.00 26,296.18 14.04
3302-4900 Depreciation
12,500.00 0.00 0.00 0.003302-4901 Depreciation/Mach/Equipment 0.00 12,500.00
26,289.00 0.00 0.00 0.003302-4902 Depreciation/Vehicles 0.00 26,289.00
Total Depreciation 38,789.00 0.00 0.00 0.00 38,789.00 0.00
3302-5400 Equipment/Furniture
140,949.00 0.00 0.00 0.003302-5401 Equip-Less Than $1,000 0.00 140,949.00
0.00 0.00 0.00 0.003302-5402 Equip-More Than $1,000 0.00 0.00
131,374.00 0.00 0.00 0.003302-5403 Vehicles 0.00 131,374.00
9,460.00 0.00 0.00 0.003302-5405 Equipment more than $5,000 0.00 9,460.00
Total Equipment/Furniture 281,783.00 0.00 0.00 0.00 281,783.00 0.00
Total Community Services 354,200.00 4,295.82 4,295.82 0.00 349,904.18 1.21
249Page:
388
11/19/2018
CITY OF HERMOSA BEACH
250
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Community Dev/Planning4101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4101-5400 Equipment/Furniture
7,790.00 5,166.03 5,166.03 66.324101-5401 Equip-Less Than $1,000 0.00 2,623.97
Total Community Dev/Planning 7,790.00 5,166.03 5,166.03 0.00 2,623.97 66.32
250Page:
389
11/19/2018
CITY OF HERMOSA BEACH
251
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Community Dev/Building4201
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4201-4200 Contract Services
384,669.00 30,291.37 30,291.37 7.874201-4201 Contract Serv/Private 0.00 354,377.63
Total Contract Services 384,669.00 30,291.37 30,291.37 0.00 354,377.63 7.87
4201-4300 Materials/Supplies/Other
1,320.00 46.22 46.22 3.504201-4310 Motor Fuels And Lubes 0.00 1,273.78
1,670.00 30.00 30.00 1.804201-4311 Auto Maintenance 0.00 1,640.00
Total Materials/Supplies/Other 2,990.00 76.22 76.22 0.00 2,913.78 2.55
4201-4900 Depreciation
3,321.00 0.00 0.00 0.004201-4902 Depreciation/Vehicles 0.00 3,321.00
Total Depreciation 3,321.00 0.00 0.00 0.00 3,321.00 0.00
4201-5400 Equipment/Furniture
12,684.00 0.00 0.00 0.004201-5401 Equip-Less Than $1,000 0.00 12,684.00
1,419.00 0.00 0.00 0.004201-5402 Equip-More Than $1,000 0.00 1,419.00
0.00 0.00 0.00 0.004201-5403 Vehicles 0.00 0.00
Total Equipment/Furniture 14,103.00 0.00 0.00 0.00 14,103.00 0.00
Total Community Dev/Building 405,083.00 30,367.59 30,367.59 0.00 374,715.41 7.50
251Page:
390
11/19/2018
CITY OF HERMOSA BEACH
252
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Public Works Administration4202
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4202-4200 Contract Services
1,930.00 2,800.00 2,800.00 145.084202-4201 Contract Serv/Private 0.00 -870.00
0.00 0.00 0.00 0.004202-4251 Contract Services/Gov't 0.00 0.00
Total Contract Services 1,930.00 2,800.00 2,800.00 0.00 -870.00 145.08
4202-4300 Materials/Supplies/Other
200.00 0.00 0.00 0.004202-4310 Motor Fuels And Lubes 0.00 200.00
2,200.00 36.20 36.20 1.654202-4311 Auto Maintenance 0.00 2,163.80
Total Materials/Supplies/Other 2,400.00 36.20 36.20 0.00 2,363.80 1.51
4202-4900 Depreciation
5,050.00 0.00 0.00 0.004202-4901 Depreciation/Mach/Equipment 0.00 5,050.00
344.00 0.00 0.00 0.004202-4902 Depreciation/Vehicles 0.00 344.00
Total Depreciation 5,394.00 0.00 0.00 0.00 5,394.00 0.00
4202-5400 Equipment/Furniture
10,762.00 0.00 0.00 0.004202-5401 Equip-Less Than $1,000 0.00 10,762.00
26,000.00 0.00 0.00 0.004202-5403 Vehicles 0.00 26,000.00
0.00 0.00 0.00 0.004202-5405 Equipment more than $5,000 0.00 0.00
Total Equipment/Furniture 36,762.00 0.00 0.00 0.00 36,762.00 0.00
Total Public Works Administration 46,486.00 2,836.20 2,836.20 0.00 43,649.80 6.10
252Page:
391
11/19/2018
CITY OF HERMOSA BEACH
253
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Building Maintenance4204
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4204-4200 Contract Services
202,494.00 17,191.15 17,191.15 8.494204-4201 Contract Serv/Private 0.00 185,302.85
Total Contract Services 202,494.00 17,191.15 17,191.15 0.00 185,302.85 8.49
4204-4300 Materials/Supplies/Other
2,190.00 228.75 228.75 10.454204-4310 Motor Fuels And Lubes 0.00 1,961.25
500.00 16.34 16.34 3.274204-4311 Auto Maintenance 0.00 483.66
Total Materials/Supplies/Other 2,690.00 245.09 245.09 0.00 2,444.91 9.11
4204-4900 Depreciation
1,348.00 0.00 0.00 0.004204-4901 Depreciation/Mach/Equipment 0.00 1,348.00
7,935.00 0.00 0.00 0.004204-4902 Depreciation/Vehicles 0.00 7,935.00
0.00 0.00 0.00 0.004204-4904 Depreciation/Improvements 0.00 0.00
Total Depreciation 9,283.00 0.00 0.00 0.00 9,283.00 0.00
4204-5400 Equipment/Furniture
0.00 0.00 0.00 0.004204-5401 Equip-Less Than $1,000 0.00 0.00
1,950.00 0.00 0.00 0.004204-5402 Equip-More Than $1,000 0.00 1,950.00
35,000.00 0.00 0.00 0.004204-5403 Vehicles 0.00 35,000.00
25,373.00 0.00 0.00 0.004204-5405 Equipment more than $5,000 0.00 25,373.00
Total Equipment/Furniture 62,323.00 0.00 0.00 0.00 62,323.00 0.00
4204-5600 Buildings/Improvements
0.00 0.00 0.00 0.004204-5602 Imprvmnts Other Than Bldgs 0.00 0.00
Total Buildings/Improvements 0.00 0.00 0.00 0.00 0.00 0.00
Total Building Maintenance 276,790.00 17,436.24 17,436.24 0.00 259,353.76 6.30
253Page:
392
11/19/2018
CITY OF HERMOSA BEACH
254
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Equipment Service4206
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4206-4100 Personal Services
164,432.00 54,518.84 54,518.84 33.164206-4102 Regular Salaries 0.00 109,913.16
6,000.00 833.98 833.98 13.904206-4106 Regular Overtime 0.00 5,166.02
2,343.00 0.00 0.00 0.004206-4111 Accrual Cash In 0.00 2,343.00
0.00 0.00 0.00 0.004206-4112 Part Time/Temporary 0.00 0.00
43,684.00 7,050.88 7,050.88 16.144206-4180 Retirement 0.00 36,633.12
0.00 0.00 0.00 0.004206-4187 Uniform Allowance 0.00 0.00
48,511.00 15,369.08 15,369.08 31.684206-4188 Employee Benefits 0.00 33,141.92
2,392.00 805.78 805.78 33.694206-4189 Medicare Benefits 0.00 1,586.22
13,570.00 4,523.32 4,523.32 33.334206-4190 Other Post Employment Benefits (OPEB) 0.00 9,046.68
Total Personal Services 280,932.00 83,101.88 83,101.88 0.00 197,830.12 29.58
4206-4200 Contract Services
6,259.00 2,496.50 2,496.50 39.894206-4201 Contract Serv/Private 0.00 3,762.50
250.00 0.00 0.00 0.004206-4251 Contract Services/Govt 0.00 250.00
Total Contract Services 6,509.00 2,496.50 2,496.50 0.00 4,012.50 38.35
4206-4300 Materials/Supplies/Other
3,700.00 1,017.11 1,017.11 27.494206-4309 Maintenance Materials 0.00 2,682.89
3,000.00 898.17 898.17 29.944206-4310 Motor Fuels And Lubes 0.00 2,101.83
1,300.00 460.14 460.14 35.404206-4311 Auto Maintenance 0.00 839.86
65,121.00 16,281.00 16,281.00 25.004206-4396 Insurance User Charges 0.00 48,840.00
Total Materials/Supplies/Other 73,121.00 18,656.42 18,656.42 0.00 54,464.58 25.51
4206-4900 Depreciation
394.00 0.00 0.00 0.004206-4901 Depreciation/Mach/Equipment 0.00 394.00
Total Depreciation 394.00 0.00 0.00 0.00 394.00 0.00
4206-5400 Equipment/Furniture
15,737.00 0.00 0.00 0.004206-5402 Equip-More Than $1,000 0.00 15,737.00
Total Equipment/Furniture 15,737.00 0.00 0.00 0.00 15,737.00 0.00
254Page:
393
11/19/2018
CITY OF HERMOSA BEACH
255
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Equipment Service4206
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
Total Equipment Service 376,693.00 104,254.80 104,254.80 0.00 272,438.20 27.68
255Page:
394
11/19/2018
CITY OF HERMOSA BEACH
256
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Community Resources4601
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4601-4200 Contract Services
3,036.00 0.00 0.00 0.004601-4201 Contract Serv/Private 0.00 3,036.00
Total Contract Services 3,036.00 0.00 0.00 0.00 3,036.00 0.00
4601-4300 Materials/Supplies/Other
1,000.00 257.76 257.76 25.784601-4310 Motor Fuels And Lubes 0.00 742.24
500.00 10.00 10.00 2.004601-4311 Auto Maintenance 0.00 490.00
Total Materials/Supplies/Other 1,500.00 267.76 267.76 0.00 1,232.24 17.85
4601-4900 Depreciation
6,934.00 0.00 0.00 0.004601-4901 Depreciation/Mach/Equipment 0.00 6,934.00
0.00 0.00 0.00 0.004601-4902 Depreciation/Vehicles 0.00 0.00
Total Depreciation 6,934.00 0.00 0.00 0.00 6,934.00 0.00
4601-5400 Equipment/Furniture
5,951.00 0.00 0.00 0.004601-5401 Equip-Less Than $1,000 0.00 5,951.00
0.00 0.00 0.00 0.004601-5402 Equip-More Than $1,000 0.00 0.00
0.00 0.00 0.00 0.004601-5403 Vehicles 0.00 0.00
9,460.00 0.00 0.00 0.004601-5405 Equipment more than $5,000 0.00 9,460.00
Total Equipment/Furniture 15,411.00 0.00 0.00 0.00 15,411.00 0.00
Total Community Resources 26,881.00 267.76 267.76 0.00 26,613.24 1.00
256Page:
395
11/19/2018
CITY OF HERMOSA BEACH
257
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Parks6101
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
6101-4300 Materials/Supplies/Other
4,990.00 1,077.96 1,077.96 21.606101-4310 Motor Fuels And Lubes 0.00 3,912.04
1,300.00 0.00 0.00 0.006101-4311 Auto Maintenance 0.00 1,300.00
Total Materials/Supplies/Other 6,290.00 1,077.96 1,077.96 0.00 5,212.04 17.14
6101-4900 Depreciation
7,868.00 0.00 0.00 0.006101-4902 Depreciation/Vehicles 0.00 7,868.00
Total Depreciation 7,868.00 0.00 0.00 0.00 7,868.00 0.00
6101-5400 Equipment/Furniture
35,000.00 0.00 0.00 0.006101-5403 Vehicles 0.00 35,000.00
Total Equipment/Furniture 35,000.00 0.00 0.00 0.00 35,000.00 0.00
Total Parks 49,158.00 1,077.96 1,077.96 0.00 48,080.04 2.19
257Page:
396
11/19/2018
CITY OF HERMOSA BEACH
258
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Fire Department Tower Demolition8632
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8632-4200 Contract Services
0.00 0.00 0.00 0.008632-4201 Contract Serv/Private 0.00 0.00
Total Fire Department Tower Demolition 0.00 0.00 0.00 0.00 0.00 0.00
258Page:
397
11/19/2018
CITY OF HERMOSA BEACH
259
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Citywide Energy Conservation Upgrades8656
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8656-4200 Contract Services
0.00 0.00 0.00 0.008656-4201 Contract Serv/Private 0.00 0.00
Total Citywide Energy Conservation Upgrades 0.00 0.00 0.00 0.00 0.00 0.00
259Page:
398
11/19/2018
CITY OF HERMOSA BEACH
260
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Equipment Replacement Fund715
Council Chambers Improvements8672
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
8672-4200 Contract Services
198,815.00 2,454.25 2,454.25 1.238672-4201 Contract Serv/Private 0.00 196,360.75
Total Council Chambers Improvements 198,815.00 2,454.25 2,454.25 0.00 196,360.75 1.23
Total Equipment Replacement Fund 4,734,572.00 500,432.17 500,432.17 0.00 4,234,139.83 10.57
260Page:
399
11/19/2018
CITY OF HERMOSA BEACH
261
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Gen Fixed Assets Account Group905
Sale Of Fixed Assets1291
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
1291-4300 Materials/Supplies/Other
0.00 0.00 0.00 0.001291-4392 Loss On Sale Of Fixed Assets 0.00 0.00
Total Sale Of Fixed Assets 0.00 0.00 0.00 0.00 0.00 0.00
261Page:
400
11/19/2018
CITY OF HERMOSA BEACH
262
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Gen Fixed Assets Account Group905
Infrastructure Purchases4209
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
4209-9000 Infrastructure
0.00 0.00 0.00 0.004209-9001 Parking Meters - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9002 Monuments - Infrastructure 0.00 0.00
Total Infrastructure 0.00 0.00 0.00 0.00 0.00 0.00
4209-9100 *** Title Not Found ***
0.00 0.00 0.00 0.004209-9101 Roadways, Major - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9102 Roadways, Minor - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9103 Roadways, Residential - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9104 Street Improvements - Infrastructure 0.00 0.00
Total *** Title Not Found *** 0.00 0.00 0.00 0.00 0.00 0.00
4209-9200 *** Title Not Found ***
0.00 0.00 0.00 0.004209-9201 Signage - Infrastructure 0.00 0.00
Total *** Title Not Found *** 0.00 0.00 0.00 0.00 0.00 0.00
4209-9300 *** Title Not Found ***
0.00 0.00 0.00 0.004209-9301 Storm Drains, Concrete - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9302 Storm Drains, Steel - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9303 Manholes & Ctch Bsns, Strm Drn-Infrstr 0.00 0.00
0.00 0.00 0.00 0.004209-9351 Traffic Signals - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9352 Traffic Flash Signals - Infrastructure 0.00 0.00
Total *** Title Not Found *** 0.00 0.00 0.00 0.00 0.00 0.00
4209-9400 *** Title Not Found ***
0.00 0.00 0.00 0.004209-9401 Street Lights - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9451 Sidewalks - Infrastructure 0.00 0.00
Total *** Title Not Found *** 0.00 0.00 0.00 0.00 0.00 0.00
4209-9500 *** Title Not Found ***
262Page:
401
11/19/2018
CITY OF HERMOSA BEACH
263
9:52AM
Page:expstat.rpt Expenditure Status Report
7/1/2018 through 10/31/2018
Periods: 0 through 4
Gen Fixed Assets Account Group905
Infrastructure Purchases4209
Prct
UsedBalance
Year-to-date
Encumbrances
Year-to-date
ExpendituresExpenditures
Adjusted
AppropriationAccount Number
0.00 0.00 0.00 0.004209-9501 Curbing - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9551 Alleys - Infrastructure 0.00 0.00
Total *** Title Not Found *** 0.00 0.00 0.00 0.00 0.00 0.00
4209-9700 *** Title Not Found ***
0.00 0.00 0.00 0.004209-9701 Sewer Pipelines - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9702 Manholes, Sewer - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9703 Sewer Pump Stations - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9704 Sewer Line Improvements - Infrastructure 0.00 0.00
Total *** Title Not Found *** 0.00 0.00 0.00 0.00 0.00 0.00
4209-9900 *** Title Not Found ***
0.00 0.00 0.00 0.004209-9901 Bike Path - Infrastructure 0.00 0.00
0.00 0.00 0.00 0.004209-9902 Bikeway Improvements - Infrastructure 0.00 0.00
Total Gen Fixed Assets Account Group 0.00 0.00 0.00 0.00 0.00 0.00
Grand Total 67,757,940.00 15,903,995.02 15,903,995.02 23.47 0.00 51,853,944.98
263Page:
402
Adjusted Year-to-date Year-to-date
Project Title/Account Number Appropriation Expenditures Expenditures Encumbrances Balance Prct Used
PCH- Aviation Mobility Project (12-143)
001-8143-4201 Contract Serv/Private 94,454.00 - - - 94,454.00 0.00%
115-8143-4201 Contract Serv/Private 34,581.00 - - - 34,581.00 0.00%
145-8143-4201 Contract Serv/Private - - - - - 0.00%
146-8143-4201 Contract Serv/Private - - - - - 0.00%
147-8143-4201 Contract Serv/Private 255,509.00 - - - 255,509.00 0.00%
301-8143-4201 Contract Serv/Private 263,437.00 - - - 263,437.00 0.00%
647,981.00 - - - 647,981.00 0.00%
PCH Traffic Improvements (12-160)
147-8160-4201 Contract Serv/Private 399,922.00 - - - 399,922.00 0.00%
301-8160-4201 Contract Serv/Private - - - - - 0.00%
399,922.00 - - - 399,922.00 0.00%
Beach Drive Green Alley (15-162)
301-8162-4201 187,500.00 - - - 187,500.00 0.00%
187,500.00 - - - 187,500.00 0.00%
Bike Friendly Street Improvements (14-168)
001-8168-4201 Contract Serv/Private - - - - - 0.00%
147-8168-4201 Contract Serv/Private 20,000.00 - - - 20,000.00 0.00%
20,000.00 - - - 20,000.00 0.00%
8th Street- Safe Route to School (14-173)
001-8173-4201 Contract Serv/Private - - - - - 0.00%
115-8173-4201 Contract Serv/Private 325,744.00 - 22,310.75 - 303,433.25 6.85%
122-8173-4201 Contract Serv/Private 67,825.00 - - - 67,825.00 0.00%
150-8173-4201 Contract Serv/Private 354,535.00 - - - 354,535.00 0.00%
301-8173-4201 Contract Serv/Private 308,438.00 - - - 308,438.00 0.00%
1,056,542.00 - 22,310.75 - 1,034,231.25 2.11%
Street Improvements - Various Locations
001-8174-4106 Contract Serv/Private - - - - - 0.00%
001-8174-4112 Contract Serv/Private - - - - - 0.00%
001-8174-4189 Contract Serv/Private - - - - - 0.00%
001-8174-4201 Contract Serv/Private - - - - - 0.00%
115-8174-4201 Contract Serv/Private 144,021.00 - 64,000.00 - 80,021.00 44.44%
122-8174-4201 Contract Serv/Private - - - - - 0.00%
145-8174-4201 Contract Serv/Private 274,892.00 - - - 274,892.00 0.00%
146-8174-4102 Regular Salaries - - 3,130.80 (3,130.80) 0.00%
146-8174-4112 Part Time Temporary - - 100.00 (100.00) 0.00%
146-8174-4201 Contract Serv/Private 799,333.00 6,908.54 123,543.32 - 675,789.68 15.46%
147-8174-4201 Contract Serv/Private 766,885.00 - - - 766,885.00 0.00%
148-8174-4201 Contract Serv/Private 282,875.00 - - - 282,875.00 0.00%
301-8174-4201 Contract Serv/Private - - - - - 0.00%
2,268,006.00 6,908.54 190,774.12 - 2,077,231.88 8.41%
CIP Report by Project
10/31/2018
403
Adjusted Year-to-date Year-to-date
Project Title/Account Number Appropriation Expenditures Expenditures Encumbrances Balance Prct Used
CIP Report by Project
10/31/2018
Street Improvement - 21st between PCH/Ardmore
150-8184-4201 Contract Serv/Private 98,152.00 - - - 98,152.00 0.00%
98,152.00 - - - 98,152.00 0.00%
ADA Improvements - PCH between 2nd & 21st Street (16-185)
150-8185-4201 Contract Serv/Private 287,260.00 - - - 287,260.00 0.00%
287,260.00 - - - 287,260.00 0.00%
Street Improvements - Various Locations (17-186)
001-8186-4201 Contract Serv/Private - - - - - 0.00%
115-8186-4201 Contract Serv/Private 144,995.00 - - - 144,995.00 0.00%
122-8186-4201 Contract Serv/Private - - - - - 0.00%
145-8186-4201 Contract Serv/Private 59,000.00 - - - 59,000.00 0.00%
146-8186-4201 Contract Serv/Private - - - - - 0.00%
147-8186-4201 Contract Serv/Private 89,551.00 - - - 89,551.00 0.00%
148-8186-4201 Contract Serv/Private 221,468.00 - - - 221,468.00 0.00%
301-8186-4201 Contract Serv/Private - - - - - 0.00%
515,014.00 - - - 515,014.00 0.00%
Stamped Concrete Replacement on the Strand (17-187)
301-8187-4201 Contract Serv/Private 140,000.00 - - - 140,000.00 0.00%
140,000.00 - - - 140,000.00 0.00%
Strand Bikeway and Walkway Improv at 35th St (17-188)
147-8188-4201 Contract Serv/Private 115,000.00 115,000.00 0.00%
115,000.00 - - - 115,000.00 0.00%
Sewer Improvements- Various Locations (15-403)
160-8403-4201 Contract Serv/Private 20,377.00 - - - 20,377.00 0.00%
20,377.00 - - - 20,377.00 0.00%
Storm Drain Master Plan
161-8415-4201 Contract Serv/Private 21,827.00 - - - 21,827.00 0.00%
21,827.00 - - - 21,827.00 0.00%
Sewer Improvements - Various Locations (17-416)
160-8416-4201 1,260,000.00 - 90,149.15 - 1,169,850.85 7.15%
1,260,000.00 - 90,149.15 - 1,169,850.85 7.15%
Storm Drain Improv - Various Locations (17-417)
161-8417-4201 645,090.00 - - - 645,090.00 0.00%
645,090.00 - - - 645,090.00 0.00%
Citywide Parks Master Plan (13-538)
001-8538-4201 Contract Serv/Private 42,065.00 - - - 42,065.00 0.00%
125-8538-4102 Regular Salaries 173,410.00 - - - 173,410.00 0.00%
215,475.00 - - - 215,475.00 0.00%
404
Adjusted Year-to-date Year-to-date
Project Title/Account Number Appropriation Expenditures Expenditures Encumbrances Balance Prct Used
CIP Report by Project
10/31/2018
Stormwater/Urban Runoff Diversion Project (16-542)
150-8542-4201 Contract Serv/Private 3,762,387.00 - 6,133.19 - 3,756,253.81 0.16%
301-8542-4201 Contract Serv/Private 421,618.00 - 965.41 - 420,652.59 0.23%
4,184,005.00 - 7,098.60 - 4,176,906.40 0.23%
Feasibility, Greenbelt Path (17-544)
301-8544-4201 Contract Serv/Private 10,000.00 - - - 10,000.00 0.00%
10,000.00 - - - 10,000.00 0.00%
Clark Stadium Bleachers (17-545)
125-8545-4201 Contract Serv/Private 30,000.00 - - - 30,000.00 0.00%
30,000.00 - - - 30,000.00 0.00%
Citywide Park Improvements (17-546)
125-8546-4201 Contract Serv/Private 56,359.00 - 26,118.94 - 30,240.06 46.34%
56,359.00 - 26,118.94 - 30,240.06 46.34%
Downtown Strategic Plan (12-609)
001-8609-4201 Contract Serv/Private 103,610.00 - - - 103,610.00 0.00%
301-8609-4201 Contract Serv/Private 559,055.00 - - - 559,055.00 0.00%
662,665.00 - - - 662,665.00 0.00%
Police Facility Improvements (14-614)
001-8614-4201 Contract Serv/Private 2,972.00 15,077.01 15,979.81 - (13,007.81) 537.68%
301-8614-4201 Contract Serv/Private 95,280.00 - 7,999.75 - 87,280.25 8.40%
98,252.00 15,077.01 23,979.56 - 74,272.44 24.41%
City Yard Renovation (15-615)
001-8615-4201 Contract Serv/Private 56,102.00 112.50 787.50 - 55,314.50 1.40%
301-8615-4201 Contract Serv/Private 173,142.00 - - - 173,142.00 0.00%
229,244.00 112.50 787.50 - 228,456.50 0.34%
Municipal Pier Structural Assessment & Repairs (16-629)
122-8629-4201 Contract Serv/Private 177,380.00 - - - 177,380.00 0.00%
191-8629-4201 Contract Serv/Private 240,000.00 - - - 240,000.00 0.00%
417,380.00 - - - 417,380.00 0.00%
405
Adjusted Year-to-date Year-to-date
Project Title/Account Number Appropriation Expenditures Expenditures Encumbrances Balance Prct Used
CIP Report by Project
10/31/2018
Community Center Gen Improvements (15-650)
001-8650-4201 Contract Serv/Private 261,640.00 425.00 1,250.00 - 260,390.00 0.48%
301-8650-4201 Contract Serv/Private 149,039.00 - 535.32 - 148,503.68 0.36%
410,679.00 425.00 1,785.32 - 408,893.68 0.84%
Municipal Pier Structural Repairs Phase 3 (15-660)
122-8660-4201 Contract Serv/Private 275,473.00 - - - 275,473.00 0.00%
301-8660-4201 Contract Serv/Private 259,711.00 - - - 259,711.00 0.00%
535,184.00 - - - 535,184.00 0.00%
Library Community Needs Assessment (15-668)
150-8668-4201 Contract Serv/Private 42,522.00 - - - 42,522.00 0.00%
42,522.00 - - - 42,522.00 0.00%
City Park Restroom Renovations (15-669)
301-8669-4201 Contract Serv/Private 1,055,994.00 54,312.00 54,312.00 - 1,001,682.00 5.14%
1,055,994.00 54,312.00 54,312.00 - 1,001,682.00 5.14%
Tree Well Grates (15-670)
301-8670-4201 Contract Serv/Private 67,220.00 - - - 67,220.00 0.00%
67,220.00 - - - 67,220.00 0.00%
Council Chambers Improvements (15-672)
001-8672-4201 Contract Serv/Private 106,209.00 - - - 106,209.00 0.00%
715-8672-4201 Contract Serv/Private 198,815.00 - 2,454.25 - 196,360.75 1.23%
305,024.00 - 2,454.25 - 302,569.75 0.80%
Police Dept Substation Facility Improvement
301-8673-4201 Contract Serv/Private 11,227.00 5,636.21 8,456.30 - 2,770.70 75.32%
11,227.00 5,636.21 8,456.30 - 2,770.70 75.32%
Police Dept Substation Facility Improvement
001-8674-4201 Contract Serv/Private 5,755.00 - 902.81 - 4,852.19 15.69%
5,755.00 - 902.81 - 4,852.19 15.69%
Pier Plaza Lamp Post Replacement (16-675)
301-8675-4201 Contract Serv/Private 71,922.00 - - - 71,922.00 0.00%
71,922.00 - - - 71,922.00 0.00%
Electrical Vehicle and Bicycle Transportation (16-682)
150-8682-4201 Contract Serv/Private 162,977.00 1,410.57 1,410.57 - 161,566.43 0.87%
301-8682-4201 Contract Serv/Private 47,186.00 - - - 47,186.00 0.00%
210,163.00 1,410.57 1,410.57 - 208,752.43 0.67%
406
Adjusted Year-to-date Year-to-date
Project Title/Account Number Appropriation Expenditures Expenditures Encumbrances Balance Prct Used
CIP Report by Project
10/31/2018
Bard Street Closure (17-683)
301-8683-4201 Contract Serv/Private 55,000.00 150.00 150.00 - 54,850.00 0.27%
55,000.00 150.00 150.00 - 54,850.00 0.27%
Emergency Operations Center Renovations (17-684)
301-8684-4201 Contract Serv/Private 193,500.00 - - - 193,500.00 0.00%
193,500.00 - - - 193,500.00 0.00%
ADA Improvements - Various Locations (17-687)
140-8687-4201 Contract Serv/Private 150,000.00 - - - 150,000.00 0.00%
150,000.00 - - - 150,000.00 0.00%
Clark Building Renovations (17-689)
301-8689-4201 Contract Serv/Private 423,554.00 - - - 423,554.00 0.00%
423,554.00 - - - 423,554.00 0.00%
ADA Improvements - Various Locations (17-687)
140-8691-4201 Contract Serv/Private 120,000.00 - - - 120,000.00 0.00%
120,000.00 - - - 120,000.00 0.00%
14th Street Beach Restroom Rehab
160 8692-4201 Contract Serv/Private 110,000.00 - - - 110,000.00 0.00%
110,000.00 - - - 110,000.00 0.00%
Grand Total 17,353,795.00 84,031.83 430,689.87 - 16,923,105.13 2.48%
407
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0714
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
CITY TREASURER’S REPORT AND CASH BALANCE REPORT
(City Treasurer Karen Nowicki)
Recommended Action:
City Treasurer recommends that the City Council receive and file the October 2018 City Treasurer’s
Report and Cash Balance Report.
Summary:
Investments in the report meet the requirements of the City of Hermosa Beach’s adopted investment
policy.
Attached is a report of all inactive Public Deposits for the month of October 2018.This is the most
current available investment information.
Attachments:
1.City Treasurer’s Report
2.Cash Balance Report
Respectfully Submitted by: Karen Nowicki, City Treasurer
Noted for Fiscal Impact: Viki Copeland, Finance Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™408
INSTITUTIONS
RATE YELD
DATE OF DATE OF ORIGINAL MARKET COST/MARKET FACE/PAR OF TO
INVESTMENT TYPE/INSTITUTION CUSIP #BOOK VALUE INVESTMENT MATURITY COST VALUE DIFFERENCE VALUE INTEREST MATURITY
POOLED INVESTMENTS
LAIF (Local Agency Investment Fund)44,487.32$ $44,487.32 2.144%
LACPIF (Los Angeles County Pooled Investment Funds)26,029,266.66$ $26,029,266.66 PENDING *
Pooled Investments % of Total Investment 75.171%$26,073,753.98
AGENCIES
Federal Home Loan Mortgage 3137EADK2 $498,245.24 8/1/2014 8/1/2019 $500,000.00 $494,755.00 ($5,245.00)$500,000.00 1.260%1.260%
Agencies % of Total Investment 1.436%$498,245.24
NEGOTIABLE CDS
Sallie Mae Bank 795450UB9 $248,000.00 10/22/2014 10/22/2019 $248,000.00 $245,880.34 ($2,119.66)$248,000.00 2.170%2.170%
American Express Bank 02587CCC2 $247,000.00 10/23/2014 10/23/2019 $247,000.00 $245,003.02 ($1,996.98)$247,000.00 2.220%2.220%
Peoples UTD Bank 71270QLM6 $247,000.00 01/21/2015 01/21/2020 $247,000.00 $243,309.21 ($3,690.79)$247,000.00 1.880%1.880%
Private Bank and Trust 74267GUU9 $248,000.00 01/23/2015 01/23/2020 $248,000.00 $244,428.45 ($3,571.55)$248,000.00 1.930%1.930%
Capital One Bank 140420SH4 $248,000.00 06/17/2015 06/17/2020 $248,000.00 $244,309.61 ($3,690.39)$248,000.00 2.180%2.180%
Discover Bank 254672QE1 $248,000.00 06/17/2015 06/17/2020 $248,000.00 $244,111.40 ($3,888.60)$248,000.00 2.130%2.130%
Capital One Nat'l Assn 14042E5U08 $246,000.00 08/19/2015 08/19/2020 $246,000.00 $243,053.80 ($2,946.20)$246,000.00 2.430%2.430%
Everbank Jacksonville 29976DA59 $245,000.00 08/28/2015 08/28/2020 $245,000.00 $240,495.69 ($4,504.31)$245,000.00 2.090%2.090%
American Express Centurion 02587DF86 $247,000.00 11/04/2015 11/04/2020 $247,000.00 $243,001.38 ($3,998.62)$247,000.00 2.290%2.290%
Synchrony Bank 87164YKW3 $247,000.00 11/20/2015 11/20/2020 $247,000.00 $242,665.54 ($4,334.46)$247,000.00 2.240%2.240%
Comenity Capital Bank 20033ANX0 $249,000.00 01/19/2016 01/19/2021 $249,000.00 $242,607.68 ($6,392.32)$249,000.00 1.950%1.950%
EnerBank USA 29266NX51 $247,000.00 01/28/2016 01/28/2021 $247,000.00 $240,619.29 ($6,380.71)$247,000.00 1.950%1.950%
World Foremost Bank Sydney 981571CQ3 $200,000.00 06/09/2016 06/09/2021 $200,000.00 $192,909.59 ($7,090.41)$200,000.00 1.760%1.760%
Wells Fargo Bank NA Siouxfall 9497485W3 $249,000.00 06/17/2016 06/17/2021 $249,000.00 $240,419.47 ($8,580.53)$249,000.00 1.810%1.810%
First Bank of Puerto Rico 33767AZY09 $248,000.00 08/26/2016 08/26/2021 $248,000.00 $236,777.28 ($11,222.72)$248,000.00 1.520%1.520%
Beneficial Mutual Savings 08173QBR6 $248,000.00 09/12/2016 09/12/2021 $248,000.00 $236,968.42 ($11,031.58)$248,000.00 1.570%1.570%
Countryside Federal Credit Union 22239MAL2 $249,000.00 10/18/2016 10/18/2021 $249,000.00 $238,466.59 ($10,533.41)$249,000.00 1.720%1.720%
Venture Bank 92326XDE8 $249,000.00 12/02/2016 09/02/2021 $249,000.00 $237,974.78 ($11,025.22)$249,000.00 1.570%1.570%
Stearns Bank NA 857894SK6 $242,000.00 01/13/2017 01/13/2022 $242,000.00 $234,021.41 ($7,978.59)$242,000.00 2.120%2.120%
East Boston Savings Bank 27113PBM2 $248,000.00 01/20/2017 01/20/2022 $248,000.00 $239,433.53 ($8,566.47)$248,000.00 2.070%2.070%
Goldman Sachs Bank 38148PKT3 $246,000.00 06/14/2017 06/14/2022 $246,000.00 $239,449.96 ($6,550.04)$246,000.00 2.410%2.410%
Barclays Bank 06740KKD8 $246,407.20 07/22/2017 07/12/2022 $247,000.00 $238,979.45 ($8,020.55)$247,000.00 2.270%2.270%
Marlin Business Bank 57116APQ5 $249,000.00 08/22/2017 08/23/2022 $249,000.00 $239,271.47 ($9,728.53)$249,000.00 2.130%2.130%
Merrick Bank South Jordan 59013JC49 $249,000.00 10/19/2017 10/20/2022 $249,000.00 $239,343.16 ($9,656.84)$249,000.00 2.180%2.180%
Northfield Bank 66612ABX5 $247,000.00 10/24/2017 10/25/2022 $247,000.00 $237,912.86 ($9,087.14)$247,000.00 2.230%2.230%
Morgan Stanley Bank 61747MH95 $249,000.00 02/01/2018 02/01/2023 $249,000.00 $241,272.50 ($7,727.50)$249,000.00 2.700%2.700%
Allegiance Bank 01748DBA3 $246,000.00 02/07/2018 02/07/2023 $246,000.00 $243,678.41 ($2,321.59)$246,000.00 2.660%2.660%
CitiBank NA 17312QN39 $245,000.00 06/15/2018 06/15/2023 $245,000.00 $246,261.09 $1,261.09 $245,000.00 3.230%3.230%
BMW Bank North America 05580AMX9 $245,000.00 06/15/2018 06/15/2023 $245,000.00 $246,261.09 $1,261.09 $245,000.00 3.230%3.230%
Industrial & Commercial Bank of China 45581EAX9 $249,000.00 08/17/2018 06/30/2023 $249,000.00 $250,858.97 $1,858.97 $249,000.00 3.280%3.280%
Bank Midwest Spirit Lake 063615BM9 $244,398.04 09/17/2018 09/15/2023 $245,000.00 $244,643.80 ($356.20)$245,000.00 3.100%3.100%
UBS Bank 90348JEJ5 $249,000.00 10/17/2018 10/17/2023 $249,000.00 $251,524.17 $2,524.17 $249,000.00 3.320%3.320%
Spring Bank 849430AY9 $249,000.00 10/24/2018 10/24/2023 $249,000.00 $250,371.10 $1,371.10 $249,000.00 3.230%3.230%
Negotiable CD % of Total Investment 23.392%$8,113,805.24
TOTAL ALL INVESTMENTS 34,685,804.46$ $8,615,000.00 $8,441,039.51 ($173,960.49)$34,688,753.98
Average Rate of Interest 2.256%
Average Yield to Maturity 2.260%
In compliance with the California Code Section 53646, the Treasurer of the City of Hermosa Beach hereby certifies that sufficient
investment liquidity and anticipated revenues are available to meet the City's budgeted expenditure requirements for the next six months.
Investments in the report meet the requirements of the City of Hermosa Beach's adopted investment policy.
*Rate will be published the first week of December
APPROVED: KAREN NOWICKI, CITY TREASURER
TREASURER'S REPORT
OCTOBER 2018
409
GENERAL ACCOUNT
FUND 9/30/2018 10/31/2018
NUMBER FUND NAME BALANCE CASH ADJUSTMENTS CHECKS ADJUSTMENTS BALANCE
001 GENERAL $3,839,120.33 $2,063,877.52 $223,672.09 ($1,077,164.57)($177,035.00)$4,872,470.37
105 LIGHTING/LANDSCAPING ($19,655.65)($13,137.55)($27,704.31)(1,172.19)($61,669.70)
115 STATE GAS TAX $190,575.35 $67,737.58 $30,216.43 $288,529.36
117 AB939 $52,638.98 $3,622.85 ($981.08)(108.48)$55,172.27
121 PROP A OPEN SPACE ($11,767.70)$6,628.70 ($5,139.00)
122 TYCO $1,053,911.90 $40,919.79 $41,466.69 $1,136,298.38
125 PARK REC FAC TAX $245,490.61 $55,494.00 ($1,592.45)$299,392.16
135 BAYVIEW DRIVE DISTRICT ADMIN EXPENSE $1,739.99 $1.98 (355.71)$1,386.26
136 LOWER PIER DISTRICT ADMIN EXPENSE ($1,672.76)$1,111.76 ($561.00)
137 MYRTLE DRIVE DISTRICT ADMIN EXPENSE $6,312.40 $5.31 ($2,606.97)$3,710.74
138 LOMA DRIVE DISTRICT ADMIN EXPENSE $15,671.72 $18.44 ($2,684.27)$13,005.89
139 BEACH DRIVE ASSESSMENT ADMIN EXPENSE $2,217.31 $2.67 ($340.53)$1,879.45
140 COMMUNITY DEVELOPMENT BLOCK GRANT $0.00 $0.00
145 PROPOSITION A $1,454,528.21 $38,606.01 $2,092.04 ($7,709.15)$1,487,517.11
146 PROPOSITION C $1,140,191.20 $31,577.86 $1,660.23 ($6,908.54)$1,166,520.75
147 MEASURE R $1,061,435.89 $23,756.70 $1,542.11 $1,086,734.70
148 MEASURE M $282,122.72 $26,763.41 $437.80 $309,323.93
150 GRANTS $979,417.73 ($2,175.97)$977,241.76
152 AIR QUALITY MANAGEMENT DISTRICT $5,259.84 ($358.12)(24.07)$4,877.65
153 SUPPLEMENTAL LAW ENFORCEMENT SERVICES $180,039.82 $68,028.91 $351.87 ($799.64)$247,620.96
160 SEWER MAINTENANCE $5,911,759.25 $7,342.00 $258.86 ($971.15)(913.38)$5,917,475.58
161 STORM DRAIN FUND $979,131.84 ($33,569.50)($7,408.72)(924.78)$937,228.84
170 ASSET SEIZURE $529,323.07 $752.93 $530,076.00
180 FIRE PROTECTION $67,263.49 $2,101.60 $99.04 $69,464.13
190 RTI UNDERSEA CABLE $332,047.69 $472.37 $332,520.06
191 RTI TIDELANDS $241,489.19 $343.52 $241,832.71
201 2015 LEASE REVENUE BONDS $0.00 $0.00
301 CAPITAL IMPROVEMENT $7,358,384.31 ($4,722.85)($59,584.29)$7,294,077.17
302 ARTESIA BLVD RELINQUISHMENT FUND $9.27 ($9.27)$0.00
609 BAYVIEW DRIVE DISTRICT REDEMPTION $84,668.75 $120.20 $84,788.95
610 LOWER PIER DISTRICT REDEMPTION $2,973.65 $4.21 $2,977.86
611 BEACH DRIVE DISTRICT REDEMPTION $41,966.71 $59.61 $42,026.32
612 BEACH DRIVE DISTRICT RESERVE $4,367.82 $6.18 $4,374.00
617 MYRTLE DRIVE DISTRICT REDEMPTION $35,055.24 $50.46 $35,105.70
618 LOMA DRIVE DISTRICT REDEMPTION $70,970.56 $101.27 $71,071.83
619 BAYVIEW DRIVE DISTRICT RESERVE $14,341.73 $20.27 $14,362.00
705 INSURANCE $7,676,624.57 ($1,417,217.69)(43,680.82)(1,015.16)$6,214,710.90
715 EQUIPMENT REPLACEMENT $6,092,157.63 $23,960.95 ($51,156.89)($177,938.11)($2,018.52)$5,885,005.06
TOTAL GENERAL ACCOUNT $39,920,112.66 $2,453,789.18 ($1,211,248.36)($1,418,032.75)($183,211.58)$39,561,409.15
TRUST BALANCE BALANCE
ACCOUNTS 9/30/2018 DEPOSITS CHARGES 10/31/2018
PAYROLL $116,943.05 $1,233,918.53 ($1,306,564.15)$44,297.43
CABLE TV DEPOSIT $16,603.81 $16,603.81
$133,546.86 $1,233,918.53 ($1,306,564.15)$60,901.24
TOTAL ALL ACCOUNTS $39,622,310.39
BANK BALANCES
INVESTMENTS GENERAL $5,340,407.62
$34,685,804.46 TRUST ACCOUNTS $103,644.59
$5,444,052.21
OUTSTANDING CHECKS ($507,546.28)
INTEREST COLLECTED $4,936,505.93
TO DATE FOR FY 18/19 INVESTMENTS $34,685,804.46
$176,130.98 BALANCE $39,622,310.39
APPROVED : KAREN NOWICKI, CITY TREASURER
CASH BALANCE REPORT
OCTOBER 2018
410
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0709
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
PROJECT STATUS REPORT AS OF OCTOBER 31, 2018
(Public Works Director Glen W.C. Kau)
Recommended Action:
Staff recommends that the City Council receive and file the Project Status Report as of October 31,
2018.
Attachments:
Project Status Report as of October 31, 2018
Respectfully Submitted by: Glen W.C. Kau, P.E., Public Works Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™411
11-27-18 CIP Status ReportFY 2018-19 CAPITAL IMPROVEMENT PROGRAMCity of Hermosa Beach Public WorksCIP No.PROJECT NAMEProject Budget PM Start Date Finish Date (est)StatusNote:Blue Shaded Areas Indicate UpdatesSTREET & HIGHWAY IMPROVEMENTS12-143 PCH Mobility Improvement Project (Previously named "PCH/Aviation Mobility Improvements")598,840$ gkProp A & C funds transferred to CIP 16-174 Annual Street Improvements for Hermosa Avenue resurface. Staff has reviewed and coordinated to request funds for the installation of new, landscaped center medians between along PCH between Artesia Blvd and Pier Ave. The center medians will provide for safer turning movements in order to reduce/eliminate left turn conflicts along the segment of PCH. Increasing the safety aspects reduces the potential for accidents and minimizes delays incurred on PCH. A request was submitted to SBCCOG/Metro for review/approval & funding. If approved, funding would be available in FY19-20.Project fund request submitted to SBCCOG10/24/1812-160 PCH Traffic Improvements294,000$ hbCaltrans is reviewing project materials, information & shop drawings. Addt'l funding ($76,734) requested from Metro was approved 10-25-18. Shop drawings were submitted to Caltrans material lab for review/approval prior to construction start. Construction start pending completion of Caltrans review.Design Phase (estimated completion date)06/16/1410/26/17Permit Phase - Caltrans10/26/1712/05/17Bid Phase12/05/1703/26/18Addttional funding requested ($76,734) from Metro was approved.09/18/1810/25/18Construction Phase (est)01/21/1904/01/1915-162 Green Alley and Beach Quality Improvement Project (Previously named "Beach Drive Green Alley")187,500$ 14-168 Bike Friendly Street Improvements (Previously named "Valley Drive Sharrows", "Bike Friendly Routes on 22nd St./Monterey Blvd. & Longfellow Ave.)20,000$ 14-173 8th Street SR2S Improvements. The project improvements will include for creating a 48" wide sidewalk, contiguous walking path, upgraded access ramps, and peripheral upgrades between Hermosa Avenue & Valley Drive.1,065,206$ Staff review of 90% plans complete; comments returned to consultant to update. Follow-up letter being prepared for significantly impacted residents and for private properties that require on-site transition work to accommodate walk path improvements. Project field review for interested residents estimated for December 5, 2018. Invite letter to be sent out estimate week of 11-19-18.Preliminary Engineering/Design Alternatives12/01/1409/04/15Design Phase (60%)11/17/1507/28/16Council Update11/10/1611/10/16Council Update10/10/1710/10/17Council Update01/13/1801/13/18Final Design Plans - in progress04/15/1812/17/18Council Update11/13/1811/13/18Solicit construction bids - (est)02/01/19TBDBid and Award - (est)03/01/19TBDConstruction Phase and Approval - (est)04/15/19TBD16-174 Annual Street Improvements - Various Locations. This project includes for annual slurry seal of City streets to maintain the pavement condition. The selected streets will be as recommended by on the current Pavement Management Plan. 948,459$ gk/lrThis year's annual street project includes pavement resurfacing Manhattan/Highland Avenue (35th St to Longfellow Ave, completed) and Hermosa Avenue (10th to 26th Streets). 34 access ramps have been upgraded. 27th St at Morningside Drive patch work (completed 10/15/18).Design phase - complete03/01/1805/14/18Construction phase - in progress09/17/1801/17/1911-14-18_11-27-18 CC Mtg FY2018-19 - CIP Status for Council1 of 511/19/2018This project is scheduled for further review in mid 2019 to further develop and refine a work scope.Monterey Blvd, 22nd St and Longfellow Ave have been implemented. Preliminary analysis for new segments has been completed for feasibility purposes. 412
11-27-18 CIP Status ReportFY 2018-19 CAPITAL IMPROVEMENT PROGRAMCity of Hermosa Beach Public WorksCIP No.PROJECT NAMEProject Budget PM Start Date Finish Date (est)StatusNote:Blue Shaded Areas Indicate Updates17-186 Annual Street Improvements - Various Locations. This project includes for annual slurry seal of City streets to maintain the pavement condition. The selected streets will be as recommended by on the current Pavement Management Plan. 1,340,000$ Design services to be solicited for via on-call consultants in mid-January 2019 (est). The identified streets will be the streets that have sewer improvements that are currently under design and will be under construction in FY 19-20.Design - solicit for design services via on-call (est early 2019)1/15/2019TBDDesign phase - (est Spring 2019)TBDConstruction phase - (est FY 19-20)TBD17-187 Stamped Concrete Replacement on the Strand140,000$ gk/lrThis project is combined with CIP# 16-174 Street Improvements - Hermosa Ave resurfacing.17-188 Strand Bikeway and Walkway Improvements at 35th Street115,000$ Preparing RFP to acquire design services. Estimate RFP solicitation late December 2018/early January 2019.Prepare RFP to acquire design services.11/13/1812/17/1816-184 Pacific Coast Highway Sidewalk Improvements98,152$ Caltrans approved additional funding request. Caltrans reviewing material submittals and shop drawings. Construction start pending Caltrans review. CIP 16-184 and CIP 16-185 are combined into one project. NOTE: This project was re-appropriated due to unanticipated time length of Caltrans review and has caused delay of estimated construction time, which was estimated to complete in FY17-18.Design - complete12/08/16 12/04/17Bid - complete02/01/18 03/15/18Award - complete07/24/18 07/24/18Construction - pending Caltrans review TBD16-185ADA Improvements onPCH between 2nd Street and 21st Stre286,756$ Caltrans approved additional funding request. Caltrans reviewing material submittals and shop drawings. Construction start pending Caltrans review. CIP 16-184 and CIP 16-185 are combined into one project. NOTE: This project was re-appropriated due to unanticipated time length of Caltrans review and has caused delay of estimated construction time, which was estimated to complete in FY17-18.Design - complete12/08/16 12/04/17Bid - complete02/01/18 03/15/18Award - complete07/24/18 07/24/18Construction - pending Caltrans review TBDSTREET & HIGHWAY IMPROVEMENTS TOTAL:5,093,913$ SEWER/STORM DRAIN IMPROVEMENTS17-416 Annual Sewer Improvements - Various Locations. This project includes design and construction of sewer improvements and repairs based on new Sewer Master Plan. Design will include improvements for multiple fiscal years.1,260,000$ lrPh.1 complete and constructed. Ph. 2 within residential areas in design at 90%. Estimate 90% design review in November 2018. Locations as per 2017 Sanitary Sewer Master Plan.Design - 90% complete4/2/201811/5/201817-417 Annual Storm Drain Improvements - Various Locations645,090$ Reviewing Storm Drain Master Plan data to identify priority projects and prepare designs for construction. (In progress)SEWER/STORM DRAIN IMPROVEMENTS TOTAL:1,905,090$ 11-14-18_11-27-18 CC Mtg FY2018-19 - CIP Status for Council2 of 511/19/2018413
11-27-18 CIP Status ReportFY 2018-19 CAPITAL IMPROVEMENT PROGRAMCity of Hermosa Beach Public WorksCIP No.PROJECT NAMEProject Budget PM Start Date Finish Date (est)StatusNote:Blue Shaded Areas Indicate UpdatesPARK IMPROVEMENTS13-538 Citywide Park Master Plan219,750$ ls/koRFP currently on hold to allow for coordination with LA County Parks Measure A funding and allocation plan criteria.16-542 Stormwater/Urban Run-Off Diversion Project on Greenbelt4,218,763$ Input received from public meetings has determined proposed locations (Greenbelt and South Park) as undesirable. Subcommittee formed to discuss with Redondo Beach potential to locate project within Redondo Beach jurisdiction.Funding Phase04/18/1612/31/17Design10/01/17TBDConstructionTBDTBD17-544 Feasibility, Greenbelt Path10,000$ 17-545 Clark Stadium Bleachers. This project will upgrade ADA access into the field seating.30,000$ This project has not yet been initiated. Initial information will be provided later as it becomes available.Requires field review to determine what upgrades are needed.PARK IMPROVEMENTS TOTAL:4,478,513$ PUBLIC BUILDING & GROUND IMPROVEMENTS12-609 Downtown Strategic Plan Implementation. This project (Phase 1) will provide for improved lighting, safety and cleanliness at Parking Lots A & B, Beach Drive between 11th and 13th Streets and Pier Plaza.673,000$ The "Phased" approach for the proposed lighting improvements was presented and approved by Subcommittee to proceed. Phase 1 will address the lighting & safety components for Parking Lots A & B, Beach Drive between 11th and 13th Streets, and Pier Plaza. Light fixture style and light posts willbe presentyed to Subcommittee for selection. Design services for upgraded electrical supply into Plaza needed. This project will include CIP 15-675 Pier Plaza Light post replacement.14-614 Police Facilities Improvements45,404$ Install police lock system improvements in progress (complete). Coordinating with PD for systematic rollout of new system. Renovate kitchen & booking area (90%). Painting & flooring (80%).15-615 New Corporate Yard Facility - (Note: $2,156,000 has been reserved for construction and contingency in the Capital Improvement Fund for this project.)211,715$ ef/kmKick-off mtg in 06-2018. Reviewing HHR complete and implementing remediation plan into project design documents. LA County Environmental Health will be oversight agency for remediation. Staff & consultant did site review towards design efforts. Consultant finalizing administration design. LA County reviewing project for soil disturbance remediation efforts.Review existing plans of City Yard10/15/1507/20/16Contract Award - Mitigation Report06/22/1604/12/17Mitigation Report Preparation 05/01/1710/30/17RFP for Design08/01/1710/30/17Design consultant proposal review and selection10/31/1712/15/17HHR review completed.06/15/18TBD16-629 Municipal Pier Structural Assessment and Repairs415,000$ fmPlans and specs 95% complete. Specs being modified for construction mitigation measures. Reviewing for preparation of application for Coastal Commission permit to be combined effort with CIP 15-650 Pier Electrical Repairs project.Contracting of pervious Consultant to Conduct Pier Assessment 02/01/1703/01/17Preparation of RFP 03/01/1705/18/17Advertise RFP Assessment, Design, and Construction Support05/18/1706/15/17Award RFP 06/15/1708/22/17Pier Assessment/Inspection 09/25/1710/30/17Design 10/20/1711/26/18Coastal Commission Application preparationTBDTBDConstructionTBDTBD11-14-18_11-27-18 CC Mtg FY2018-19 - CIP Status for Council3 of 511/19/2018414
11-27-18 CIP Status ReportFY 2018-19 CAPITAL IMPROVEMENT PROGRAMCity of Hermosa Beach Public WorksCIP No.PROJECT NAMEProject Budget PM Start Date Finish Date (est)StatusNote:Blue Shaded Areas Indicate Updates15-650 Community Center General Improvements - Phase III. Description: On-going improvements to the Community Center including, repainting windows, doors and interior & exterior surface of the building.418,031$ efExterior wall repairs, concrete and rebar repairs, pressure washing of exterior walls and preparation of windows initiated.Preliminary Phase12/01/1608/30/17Public Works Commission 05/17/1705/17/17Bid Phase -Design01/02/1801/31/18Contract award09/25/1809/25/18Construction Phase11/13/1802/27/1915-660 Municipal Pier Electrical Repairs541,202$ hbDesign complete. Design review 100% complete. Specs being modified for construction mitigation measures. Reviewing for preparation of application for Coastal Commission permit to be combined effort with CIP 16-629 Pier Structural Assessment project.RFP Phase03/17/1706/30/17Consultant selection06/30/1708/21/17Design - 100% draft complete09/28/1710/01/18Coastal Commission Application preparationTBDTBDConstructionTBDTBD15-669 City Park Restroom Renovations (Previously named 'Fort Lots-O-Fun and Seaview Parkette Restrooms'; combined with 'South Park Restroom Renovations', and 'Clark Field Restroom Improvements')1,081,122$ ef/kmDesign complete. Construction documents being reviewed. Coastal commission application submitted.15-670 Installation of Grates in Tree Wells on Pier Plaza131,748$ ef/kmInstallation is complete. Staff has solicited quotes for installing tree grates for trees on Hermosa Avenue between 10th & 14th Streets.15-672 Council Chamber Improvements. Replacement of audio/visual equipment in the Council Chambers.305,024$ hbDesign completed. Need to review specs for current tech upgrades available. Project documents under review to prepare and finalize Bid Package for advertising. Solicit project bids for supply and installation estimate February 2019.Design - complete04/25/1709/30/17Bid specs review11/13/1801/07/19Solicit for bidsTBDTBDConstructionTBDTBD15-675 Pier Plaza Lamp Post Replacement71,922$ This project to be combined as part of CIP 12-609 Downtown Strategic Plan Implementation.16-682 Lot D Electrical Vehicle and Bicycle Transportation Infrastructure Expansion401,000$ km/rs90% project documents to be presented to Pub Works Comm in November 2018. Item presented to City Council.17-684 Emergency Operations Center Renovations193,500$ 17-687 ADA Improvements at Various Locations. Improvements and relocation of sidewalks, curb ramps and obstructions in highly traversed areas within the City in order to follow the Americans with Disabilities Act (ADA) and meet the latest Federal Standards. 150,000$ fmStaff has revised project docs. In discussions with Community Development Commission of LA County (LACDC), staff requested to combine this project with CIP 18-692 ADA Improvement at Various Locations to create a more competitive bid package. LACDC approved the project combination and requested that Labor Compliance services be acquired for the project. Solicited & received RFP for labor compliance services; under review. Estimate to solicit for construction bids mid February 2019. Locations are:6th St @ Prospect Ave, NW, SW; 4th St @ Prospect Ave., NW, SW; Gentry Ave @ Prospect Ave, NW, SW; Hollowell Ave. @ Prospect Ave., NW, NE, Southwest. (If project budget allows)Design - in house, complete12/15/2017 3/20/2018Solicit construction bids - complete5/1/20186/15/2018Rejected bids - single bid received8/26/20188/26/2018Develop & solicit RFP for Labor Compliance services9/15/201810/30/2018ConstructionTBDTBD11-14-18_11-27-18 CC Mtg FY2018-19 - CIP Status for Council4 of 511/19/2018415
11-27-18 CIP Status ReportFY 2018-19 CAPITAL IMPROVEMENT PROGRAMCity of Hermosa Beach Public WorksCIP No.PROJECT NAMEProject Budget PM Start Date Finish Date (est)StatusNote:Blue Shaded Areas Indicate Updates17-689 Clark Building Renovations. Remodel of kitchen and Restrooms at Clark Building423,554$ gk/ef/lzEquipment layout/schedule to be presented to Pub Works Comm meeting in November 2018. Public Works Field staff have upgraded the plumbing, building electrical (80%), installed & relocated a new water heater, coordinating for installation of new area drains. Project requires upgraded electrical supply for building; staff discussing details with SCE.RFP- Architectural Programming and Schematic Design09/14/1711/30/17Architectural Programming and Schematic Design 12/14/1701/15/18Design - 95%7/15/20182/1/2019ConstructionTBDTBD18-691 ADA Improvements at Various Locations. Improvements and relocation of sidewalks, curb ramps and obstructions in highly traversed areas within the City in order to follow the Americans with Disabilities Act (ADA) and meet the latest Federal Standards. 120,000$ fmStaff has revised project docs. In discussions with Community Development Commission of LA County (LACDC), staff requested to combine this project with CIP 18-692 ADA Improvement at Various Locations to create a more competitive bid package. LACDC approved the project combination and requested that Labor Compliance services be acquired for the project. Solicited & received RFP for labor compliance services; under review. Estimate to solicit for construction bids mid February 2019. Locations are:6th St @ Prospect Ave, NW, SW; 4th St @ Prospect Ave., NW, SW; Gentry Ave @ Prospect Ave, NW, SW; Hollowell Ave. @ Prospect Ave., NW, NE, Southwest. (If project budget allows)Design - in house, complete12/15/2017 3/20/2018Solicit construction bids - complete5/1/20186/15/2018Develop & solicit RFP for Labor Compliance services9/15/201810/20/2018ConstructionTBDTBD18-692 14th Street Beach Restroom Rehabilitation - Phase 1. Project will rehabilitate restroom in 2 phases. 1st Phase will rehab wastewater handling (sewage lift station). 2nd phase will rehab restroom facility.110,000$ gk/efField review1/15/20191/30/2019Design & develop construction documents2/11/20193/28/2019Solicit consctruction bidsTBDTBDConstructionPUBLIC BUILDING & GROUND IMPROVEMENTS TOTAL:5,292,222$ GRAND TOTAL:16,769,738$ 11-14-18_11-27-18 CC Mtg FY2018-19 - CIP Status for Council5 of 511/19/2018Staff will need to meet with designer to discuss immediate sewer issue that effects overall phashing of the project. This is projected to occur in mid 2019.416
From: noreply@granicusideas.com <noreply@granicusideas.com>
Sent: Monday, November 26, 2018 2:00 PM
To: Ann Yang <anny@hermosabch.org>
Subject: New eComment for City Council Meeting (Closed Session - 6:00 P.M. and Regular Meeting -
7:00 P.M.)
New eComment for City Council Meeting (Closed
Session - 6:00 P.M. and Regular Meeting - 7:00
P.M.)
Claudia Berman submitted a new eComment.
Meeting: City Council Meeting (Closed Session - 6:00 P.M. and Regular Meeting - 7:00 P.M.)
Item: 2e) REPORT 18-0709 PROJECT STATUS REPORT AS OF OCTOBER 31, 2018 (Public
Works Director Glen W.C. Kau)
eComment: Thank you for the new format for the CIP status report. It is MUCH easier to read
and understand the updates.
View and Analyze eComments
417
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0728
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
PLANNING COMMISSION TENTATIVE FUTURE AGENDA ITEMS
(Community Development Director Ken Robertson)
Recommended Action:
Staff recommends that the City Council receive and file the December 10, 2018 Planning
Commission tentative future agenda item(s).
Attachments:
Planning Commission December 10, 2018 - Tentative Future Agenda
Respectfully submitted by: Ken Robertson, Community Development Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™418
Tentative Future Agenda
PLANNING COMMISSION
City of Hermosa Beach
December 10, 2018
Regular Meeting
7:00 P.M.
Project Title Public
Notice
Meeting
Date
320 Massey Street, Our Lady of Guadalupe—Conditional Use Permit,
Precise Development Plan and Parking Plan Amendment to add science
and music rooms and administrative offices. 11/8 12/10
f:\b95\cd\pc\future items\tent. future agendas\planning commission tentative agenda 11-20-18
419
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0730
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
ACTION SHEET OF THE PLANNING COMMISSION
MEETING OF NOVEMBER 20, 2018
Recommended Action:
Staff recommends that the City Council receive and file the action sheet of the Planning Commission
meeting of November 20, 2018.
Attachments:
Action Sheet of November 20, 2018
Approved:Ken Robertson, Community Development Director
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™420
City Hall
City of Hermosa Beach 1315 Valley Drive
Hermosa Beach, CA
90254
Action Minutes - Draft
Planning Commission
Chair
Marie Rice
Vice Chair
David Pedersen
Commissioners
Peter Hoffman
Michael Flaherty
Rob Saemann
Council Chambers
Tuesday, November 20, 2018 7:00 PM 1. Call to Order 2. Pledge of Allegiance 3. Roll Call
Present 5 - Commissioner Michael Flaherty, Commissioner Peter Hoffman, Vice Chair David
Pedersen, Chairperson Marie Rice, and Commissioner Rob Saemann
Absent 0
Also Present: Ken Robertson, Community Development Director
Lauren Langer, Assistant City Attorney
Kim Chafin, Planning Manager
Nicole Ellis, Associate Planner 4. Oral / Written Communications Section I 5. CONSENT CALENDAR
a. REPORT Approval of the October 1 and October 16, 2018 Planning Commission
18-0697 Action Minutes
Attachments: 1. October 1, 2018 Planning Commission action minutes
2. October 16, 2018 Planning Commission action minutes
ACTION: Motion by Commissioner Hoffman and seconded by Commissioner
Flaherty to approve the Planning Commission action minutes of the October 1,
421
2018 special meeting as amended. The motion carried by a unanimous vote.
ACTION: Motion by Commissioner Hoffman and seconded by Commissioner
Saemann to approve the 11/20/18 version of the Planning Commission action
minutes of the October 16, 2018 meeting. The motion carried by a unanimous
vote. 6. Resolution(s) for Consideration - None
7. REPORT Information Only: Public Hearing Notices and Projects Zoning Map
18-0705
Attachments: 1. Public Notices
2. Projects Zoning Map Section II PUBLIC HEARING
8. REPORT CON 18-7, PDP 18-10, VTPM #82330 -- Conditional Use Permit, Precise
18-0693 Development Plan and Vesting Tentative Parcel Map No. 82330 for a
two-unit condominium project at 222-220 27th Street, and determination
that the project is categorically exempt from the California Environment al
Quality Act (CEQA).
Attachments: 1. Draft Resolution
2. Poster Verification
3. Radius Map
4. Application Submittal
5. Site Photographs
Coming forward to speak: Joseph Fournier
ACTION: Motion by Commissioner Hoffman and seconded by Commissioner
Flaherty to adopt the attached resolution approving the Conditional Use Permit,
Precise Development Plan, and Vesting Tentative Parcel Map #82330 for a
two-unit detached condominium project at 222-220 27th Street, subject to
conditions, and determine the project is Categorically Exempt from the California
Environmental Quality Act (CEQA).
The motion carried by the following vote:
Ayes: Commissioners Hoffman, Saemann, Flaherty and Pedersen
Noes: none
Abstain: none
Absent: none
Recuse: Chairperson Rice
This final action is subject to potential review by the City Council pursuant to Chapter 2.52 of the Municipal
Code*, or may be appealed to the City Council by any party if filed by December 10, 2018.
422
9. REPORT CUP 18-5, PDP 18-12, PARK 18-3 - Conditional Use Permit Amendment
18-0702 18-5, Precise Development Plan 18-12 and Parking Plan Amendment
18-3 to allow a 7,415 gross square foot addition (including a 5,593
square foot building addition and a 1,822 square foot exterior covered
area) remodel and parking lot modifications in conjunction with Our Lady
of Guadalupe Catholic church and school to include two classrooms
(music and science) and administrative and faculty space with no
increase tostudent enrollment or faculty at an existing 20,565 square foot
building for a total of 24,655 gross square foot building located at 320
Massey Street.
Coming forward to speak: Pamilla Beeson
ACTION: Motion by Commissioner Pedersen and seconded by Commissioner
Saemann to continue to December 10, 2018 the public hearing to con sider the
request approval of Conditional Use Permit Amendment 18-5, Precise
Development Plan 18-12 and Parking Plan Amendment 18-3 to allow a 7,415
gross square foot addition (including a 5,593 square foot building addition and a
1,822 square foot exterior covered area) remodel and parking lot modifications in
conjunction with Our Lady of Guadalupe Catholic church and school to include
two classrooms (music and science) and administrative and faculty space with no
increase to student enrollment or faculty at an existing 20,565 square foot
building for a total of 24,655 gross square foot building located at 320 Massey
Street.
The motion carried by a unanimous vote. Section III HEARING
10. REPORT TRI-ANNUAL REPORT FOR ON-SALE ALCOHOLIC BEVERAGE
18-0694 CONDITIONAL USE PERMITS
Attachments: 1. Process and Standards, updated 2017
2. Police/ABC Report for this period
3. Police Statistics for this period
4. Police Statistics for this period
5. LACoFD Business License inspection report
6. Code Enforcement Data March 1, 2018 to August 31, 2018
7. Code Enforcement Data November 1, 2017 April, 2018
8. Supplemental-Training Summaries, added on 11/15 @ 10am
ACTION: Motion by Commissioner Hoffman and seconded by Commissioner
Flaherty to receive and file the report, noting that no establishments are
recommended for further review. The motion carried by a unanimous vote.
Section IV 11. Staff Items
423
a. REPORT Verbal Report on City Council Actions
18-0695
b. REPORT Verbal Report on Major Planning Projects
18-0696
c. REPORT December 10, 2018 Planning Commission Tentative Future Agenda Items
18-0703
Attachments: Planning Commission Tentative Agenda for 12-10-18
ACTION: Motion by Commissioner Pedersen and seconded by Commissioner
Hoffman to receive and file the December 10, 2018 Planning Commission
tentative future agenda items. The motion carried by a unanimous vote.
d. REPORT Community Development Department Activity Report of September, 2018
18-0698
Attachments: 1. September Activity Report
ACTION: Motion by Commissioner Saemann and seconded by Commissioner
Hoffman to receive and file the September, 2018 Community Development
Department activity report. The motion carried by a unanimous vote. 12. Commissioner Items
Put item on next agenda for discussion regarding donating mature trees that are
being removed from properties. 13. Adjournment
ACTION: Motion by Commissioner Saemann and seconded by Commissioner
Hoffman to adjourn to the December 10, 2018 meeting. The motion carried by a
unanimous vote. The meeting was adjourned at 8:15pm by Chairperson Rice.
*Chapter 2.52, Section 2.52.040 of the Municipal Code provides for Council review and reconsideration of any
decision of the Planning Commission by two affirmative votes at the next regularly scheduled City Council
meeting. In the event the Council initiates a review, the review will be placed on a future agenda of City Council
within a reasonable time period, and the Commission’s decision is stayed pending Council’s review and final
decision.
424
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0719
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
AWARD OF ASSESSMENT ENGINEER SERVICES FOR
UNDERGROUND UTILITIES ASSESSMENT DISTRICT ON
HERMOSA AVE FROM 27TH STREET TO NORTH OF
34TH STREET (GREENWICH VILLAGE NORTH)
(Public Works Director Glen W.C. Kau)
Recommended Action:
Staff recommends that the City Council:
1.Award a Professional Services Agreement (PSA) to NV5 for assessment engineer services for
Underground Utilities Assessment District on Hermosa Ave from 27th Street to North of 34th
Street. This will be a five-year contract in an amount not to exceed $35,000 for services;
and,
2.Authorize the Mayor to execute and the City Clerk to attest the attached Professional Services
Agreement subject to approval by the City Attorney.
Executive Summary:
Staff recommends award of a contract for an assessment engineer to provide underground utilities
assessment district services for Hermosa Avenue from 27th Street to north of 34th Street.This project
is initiated by residents along Hermosa Avenue for the undergrounding of overhead electric facilities.
Under the California Public Utilities Commission's guidelines,applicants (property owners)for this
class of project are responsible for the costs of the undergrounding.
Background:
On May 04,2017,the Public Works Department received a formal request (Attachment 1)declaring
the intent to proceed with the Greenwich Assessment District (District).This Assessment District
contains 101 parcels and spans from the one power pole north of 34th Street to 27th Street along
Hermosa Ave.The power poles along Palm Drive and parcels on the east side of Palm Drive are not
included in the district.The items included with the formal request are:potential boundary map,
spreadsheet indicating the property address,petition signatures,and notes from County Assessor’s
maps.
Pursuant to the City’s “Underground Utilities Assessment Districts Guide”(Initiated by Property
Owners)(UUAG)(Attachment 2),Alternative 2,the District along with the City has completed steps
City of Hermosa Beach Printed on 4/3/2024Page 1 of 4
powered by Legistar™425
Staff Report
REPORT 18-0719
Owners)(UUAG)(Attachment 2),Alternative 2,the District along with the City has completed steps
1 through 3 which included:
1)The applicant and interested parties (in support) submitted a letter including proposed
boundaries, and 60% owner signatures to the City expressing their interest in forming an
Underground Utilities Assessment District (UUAD);
2)City staff prepared the boundary map (Attachment 3) that was submitted to the utility
companies for feasibility so that they may provide the City with a preliminary cost estimate for
the design and construction of the District. These preliminary costs were summed up and
provided to the applicant of the District via an official city letter dated November 20th 2017
(Attachment 4), which totaled an amount of $1,986,259.14;
3)A letter of continued commitment from the applicant signed by 60% of property owners within
the proposed district was submitted to the City via email dated February 13th 2018
(Attachment 5).
According to the stated guidelines,the next step in the process is for the City to retain the services of
consultants,including a Financial Advisor,Bond Counsel,and Assessment Engineer.As the project
applicant,property owners are responsible for costs associated with this project,therefore,they must
deposit funds with the City to pay the consultants.
Discussion:
Staff noticed and advertised the RFP in July 2018 for assessment engineering services.Four
companies submitted proposals by the August 7th 2018 submittal deadline.The companies were
NBS, NV5, Harris and Associates, and David Taussig & Associates.
Staff reviewed the proposals and determined the best candidate based on appropriate qualifications
and RFP responsiveness.Qualification Based Selection (QBS)was used for review of the submitted
proposals based on qualifications,demonstrated ability to perform the work and on similar project
types. The fee is reviewed and considered afterwards.
The selected consultant has the qualifications,previous experience with similar sized projects and
depth of resources to perform timely and properly the services of the agreement.Staff confirmed the
firm’s qualifications and past performance by conducting reference checks.From the initial review,
the rankings are as follows:
Firm Proposed Fee Rank
NV5 $ 63,015 1
Harris & Associates $ 38,455 2
NBS $ 49,740 3
Four proposals were received;one was deemed non-responsive.The remaining three proposals
City of Hermosa Beach Printed on 4/3/2024Page 2 of 4
powered by Legistar™426
Staff Report
REPORT 18-0719
Four proposals were received;one was deemed non-responsive.The remaining three proposals
were deemed responsive to the work scope.The non-responsive proposal included their fee within
the proposal.The RFP required that the fee shall be provided under separate,sealed cover and
therefore their proposal was deemed not qualified.The proposal from NV5 ranked the highest and
was reviewed and discussed with them.Staff negotiated with NV5 and they agreed to a reduced fee
of $35,000 for the services required.
Staff recommends that Council award a contract to NV5 for the subject services.Council approval
would allow the Assessment Engineer to be contracted with the City (as liaison)and proceed with the
remainder of the Assessment District Process and Guidelines per the sample Professional Services
Agreement (Attachment 6).
General Plan Consistency:
This report and associated recommendations have been evaluated for their consistency with the
City’s General Plan. Relevant policies are listed below:
Governance Element:
2.6 Responsive to community needs.Continue to be responsive to community inquiries,providing
public information and recording feedback from community interactions.
2.7 Major planning efforts.Require major planning efforts,policies,or projects to include a public
engagement effort.
5.8 Public private partnerships.Pursue the use of public-private partnerships to implement projects
and efforts that maintain character and benefit the community.
Parks + Open Space Element:
5.6 Signage and infrastructure.Encourage signage,infrastructure,and utilities that do not block or
detract from views of scenic vistas.
Infrastructure Element:
6.2 Below ground utilities.Encourage the phase out and replace overhead electric lines with
subsurface lines to reduce visual obstructions and the need for utility poles which can impede
sidewalk accessibility.
This project falls within the Walk Street and Sand Section Neighborhoods of the City,where key
priorities are maintaining the high quality pedestrian connections through the walk streets,enhancing
multimodal connectivity and retaining the form, scale, and orientation of buildings in this area.
Fiscal Impacts:
Assessment Engineer Services would be paid from funds deposited by the applicant of the
Assessment District to pay for the consultant services.While the funds have not yet been deposited,
staff has been in communication with the applicant who intends to fund the cost of all consultants
City of Hermosa Beach Printed on 4/3/2024Page 3 of 4
powered by Legistar™427
Staff Report
REPORT 18-0719
staff has been in communication with the applicant who intends to fund the cost of all consultants
upon approval of the agreement.The Financial Advisor and Bond Counsel selected for the issuance
of oil settlement bonds submitted proposals of $30,000 each,which are within the City Manager’s
signing authority. These services would also be paid from funds deposited by the applicant.
Attachments:
1.Formal Request Letter
2.Underground Utilities Assessment Districts Guide
3.Greenwich Village Boundary Map
4.Letter of Preliminary Assessment Costs
5.Continued Commitment Letters
6.Sample Professional Services Agreement for NV5
Respectfully Submitted by:Reed Salan, Associate Engineer
Concur:Glen W.C. Kau, P.E., Public Works Director/City Engineer
Noted for Fiscal Impact:Viki Copeland, Finance Director
Noted for Legal Review:Mike Jenkins, City Attorney
Approved:Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 4 of 4
powered by Legistar™428
ATTACHMENT 1
429
430
Underground Utilities Assessment Districts
Guide (Initiated by Property Owners)
Most underground utility assessment districts are formed at the request of the local property owners.
The multi-step, multi-year process for each alternative (Alternative 1 & Alternative 2) are explained
below. Undergrounding utilities includes Southern California Edison (“SCE”), Telephone, Cable and
other utilities. The City’s role is to facilitate meetings, coordinate tasks, and hire and manage
consultants. Unless otherwise stated, or decided by the City Council at a time of district formation, all
costs of formation of a district, related studies, undergrounding of overhead electrical and
communications facilities are the responsibility of the homeowners. 1
Alternative 1
1. The process is initiated by an interested property owner (proponent) who acts as a liaison between
the City, utility companies, and neighbors. The proponent and other neighbors (interested parties)
in support of undergrounding, submit a letter to the City expressing their interest in forming an
Underground Utility Assessment District. The letter must include the proposed boundaries of the
area for undergrounding and must be signed by owners representing at least 60% of the properties
within the proposed district.
2. Based upon the interest letter, City staff prepares a boundary map and submits it to the appropriate
utility companies who review and evaluate the map to ensure the boundaries are logical and
feasible. Once the district boundaries are accepted by all parties, the utility companies provide the
City with a preliminary cost estimate for the design and construction of the district.
3. Once an estimated cost of preliminary design is known (which is deposited by the property owners
in Step 8 below), and an estimate of the preliminary cost for the construction is known, the interested
parties decide if there is continued support to pursue an assessment district, use a different payment
option or agree to abandon the project. Should the interested parties wish to pursue an assessment
district, a letter of continued commitment signed by 60% of property owners within the proposed
district is submitted to the City.
4. The City retains the services of consultants, including a Financial Advisor, Bond Counsel and
Assessment Engineer. Unless otherwise decided by the City Council, the City collects funds from
the property owners to pay the consultants. Should the district ultimately fail, the funds advanced
by the property owners will not be reimbursed.
5. Bond Counsel prepares a formal petition to be circulated by the proponents to all affected property
owners within the proposed district boundaries. The petition states the approximate costs each
property owner would be responsible for should the property owners vote in favor of forming the
district and proceeding with the utility undergrounding project. The cost is based on the preliminary
costs received from the utility companies. In order for the process to continue, at least 60 percent
of the property owners must sign/express interest. This petition is a “show of interest” and does not
bind the property owner to the district. (The interested parties are the ≥ 60% of the owners; that
means that only those pay for the bond counsel, and the other consultants-not the remaining ≤ 40%).
6. Concurrently with the Bond Counsel preparing the petition, the Assessment Engineer prepares a
Preliminary Engineer’s Report identifying the benefits of the district, identifies the improvements and
works with the Financial Advisor to provide an approximate assessment to each owner, based on
the specific benefits of the project that each owner will receive. The Bond Counsel’s petition is
certified by the retained Assessment Engineer. Attachment 2 431
7. Once the Preliminary Engineer’s Report is prepared and the petition is certified, City staff prepares
a report to the City Council for the Council’s review and approval at a public hearing to consider
whether to proceed further with the process and whether to direct the preparation of the Final
Engineer’s Report. Before the close of the public hearing, the interested parties should report to the
City Council whether there is consensus from the interested parties to proceed with the formal
design of the project by Southern California Edison (“SCE”), Telephone, and Cable utilities. This
would each generate their final cost for construction based on their respective tariffs and franchise
agreements.
8. Design process begins once the utility companies receive the engineering and design fee. It usually
involves the following steps:
a) Base mapping
b) SCE underground conduit and structures and electrical design
c) Telephone and cable company design
d) Cost estimate
As with the cost for the consultants, unless otherwise decided by the City Council, the City collects
funds from the property owners to pay for the design. Should the district fail, the funds advanced
by the property owners will not be reimbursed. The duration of each step varies greatly depending
on the number of other underground districts in queue, the size of the proposed district, and
complexity of the design. According to SCE, as of 2014, estimated time to complete engineering
and designs from all the utility companies is 18-24 months.
9. Once the design is complete and accepted by the City and utility companies, the utility companies
provide a “guaranteed cost” or “cost of construction”. The Assessment Engineer will use the
guarantee cost and all other costs incurred in the past (see Steps 4 and 8), or anticipated in the
future, to generate a Final Engineer’s Report. This report will document the assessment amount
each property owner within the district would be responsible for, should the district pass.
10. The completed design plans, Final Engineer’s Report, and Resolution of Intention are submitted to
the City Council for approval and a public hearing is scheduled. An informal property owner
information meeting is also held prior to the public hearing to explain the details of the proposed
district.
11. Ballots are prepared by the bond counsel with the assessment amount and sent to each property
owner within the proposed district’s boundaries. Each property owner then casts his or her ballot for
or against forming the district.
12. All ballots must be submitted to the City by the end of the scheduled public hearing. Each property's
vote is weighted in proportion to its assessment.
13. Following the majority protest hearing, the City Council will approve formation of the district unless
a majority protest exists. If a majority of the ballots cast by the district property owners by the close
of the public hearing vote YES, then there is no majority protest and City Council may choose to
proceed with the formation of the district. If a majority of the ballots cast vote NO, then there is a
majority protest and the district fails. Should the district fail, the funds advanced by the property
owners will not be reimbursed. If the district is established by City Council, all property owners
within the district will be responsible for the assessment amount regardless of the property owner’s
personal vote. Attachment 2 432
14. If the district is approved, the property owner will have two options to pay for the assessment.
a) 30-Day Cash Payment Period: Thirty (30) days after the close of the public hearing, the
property owner has the option to pay the full or a portion of the assessment amount. Bonds will
be sold for any unpaid portion of the assessment and a lien will be placed on the property until
the bond is paid in full.
b) Bond: If the property owner elects to not pay during the 30-Day Cash Payment Period,
the unpaid Assessment will be financed through the issuance of bonds with the Assessments
payable in annual installments corresponding in number and proportionate amount to
the number of installments and principal amounts of bonds maturing in each year.
Bonds are typically amortized over a 15-20 year period but can be amortized over as long a
period as 30 years. The annual installments along with administrative expenses will
be collected on the regular property tax bill. During that time, a lien will be placed on the
property until the bond amount is paid in full. Bonds incur a finance charge.
15. All upfront costs incurred by the property owners, or City can be included in the Assessments and
reimbursed to such property owners from proceeds of the sale of bonds. Once the bonds are sold
and all moneys are collected, the construction phase will commence. The construction duration will
vary depending on the size of the district. In general, the construction phase lasts from 1 to 3 years.
If the district fails, funds advanced by the property owners will not be reimbursed.
16. In areas outside of public right-of-way where no dedicated utility easement exists, each homeowner
may be required to deed an easement to the utilities for the underground lines and structures. Legal
costs related to the deeding and recording of these easements may be included in the SCE cost for
the construction and if not, are the responsibility of the property owner.
17. When construction of the underground infrastructure is completed, all property owners are notified
that it is time to implement their private conversions. Private conversions require property owners
to hire a licensed electrician to connect the property’s existing overhead connection to the
underground infrastructure and remove the above ground lines. The cost of the private conversion
is not covered in the assessment amount. The assessment amount only covers work performed in
the roadway easement and where utility easements have been obtained.
18. It is the property owner’s responsibility to perform the conversion within the designated timeframe.
Delays caused by one property owner’s private conversion, may cause delays to the whole district.
It is important to note, that according to SCE, from the initial letter to the last private conversion, the
average process takes approximately seven (7) years, depending on the size of the district.
Attachment 2 433
Alternative 2
1. The process is initiated by an interested property owner (proponent) who acts as a liaison between
the City, utility companies, and neighbors. The proponent and other neighbors (interested parties) in
support of undergrounding, submit a letter to the City expressing their interest in forming an
Underground Utility Assessment District. The letter must include the proposed boundaries of the area
for undergrounding and must be signed by owners representing at least 60% of the properties within
the proposed district.
2. Based upon the interest letter, City staff prepares a boundary map and submits it to the appropriate
utility companies who review and evaluate the map to ensure the boundaries are logical and feasible.
Once the district boundaries are accepted by all parties, the utility companies provide the City with a
preliminary cost estimate for the design and construction of the district.
3. Once an estimated cost of the design and construction is known, the interested parties decide if there
is continued support to pursue an assessment district, use a different payment option or agree to
abandon the project. Should the interested parties wish to pursue an assessment district, a letter of
continued commitment signed by 60% of property owners within the proposed district is submitted to
the City. NOTE: In this alternative the cost of design is paid after the assessment district is formed.
However, this means that the assessment is based on an estimate of costs and the residents will be
responsible for paying additional costs if the actual costs are greater than the estimate. See
discussion in Step 19 below.
4. The City retains the services of consultants, including a Financial Advisor, Bond Counsel and
Assessment Engineer. Unless otherwise decided by the City Council, the City collects funds from the
property owners to pay the consultants.
5. Bond Counsel prepares a formal petition to be circulated by the proponents to all affected property
owners within the proposed district boundaries. The petition states the approximate costs each
property owner would be responsible for should the property owners vote in favor of forming the
district and proceeding with the utility undergrounding project. The cost is based on the preliminary
costs received from the utility companies. In order for the process to continue, at least 60 percent of
the property owners must sign/express interest. This petition is a “show of interest” and does not
bind the property owner to the district. (The interested parties are the ≥60% of the owners; that means
that only those pay for the bond counsel, and the other consultants-not the remaining ≤40%).
6. Concurrently with the Bond Counsel preparing the petition, the Assessment Engineer prepares a
Preliminary Engineer’s Report identifying the benefits of the district, identifies the improvements and
works with the Financial Advisor to provide an approximate assessment to each owner, based on the
specific benefits of the project that each owner will receive. The Bond Counsel’s petition is certified
by the retained Assessment Engineer.
7. Once the Preliminary Engineer’s Report is prepared and the petition is certified, City staff prepares
a report to the City Council for the Council’s review and approval at a public hearing to consider
whether to proceed further with the process and whether to direct the preparation of the Final
Engineer’s Report. Before the close of the public hearing, the interested parties should report to the
City Council whether there is consensus from the interested parties to proceed.
Attachment 2 434
8. The Assessment Engineer will use this estimated cost and all other costs incurred in the past, and
those anticipated in the future (e.g., the cost for Engineer’s Report and Bond Counsel, etc.) plus a
significant contingency to try to account for the uncertainty of not having a completed design, to
generate a Final Engineer’s Report. This report will document the assessment amount each property
owner within the district should be responsible for, should the district pass. All upfront costs incurred
by the property owners or City could be folded into the assessment costs. If the district fails, then all
costs incurred will be lost.
9. The completed Final Engineer’s Report, and Resolution of Intention are submitted to the City Council
for approval and a public hearing is scheduled. An informal property owner information meeting is
held prior to the public hearing to explain the details of the proposed district.
10. Ballots are prepared by the bond counsel with the assessment amount and sent to each property
owner within the proposed district’s boundaries. Each property owner then votes for or against
forming the district.
11. All ballots must be submitted to the City by the end of the scheduled public hearing. Each property's
vote is weighted in proportion to its assessment. The district passes if the City receives more than
50% YES votes from the district property owners by the close of the public hearing session. If the
district passes, all property owners within the district will be responsible for the assessment amount
regardless of the property owner’s personal vote.
12. Following the majority protest hearing, the City Council will approve formation of the district unless
a majority protest exists.
13. If the district is approved, the property owner will have two options to pay for the assessment.
a) 30-Day Cash Payment Period: Thirty (30) days after the close of the public hearing, the property
owner has the option to pay the full or a portion of the assessment amount. Bonds will be sold for
any unpaid portion of the assessment and a lien will be placed on the property until the bond is paid
in full.
b) Bond: If the property owner elects to not pay during the 30-Day Cash Payment Period, bonds will be
sold. Assessments are placed on the property tax bill that may be paid over a 15-30 year financing
period. During that time, a lien will be placed on the property until the bond amount is paid in full.
Bonds incur a finance charge.
14. Once the bonds are sold and all moneys are collected, the City forwards the payment to the utility
companies to begin the design process. The remaining funds will be retained for construction.
15. Design process begins once the utility companies receive the engineering and design fee. It usually
involves the following steps:
a) Base mapping
b) SCE underground conduit and structures and electrical design
c) Telephone and cable company design
d) Cost estimate
The duration of each step varies greatly depending on the number of other underground districts in
queue, the size of the proposed district, and complexity of the design. According to SCE, as of 2014,
estimated time to complete engineering and designs from all the utility companies is 18-24 months. Attachment 2 435
16. In areas outside of public right-of-way where no dedicated utility easement exists, each homeowner
may be required to deed an easement to the utilities for the underground lines and structures. Legal
costs related to the deeding and recording of these easements may be included in the SCE “cost of
design and of construction”, and if not, are the responsibility of the property owner.
17. The construction phase begins. The construction duration will vary and can range anywhere from 1
to 3 years.
18. When construction of the underground infrastructure is completed, all property owners are notified
that it is time to implement their private conversions. Private conversions require property owners
to hire a licensed electrician to connect the property’s existing overhead connection to the
underground infrastructure and remove the above ground lines. The cost of the private conversion is
not covered in the assessment amount. The assessment amount only covers work performed in the
roadway easement and where utility easements have been obtained.
19. It is the property owner’s responsibility to perform the conversion within the designated timeframe.
Delays caused by one property owner’s private conversion, will cause delays to the whole district
because overhead structures cannot be removed until all properties have completed their private
conversions.
In the event the actual costs for the undergrounding work exceed the total costs reported in the Final
Engineer’s Report, the property owners will have to decide if there is continued support of the project or
to disband the district. Continuing the project would require one of two options:
a) The property owners can fund the costs exceeding the total amount reported in the
Engineer’s Report, or
b) The Engineer’s Report will have to be revised, taking the revised assessment
amounts through the process again beginning from task 9 of Alternative 2.
It is important to note, that according to SCE, from the initial letter to the last private conversion, the
average 1process takes approximately seven (7) years, depending on the size of the district.
1 These Guidelines may be revised from time to time by the City of Hermosa Beach Director of Public Works.
(April 2017) Attachment 2 436
UNDERGROUNDING OF UTILITY LINES AND FORMATION OF ASSESSMENT DISTRICTS
FREQUENTLY ASKED QUESTIONS:
What equipment will still be visible above ground?
Transformers may be located above ground on concrete pads or will be located in subsurface vaults
covered by manhole covers. Each vault requires two, 12-inch diameter by 30-inch high vents.
Telephone systems may also require small above terminals to provide maintenance access.
Will my electricity be out during the construction?
NO. During construction there will be some disruption because the streets in the area will be dug up,
but your electricity, cable TV, and telephone service should not be affected. Only after everyone in the
project area has connected to the underground system will the overhead wires and poles be removed.
Will property owners get a chance to review proposed locations of the equipment before they
are cast in concrete?
The locations of pad mounted equipment and vents will be marked on the ground after the plans have
been completed so that the property owners can see the proposed placements. Locations for these
structures will be placed in the roadway easement selected by both the City staff and utility companies
for ease of utility operations and in consideration of the property owners. Location adjustments to these
structures are typically not allowed after the designs are finalized.
If a utility pole has a cell phone antenna, will it be removed?
Cell phone companies will be notified by the utility company that the pole is going to be removed and
that the antennas will need to be removed.
What will happen to the streetlights?
In most cases throughout the City, the streetlights are attached to the utility poles. The project will
include the installation of new streetlights. Unless your neighborhood chooses to pay for more
expensive decorative lights, standard concrete streetlight poles will be installed. If your project moves
forward, City staff will meet with your neighborhood to discuss the various street lighting options.
I’ve heard about new technologies like fiber optics coming to residential neighborhoods, how
does utility undergrounding fit into all of this?
New technologies such as fiber optics can exist, both on overhead poles or underground. Currently,
when undergrounding projects take place, there is additional room for fiber optic cables to be laid down.
How much does it cost?
Costs vary substantially from district to district depending on the size, physical constraints, specific
benefit of each property, how many overhead lines need to be placed underground, how many poles
need to be removed, size and number of property owners within the undergrounding district, labor and
material costs, and inflation. Costs estimated in a 2001 study for City-wide undergrounding project in
Rolling Hills estimated per household cost between $52,000 and $62,000. Please note that the
assessment amount does not include the private conversion portion of the project, conversion of your
electrical panel, if necessary or the connection from your home to the street. Estimated cost for this
work is at $9,000-$20,000 and will depend upon the terrain, type of soil and the distance from the
house to the road easement and connection to the main conduit.
Is there money available from other sources to help pay for undergrounding?
Edison offers three options for undergrounding power lines. The first is where a municipality (City)
organizes the project and it is paid for with money accumulated from a small surcharge on a utility bill,
Attachment 2 437
called Rule 20A. The money from this source must be used on a project with a minimum of 600 linear
feet and must be on main thoroughfares.
The second option is where homeowners initiate the undergrounding and form a district. To qualify, the
area to be undergrounded must be a minimum of 600 linear feet and all existing overhead
communication and electric facilities within the area must be removed and all property owners served
by the overhead facilities to be undergrounded agree in writing to have the wiring changes made on
their premises necessary to allow service through the underground system. If the project meets these
requirements, it may qualify for Rule 20B in which, Edison removes all of the utility poles at their own
cost and a subsidy from Edison is available in the amount equal to building an equivalent overhead
system, which SCE estimates is generally 20% of the cost of undergrounding. That subsidy is applied
to SCE’s final invoice to offset the cost of constructing a new underground system.
The third option for undergrounding is Rule 20C in which the property owner(s) pays the entire cost of
the underground project including the removal of overhead facilities.
Why can’t the City pay for a part of this project?
The City of Hermosa Beach is supportive of neighborhood undergrounding projects, however, there are
many competing infrastructure needs that must be met, such as repaving roads, repairing public
buildings, and maintaining our parks.
Why can’t the Utilities pay for this project? It’s their wires, right?
Unfortunately, undergrounding is expensive and there is no legal requirement for them to
underground their facilities.
What costs are included in the assessment amount?
The assessment amount includes district formation, design engineering, construction, legal,
administration, and bond issuance costs. Upfront costs incurred by the owners can be reimbursed
from the bonds as well. However, if an assessment district does not pass, the upfront costs are non-
refundable.
What costs are not included in the assessment amount?
The assessment amount does not include the private conversion portion of the project, conversion of
your electrical panel, if necessary, or the connection from your home to the street. Estimated cost for
this work is at $9,000-$20,000 and will depend upon the terrain, type of soil and the distance from the
house to the road easement and connection to the main conduit.
How do property owners pay the assessment?
The assessment can be paid in cash or through bond financing. Once the Assessment District has
been approved by the City Council, property owners have a 30-Day Cash Payment Period to pay their
assessment. After the 30-Day Cash Payment Period, any unpaid portion of the assessment will be
financed through bond sales. If the property owner elects to finance the costs, annual installments of
principal, interest, and administrative fees will be collected with the property tax bill.
Can the assessment be paid partially in cash and partially go to bond?
Yes, during the 30-Day Cash Payment Period, the property owner will save the additional costs that
would be incurred in a bond issuance on the portion of the assessment paid. After this period, the
property owner can at any time make cash payments to pay off the assessment by paying off any
Attachment 2 438
outstanding delinquencies, a portion or the remaining principal amount, applicable bond redemption
premium, interest to the next available bond call date, and an administrative fee fixed by the City. Any
payments made after the 30-Day Cash Payment Period will not receive the savings, because the costs
of a bond issuance will be incurred.
Is the assessment tax deductible?
Please direct any tax-related questions to your tax advisor or accountant.
What is the term of the bond financing?
Usually the bonds are financed over a 15-20 year term. However, some bonds have been financed
over a 30-year term.
What is the rate of interest on the bonds?
The bond financing reflects the market rate at the time of issuance. The City does not have the
capability to predict such rates.
What if I sell my home before the assessment is paid in full?
This is a matter that can be negotiated between the buyer and seller. The lien is placed on the property
and will remain with the property unless the assessment is paid in full. This information should be
disclosed to the buyer.
What is the private conversion and what does it include?
Private conversion involves undergrounding the service wires and equipment that are on private
property - that connect from the main service conduit in the roadway easement to the property owner's
home or business. This work includes trenching, installing service conduit, backfill, and modification or
replacement of the customer’s electric panel to accept underground service.
What is the private conversion portion of the project?
Each property owner must connect his or her overhead utility lines to the underground utility system. It
is recommended to obtain bids from licensed contractors to perform this work. This cost is not included
in the assessment amount.
What is the typical cost for the private conversion?
It typically costs between $9,000 and $20,000 to convert overhead utilities to underground. The cost
depends on the terrain of the lot, type of soil and the distance from the electrical panel to the main
conduit in the roadway easement. These costs are not included in the assessment.
Can the cost of the private conversion be added to my property tax bill as well?
No. The cost of the private conversion is negotiated between you and your contractor. Each property
owner pays for this service separately from the assessment.
Who do property owners contact with questions or concerns regarding the project?
Questions and concerns regarding the project should be directed to the Department of Public Works,
by calling 310-318-0214. Property owners should not contact the utility companies directly with
questions.
Attachment 2 439
Myths and Facts of the process for undergrounding of utility lines and formation of
assessment districts
FORMATION AND COSTS
Myth: The undergrounding of utilities is a City driven project.
Fact: The assessment districts for the undergrounding of utilities are property owner driven
projects. The City acts as a liaison between the utility companies and property owners
Myth: Rule 20A money can be applied anywhere in the City.
Fact: Generally, Rule 20A money can be applied to major thoroughfares only.
Myth: Everything is included in the assessment costs.
Fact:
The assessment covers the district formation and construction costs to underground the utility
lines. Property owners are responsible for hiring and paying a contractor to connect their
property's utilities to the underground system.
Myth: The City is not assessed for any City owned parcels.
Fact: City property is assessed based on the same assessment methodology as other properties
within the assessment district.
Myth: The City withholds information from property owners.
Fact:
The City makes every effort in being transparent about the assessment process and welcomes
any calls or inquiries. The utility companies should not be contacted directly with questions
regarding the project. The property owners are welcome and encouraged to engage their own
facilitator to act as a liaison to the utility companies on their behalf.
Myth: I still have to pay the assessment if I sell my property.
Fact: The City does not require the assessment to be paid off when a property is sold; however, the
buyer may make the request.
CONSTRUCTION
Myth: I will not have access to my property during construction.
Fact:
Construction for a typically sized district takes 1 year but can last up to 3 years. The work area
generally shifts each week. Access during working hours will be limited, but is reopened at the
end of each work day.
Myth: If the contractor/construction causes damage to my private property, it will not be repaired.
Fact: The contractor is responsible for repairing all damages done during construction. Should any
damage occur, please notify the project superintendent or city staff.
Myth: The City has an approved list of electrical contractors to perform the private conversion.
Fact: The City may provide a list of electrical contractors who conduct business within the City, but
do not maintain a list of prequalified or approved contractors.
Myth: A select few electrical contractors make arrangements with the City to perform private
conversions prior to properties being released for conversion.
Attachment 2 440
Fact: Private conversion should NOT be started prior to written notification from the Utility company,
issuance of a building permit, and pre-inspection from the building inspector.
Myth: My service panel will have to be replaced or upgraded.
Fact: Service panel replacements are required if the existing panel is not compatible with the new
underground system and is paid by the property owner.
Myth: The electrical conversion process will disrupt electrical service to my property for a long period
of time.
Fact: The service conversion or "cut-over" to the underground system takes approximately 10-20
minutes to complete. Electrical service is restored after completion of the cut-over.
Attachment 2 441
417
125
2909
2622142601
2702
2202593233324
2721
2728
1372806 250321632322930
27002546 2562826
3031
3301
2810
3033
2666
2640
32243443
26413003
325
3001
212
2528 26022541 2353125252222249111
2800
2918
28312838
108
115
2540
2840 1181331233232 125255221835043510 31132125532031424823013213226325423522014612631112813112324212032313513122713213624124512323131532051361202422311211323372451201212382282251213303093102321262483151391361241281351501323141232302503073181222601382312172252223103222071301352553011332391272461423192602272153122382572412302462082452202022293063082172552002422343152442313182493162211262182143012203172503002493063022352422592212012282082432322393012072543262540 23233352252615
3007
2934 331225223248261026182626 24013513224123012621025312092527
2634125
2600
34043408
1443414
3320216
2453412
2202211331402362920
3306122
2924
2902
2910
3302
3035
2617 1191153113113100
2621
3104
3417
3116
201
2630 1333108
25921723524324224231431825426013023430320732932132222632220522520013512524425530123431712414021620913320122521933630231031023712024321822422112524524424826342642
3423
3124
2648
3129
25453133
26522654 1332812
2716
3205
3407
2836
3415
2732
2824
3518
33163312
3216
2828
2728
3206
2722
2712
3422
2818
2804
3430
3207
330321732013220
280128233112
247
3116
30053222
138
2918290129063122
30183022
3231
3010
3104
3026 1373130
3002
3405
3233 33133302330030203320331033183323302031013330 2242643 1351213411 2301302292293030 2251262604
2540
250
24934353436
247216124123215316317235122126201245252Palm DrThe StrandHermosa AveManhattan Ave33rd St
31st St
30th St
29th St
28th St
27th St
33rd Pl
34th St
30th Pl
29th Ct
28th Ct
34th Pl
26th St
Longfellow Ave
35th St
27th Ct Highland AveCrest Dr35th Pl
26th St
35th St
±
Greenwich Village NorthProposed Undergrounding
Undergrounding Area
Attachment 3442
City of Hermosa Beach
Civic Center, 1315 Valley Drive, Hermosa Beach, CA 90254-3885 Tel: (310) 318-0235
November 20, 2017
Greenwich Village Underground Utility Assessment District (UUAD) Association
(Via Email)
Re: Preliminary estimated cost of design and construction –
For the Association’s information and review
Dear Prospective Greenwich Village UUAD Association Member:
The City has received the preliminary cost estimate for undergrounding of the overhead
utilities for your district, and is provided below. Please refer to item 3 (provided below)
of Alternative 2 for the next steps of the previously provided City’s UUAD guide.
The estimated cost for the undergrounding of the utilities identified on the pole (Crown
Castle, Frontier and SCE) is $1,986,259.14 as of this dated letter.
SCE $900,000
Frontier $999,000
Crown Castle $87,259.14
Total $1,986,259.14
Once an estimated cost of the design and construction is known, the interested parties
decide if there is continued support to pursue an assessment district, use a different
payment option or agree to abandon the project. Should the interested parties wish to
pursue an assessment district, a letter of continued commitment signed by 60% of
property owners within the proposed district is to be submitted to the City.
NOTE: In this alternative, the cost of design is paid after the assessment district is
formed. However, this means that the assessment is based on an estimate of costs
and the residents will be responsible for paying additional costs if the actual costs are
greater than the estimate.
Should you have any questions or require further information, please contact Reed
Salan, Associate Engineer, at (310) 318-0229 or email at rsalan@hermosabch.org.
Sincerely,
Glen W.C. Kau, P.E.
Public Works Director /City Engineer
Attachment 4 443
From:Vicki Patman
To:Reed Salan
Subject:Continued Commitment Letters
Date:Tuesday, February 13, 2018 8:37:09 PM
Attachments:image002.jpg
GVUAcommitment letter 20.pdf
GVUAcommitment letter 35.pdf
Hi Reed-
Attached please find continued commitment letters signed by 60% of property owners in the
proposed district.
Please let me know how we proceed to the step # 4, the hiring of the assessment engineer, bond
counsel and the financial advisor.
Best-
Vicki
Banner_Small
Attachment 5 444
Attachment 5 445
Attachment 5 446
Attachment 5 447
Attachment 5 448
Attachment 5 449
Attachment 5 450
Attachment 5 451
Attachment 5 452
Attachment 5 453
Attachment 5 454
Attachment 5 455
Attachment 5 456
Attachment 5 457
Attachment 5 458
Attachment 5 459
Attachment 5 460
Attachment 5 461
Attachment 5 462
Attachment 5 463
Attachment 5 464
Attachment 5 465
Attachment 5 466
Attachment 5 467
Attachment 5 468
Attachment 5 469
Attachment 5 470
Attachment 5 471
Attachment 5 472
Attachment 5 473
Attachment 5 474
Attachment 5 475
Attachment 5 476
Attachment 5 477
Attachment 5 478
Attachment 5 479
Attachment 5 480
Attachment 5 481
Attachment 5 482
Attachment 5 483
Attachment 5 484
Attachment 5 485
Attachment 5 486
Attachment 5 487
Attachment 5 488
Attachment 5 489
Attachment 5 490
Attachment 5 491
Attachment 5 492
Attachment 5 493
Attachment 5 494
Attachment 5 495
Attachment 5 496
Attachment 5 497
Attachment 5 498
Attachment 5 499
Agreement No. 18.002
CONTRACT FOR PROFESSIONAL ENGINEER SERVICES FOR UNDERGROUND
UTILITIES ASSESSMENT DISTRICT ON HERMOSA AVE FROM 27TH STREET TO
NORTH OF 34TH STREET “GREENWICH VILLAGE”
This AGREEMENT is entered into this 27TH day of November, 2018, by and between the
CITY OF Hermosa Beach, a general law city a municipal corporation (“CITY”) and NV5
(“CONSULTANT”).
R E C I T A L S
A. The City desires to obtain assistance for Assessment Engineer services for the
processing of an Underground Utility Assessment District.
B. The City does not have the personnel able and/or available to perform the
services required under this agreement and therefore, the City desires to contract
for consulting services to accomplish this work.
C. The Consultant warrants to the City that it has the qualifications, experience and
facilities to perform properly and timely the services under this Agreement.
D. The City desires to contract with the Consultant to perform the services as
described in Exhibit A of this Agreement.
NOW, THEREFORE, based on the foregoing recitals, the City and the Consultant
agree as follows:
1. CONSIDERATION AND COMPENSATION
A. As partial consideration, CONSULTANT agrees to perform the work listed in
the SCOPE OF SERVICES, attached as EXHIBIT A.
B. As additional consideration, CONSULTANT and CITY agree to abide by the
terms and conditions contained in this Agreement.
C. As additional consideration, CITY agrees to pay CONSULTANT a total not to
exceed $35,000 , for CONSULTANT’s services, unless otherwise specified by
written amendment to this Agreement.
D. No additional compensation shall be paid for any other expenses incurred,
unless first approved by the City Manager or his/her designee.
E. CONSULTANT shall submit to CITY, by not later than the 10th day of each
month, its invoice for services itemizing the fees and costs incurred during the
previous month. CITY shall pay CONSULTANT all uncontested amounts set
forth in CONSULTANT’s invoice within 30 days after it is received.
Attachment 6 500
Page 2 of 10
2. SCOPE OF SERVICES.
A. CONSULTANT will perform the services and activities set forth in the SCOPE
OF SERVICE attached hereto as Exhibit A and incorporated herein by this
reference.
B. Except as herein otherwise expressly specified to be furnished by CITY,
CONSULTANT will, in a professional manner, furnish all of the labor, technical,
administrative, professional and other personnel, all supplies and materials,
equipment, printing, vehicles, transportation, office space, and facilities necessary
or proper to perform and complete the work and provide the professional services
required of CONSULTANT by this Agreement.
3. PAYMENTS. For CITY to pay CONSULTANT as specified by this Agreement,
CONSULTANT must submit an invoice to CITY which lists the reimbursable costs, the specific
tasks performed, and, for work that includes deliverables, the percentage of the task completed
during the billing period in accordance with the schedule of compensation incorporated in
“Exhibit A.”
4. TIME OF PERFORMANCE. The services of the CONTRACTOR are to commence
upon receipt of a notice to proceed from the CITY and shall continue until all authorized work is
completed to the CITY’s reasonable satisfaction, in accordance with the schedule incorporated in
“Exhibit A,” unless extended in writing by the CITY.
5. FAMILIARITY WITH WORK. By executing this Agreement, CONSULTANT
represents that CONSULTANT has (a) thoroughly investigated and considered the scope of
services to be performed; (b) carefully considered how the services should be performed; and (c)
understands the facilities, difficulties, and restrictions attending performance of the services
under this Agreement.
6. KEY PERSONNEL. CONSULTANT’s key person assigned to perform work under this
Agreement is Mr. Jeffrey Cooper CONSULTANT shall not assign another person to be in charge
of the work contemplated by this Agreement without the prior written authorization of the City.
7. TERM OF AGREEMENT. The term of this Agreement shall commence upon execution
by both parties and shall expire on December 31, 2024 unless earlier termination occurs under
Section 11 of this Agreement, or this Agreement is extended in writing in advance by both
parties.
8. CHANGES. CITY may order changes in the services within the general scope of this
Agreement, consisting of additions, deletions, or other revisions, and the contract sum and the
contract time will be adjusted accordingly. All such changes must be authorized in writing,
executed by CONSULTANT and CITY. The cost or credit to CITY resulting from changes in
the services will be determined in accordance with written agreement between the parties.
9. TAXPAYER IDENTIFICATION NUMBER. CONSULTANT will provide CITY with a
Taxpayer Identification Number.
Attachment 6 501
Page 3 of 10
10. PERMITS AND LICENSES. CONTRACTOR will obtain and maintain during the term
of this Agreement all necessary permits, licenses, and certificates that may be required in
connection with the performance of services under this Agreement.
11. TERMINATION.
A. Except as otherwise provided, CITY may terminate this Agreement at any time
with or without cause. Notice of termination shall be in writing.
B. CONSULTANT may terminate this Agreement. Notice will be in writing at least
30 days before the effective termination date.
C. In the event of such termination, the CONTRACTOR shall cease services as of
the date of termination, and all finished or unfinished documents, data, drawings,
maps, and other materials prepared by CONSULTANT shall, at CITY’s option,
become CITY’s property, and CONSULTANT will receive just and equitable
compensation for any work satisfactorily completed up to the effective date of
notice of termination.
D. Should the Agreement be terminated pursuant to this Section, CITY may procure
on its own terms services similar to those terminated.
12. INDEMNIFICATION.
A. CONSULTANT shall indemnify, defend with counsel approved by CITY, and
hold harmless CITY, its officers, officials, employees and volunteers from and
against all liability, loss, damage, expense, and cost (including without limitation
reasonable attorneys fees, expert fees and all other costs and fees of litigation) of
every nature arising out of or in connection with CONSULTANT's performance
of work hereunder or its failure to comply with any of its obligations contained in
this AGREEMENT, regardless of CITY’S passive negligence, but excepting such
loss or damage which is caused by the sole active negligence or willful
misconduct of the CITY. Should CITY in its sole discretion find
CONSULTANT’S legal counsel unacceptable, then CONSULTANT shall
reimburse the CITY its costs of defense, including without limitation reasonable
attorneys fees, expert fees and all other costs and fees of litigation. The
CONSULTANT shall promptly pay any final judgment rendered against the
CITY (and its officers, officials, employees and volunteers) covered by this
indemnity obligation. It is expressly understood and agreed that the foregoing
provisions are intended to be as broad and inclusive as is permitted by the law of
the State of California and will survive termination of this Agreement.
B. The requirements as to the types and limits of insurance coverage to be
maintained by CONSULTANT as required by Section 17, and any approval of
said insurance by CITY, are not intended to and will not in any manner limit or
qualify the liabilities and obligations otherwise assumed by CONSULTANT
pursuant to this Agreement, including, without limitation, to the provisions
Attachment 6 502
Page 4 of 10
concerning indemnification.
13. ASSIGNABILITY. This Agreement is for CONSULTANT’s professional services.
CONSULTANT’s attempts to assign the benefits or burdens of this Agreement without CITY’s
written approval are prohibited and will be null and void.
14. INDEPENDENT CONTRACTOR. CITY and CONSULTANT agree that
CONSULTANT will act as an independent contractor and will have control of all work and the
manner in which is it performed. CONSULTANT will be free to contract for similar service to
be performed for other employers while under contract with CITY. CONSULTANT is not an
agent or employee of CITY and is not entitled to participate in any pension plan, insurance,
bonus or similar benefits CITY provides for its employees. Any provision in this Agreement that
may appear to give CITY the right to direct CONSULTANT as to the details of doing the work
or to exercise a measure of control over the work means that CONSULTANT will follow the
direction of the CITY as to end results of the work only.
15. AUDIT OF RECORDS.
A. CONSULTANT agrees that CITY, or designee, has the right to review, obtain,
and copy all records pertaining to the performance of this Agreement.
CONSULTANT agrees to provide CITY, or designee, with any relevant
information requested and will permit CITY, or designee, access to its premises,
upon reasonable notice, during normal business hours for the purpose of
interviewing employees and inspecting and copying such books, records,
accounts, and other material that may be relevant to a matter under investigation
for the purpose of determining compliance with this Agreement. CONSULTANT
further agrees to maintain such records for a period of three (3) years following
final payment under this Agreement.
B. CONSULTANT will keep all books, records, accounts and documents pertaining
to this Agreement separate from other activities unrelated to this Agreement.
16. CORRECTIVE MEASURES. CONSULTANT will promptly implement any corrective
measures required by CITY regarding the requirements and obligations of this Agreement.
CONSULTANT will be given a reasonable amount of time as determined by the City to
implement said corrective measures. Failure of CONSULTANT to implement required
corrective measures shall result in immediate termination of this Agreement.
17. INSURANCE REQUIREMENTS.
A. The CONSULTANT, at the CONSULTANT’s own cost and expense, shall
procure and maintain, for the duration of the contract, the following insurance
policies:
1. Workers Compensation Insurance as required by law. The Consultant shall
require all subcontractors similarly to provide such compensation
insurance for their respective employees. Any notice of cancellation or
Attachment 6 503
Page 5 of 10
non-renewal of all Workers’ Compensation policies must be received by
the CITY at least thirty (30) days prior to such change. The insurer shall
agree to waive all rights of subrogation against the CITY, its officers,
agents, employees, and volunteers for losses arising from work performed
by the CONTRACTOR for City.
2. General Liability Coverage. The CONSULTANT shall maintain
commercial general liability insurance in an amount of not less than two
million dollars ($2,000,000) per occurrence for bodily injury, personal
injury, and property damage. If a commercial general liability insurance
form or other form with a general aggregate limit is used, either the
general aggregate limit shall apply separately to the work to be performed
under this Agreement or the general aggregate limit shall be at least twice
the required occurrence limit.
3. Automobile Liability Coverage. The CONSULTANT shall maintain
automobile liability insurance covering bodily injury and property damage
for all activities of the CONSULTANT arising out of or in connection
with the work to be performed under this Agreement, including coverage
for owned, hired, and non-owned vehicles, in an amount of not less than
one million dollars ($1,000,000) combined single limit for each
occurrence.
4. Professional Liability Coverage. The CONSULTANT shall maintain
professional errors and omissions liability insurance for protection against
claims alleging negligent acts, errors, or omissions which may arise from
the CONSULTANT’S operations under this Agreement, whether such
operations be by the CONSULTANT or by its employees, subcontractors,
or subconsultants. The amount of this insurance shall not be less than one
million dollars ($1,000,000) on a claims-made annual aggregate basis, or a
combined single-limit-per-occurrence basis. When coverage is provided
on a “claims made basis,” CONSULTANT will continue to renew the
insurance for a period of three (3) years after this Agreement expires or is
terminated. Such insurance will have the same coverage and limits as the
policy that was in effect during the term of this Agreement, and will cover
CONSULTANT for all claims made by CITY arising out of any errors or
omissions of CONSULTANT, or its officers, employees or agents during
the time this Agreement was in effect.
B. Endorsements. Each general liability, automobile liability and professional
liability insurance policy shall be issued by a financially responsible insurance
company or companies admitted and authorized to do business in the State of
California, or which is approved in writing by City, and shall be endorsed as
follows. CONSULTANT also agrees to require all contractors, and
subcontractors to do likewise.
1. “The CITY, its elected or appointed officers, officials, employees, agents,
and volunteers are to be covered as additional insureds with respect to
Attachment 6 504
Page 6 of 10
liability arising out of work performed by or on behalf of the
CONSULTANT, including materials, parts, or equipment furnished in
connection with such work or operations.”
2. General Liability and Auto Insurance Liability policies shall be considered
primary insurance as respects the CITY, its elected or appointed officers,
officials, employees, agents, and volunteers. Any insurance maintained by
the CITY, including any self-insured retention the CITY may have, shall
be considered excess insurance only and shall not contribute with this
policy.
3. This insurance shall act for each insured and additional insured as though
a separate policy had been written for each, except with respect to the
limits of liability of the insuring company.
4. The insurer waives all rights of subrogation against the CITY, its elected
or appointed officers, officials, employees, or agents.
5. Any failure to comply with reporting provisions of the policies shall not
affect coverage provided to the City, its elected or appointed officers,
officials, employees, agents, or volunteers.
6. The insurance provided by this policy shall not be suspended, voided,
canceled, or reduced in coverage or in limits except after thirty (30) days
written notice has been received by the CITY.
C. CONSULTANT agrees to provide immediate notice to CITY of any claim or loss
against Contractor arising out of the work performed under this agreement. CITY
assumes no obligation or liability by such notice, but has the right (but not the
duty) to monitor the handling of any such claim or claims if they are likely to
involve CITY.
D. Any deductibles or self-insured retentions must be declared to and approved by
the CITY. At the CITY’s option, the CONSULTANT shall demonstrate financial
capability for payment of such deductibles or self-insured retentions.
E. The CONSULTANT shall provide certificates of insurance with original
endorsements to the CITY as evidence of the insurance coverage required herein.
Certificates of such insurance shall be filed with the CITY on or before
commencement of performance of this Agreement. Current certification of
insurance shall be kept on file with the CITY at all times during the term of this
Agreement.
F. Failure on the part of the CONSULTANT to procure or maintain required
insurance shall constitute a material breach of contract under which the CITY
may terminate this Agreement pursuant to Section 11 above.
Attachment 6 505
Page 7 of 10
G. The commercial general and automobile liability policies required by this
Agreement shall allow City, as additional insured, to satisfy the self-insured
retention (“SIR”) and/or deductible of the policy in lieu of the Consultant (as the
named insured) should Consultant fail to pay the SIR or deductible requirements.
The amount of the SIR or deductible shall be subject to the approval of the City
Attorney and the Finance Director. Consultant understands and agrees that
satisfaction of this requirement is an express condition precedent to the
effectiveness of this Agreement. Failure by Consultant as primary insured to pay
its SIR or deductible constitutes a material breach of this Agreement. Should City
pay the SIR or deductible on Consultant’s behalf upon the Consultant’s failure or
refusal to do so in order to secure defense and indemnification as an additional
insured under the policy, City may include such amounts as damages in any
action against Consultant for breach of this Agreement in addition to any other
damages incurred by City due to the breach.
18. USE OF OTHER CONSULTANTS. CONSULTANT must obtain CITY’s prior written
approval to use any consultants while performing any portion of this Agreement. Such approval
must include approval of the proposed consultant and the terms of compensation.
19. FINAL PAYMENT ACCEPTANCE CONSTITUTES RELEASE. The acceptance by
the CONSULTANT of the final payment made under this Agreement shall operate as and be a
release of the CITY from all claims and liabilities for compensation to the CONSULTANT for
anything done, furnished or relating to the CONSULTANT’S work or services. Acceptance of
payment shall be any negotiation of the CITY’S check or the failure to make a written extra
compensation claim within ten (10) calendar days of the receipt of that check. However,
approval or payment by the CITY shall not constitute, nor be deemed, a release of the
responsibility and liability of the CONSULTANT, its employees, sub-consultants and agents for
the accuracy and competency of the information provided and/or work performed; nor shall such
approval or payment be deemed to be an assumption of such responsibility or liability by the
CITY for any defect or error in the work prepared by the Consultant, its employees, sub-
consultants and agents.
20. CORRECTIONS. In addition to the above indemnification obligations, the
CONSULTANT shall correct, at its expense, all errors in the work which may be disclosed
during the City’s review of the Consultant’s report or plans. Should the Consultant fail to make
such correction in a reasonably timely manner, such correction shall be made by the CITY, and
the cost thereof shall be charged to the CONSULTANT. In addition to all other available
remedies, the City may deduct the cost of such correction from any retention amount held by the
City or may withhold payment otherwise owed CONSULTANT under this Agreement up to the
amount of the cost of correction.
21. NON-APPROPRIATION OF FUNDS. Payments to be made to CONSULTANT by
CITY for services preformed within the current fiscal year are within the current fiscal budget
and within an available, unexhausted fund. In the event that CITY does not appropriate sufficient
funds for payment of CONSULTANT’S services beyond the current fiscal year, the Agreement
shall cover payment for CONSULTANT’S services only to the conclusion of the last fiscal year
in which CITY appropriates sufficient funds and shall automatically terminate at the conclusion
of such fiscal year.
Attachment 6 506
Page 8 of 10
22. NOTICES. All communications to either party by the other party will be deemed made
when received by such party at its respective name and address as follows:
CITY CONSULTANT
City of Hermosa Beach
1315 Valley Drive
Hermosa Beach, CA 90254
ATTN: Reed Salan
NV5
9890 Irvine Center Drive
Irvine, CA 92618
ATTN: Jeff Cooper
Any such written communications by mail will be conclusively deemed to have been received by
the addressee upon deposit thereof in the United States Mail, postage prepaid and properly
addressed as noted above. In all other instances, notices will be deemed given at the time of
actual delivery. Changes may be made in the names or addresses of persons to whom notices are
to be given by giving notice in the manner prescribed in this paragraph. Courtesy copies of
notices may be sent via electronic mail, provided that the original notice is deposited in the U.S.
mail or personally delivered as specified in this Section.
23. SOLICITATION. CONSULTANT maintains and warrants that it has not employed nor
retained any company or person, other than CONSULTANT’s bona fide employee, to solicit or
secure this Agreement. Further, CONSULTANT warrants that it has not paid nor has it agreed
to pay any company or person, other than CONSULTANT’s bona fide employee, any fee,
commission, percentage, brokerage fee, gift or other consideration contingent upon or resulting
from the award or making of this Agreement. Should CONSULTANT breach or violate this
warranty, CITY may rescind this Agreement without liability.
24. THIRD PARTY BENEFICIARIES. This Agreement and every provision herein is
generally for the exclusive benefit of CONSULTANT and CITY and not for the benefit of any
other party. There will be no incidental or other beneficiaries of any of CONSULTANT’s or
CITY’s obligations under this Agreement.
25. INTERPRETATION. This Agreement was drafted in, and will be construed in
accordance with the laws of the State of California, and exclusive venue for any action involving
this agreement will be in Los Angeles County.
26. ENTIRE AGREEMENT. This Agreement, and its Attachments, sets forth the entire
understanding of the parties. There are no other understandings, terms or other agreements
expressed or implied, oral or written.
27. RULES OF CONSTRUCTION. Each Party had the opportunity to independently
review this Agreement with legal counsel. Accordingly, this Agreement will be construed
simply, as a whole, and in accordance with its fair meaning; it will not be interpreted strictly for
or against either Party.
28. AUTHORITY/MODIFICATION. The Parties represent and warrant that all necessary
action has been taken by the Parties to authorize the undersigned to execute this Agreement and to
engage in the actions described herein. This Agreement may be modified by written amendment
Attachment 6 507
Page 9 of 10
with signatures of all parties to this Agreement. CITY’s city manager, or designee, may execute
any such amendment on behalf of CITY.
29. ACCEPTANCE OF FACSIMILE OR ELECTRONIC SIGNATURES. The Parties
agree that this Contract, agreements ancillary to this Contract, and related documents to be
entered into in connection with this Contract will be considered signed when the signature of a
party is delivered by facsimile transmission or scanned and delivered via electronic mail. Such
facsimile or electronic mail copies will be treated in all respects as having the same effect as an
original signature.
30. FORCE MAJEURE. Should performance of this Agreement be impossible due to fire,
flood, explosion, war, embargo, government action, civil or military authority, the natural
elements, or other similar causes beyond the Parties’ control, then the Agreement will
immediately terminate without obligation of either party to the other.
31. TIME IS OF ESSENCE. Time is of the essence to comply with dates and schedules to
be provided.
32. ATTORNEY’S FEES. The parties hereto acknowledge and agree that each will bear his
or its own costs, expenses and attorneys' fees arising out of and/or connected with the
negotiation, drafting and execution of the Agreement, and all matters arising out of or connected
therewith except that, in the event any action is brought by any party hereto to enforce this
Agreement, the prevailing party in such action shall be entitled to reasonable attorneys' fees and
costs in addition to all other relief to which that party or those parties may be entitled.
33. STATEMENT OF EXPERIENCE. By executing this Agreement, CONSULTANT
represents that it has demonstrated trustworthiness and possesses the quality, fitness and capacity
to perform the Agreement in a manner satisfactory to CITY. CONSULTANT represents that its
financial resources, surety and insurance experience, service experience, completion ability,
personnel, current workload, experience in dealing with private consultants, and experience in
dealing with public agencies all suggest that CONSULTANT is capable of performing the
proposed contract and has a demonstrated capacity to deal fairly and effectively with and to
satisfy a public agency.
34. OWNERSHIP OF DOCUMENTS. It is understood and agreed that the City shall own
all documents and other work product of the Consultant, except the Consultant’s notes and work
papers, which pertain to the work performed under this Agreement. The City shall have the sole
right to use such materials in its discretion and without further compensation to the Consultant,
but any re-use of such documents by the City on any other project without prior written consent
of the Consultant shall be at the sole risk of the City.
35. DISCLOSURE REQUIRED. (City and Consultant initials required at the following
paragraph)
By their initials next to this paragraph, City and Consultant hereby acknowledge that Consultant
is not a “consultant” for the purpose of the California Political Reform Act because Consultant’s
duties and responsibilities are not within the scope of the definition of consultant in Fair Political
Attachment 6 508
Attachment 6509
9890 Irvine Center Drive | Irvine, CA 92618 | www.nv5.com | Office: 949.585.0477 | Fax: 949.585.0433
PN: P2270182349
August 7, 2018
City of Hermosa Beach
Office of the City Clerk, 2nd Floor
Attn: Reed Salan, Associate Engineer
1315 Valley Drive
Hermosa Beach, CA 90254
SUBJECT: Fee Proposal for Assessment Engineer for Underground Utilities Assessment District on Hermosa
Avenue from 27th Street to North of 34th Street
Dear Mr. Salan,
Enclosed please find our fee proposal for the above referenced RFP. Our fee is a negotiable offer. We look forward to
meeting with you and discussing the scope of work and fees. We are excited about the opportunity to assist you and the
City of Hermosa Beach.
Respectfully,
NV5
Jeffrey M. Cooper, PE
Director of Municipal Services
Exhibit A
Attachment 6 510
FEE PROPOSAL
Task Description
Project
Manager/
Assessment
Engineer
Mapping +
Database
Admin
Support
Total
Estimated
Hours
Total
Estimated
Fee
$215 $110 $95
A Determine Proposed Assessment
District Boundary 2 2 0 4 $650
B Create Property Owner Database 2 0 8 10 $1,190
C Prepare Proposed Assessment District
Spreadsheet 4 0 16 20 $2,380
D Determine Sufficient Valid Petitions
Exist to Proceed 4 0 20 24 $2,760
E Execute Certificate of Sufficiency
Petition 2 0 1 3 $525
F Assist in Establishing Project Schedule 2 0 2 4 $620
G Attend Utility Coordination Meetings
(assume 3 meetings)6 0 2 8 $1,480
H Prepare Boundary Map of Assessment
District 2 8 0 10 $1,310
I Prepare Engineer’s Report 6 12 8 26 $3,370
J File Preliminary Engineer’s Report with
Public Works 2 0 0 2 $430
K Attend City Council Meeting at which
Resolution of Intention is adopted 4 0 0 4 $860
L Prepare Formal Boundary Map for
Recordation 2 6 0 8 $1,090
M Print and Mail Resolution of Intent 4 0 32 36 $3,900
N Prepare Amended Engineer’s Report 2 0 1 3 $525
O File Amended Engineer’s Report with
Public Works 2 0 0 2 $430
P Attend Property Owner Information
Meeting 4 0 2 6 $1,050
Q Attend Public Meeting, Public Hearing,
Make Presentations (assume 1)4 0 2 6 $1,050
R Count Ballots Received 2 0 4 8 $810
S Make Revisions to Engineer’s Report
as ordered by City Council 2 1 1 4 $635
T Print and Mail Confirmed Assessment
Amount to Each Property Owner 4 0 24 28 $3,140
NOT-TO-EXCEED FEE PROPOSAL — GREENWICH VILLAGE NORTH DISTRICT
City of Hermosa Beach — Assessment Engineer for Underground Utilities Assessment District NV5 | 1
Exhibit A
Attachment 6 511
FEE PROPOSAL
Task Description
Project
Manager/
Assessment
Engineer
Mapping +
Database
Admin
Support
Total
Estimated
Hours
Total
Estimated
Fee
$215 $110 $95
U
Prepare Assessment Diagram,
Notice of Assessment, and List of
Assessed Property Owners Names for
Recordation
2 0 2 4 $620
V Review Preliminary and Final Official
Statements 2 0 0 2 $430
W Staff Meetings, Project Administration,
and Coordination 8 0 8 16 $2,480
X
Answer Assessment District-related
Questions from Residents/Property
Owners
8 0 8 16 $2,480
Misc. Expenses $785
Total for District $35,000
City of Hermosa Beach — Assessment Engineer for Underground Utilities Assessment District NV5 | 2
Exhibit A
Attachment 6 512
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0720
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
SOUTH BAY WORKFORCE INVESTMENT BOARD
QUARTERLY SUMMARY
Recommended Action:
Staff recommends that the City Council receive and file the Quarterly Summary from the South Bay
Workforce Investment Board (SBWIB).
Attachments:
1. SBWIB 1st Quarter Report for Program Year 2018-2019
Submitted by: Chris Cagle, SBWIB Regional Affairs Manager
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™513
SOUTH BAY WORKFORCE INVESTMENT BOARD
11539 Hawthorne Blvd., Suite 500, Hawthorne, CA 90250
Office 310-970-7700; Fax 310-970-7712
Quarterly Summary of the
October 18, 2018 South Bay Workforce Investment Board of Directors
Meeting
Hermosa Beach
This report summarizes the October 18, 2018, South Bay Workforce
Investment Board (SBWIB) meeting activities and program
accomplishments during the 1st Quarter of Program Year 2018-2019. As
you are aware, the South Bay WIB is comprised of representatives from
the eleven participating cities of Hermosa Beach, Redondo Beach
Lawndale, El Segundo, Inglewood, Carson, Manhattan Beach, Torrance,
Hawthorne, Lomita and Gardena for the delivery of employment and
training services through its One-Stop Business and Career Centers.
*The South Bay Workforce Investment Board’s 23rd Annual Awards
Ceremony was held on Thursday, November 1, 2018 at the Torrance
Marriot. Dennis Fitzgerald VP of Operations from Impressa Aerospace,
was presented with the SBWIB’s highest award, the Esther Williams
Award of Excellence. During the Ceremony the SBWIB also recognized
former participant and Hermosa Beach resident Marta Caires. The
Awards Ceremony celebrated the outstanding accomplishments of the
workforce development community during the past year and attracted
more than 400 civic leaders, employers, training providers and graduates
of job and career training programs.
*The South Bay One-Stop Business & Career Center held 12 recruitment
fairs during the 1st quarter for Hermosa Beach, Lomita, Redondo Beach,
Torrance and Manhattan Beach residents. 242 job seekers attended the
recruitment fairs resulting in 52 applicants being offered a second
interview. Some of the employers in attendance included Walmart, Air
China, Amazon and Blue Crew.
*One Hermosa Beach youth was enrolled in the WIOA year-round Youth
Program; this individual received pre-employment Blueprint for Workplace
Success training and access to free occupational training based on their
career interest. Other services included paid work experience at a
worksite in the City of Hermosa Beach.
514
*Under the SBWIB’s Incumbent Worker Training Program a total of 9
nurses were enrolled in a 16-week perioperative registered nurse (RN)
speciality training course offered by Azusa Pacific University. This 16-
week course is being offered to hospitals throughout Los Angeles County
to upskill experienced RNs to take on higher waged perioperative care
positions.
*The South Bay One-Stop Business and Career Centers are currently
recruiting for the Fit for Gold Tutoring & Fitness Academy. The candidates
should be high school seniors interested in working with elementary and
middle school aged youth. Youth will have the opportunity to make up to
$1,300 and be eligible for program scholarships. Under this program the
high school seniors provide homework assistance, nutrition information,
and physical fitness activities to students in grade 3rd – 8th. Those
interested in participating should contact a South Bay One-Stop Center.
*The South Bay One-Stop Business and Career Centers have partnered
with Census 2020 to assist with recruiting individuals interested in open
positions as Recruiters, Canvassers, Clerical Professionals, Information
Technology Support and Managerial with pay ranges from $23hr - $35hr.
Last quarter an onsite recruitment event was held at the Torrance One-
Stop and two additional recruitment fairs will be held the following quarter.
The service areas include the cities of Inglewood, Woodland Hills, Long
Beach, South Gate and West Covina areas.
*As part of the Summer Jobs Program, one Hermosa Beach student was
recruited for an opportunity to receive paid pre-employment training and
120 hours of paid work experience. Youth had a chance to earn up to
$1,590 this summer.
*During the first quarter, the California Employment Training Panel (ETP)
awarded the SBWIB with a $131,536 grant to establish a program that will
help subsidize job skills training for eligible manufacturers primarily in the
aerospace sector. With this funding the SBWIB will work in partnership
with the Training Funding Partners to analyze the employer’s workforce
development needs in order to contract with a training provider to deliver
services. These funds can cover training for current employees as well as
new hires.
515
*In partnership with the Department of Children and Family Services
(DCFS) the SBWIB hosted a Bridge-to-Work enrollment fair on
September 29th in which over 100 foster care youth were invited including
Hermosa Beach residents. The youth will go through pre-employment
training and have the opportunity to earn up to $5,300.
*Our 1st quarter totals reflect 30,563 visits to our South Bay One-Stop
Business and Career Centers of which 5,430 visited the Torrance One-
Stop.
*Rapid Response services were provided to 6 South Bay companies that
employ 1,206 individuals who were affected by layoffs/closures during the
1st Quarter of Program Year 2018-2019. Staff completed orientations to
One-Stop services in addition to information regarding unemployment
insurance benefits.
*Last quarter representatives for the U.S. Department of Labor Veterans
Employment and Training Services Division visited the SBWIB for a
briefing on programs offered to veterans including employment and
training services. The DOL visitors received an overview of how the
SBWIB is assisting target groups including recently separated veterans,
post 9/11 veterans, homeless veterans, female veterans, spouses of
active duty service members, underemployed veterans, disabled veterans
and formerly incarcerated veterans. Also in attendance were strategic
partners that work with the SBWIB in the areas of housing, mental health,
training, employment, as well as veteran and unemployment benefits.
*During the first quarter, the South Bay One-Stop Business & Career
Center reached out to numerous Hermosa Beach employers including 3V
Signs and Graphics. The South Bay One-Stop Business & Career Center
will continuously conduct monthly outreach to Hermosa Beach
businesses to market SBWIB services available to meet their hiring and
business needs.
*The Torrance One Stop offers Youth Job Club every Thursday from
4pm-6pm to Hermosa Beach youth and young adults between the ages of
16-24. During Job Club participants receive assistance with resume
preparation, filling out applications and job leads.
*As of September 2018, the SBWIB acquired SBWIB YouthBuild, formerly
known as CCEO Youth Build. SBWIB YouthBuild is designed to assist
516
youth and young adults with obtaining a high school diploma while
participating in vocational training in the field of construction. SBWIB
YouthBuild students receive academic assistance, mentoring, enrichment
services, as well as training and assistance with securing employment.
For more information, please contact South Bay One-Stop Youth
Services.
*In July, the South Bay WIB once again joined forces with the California
Department of Corrections and Rehabilitation’s Parole Department and
the Employment Development Department to conduct a weeklong Career
Pathways 180 Job Preparation Academy, for forty recently paroled men
and women. During the Academy the parolees were provided with
intensive pre-employment instruction through the SBWIB’s Blueprint for
Workplace Success curriculum with an emphasis on overcoming their
barriers and preparing for job interviews. The participants also received
information on the labor market, housing and child support services and
donations of suits and business attire to help prepare them for job
interviews. The Academy culminated with a graduation ceremony and a
mini job fair with employers that included Granite Construction, Robert
Half, Los Angeles Hospitality Training Academy, Elwood Staffing, Kevin
Scott Tunnel Consultants, and Diversified Vocational School.
This concludes my oral report. A written summary, along with a report of
Program Year 2018-2019’s 1st quarter activities and accomplishments is
being provided for your personal review.
Thank you.
517
1 | Page
Committees Activity Report
(Based upon the October 18, 2018, South Bay Workforce Investment Board Meeting)
*Rapid Response Summary of Activity from July 2018 – September 2018:
Number of Companies
Affected
Number of Employees
Affected
Number of companies
utilizing services
Number of companies
not receiving service
6 1,206 6 0
City Number of
Companies Affected
Number of Employees
Affected
Inglewood 1 150
Hawthorne
Lawndale
El Segundo 2 103
Gardena 1 72
Carson
Redondo Beach
Hermosa Beach
Manhattan Beach
Torrance 1 52
Lomita
Los Angeles 1 829
Across all areas
Youth Development Council (YDC) Committee Meeting, August 7, 2018:
The August 7, 2018, Youth Development Council meeting was called to order at 9:02 a.m. The following
information was discussed or acted upon:
The Committee took action to approve the May 1, 2018 Meeting Minutes and the Youth Activity and
Performance Report.
The Committee was provided with a presentation from five (5) youth enrolled under the Summer Jobs
Program. Under this program, youth have an opportunity to receive 20 hours of paid pre-employment training
and 120 hours of paid work experience.
Staff member Chris Cagle also provided the Committee with a brief update on special youth grants and
projects.
During the meeting SBWIB staff members provided updates on activities conducted at the Hawthorne and
Inglewood Teen Centers, both Bridge to Work Programs, the Fit for Gold Program, the Summer Jobs
Program, Career Pathways Programs as well as the South Bay Promise Program.
In regards to the Bridge to Work Program, Mr. Romeo Hebron reported that an Enrollment Fair was held in
May at the Hawthorne Memorial Center in which over 108 foster care youth were invited. Under this program
starting July 1st the youth will be paid $13.25 an hour and have the opportunity to earn up to $5,300.
For the South Bay Promise program update, Ms. Garcia shared a slideshow with the Committee that
displayed pictures of 15 eighth graders that participated in the South Bay Workforce Investment Board’s 5th
Annual “A Day in the Life of a College Student” field trip held at California State University of Dominguez Hills
518
2 | Page
in July. During the field trip students were provided with a campus tour, informational workshops and also
allowed to stay overnight in the dormitories.
In regards to the California Career Pathways grant, the Committee was informed that the grant funding has
ended but the South Bay WIB would like to continue working with employers and school districts to provide
these work-based learning opportunities in an effort to increase student interest in Engineering and Advanced
Manufacturing career fields.
During the meeting the Committee watched a video clip from the May 17th Fit For Gold Closing Ceremony as
well as a video clip from the 18th Annual Blueprint for Workplaces Success Job Fair.
Presidents, Superintendents and Representatives from El Camino College, the Southern California Regional
Occupation Center, Marymount California University, Los Angeles Job Corps Center, El Segundo,
Hawthorne, Centinela Valley and Los Angeles school districts provided the Committee with brief updates on
things happening in their districts.
The meeting was adjourned at 10:15 a.m.
One Stop Policy Committee Meeting, August 22, 2018: The August 22, 2018, One Stop Policy Committee meeting was called to order at 9:00 a.m. The following
items were discussed or acted upon.
The May 16, 2018 meeting minutes and the 2017-2018 4th Quarter Summary for Classroom Training
Providers Activity report for Program Year (PY) 2017-2018 were approved.
The 2018-19 1st Quarter Self-Service Activity Report through July 31, 2018 was presented by Mr. Jan Vogel
and approved by the Committee as well.
In order to reach the goal of placing eligible CalWORKs Homeless participants into paid work experience, on-
the-job training, specialized work experience, and/or classroom training courses the South Bay WIB sub-
contracted with service providers that specialize in working with the unique needs of homeless families
throughout Los Angeles County. The SBWIB contracts with UAW Labor Employment and Training
Corporation, Union Station Homeless Services, and Goodwill of Southern California to provide these services
to Supervisorial districts 1,2,3, and 4. The agency that previously served Supervisorial district 5 was not
approved as a One-Stop Provider by the Los Angeles County Workforce Development Board, left their
Antelope Valley facility and are unable to continue serving that district. JVS SoCal submitted a proposal for
consideration to serve Supervisorial district 5 under this initiative. The proposal was reviewed by two SBWIB
staff members and a representative from DPSS resulting in JVS SoCal receiving an average score of 95%.
Being that each of the five Supervisorial districts need to be covered, the Committee approved JVS SoCal as
a new CalWORKS Homeless Program Provider.
Staff member Justina Munoz provided the Committee with an update on the certification of the
comprehensive One-Stop Business and Career Center and the Partner MOUs for all three of the SBWIB
affiliate sites.
519
3 | Page
SBWIB One-Stop Operator Mr. Don Nakamoto provided a brief report on his role as the Operator and the
Comprehensive One-Stop partner meetings Mr. Nakamoto informed the Committee that three partner
meetings were held in the last quarter. The most recent all partners meeting held in July focused on serving
those with barriers to employment because of the current economic and employment situations around the
Country. The Committee was provided with a copy of the 4th quarter One-Stop Operator report.
The meeting was adjourned at 9:27 a.m.
Performance & Evaluation Committee Meeting, August 21, 2018:
The August 21, 2018, Performance & Evaluation Committee meeting was called to order at 9:00 a.m. The
following items were discussed or acted upon:
The May 15, 2018, meeting minutes were reviewed and approved by the Committee.
The WIOA FY 2017/18 4th quarter expenditure report through June 30, 2018 was approved unanimously, as
well as the PY 2018/19 Self-Service and Activity report through July 31, 2018.
Staff member Justina Munoz presented the 4th Quarter One-Stop Service Providers Report. The Committee
members were provided with a copy of the Corrective Action response submitted by the Carson Career
Center in June regarding the number of enrollments under Workforce Innovation and Opportunity Act (WIOA)
Youth Grant. Ms. Munoz informed the Committee that since June the Carson Career Center enrolled 31
individuals into the WIOA Youth Grant exceeding the enrollment goal of 30. Ms. Munoz stated that there are
no staff recommendations regarding the One-Stop Centers and Service Providers performance at this time.
Ms. Catherine Blaylock presented the 4th Quarter Vendor Performance Report. Staff recommendations were
to place 4 training providers on probation and to place 4 training courses on hold. SBWIB staff will send
inquiry letters to the 4 training providers who have demonstrated placement rates less than 50%. Those
providers placed on hold will not receive any more referrals until their placement numbers are improved. After
a discussion the 4th Quarter Vendor Performance Report was approved unanimously by the Committee.
The meeting was adjourned at 9:38 a.m.
Business & Economic Development Committee Meeting, October 3, 2018:
The October 3 2018, Business, Technology and Economic Development Committee meeting was called to
order at 9:08 a.m.
The Committee approved the June 27, 2018, 2018, Meeting Minutes.
Staff member Catherine Blaylock presented the PY 18-19 1st quarter Rapid Response Activity Report. 6
companies received Rapid Response services through September 30, 2018, with a total of 1,206 employees
affected by layoffs/closures. After review and discussion, the report was approved unanimously by the
Committee.
South Bay Workforce Investment Board (SBWIB) staff provided the Committee with an update on four
projects the SBWIB will be working on in partnership with 6 other Workforce Development Boards in the
520
4 | Page
region under the Los Angeles Basin Regional Planning Unit (LARPU). The SBWIB was awarded $45,000 for
the P3 initiative, $90,000 for the Aero-Flex Pre-Apprenticeship Initiative, $27,000 for the I-TRAIN Regional
Training Directory Enhancements, and another $90,000 for the RN Specialty Training Initiative.
During the meeting the Committee was also provided with updates on the Employment Training Panel (ETP)
Multiple Employer Contract (MEC) for the manufacturing sector, the South Bay Resource Guide, the
Telework Flexible Workplace Practices study, Propel LA and efforts made to update the local and regional
plans.
For the Manufacturing, Transportation and Logistics Sector update, Mr. Cagle reported that the SBWIB
recently registered a formal apprenticeship with the Department of Labor called the Aerospace Engineering
Apprenticeship program which is the first of its kind in the nation. The Committee was informed that El
Camino College recently graduated 10 Aero-Flex apprentices. 5 of those apprentices are being hired by
Northrop Grumman and will enroll in Northrop’s Apprenticeship program. Mr. Cagle informed the Committee
that the Aero-Flex Apprenticeship/Pre-Apprenticeship model is being replicated to develop Bio-Flex pre-
apprenticeship and apprenticeship programs. Mr. Cagle reported that the SBWIB has partnered with West LA
College to submit an apprenticeship grant proposal to the Department of Labor and partnered with El Camino
College under the Chancellor’s office California Apprenticeship Initiative grant to pilot an aerospace
engineering technician training program.
Mr. Vogel provided the Committee with an update on the Construction, Utilities, and Public Infrastructure
sector. Mr. Vogel shared the latest Construction and Utilities Preparation Program (CUPP) report with the
Committee which reflected that over 700 individuals were hired to work on a construction site or enrolled in an
apprenticeship program since the program began in January of 2017.
The meeting was adjourned at 9:57 a.m.
Executive Committee Meetings:
The following are highlights of the September 20, 2018 and October 11, 2018, Executive Committee
Meetings:
The August 16, 2018 Executive Committee meeting was canceled due to anticipated lack of a quorum.
The Executive Committee approved all committee reports and meeting minutes this quarter.
During the September 20th meeting the Executive Committee ratified the One Stop Policy Committee’s
decision to approve JVS SoCal as a new CalWORKS Homeless Program Provider.
Last quarter, the Executive Committee approved the adoption of the SBWIB’s existing general policies and
procedures for administrative, programs and general operations for both Workforce Innovation and
Opportunity Act (WIOA) programs and non-WIOA programs (special projects); programs funded by federal,
state, county or local entities.
The following individuals were approved to serve as alternates on the SBWIB: Ms. Jenifer Harris from
Behavioral Health Services, Ms. Valerie Flood from GAIN Region I, and Mr. Mike Costigan from IBEW Local
521
5 | Page
11.
During the October 11th meeting, the Executive Committee approved the South Bay Workforce Investment
Board October 18, 2018, Meeting Agenda.
During the September 25th Inglewood City Council meeting the Mayor and City Council ratified the following
appointments/re-appointments to the Board: Mr. Ray Grothaus, Mr. David Fleck, Mr. Chris Patronas, Mr.
Kendrick Roberson and Mr. Armando Pena.
This concludes the Executive Committee Report.
522
10/10/2018 Self Serve PY18/19:excel
SOUTH BAY WORKFORCE INVESTMENT BOARD
PY 2018-2019
NUMBER OF INDIVIDUALS SERVED - INFORMATIONAL/SELF SERVICE ONLY
PREVIOUS CUMULATIVE PREVIOUS MONTH OF CUMULATIVE
REPORT MONTH SEPTEMBER PY 18/19
INGLEWOOD, HAWTHORNE, LAWNDALE,13355 5868 6658 20013
EL SEGUNDO ONE-STOP BUSINESS
AND CAREER CENTER
GARDENA ONE-STOP 2756 1427 1369 4125
BUSINESS AND CAREER CENTER
TORRANCE ONE-STOP 3832 1909 1598 5430
BUSINESS AND CAREER CENTER
CARSON BUSINESS AND 845 581 150 995
CAREER CENTER
TOTAL 20788 9785 9775 30563
523
SOUTH BAY WORKFORCE INVESTMENT BOARD
PROGRAM YEAR 2018 / 2019 MONTHLY ACTIVITY REPORT (NEW ENROLLMENT REPORT)
SUMMARY BY CAREER CENTER
REPORT PERIOD: 07/01/2018 TO 9/30/2018 Page 2
ADULT PROGRAM (G201)
Qtr.%Yr.%Qtr.%Yr.%Qtr.%Yr.%Qtr.%Yr.%SBWIB Qtr.%Year-End %
Gardena Plan Plan Plan Plan Inglewood Plan Plan Plan Plan Torrance Plan Plan Plan Plan Carson Plan Plan Plan Plan TOTAL Plan Plan Plan Plan
I. TOTAL CLIENTS 28 27 104%46 61%222 126 176%222 100%31 27 115%60 52%34 37 92%79 43%315 217 145%407 77%
A. CARRIED IN 21 21 21 94 94 94 16 16 16 23 23 23 154 154 154
B. NEW 7 6 117%25 28%128 32 400%128 100%15 11 136%44 34%11 14 79%56 20%161 63 256%253 64%
II. TOTAL EXITS 2 16 13%33 54 61%7 4 175%0 27 0%42 101 42%42
A. UNSUBSIDIZED EMPLOYMENT 1 13 8%27 44 61%5 3 167%0 21 0%33 81 41%33
B. ALSO ATTAINED CREDENTIAL 0 13 0%12 44 27%0 3 0%0 21 0%12 81 15%0
C. % OF PLACEMENT 50%82%71%#DIV/0!79%
D. AVERAGE PLACEMENT WAGE $14.00 $18.49 $29.94 $0.00 $20.81
Grant (201)
YOUTH PROGRAM (G301)
Qtr.%Yr.%Qtr.%Yr.%Qtr.%Yr.%Qtr.%Yr.%SBWIB Qtr.%Year-End %
Gardena Plan Plan Plan Plan Inglewood Plan Plan Plan Plan Torrance Plan Plan Plan Plan Carson Plan Plan Plan Plan TOTAL Plan Plan Plan Plan
I. TOTAL CLIENTS 16 15 107%25 64%103 91 113%156 66%32 31 103%49 65%49 52 94%77 64%200 189 106%307 65%
A. CARRIED IN 11 11 11 73 73 73 25 25 25 44 44 44 153 153 153
B. NEW ENROLLEES 5 4 125%14 36%30 18 167%83 36%7 6 117%24 29%5 8 63%33 15%47 36 131%154 31%
II. TOTAL EXITS 7 14 50%26 121 21%9 6 150%0 27 0%42 168 25%42
A. UNSUBSIDIZED EMPLOYMENT 1 12 6 0 19
B. ENT. TRAINING/POST-SECONDARY 6 7 3 0 16
C. ATTAINED RECOGNIZED DEGREE 3 0 2 0 5
D. AVERAGE PLACEMENT WAGE $12.50 $17.88 $14.87 $0.00 $15.08
YOUTH POSITIVE EXIT RATE 100%73%100%#DIV/0!83%
Grant (301)
DISLOCATED WORKER (G501)
Qtr.%Yr.%Qtr.%Yr.%Qtr.%Yr.%Qtr.%Yr.%SBWIB Qtr.%Year-End %
Gardena Plan Plan Plan Plan Inglewood Plan Plan Plan Plan Torrance Plan Plan Plan Plan Carson Plan Plan Plan Plan TOTAL Plan Plan Plan Plan
I. TOTAL CLIENTS 27 25 108%40 68%109 104 105%167 65%225 123 183%191 118%45 30 150%53 85%406 282 144%451 90%
A. CARRIED IN 20 20 20 84 84 84 103 103 103 22 22 22 229 229 229
B. NEW 7 5 140%20 35%25 20 125%83 30%122 20 610%88 139%23 8 288%31 74%177 53 334%222 80%
II. TOTAL EXITS 1 11 9%7 97 7%48 35 137%15 69 22%71 212 33%71
III. TOTAL UNSUBSIDIZED EMPLOYMENT 1 9 11%6 82 7%41 29 141%12 58 21%60 178 34%60
A. RETRAINING 0 2 17 9 28
ALSO ATTAINED CREDENTIAL 0 2 17 9 28
B. CALLED BACK WITH EMPLOYER 0 0 0 0 0
IV. % PLACEMENT (INCL. CALL BACKS)100%86%85%80%85%
V. % PLACEMENT (EXCL. CALL BACKS)0%0%0%0%0%
AVERAGE PLACEMENT WAGE $30.77 $45.14 $38.21 $20.38 $33.63
Grant (501)
Serving laid of workers; with priority given to those individuals that have been laid-off from employers located in the nine cities that comprise the South Bay Workforce Investment Area.
Serving economically disadvantaged adults 18 years and over in the nine cities that comprise the South Bay Workforce Investment Area.
Serving low income, in school and out of school youth between the ages of 14 and no more than 21 years of age in the nine cities that comprise the South Bay Workforce Investment Area.
524
SOUTH BAY WORKFORCE INVESTMENT BOARD
PROGRAM YEAR 2018 / 2019 MONTHLY ACTIVITY REPORT (NEW ENROLLMENT REPORT)
DETAIL BY CITY
REPORT PERIOD: 07/01/2018 TO 9/30/2018
ADULT PROGRAM (G201)
Year Year Year Year Year Year Year Year Year Year Year TOTAL Year
Gardena Plan Inglewood Plan Hawthorne Plan Lawndale Plan El Segundo Plan Redondo Plan Hermosa Plan Manhattan Plan Torrance Plan Lomita Plan Carson Plan SBWIB Plan
I. TOTAL CLIENTS 28 46 184 155 29 47 8 19 1 1 6 12 0 1 1 2 19 37 5 8 34 79 315 407
A. CARRIED IN 21 21 71 71 16 16 7 7 0 0 3 3 0 0 1 1 11 11 1 1 23 23 154 154
B. NEW 7 25 113 84 13 31 1 12 1 1 3 9 0 1 0 1 8 26 4 7 11 56 161 253
II. TOTAL EXITS 2 2 25 25 4 4 4 4 0 0 1 1 0 0 0 0 5 5 1 1 0 0 42 42
A. UNSUBSIDIZED EMPLOYMENT 1 1 20 20 3 3 4 4 0 0 1 1 0 0 0 0 4 4 0 0 0 0 33 33
ALSO ATTAINED CREDENTIAL 0 10 2 0 0 0 0 0 0 0 0 12
B. OTHER TERMINATION 1 5 1 0 0 0 0 0 1 1 0 9
14 20.59 18.89 16 0 12 0 0 17.94 0 0 99.42
YOUTH PROGRAM (G301)
Year Year Year Year Year Year Year Year Year Year Year TOTAL Year
Gardena Plan Inglewood Plan Hawthorne Plan Lawndale Plan El Segundo Plan Redondo Plan Hermosa Plan Manhattan Plan Torrance Plan Lomita Plan Carson Plan SBWIB Plan
I. TOTAL CLIENTS 16 25 43 76 40 55 16 21 4 4 6 8 2 2 1 2 20 33 3 4 49 77 200 307
A. CARRIED IN 11 11 23 23 33 33 14 14 3 3 4 4 1 1 1 1 18 18 1 1 44 44 153 153
B. NEW 5 14 20 53 7 22 2 7 1 1 2 4 1 1 0 1 2 15 2 3 5 33 47 154
II. TOTAL EXITS 7 7 10 10 10 10 4 4 2 2 4 4 0 0 0 0 4 4 1 1 0 0 42 42
A. UNSUBSIDIZED EMPLOYMENT 1 5 5 1 1 3 0 0 2 1 0 19
ALSO ATTAINED CREDENTIAL 3 0 0 0 0 0 0 0 2 0 0 5
B. ENT. TRAINING/POST-SECONDARY 6 4 0 3 0 1 0 0 2 0 0 16
C. ATTAINED RECOGNIZED DEGREE 0 1 0 0 0 0 0 0 0 0 0 1
D. RETURNED TO SCHOOL 0 0 0 0 0 0 0 0 0 0 0 0
E. OTHER EXITS 0 0 5 0 1 0 0 0 0 0 0 6
12.5 12.67 13.05 15.91 12 14.61 0 0.00 16.50 13.50 0.00 110.74
DISLOCATED WORKER (G501)
Year Year Year Year Year Year Year Year Year Year Year TOTAL Year
Gardena Plan Inglewood Plan Hawthorne Plan Lawndale Plan El Segundo Plan Redondo Plan Hermosa Plan Manhattan Plan Torrance Plan Lomita Plan Carson Plan SBWIB Plan
I. TOTAL CLIENTS 27 40 68 90 28 53 7 14 6 10 49 57 9 14 11 20 142 80 14 20 45 53 406 451
A. CARRY IN 20 20 50 50 24 24 5 5 5 5 33 33 7 7 10 10 41 41 12 12 22 22 229 229
B. NEW 7 20 18 40 4 29 2 9 1 5 16 24 2 7 1 10 101 39 2 8 23 31 177 222
II. TOTAL EXITS 1 1 3 3 4 4 0 0 0 0 10 10 2 2 3 3 29 29 4 4 15 15 71 71
III. TOTAL UNSUBSIDIZED EMPLOYMENT 1 1 2 2 4 4 0 0 0 0 9 9 2 2 3 3 24 24 3 3 12 12 60 60
A. RETRAINING 0 1 1 0 0 3 0 1 13 0 9 28
ALSO ATTAINED CREDENTIAL 0 1 1 0 0 3 0 1 13 0 9 28
B. READJUSTMENT SERVICES 0 0 0 0 0 0 0 0 0 0 0 0
C. CALLED BACK WITH EMPLOYER 0 0 0 0 0 0 0 0 0 0 0 0
IV. ALL OTHER TERMINATIONS 0 1 0 0 0 1 0 0 5 1 3 11
PAGE 3
525
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
GRANT PERIOD: 07/01/2018 TO 6/30/2019 WTW SUBSIDIZED TRANSITIONAL EMPLOYMENT PROGRAM (STEP 100H) - PAID WEX
REPORT PERIOD: 07/01/18 TO 9/30/2018 DETAIL BY CAREER CENTER
I. TOTAL CLIENTS 17 54 35 33 14 0 0 0 0 12 6 7
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0 0 0
B. NEW 17 54 35 33 14 0 0 0 0 12 6 7
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 18 6 0 10 3 0 0 26 3 0 12 29
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0 0 0
B. NEW 18 6 0 10 3 0 0 26 3 0 12 29
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 0 17 20 14 20 0 0
A. CARRIED IN 0 0 0 0 0 0 0
B. NEW 0 17 20 14 20
II. TOTAL EXITS 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 15 17 0 0 0 0 0
A. CARRIED IN 0 0 0 0 0 0 0
B. NEW 15 17 0 0 0 0 0
II. TOTAL EXITS 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 153 12 6 7 178 32 0 388 0
A. CARRIED IN 0 0 0 0 0 0 0 0 0
B. NEW 153 12 6 7 178 32 0 388 0
II. TOTAL EXITS 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0
% OF PLACEMENT #DIV/0!#DIV/0!#DIV/0!#DIV/0!#DIV/0!#DIV/0!#DIV/0!
AVERAGE PLACEMENT WAGE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Targets Temporary Assistance to Needy Families, TANF participants; and places them into Paid Work Experience activity. Participants are placed at worksites that are either Public or Non-Profit in an effort to obtain unsubsidized employment and long term self-
sufficiency.
Targets Calworks participants; and places them into Paid Work Experience and On-the-Job activities in an effort to obtain unsubsidized employment and long term self-sufficiency.PAGE TOTALSPLANNED PERCENT
ENROLLMENT OF PLAN
1,496 26%S
B
W
I
B
T
O
T
A
L
S
F
O
O
T
H
I
L
L
T
O
T
A
L
S
S
E
L
A
C
O
V
E
R
D
U
G
O
T
O
T
A
L
S
L
A
C
O
U
N
T
Y
T
O
T
A
L
S
P
R
O
V
I
D
E
R
T
O
T
A
L
SInternational Inst. of L.A.Catholic Charities of Los AngelesCatholic Charities New Central SGVResCare Boyle HeightsYOUTH POLICY INSTITUTEHOUSING AUTHORITYSASSFA PARAMOUNTSELA AREA SOCIAL SERVICESPACEWILSHIRE METRO WORKSOURCE CENTERHUB CITIES CONSORTIUMJVS PALMDALEMCS POMONAJVS PALMDALEJVS CULVER CITYJVS PACOIMAPACIFIC GATEWAYEL PROYECTO DEL BARRIOHOLLYWOOD WORKSOURCE CTRCENTRAL SAN GABRIEL VALLEY GOODWILLSOUTH VALLEY WORKSOURCE GOODWILLCANOGA PARK WEST HILLSMCS ROSEMADMCS WEST COVINAFOOTHILLSELACOVERDUGOGARDENAINGLEWOODINGLEWOOD (POMONA)CARSONTORRANCEPAGE 4
526
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
GRANT PERIOD: 07/01/2018 TO 6/30/2019 WTW SUBSIDIZED TRANSITIONAL EMPLOYMENT PROGRAM (STEP 100H) - OJT
REPORT PERIOD: 07/01/18 TO 9/30/2018 DETAIL BY CAREER CENTER
I. TOTAL CLIENTS 0 15 1 1 0 0 0 0 0 3 0 0
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0 0 0
B. NEW 0 15 1 1 0 0 0 0 0 3 0 0
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 3 1 0 0 0 6 0 7 0 0 2 1
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0 0 0
B. NEW 3 1 0 0 0 6 0 7 0 0 2 1
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 0 2 5 6 2 0 0
A. CARRIED IN 0 0 0 0 0 0 0
B. NEW 0 2 5 6 2 0
II. TOTAL EXITS 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 0 0 0 0 0 0 0
A. CARRIED IN 0 0 0 0 0 0 0
B. NEW 0 0 0 0 0 0 0
II. TOTAL EXITS 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0
0.00 0.00 SOUTH 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 17 3 0 0 35 0 0 55 0
A. CARRIED IN 0 0 0 0 0 0 0 0 0
B. NEW 17 3 0 0 35 0 0 55 0
II. TOTAL EXITS 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0
% OF PLACEMENT 0%0%0%0%0%0%0 0%0
AVERAGE PLACEMENT WAGE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Targets Temporary Assistance to Needy Families, TANF participants; and places them into Paid Work Experience activity. Participants are placed at worksites that are either Public or Non-Profit in an effort to obtain unsubsidized employment and long term self-
sufficiency.
Targets Calworks participants; and places them into Paid Work Experience and On-the-Job activities in an effort to obtain unsubsidized employment and long term self-sufficiency.PAGE TOTALSPLANNED PERCENT
ENROLLMENT OF PLAN
499 11%S
B
W
I
B
T
O
T
A
L
S
F
O
O
T
H
I
L
L
T
O
T
A
L
S
S
E
L
A
C
O
V
E
R
D
U
G
O
T
O
T
A
L
S
L
A
C
O
U
N
T
Y
T
O
T
A
L
S
P
R
O
V
I
D
E
R
T
O
T
A
L
SInternational Inst. of L.A.Catholic Charities of Los AngelesCatholic Charities New Central SGVResCare Boyle HeightsYouth Policy InstituteHousing AuthoritySASSFA PARAMOUNTSELA AREA SOCIAL SERVICESPACEWILSHIRE METRO WORKSOURCE CENTERHUB CITIES CONSORTIUMJVS PALMDALEMCS POMONAJVS PALMDALEJVS CULVER CITYJVS PACOIMAPACIFIC GATEWAYEL PROYECTO DEL BARRIOHOLLYWOOD WORKSOURCE CTRCENTRAL SAN GABRIEL VALLEY GOODWILLSOUTH VALLEY WORKSOURCE GOODWILLCANOGA PARK WEST HILLSMCS ROSEMADMCS WEST COVINAFOOTHILLSELACOVERDUGOGARDENAINGLEWOODINGLEWOOD (POMONA)CARSONTORRANCEPAGE 5
527
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
GRANT PERIOD: 07/01/2018 TO 6/30/2019 WTW SUBSIDIZED TRANSITIONAL EMPLOYMENT PROGRAM (GROW 055H) - PAID WEX
REPORT PERIOD: 07/01/18 TO 9/30/2018 DETAIL BY CAREER CENTER
PAGE 6
I. TOTAL CLIENTS 0 5 10 5 0 0 0 0 2 0
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0
B. NEW 0 5 10 5 0 0 0 0 2
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 0 0 5 0 0 3 12
A. CARRIED IN 0 0 0 0 0 0 0
B. NEW 0 0 5 0 0 3 12
II. TOTAL EXITS 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 0
A. CARRIED IN 0
B. NEW
II. TOTAL EXITS 0
UNSUBSIDIZED EMPLOYMENT 0
OTHER TERMINATIONS 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 0 0 0 0 0
A. CARRIED IN 0 0 0 0 0
B. NEW 0 0 0 0
II. TOTAL EXITS 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
I. TOTAL CLIENTS 20 2 0 0 20 0 0 42 0
A. CARRIED IN 0 0 0 0 0 0 0 0 0
B. NEW 20 2 0 0 20 0 0 42 0
II. TOTAL EXITS 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0
% OF PLACEMENT #DIV/0!#DIV/0!0%0%#DIV/0!#DIV/0!#DIV/0!0
AVERAGE PLACEMENT WAGE $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Targets Temporary Assistance to Needy Families, TANF participants; and places them into Paid Work Experience activity. Participants are placed at worksites that are either Public or Non-Profit in an effort to obtain unsubsidized employment and long term self-
sufficiency.
Targets Calworks participants; and places them into Paid Work Experience and On-the-Job activities in an effort to obtain unsubsidized employment and long term self-sufficiency.PAGE TOTALSPLANNED PERCENT
ENROLLMENT OF PLAN
50 84%S
B
W
I
B
T
O
T
A
L
S
F
O
O
T
H
I
L
L
T
O
T
A
L
S
S
E
L
A
C
O
V
E
R
D
U
G
O
T
O
T
A
L
S
L
A
C
O
U
N
T
Y
T
O
T
A
L
S
P
R
O
V
I
D
E
R
T
O
T
A
L
SYOUTH POLICY INSTITUTEWILSHIRE METRO WORKSOURCE CENTERHUB CITIES CONSORTIUMCENTRAL SAN GABRIEL VALLEY GOODWILLJVS ANTELOPE VALLEYJVS CULVER CITYJVS PACOIMAPACEFOOTHILLVERDUGOGARDENAINGLEWOODINGLEWOOD (POMONA)CARSON528
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
GRANT PERIOD: 07/01/2018 TO 06/30/19 REPORT PERIOD: 07/01/18 TO 9/30/2018
HOMELESS INITITAIVE
I. TOTAL CLIENTS 43 6 19 0 0 0 0 0 0 68
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0
B. NEW 43 6 19 0 0 0 0 0 0 68
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0
% OF PLACEMENT #DIV/0!
AVERAGE PLACEMENT WAGE -$
GRANT PERIOD: 07/01/2018 TO 06/30/19 REPORT PERIOD: 07/01/18 TO 9/30/2018
SHORT TERM VOCATIONAL TRAINING SPECIAL (TECHNICAL)
I. TOTAL CLIENTS 0 3 2 0 0 2 0 0 0 7
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0
B. NEW 0 3 2 0 0 2 0 0 0 7
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0 0
% OF PLACEMENT #DIV/0!#DIV/0!
AVERAGE PLACEMENT WAGE 0 -$
Planned Enrollments are based on individual need and available funds.
The program is part of a countywide homeless inititive to target eligible CalWORKs families to participate in the Transitional Subsidized Employment (TSE) programs to improve their ability to become self-sufficient and retain housing. Program
services will include paid work experience, specialized work experience, on-the-job training and classroom training.
200 34%METRO NORTH WORKSOURCE CTRUNION STATION HOMELESS SRVSLAI/SOUTHEAST LA CRENSHAWPAGE TOTALSPLANNED PERCENT
ENROLLMENT OF PLAN
ENROLLMENT OF PLAN
GARDENAINGLEWOODCARSONCENTRAL SAN GABRIEL VALLEY GOODWILLFOOTHILLHUB CITITIES CONSORTIUM50 14%
Targets Temporary Assistance to Needy Families, TANF participants; and places them into short-term vocational training programs in an effort to obtain employment and long term self-sufficiency.PAGE TOTALSPLANNED PERCENT
PAGE 7
529
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
GRANT PERIOD: 07/01/2018 TO 6/30/2019 COLLEGE WORK STUDY PROGRAM (150H)
REPORT PERIOD: 07/01/18 TO 9/30/2018 DETAIL BY COLLEGE
PAGE 8
I. TOTAL CLIENTS 2 20 5 12 12 5 1 5 0 0 0 0
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0 0 0
B. NEW 2 20 5 12 12 5 1 5 0 0 0 0
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0 0 0 0
I. TOTAL CLIENTS 0 0 0
A. CARRIED IN 0 0 0
B. NEW 0 0 0
II. TOTAL EXITS 0 0 0
OTHER TERMINATIONS 0 0 0
I. TOTAL CLIENTS 62
A. CARRIED IN 0
B. NEW 62
II. TOTAL EXITS 0
UNSUBSIDIZED EMPLOYMENT 0
OTHER TERMINATIONS 0
% OF PLACEMENT 0%
AVERAGE PLACEMENT WAGE $0.00L.A. CITY COLLEGEEAST L.A. COLLEGEEL CAMINO /COMPTONL.A. MISSION COLLEGEL.A. PIERCE COLLEGEWEST L.A. COLLEGEL.A. SOUTHWEST COLLEGELONG BEACH CITY COLLEGETargets Calworks participants/Individuals whose families are on Public Assistance; enrolled in Community Colleges; and places them into a Paid Work Experience activity. Participants are placed at worksites that are either Public or Non-Profit in an effort to
obtain unsubsidized employment and long term self-sufficiency.
PLANNED PERCENT
ENROLLMENT
75
OF PLAN
83%PAGE TOTALS530
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
GRANT PERIOD: 07/01/2018 TO 06/30/19 REPORT PERIOD: 07/01/18 TO 9/30/2018
DPSS PROBATION PROGRAM (950H TIER I)
I. TOTAL CLIENTS 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
B. NEW 0 0 0 1 0 0 0 0 0 0 0 0 0 0 1
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% OF PLACEMENT 0%
AVERAGE PLACEMENT WAGE -$
GRANT PERIOD: 07/01/2018 TO 06/30/19 REPORT PERIOD: 07/01/18 TO 9/30/2018
DPSS PROBATION PROGRAM (951H TIER I)
I. TOTAL CLIENTS 1 5 0 3 0 0 1 0 0 0 0 0 0 0 10
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
B. NEW 1 5 0 3 0 0 1 0 0 0 0 0 0 0 10
II. TOTAL EXITS 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
UNSUBSIDIZED EMPLOYMENT 0 0 1 0 0 0 0 0 0 0 0 0 0 0 1
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% OF PLACEMENT 0%
AVERAGE PLACEMENT WAGE 0.00 -$ INGEWOODINGLEWOOD (POMONA)HOLLYWOOD WORKSOURCE CTRFOOTHILLPACIFIC GATEWAYHUBCITIESYOUTH POLICY INSTITUTESELA AREA SOCIAL SERVICESYOUTH POLICY INSTITUTEMCS SAN GABRIEL VALLEYSELA AREA SOCIAL SERVICESMCS SAN GABRIEL VALLEYPAGE TOTALSPLANNED PERCENT
ENROLLMENT OF PLAN
11 9%
44 23%
Serving Youth on probation, between 16-17 years of age, throughout Los Angeles County.INGLEWOOD INGLEWOOD (POMONA)HOLLYWOOD WORKSOURCE CTRFOOTHILLPACFICI GATEWAYHUBCITITESServing Youth on probation, between 18-21 years of age, throughout Los Angeles County.PAGE TOTALSPLANNED PERCENT
ENROLLMENT OF PLAN
PAGE 9
531
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
GRANT PERIOD: 07/01/2018 TO 06/30/2019 REPORT PERIOD: 07/01/18 TO 9/30/2018
DCFS ILP PROGRAM (006H TIER I)
I. TOTAL CLIENTS 3 2 0 0 0 1 0 0 0 0 0 0 0 0 7
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
B. NEW 3 2 0 0 0 1 0 0 0 0 0 0 0 0 7
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% OF PLACEMENT 0%
AVERAGE PLACEMENT WAGE -$
I. TOTAL CLIENTS 1 0 0 0
A. CARRIED IN 0 0 0 0
B. NEW 1 0 0 0
II. TOTAL EXITS 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0
TRANSFER TO OTHER AGENCY 0 0 0 0
OTHER TERMINATIONS 0 0 0 0
% OF PLACEMENT
AVERAGE PLACEMENT WAGE
GRANT PERIOD: 07/01/2018 TO 06/30/2019 REPORT PERIOD: 07/01/18 TO 9/30/2018
DCFS ILP PROGRAM (007H TIER II)
I. TOTAL CLIENTS 1 4 5 0 1 1 0 0 0 2 1 0 0 2 19
A. CARRIED IN 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
B. NEW 1 4 5 0 1 1 0 0 0 2 1 0 0 2 19
II. TOTAL EXITS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
OTHER TERMINATIONS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
% OF PLACEMENT 0%
AVERAGE PLACEMENT WAGE -$
I. TOTAL CLIENTS 2 0 0 0
A. CARRIED IN 0 0 0 0
B. NEW 2 0 0 0
II. TOTAL EXITS 0 0 0 0
UNSUBSIDIZED EMPLOYMENT 0 0 0 0
TRANSFER TO OTHER AGENCY 0 0 0 0
OTHER TERMINATIONS 0 0 0 0
% OF PLACEMENT
AVERAGE PLACEMENT WAGE
PERCENT
29%JVS (ANTELOPE VALLEY)SELA AREA SOCIAL SERVICESServing Youth in the Foster Care Independent Living Program, between 16-17 years of age, throughout Los Angeles County.PAGE TOTALSPACIFIC GATEWAYPLANNED JVS (ANTELOPE VALLEY)SELA AREA SOCIAL SERVICESPERCENT
OF PLAN
SELACOMCS HOLLYWOODMCS COVINAOF PLANENROLLMENTGARDENAINGLEWOODINGLEWOOD POMONACARSONTORRANCEFOOTHILLVERDUGOJVS (MARINA DEL REY)CARSONPLANNED
132PAGE TOTALSJVS (MARINA DEL REY)ENROLLMENT
24
14%FOOTHILLGARDENAINGLEWOODINGLEWOOD POMONAMCS COVINAVERDUGOTORRANCESELACOPACIFIC GATEWAYMCS HOLLYWOODHUB CITIESCANOGA PARKYOUTH POLICY INSTITUTEServing Youth in the Foster Care Independent Living Program, between 18-21 years of age, throughout Los Angeles County.HUB CITIESCANOGA PARKYOUTH POLICY INSTITUTEPAGE 10
532
PROGRAM YEAR 2018 / 2019
LA COUNTY PROBATION EMPLOYMENT SERVICES - GRANT 962 REPORT PERIOD: 07/01/18 TO 9/30/2018
GRANT TERM: 07/01/18 TO 6/30/2019
Qrt %Year % of
Enrolled Plan Plan Plan Plan
ENROLLMENTS/ASSESSMENTS 9 4 225%48 19%
BLUEPRINT/EMPLOYMENT 1 3 33%31 3%
RETENTION MONTHS 3 5 60%55 5%
Serving Probation Youth, 16-18 years of age, in Area I (Inglewood/Culver City/Florence) and Area 2 (Gardena/Carson/Compton/Lynwood).
YOUTHBUILD REPORT PERIOD: 08/01/17 TO 9/30/2018
GRANT TERM: 09/01/2017 TO 12/31/2020
Planned % of
Enrolled Services Plan
ENROLLMENTS 38 62 61%
EDUCATION & EMPLOYMENT
-Education (Obtained High School Diploma)6 23 26%
-Entered Employment
ATTAINMENT OF DEGREE/CERTIFICATE 20 23 87%
LITERACY & NUMERACY ATTAINMENT 15 20 75%
RETENTION 0 0 #DIV/0!
RECIDIVISM 0 0 #DIV/0!CLUSTER 2/AREA1 INGLEWOOD/LOS ANGELESThe South Bay WIB, Inc., will serve as the administrative and fiscal agent to the YouthBuild Partnership. The partnership includes the Century Center for Economic Opportunity, Inc. (CCEO)
and Habitat for Humanity of Greater Los Angeles as the housing partner and will provide educational, occupational skills training in construction and leadership skills to disadvantaged
youth ages 16-24 years residing in targeted communities. Outcome measures are based on qualified enrollment criteria.YOUTHBUILDPAGE 11
533
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
SPECIAL PROJECTS SUMMARY PAGE 12
LEAP2 REENTRY WORKS REPORT PERIOD: 06/01/17 TO 9/30/2018
GRANT TERM: 6/1/16 TO 12/31/2018
Year % of
Enrolled Plan Plan
ENROLLMENTS (100%)103 100 103%
PRE-RELEASE SERVICES (90%)103 90 114%
WORK READINESS/POST RELEASE (80%)44 72 61%
EMPLOYMENT, EDUCATION OR TRAINING (60%)9 48 19%
POST RELEASE RETENTION (70%)0 42 0%
RECIDIVISM (22%)0 15 0%
Grant Extension Approved through 12/31/18
CONSTRUCTION WORKFORCE PILOT (CALTRANS)REPORT PERIOD: 09/01/2018 - 9/30/2018
GRANT TERM: 9/1/2018 TO 8/31/2019
Year % of
Enrolled Plan Plan
Enrollment into Construction Pre-Apprentice Program Training 23 50 46%
Completion of Construction Pre-Apprentice Program Training 0 40 0%
Placement into Apprenticeship 0 25 0%
Pilot project with Caltrans to connect classroom training in construction, supportive services and job development activities; co-enrollment with WIOA programs to maximize services
and outcomes.CALTRANSLEAP2Program to increase employment outcomes amongst the formerly incarcerated by providing pre-release jail based services and transitional services seamlessly to transition from jail to
community.
534
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
SPECIAL PROJECTS SUMMARY PAGE 13
SUMMBER JOBS PROGRAM
GRANT TERM: 7/1/2018 TO 6/30/2019 REPORT PERIOD: 7/01/18 TO 9/30/2018
% of
Enrolled Plan Grant Plan
TOTAL ENROLLMENTS 170 220 77%
CALWORKS 65 109
NCC (Low Income)82 80
FOSTER YOUTH 17 16
PROBATION YOUTH (New)6 15
FAMILIES FIRST
GRANT TERM: 7/1/2018 TO 6/30/2019 REPORT PERIOD: 7/01/2018 TO 9/30/18
Year % of
Enrolled Plan Plan
ORIENTATIONS/WORKSHOPS 0 10 0%
INDIVIDUAL MEETINGS 0 20 0%
JOB REFERRALS / INTERVIEWS 0 15 0%
JOB READINESS / RESUME COMPLETION 0 20 0%
PLACEMENT 0 10 0%
* Not in session (resume 10/18)
The South Bay WIB, Inc., will provide job development staff support and services to Family First Charter School students at the Century Regional Detention Facility. Job Development services will include job readiness workshops, one-
on- one interviewing and counseling, job match and referrals to employment and worksites, progress monitoring and follow-up.
The Summer Jobs Programs provide eligible youth ages 14-21 with paid work experience and education support during school breaks.TOTALPY18-19535
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
SPECIAL PROJECTS SUMMARY PAGE 14
VETERANS EMPLOYMENT RELATED ASSISTANCE PROGRAM (VEAP)
GRANT TERM: 6/01/2017 TO 12/31/2018
REPORT PERIOD: 06/01/2017 TO 9/30/2018
Year % of
Enrolled Plan Plan
ENROLLMENTS (100%)108 100 108%
ENROLLED INTO EDUCATION OR TRAINING (65%)69 65 106%
ATTAINMENT OF CREDENTIAL/CERTIFICATE (55%)51 36 142%
EXIT RATE (100%)53 53 100%
ENTERED EMPLOYMENT RATE (80%)50 50 100%
EMPLOYMENT RETENTION (70%)0 70 0%
AVERAGE WAGE AT EMPLOYMENT 25.67$
HOMELESS VETERANS REINTERGRATION PROGRAM (HVRP) THROUGH US VETS
GRANT TERM: 7/1/2017 TO 6/30/2018*
REPORT PERIOD: 07/01/2017 TO 9/30/2018
Year % of
Enrolled Plan Plan
ENROLLMENTS (100%)50 57 88%
ENROLLED INTO TRAINING (70%)40 40 100%
ATTAINMENT OF CREDENTIAL/CERTIFICATE (55%)30 22 136%
ENTERED EMPLOYMENT RATE (70%)20 40 50%
EMPLOYMENT RETENTION (70%)0 28 0%
*Follow-up period through 6/30/2019 VEAPThis project will assist eligible veterans with significant barriers to employment (i.e., long-term unemployed, homeless, transitioning) to receive career and training services leading to employment in high growth employment
sectors such as Construction Trades.HVRPThis project will assist to reintegrate homeless veterans into employment. Veterans will receive career counseling, case management and training services to bridge employment in various occupations. Co-enrollment
opportunities in other adult/dislocated worker grants will be made to leverage and increase available resources.
536
PROGRAM YEAR 2018 / 2019 SOUTH BAY WORKFORCE INVESTMENT BOARD
SPECIAL PROJECTS SUMMARY
PAGE 15
DISABILITY EMPLOYMENT ACCELERATOR (DEA)
GRANT TERM: 4/01/2018 TO 12/31/2019
REPORT PERIOD: 04/01/2018 TO 9/30/2018
Year % of
Enrolled Plan Plan
ENROLLMENTS (100%)0 60 0%
ENROLLED INTO EDUCATION OR TRAINING 0 42 0%
ATTAINMENT OF CREDENTIAL/CERTIFICATE 0 30 0%
ENTERED EMPLOYMENT RATE 0 30 0%
AVERAGE WAGE AT EMPLOYMENT 0 12.00$ 0
**Start-up period through June 30, 2018 - Outreach begins July-Sept. 2018
CALIFORNIA VIOLENCE INTERVENTION & PREVENTION (CalVIP)
GRANT TERM: 5/01/2018 TO 4/30/2020
REPORT PERIOD: 05/01/2018 TO 9/30/2018
Year % of
Enrolled Plan Plan
ENROLLMENTS (100%)0 100 0%
RISK ASSESSMENT & INTERVENTION SERVICES 0 100 0%
WORK READINESS PREPARATION 0 50 0%
PAID WORK EXPERIENCE, INTERNSHIP OR OJT 0 50 0%
FOLLOW-UP SERVICES FOR 12 MONTHS 0 80 0%
**Start-up period through June 30, 2018 - Outreach begins July 2018DEAIn partnership with El Camino College (ECC) and Los Angeles Harbor College (LAHC), the project will target individuals with disabilities including, but not limited to, the following: mobility impaired, developmentally delayed
learner, learning disabled, and other disabilities including Autism, Attention Deficit Hyperactivity Disorder, Tourette’s Syndrome, and others. From the target population a total of 60 Persons with Disabilities (PWD) will be
enrolled and receive a pre and registered apprenticeship, PWEX, OJT or training as a CNC (Computer Numerical Control) Machine Operator.CalVIPThis project will provide services to Inglewood youth that are disproportionally affected by violence and will receive evidence-based services for diversion, restorative justice, and employment opportunities through the
Inglewood Community and Regional Engagement Violence Intervention and Prevention (I-CARE VIP) collaboration. The project will serve 100 youth ages 14-18 and provide preventive and diversion activities, case
management along with paid pre-employment training, paid work experience and job search assistance.
537
Inglewood Teen Center New Returning Total Inglewood Teen Center New Returning Total
Inglewood 4 45 49 Inglewood 25 83 108
Hawthorne 0 0 0 Hawthorne 0 0 0
Lawndale 0 0 0 Lawndale 0 0 0
Gardena 0 0 0 Gardena 0 0 0
TOTAL 4 45 49 TOTAL 25 83 108
Hawthorne Teen Center New Returning Total Hawthorne Teen Center New Returning Total
Inglewood 0 2 2 Inglewood 0 3 3
Hawthorne 0 58 58 Hawthorne 0 55 55
Lawndale 0 1 1 Lawndale 0 0 0
Gardena 0 1 1 Gardena 0 0 0
Torrance 0 0 0 Torrance 0 0 0
TOTAL 0 62 62 TOTAL 0 58 58
Inglewood Teen Center New Returning Total QUARTER TOTAL
Inglewood 9 77 86 Inglewood Teen Center 243
Hawthorne 0 0 0 Hawthorne Teen Center 172
Lawndale 0 0 0
Gardena 0 0 0
TOTAL 9 77 86
Hawthorne Teen Center New Returning Total
Inglewood 0 2 2
Hawthorne 1 49 50
Lawndale 0 0 0
Gardena 0 0 0
Torrance 0 0 0
TOTAL 1 51 52
July 1, 2018- July 31, 2018
August 1, 2018- August 31, 2018
September 1, 2018- September 30, 2018
Teen Center Attendance Report PAGE 16
538
An employer-centric workforce pipeline development program
Modeled after the successful SBWIB Aero-Flex initiative
Bio-Flex is a new innovative project to develop pre-
apprenticeship and registered apprenticeship career
pathways for the Bio-Science industry.
Bio-Science Employers - your input and guidance is
needed for program development. Please connect with us
to participate.
Ask us about other programs available to support your
business growth.
Please contact:
Deborah Shepard
South Bay Workforce Investment Board
Email: dshepard@sbwib.org; Phone: (310) 970-7700
This WIOA Title 1 financially assisted program or activity is an equal opportunity employer/program. Auxiliary aids and services are
available upon request to individuals with disabilities by calling in advance to CRS 1-800-735-2922 or 310-680-3700.
• Employment Training
Panel Funding (ETP)
• Wage Subsidy programs
• City & County Business
incentives
• Tax credits for equipment
purchases
A WORKFORCE
DEVELOPMENT BOARD
Announcing
539
A WORKFORCE
DEVELOPMENT BOARD
Auxiliary aids and services are available upon request to individuals with disabilities by calling in advance
to CRS 1-800-735-2922 or 310-680-3700.
South Bay Workforce Investment Board
All forums will be held at the
South Bay Workforce Investment Board Conference Room
11539 Hawthorne Blvd., 5th Floor Hawthorne, CA 90250
Save the DatesSave the Dates
is updating its Local Plan & the Los Angeles Basin
Regional Plan
The SBWIB invites you to join the discussion. Your participation and input is
critical to developing a plan that is responsive to the needs of our community.
Review the current plan at www.sbwib.org/local-plan
RSVP to Elisa Irish
Email: eirish@sbwib.org
Phone: (310) 970-7700
RSVP to Elisa Irish
Email: eirish@sbwib.org
Phone: (310) 970-7700
November 27th
3:00 P.M. to 5:00 P.M.Child Support Services
Strengthening partnerships with local
child support agencies to serve
non-custodial parents
November 14th
9:00 A.M. to 11:30 A.M.LA Basin Self-Assessment Forum
Assess of progress on implementation of
regional workforce goals
CalFresh Employment & Training
Developing workforce system
partnerships with CalFresh
employment and training programs
October 25th
2:00 P.M. to 4:30 P.M.LA Basin Region Re-entry Planning Forum
Strategies to improve labor market outcomes
for formerly incarcerated and other justice-
involved individuals
December 4th
9:00 A.M. to 11:00 A.M.
540
A WORKFORCE
DEVELOPMENT BOARD
Auxiliary aids and services are available upon request to individuals with disabilities by calling in advance to CRS 1-800-735-2922 or 310-680-3700.
RSVP to
Email: info@sbwib.org
or
Phone: (310) 970-7700
No cost registration
Breakfast & lunch provided
Double Tree by Hilton Hotel Torrance
21333 Hawthorne Blvd.,
Torrance, CA 90503
January 16, 2019
8:30 a.m. - 12:30 p.m.
The
Workforce
Save the DateSave the Date
21st Century 21st Century
Employers
Managers
HR Professionals
And others interested
in workplace strategies
Who should
attend
www.surveymonkey.com/r/NFJ6SM9
Strategies for enhancing productivity and attracting talent in a
competitive environment through flexible workplace practices
bit.ly/2QrWxJh
541
Hawthorne Hermosa Beach Gardena Lawndale Redondo Beach Manhattan Beach Carson El Segundo Lomita Torrance Inglewood
11539 Hawthorne Boulevard, 5th Floor, Suite #500, Hawthorne CA 90250 / w. 310.970.7700 / f. 310.970.7711
PRESS RELEASE South Bay Workforce Investment Board
11539 Hawthorne Blvd., Suite 500
November 13, 2018 Hawthorne, CA 90250
Contact: 310-970-7700
South Bay Workforce Investment Board Honors Training Partners,
Businesses and Successful Job Seekers at 23rd Annual Awards Banquet
HAWTHORNE – Nearly 500 community leaders, educators, employers, training partners and successful job
seekers joined with the South Bay Workforce Investment Board (SBWIB) staff and administrators for the 23rd
Annual Awards Ceremony and Banquet, November 1st, at the Torrance Marriott.
SBWIB Executive Director Jan Vogel served as master of ceremonies for the event that was attended by
numerous elected officials from the South Bay area including: Inglewood Mayor James T. Butts, Jr, along with
Councilmembers Ralph Franklin and George Dotson; Hawthorne Mayor Alex Vargas and Councilmembers
Olivia Valentine and Nilo Michelin; Lawndale Mayor Robert Pullen-Miles and Councilman Pat Kearney; Lomita
Councilman Ben Traina; Carson Mayor Albert Robles and Councilman Elito Santarina; Gardena Mayor Tasha
Cerda; Torrance Mayor Pat Furey and Councilman Tim Goodrich; West Basin Municipal Water District Board
President Harold Williams and Vice President Scott Houston; Centinela Valley Unified School District President
Hugo Rojas and Trustees Daniel Urrutia and Gloria Ramos; and, Hawthorne School District Board President Dr.
Eugene Krank along with Trustees Cristina Chiappe, Luciano Aguilar, Alex Montiero and Sergio Mortara.
SBWIB Chairman of the Board Wayne Spencer joined with Mr. Vogel to honor 67 training partners who had
achieved 90 – 100 percent placements of individuals into full time employment through the SBWIB. Special
awards were also presented to following four South Bay area businesses: EV Connect in El Segundo, TEAM
Industrial Services in Torrance, Hawthorne-based SpaceX, and Turner Construction which is part of the
contractor team that is building the 70,000 seat football stadium in Inglewood that will house the Los Angeles
Rams and Los Angeles Chargers.
The evening’s top award – the Esther Williams Award of Excellence - was presented to Dennis Fitzgerald, Vice
President of Operations for Gardena-based Impresa Aerospace, LLC. He was honored for his many years of
superior performance in a wide breadth of industries including aerospace manufacturing, defense acquisition,
developmental flight test, and as both a U.S. Naval pilot and commercial airline co-pilot. Mr. Fitzgerald was
also one of the co-founders and active member of the SBWIB’s Aero-Flex Unilateral Apprenticeship
Committee. Impresa is hiring the first Aero-Flex Engineering Apprentice in the country.
The net proceeds of the event benefit the many youth programs the SBWIB provides. The SBWIB operates
four One Stop Business & Career Centers within its South Bay service area plus two Teen Centers in Inglewood
and Hawthorne providing no cost adult, youth and business services. For further information, telephone 310-
970-7700 or visit sbwib.org.
# # #
542
Hawthorne Hermosa Beach Gardena Lawndale Redondo Beach Manhattan Beach Carson El Segundo Lomita Torrance Inglewood
11539 Hawthorne Boulevard, 5th Floor, Suite #500, Hawthorne CA 90250 / w. 310.970.7700 / f. 310.970.7711
SBWIB Awards Ceremony Photo Caption
Four of the individuals honored for their successful completion of training through the South Bay Workforce
Investment Board and gaining full employment proudly pose with their awards during the 23rd annual Awards
Ceremony held November 1st at the Torrance Marriott. Pictured from left are Marta Caires of Hermosa Beach,
Nanci Lane of Redondo Beach, Carolina Dorado of Torrance, and Patricia Goode of Manhattan Beach.
# # #
543
Hawthorne Hermosa Beach Gardena Lawndale Redondo Beach Manhattan Beach Carson El Segundo Lomita Torrance Inglewood
11539 Hawthorne Boulevard, 5th Floor, Suite #500, Hawthorne CA 90250 / w. 310.970.7700 / f. 310.970.7711
PRESS RELEASE South Bay Workforce Investment Board
11539 Hawthorne Blvd., Suite 500
September 26, 2018 Hawthorne, CA 90250
Contact: 310-970-7700
Deputy Assistant Secretary for Policy from U.S. Department of Labor Visits
South Bay Workforce Investment Board for Briefing
on Veterans Employment and Training Services
HAWTHORNE – Matthew Miller, Deputy Assistant Secretary (DAS) for Policy/Veterans Employment and
Training Services at the U.S. Department of Labor, was a recent visitor to the South Bay Workforce Investment
Board (SBWIB) where he was briefed on the programs the SBWIB and its partnering agencies are providing for
veterans including employment and training services. DAS Miller was accompanied by Tony Forbes, U.S.
Department of Labor Office of Strategic Outreach for Veterans Employment and Training Services.
SBWIB Executive Director Jan Vogel welcomed the visitors to the Inglewood One-Stop Business and Career
Center and provided an overview of how the SBWIB is assisting target groups including recently separated
veterans, post 9/11 veterans, homeless veterans, female veterans, spouses of active duty service members
underemployed veterans, special disabled veterans and formerly incarcerated veterans.
Also in attendance were representatives from the strategic partners that work with the SBWIB in the areas of
housing, mental health services, training providers, employers, Veterans Administration, and the California
Economic Development Department.
The Labor officials were then given a tour of the National Football League football stadium in Inglewood
where they met with some of the former veterans that had been hired by contractors after going through the
SBWIB’s Career-Pathway-oriented program that enables veterans to earn industry-recognized credentials and
to attain marketable skills as they seek work in growing career fields.
The SBWIB operates four One-Stop Business & Career Centers that provide no cost services to large and small
businesses along with job search and career preparation for adults and youth in the communities of Carson,
Inglewood, Hawthorne, Torrance, Lomita, Gardena, Redondo Beach, Lawndale, Hermosa Beach, El Segundo
and Manhattan Beach. SBWIB also operates two Teen Center in Inglewood and Hawthorne.
# # #
544
Hawthorne Hermosa Beach Gardena Lawndale Redondo Beach Manhattan Beach Carson El Segundo Lomita Torrance Inglewood
11539 Hawthorne Boulevard, 5th Floor, Suite #500, Hawthorne CA 90250 / w. 310.970.7700 / f. 310.970.7711
Department of Labor Visitors Photo Caption
U.S. Department of Labor Deputy Assistant Secretary Matthew Miller (second from right) thanks staff
members at the South Bay Workforce Investment Board’s One-Stop Business & Career Center Inglewood for
their successful efforts in helping veterans find jobs and career training. DAS Miller traveled to California
recently to learn more about the SBWIB’s employment and training program which he termed should be a
model for other states to follow.
# # #
545
Hawthorne Hermosa Beach Gardena Lawndale Redondo Beach Manhattan Beach Carson El Segundo Lomita Torrance Inglewood
11539 Hawthorne Boulevard, 5th Floor, Suite #500, Hawthorne CA 90250 / w. 310.970.7700 / f. 310.970.7711
PRESS RELEASE South Bay Workforce Investment Board
11539 Hawthorne Blvd., Suite 500
September 5, 2018 Hawthorne, CA 90250
Contact: 310-970-7700
South Bay Workforce Investment Board Awarded Nearly $132,000
by the California Employment Training Panel to Fund
Employee Training
HAWTHORNE – The California Employment Training Panel (ETP) has awarded a $131,536 grant to the South
Bay Workforce Investment Board (SBWIB) to establish a program that will help subsidize job skills training for
eligible small and larger manufacturers primarily in the aerospace sector. ETP is a business and labor-
supported state agency that funds the costs of job skills training. The new funding will support employee
training at multiple employers in the region through the SBWIB.
The SBWIB will work in partnership with Training Funding Partners to analyze the employer’s workforce
development needs and contract with the appropriate training providers to deliver services. The funds can
cover training for current employees and newly hired workers.
“Training costs are a major concern for smaller manufacturers who need to stay competitive,” said SBWIB
Executive Director Jan Vogel. “These types of innovative subsidy programs can help the employers attract and
retain skilled workers who need to improve their job skills and knowledge,” he noted.
The SBWIB provides comprehensive employment and training services under the Federal Workforce
Innovation Opportunity Act with the goal of providing a fully-integrated workforce system that maximizes
employment and economic opportunity in partnership with business.
No cost services are provided for job seekers and employers through the SBWIB’s four One-Stop Business &
Career Centers serving 11 South Bay communities. It also operates two Teen Centers in Inglewood and
Hawthorne. Employers interested in participating in the SBWIB new ETP program, or to access other services
available, please call (310) 970-7700 or visit www.sbwib.org.
# # #
546
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0704
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
STATE OF CALIFORNIA, CALIFORNIA GOVERNOR’S OFFICE
OF EMERGENCY SERVICES DESIGNATION OF APPLICANT’S
AGENT RESOLUTION FORM 130
(City Manager Suja Lowenthal)
Recommended Action:
Staff recommends that the City Council:
1.Approve the positions of City Manager, Finance Director and Chief of Police as the City of
Hermosa Beach’s Designated Authorized Agents; and,
2.Approve Resolution XX-XXXX as the State of California, California Governor’s Office of
Emergency Services (Cal OES) Designation of Authorized Agents Resolution Form 130.
Executive Summary:
The California Governor’s Office of Emergency Services requires jurisdictions to identify the
members of the organization authorized to sign agreements on behalf of the local jurisdiction to
receive grant and cost recovery funding. The Designation of Subrecipient’s agent is required by
resolution through a template commonly known as Form 130 and must be updated every three years.
The City of Hermosa Beach approved the current Form 130 in April of 2016 and identified three staff
members by name and position as designated agents. Over the course of the three years, those staff
members have changed, therefore, the City needs to update the Form 130 to prevent grant and
disaster cost recovery eligibility issues.
Background:
California Governors’ Office of Emergency Services (Cal OES) requires local jurisdictions to identify
and designate three authorized agents who are able to request certain federal financial assistance
allowable under the Public Law 93-288 as amended by the Robert T. Stafford Disaster Relief and
Emergency Assistance Act of 1988 and/or state financial assistance under the California Disaster
Assistance Act. The funding is for Federal pre-disaster grant funds that are made available and
administered through Cal OES along with post disaster recovery funding released as a result of a
declared emergency. Cal OES requires the Designation of Applicant’s Agent Resolution Form 130 to
be updated at least every three years by local jurisdictions and submitted to Cal OES for processing.
City of Hermosa Beach Printed on 4/3/2024Page 1 of 3
powered by Legistar™547
Staff Report
REPORT 18-0704
At its April 12, 2016 meeting, City Council adopted Resolution 16-7021 identifying Tom Bakaly, City
Manager; Sharon Papa, Chief of Police; and Viki Copeland, Finance Director as the City’s authorized
agents for Cal OES Form 130. The Resolution is set to expire in April of 2019 (Attachment 1).
Discussion:
According to Cal OES, authorized agents are the individuals that are authorized by the Governing
Body to engage with the Federal Emergency Management Agency and the California Governor’s
Officer of Emergency Service regarding grants applied for by the subrecipient (City of Hermosa
Beach). There are two ways to determine authorized agents: by title or by name and title. Identifying
agents by title alone allows the document to remain valid if an authorized agent leaves the position
and/or is replaced by another individual. Identifying agents by name and title requires a new Cal OES
Form 130 to be submitted when an authorized agent is replaced, leaves the position or the person’s
title changes.
The City’s current Cal OES Form 130 identified agents by name and title. Since the adoption of
Resolution 16-7021, there have been numerous changes in the City Manager position. Therefore, the
Cal OES Form 130 requires update to accurately reflect identified agents. Proposed Resolution XX-
XXXX designates the authorized agents by title (City Manager, Finance Director and Chief of Police)
and will be valid for three years, expiring in December of 2021 and will supersede Resolution 16-
7021, which was adopted in 2016 (Attachment 2).
General Plan Consistency:
This report and associated recommendations have been evaluated for their consistency with the
City’s General Plan. Relevant policies are listed below:
Governance Element:
1.6 Long-term considerations. Prioritize decisions that provide long-term community benefit and
discourage decisions that provide short-term community benefit but reduce long-term opportunities
Public Safety Element
1.11 Secure Funds. Establish centralized internal procedures to coordinate efforts for securing funds
that support risk reduction measures.
6.3 Invest in critical facilities. Invest in public and critical facilities to make them more resilient to the
potential impacts of natural disasters.
6.4 Post-disaster evaluation. The Emergency Operations Center and Police/Fire facilities shall be the
top priority in conducting post-disaster building evaluations.
6.5 Optimize community benefits. Ensure that post-disaster recovery decisions optimize long-term
community benefits.
City of Hermosa Beach Printed on 4/3/2024Page 2 of 3
powered by Legistar™548
Staff Report
REPORT 18-0704
6.6 Assist businesses. Assist local/small businesses in planning for continuity of operations and
emergency preparedness.
Fiscal Impact:
There is no immediate fiscal impact related to this recommendation. If Cal OES Form 130 is not
updated, it can hinder the City’s eligibility for future disaster cost recovery and grant funding such as
pre-disaster hazard mitigation grants.
Attachments:
1. Resolution Number 16-7021
2. Resolution Number XX-XXX
Respectfully Submitted by: Brandy Villanueva, Emergency Services Coordinator
Noted for Fiscal Impact: Viki Copeland, Finance Director
Legal Review: Mike Jenkins, City Attorney
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 3 of 3
powered by Legistar™549
550
551
Page 1 of 2 17-____
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
C.C. RESOLUTION NO. 17-XX
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH,
CALIFORNIA, APPROVING CALIFORNIA GOVERNOR’S OFFICE OF EMERGENCY
SERVICES FORM 130 DESIGNATION OF SUBRECIPIENTS’ AGENTS.
THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA, DOES
HEREBY RESOLVE AND ORDER AS FOLLOWS:
Section 1. The State of California, California Governor’s Office of Emergency Services
ensures that local jurisdictions meet federal and state eligibility requirements defined in the Robert
T. Stafford Disaster Relief and Emergency Assistance Act of 1988, as amended 44 CFR 302 and
the California Disaster Assistance Act
Section 2. The City of Hermosa Beach is a public entity established under the laws of the State
of California, authorized to make applications and to file them in the California Office of Emergency
Services (Cal OES) for the purpose of obtaining certain federal assistance under Public Law 93-288,
as amended by the Robert T. Stafford Disaster Relief and Emergency Assistance Ace of 1988; and/or
state financial assistance under the California Disaster Assistance Act. .
Section 3. The Cal OES Form 130 – Designation of Applicant’s Agent Resolution is a required
form designating the authorized agents of the City to execute any and all documents related to pre and
post disaster funding. Cal OES Form 130 must be approved by City Council and on file with Cal OES
prior to the submission of funding requests.
Section 4. The City of Hermosa Beach is interested in receiving pre-disaster mitigation funds
to implement programs that will enhance the safety of the community, increase response and recovery
capabilities during disasters as well as request cost recovery funding for disaster response not only in
the City of Hermosa Beach but also mutual aid responses for County, Regional and State-wide
disasters.
Section 5. The City of Hermosa Beach designated three authorized agents by title: City
Manager or Finance Director or Chief of Police to execute for and on behalf of the City of Hermosa
552
Page 2 of 2 17-____
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
Beach for all matters pertaining to such state disaster assistance, the assurances and agreements
required under the laws referenced above.
Section 6. The City of Hermosa Beach authorizes this resolution as a universal resolution and
is effect for all open and future Disasters/Grants up to three (3) years following the date of approval.
NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED that the City
Council of the City of Hermosa Beach hereby:
1. Authorizes the City Manager, Finance Director and the Chief of Police of the City of Hermosa
Beach to execute all necessary applications, agreements, grant reports, and amendments thereto
to implement and carry out the grant application and/or cost recovery processes at required by
State and Federal Law.
VOTE: AYES:
NOES:
ABSTAIN:
ABSENT:
PASSED, APPROVED and ADOPTED this 27th day of November 2018.
______________________________________________________________________________________________
PRESIDENT of the City Council and MAYOR of the City of Hermosa Beach, California
ATTEST: APPROVED AS TO FORM:
City Clerk City Attorney
553
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0712
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
RESOLUTION ESTABLISHING A POLICY AND
VOTING PROCEDURES FOR BOARD AND
COMMISSION APPOINTMENTS
(City Clerk Elaine Doerfling)
Recommended Action:
City Clerk recommends that the City Council adopt the attached resolution establishing a policy and
voting procedures for Board and Commission appointments using paper ballots/voting sheets
provided by the City Clerk.
Background:
At its November 13, 2018 meeting, the City Council considered options to establish a policy and
voting procedures for Board and Commission appointments that would eliminate past confusion and
ensure consistency in the future.
The City Clerk’s report provided a review of past voting procedures, including a formal motion for
each appointment, voice vote by consensus, paper voting for single/multiple appointments, and
weighted paper voting for multiple appointments. The report also reviewed previous Council
directions/actions regarding voting procedures, including a policy developed by a Council
subcommittee and staff in 2012, calling for members to mark their selection(s) on paper instead of
voice voting, and having the City Clerk to read the selections aloud, tally the votes, and announce the
winning applicants, which is the option unanimously approved by the Council. The attached
resolution is presented to formalize Council’s action at its November 13 meeting.
Attachments:
1. Draft Resolution
2. Exhibit A - Sample Paper Ballot
Submitted by: Elaine Doerfling, City Clerk
Concur: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™554
Page 1 of 2 18-7111
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 18-
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF HERMOSA
BEACH, CALIFORNIA, ESTABLISHING A POLICY AND VOTING
PROCEDURES FOR BOARD AND COMMISSION APPOINTMENTS
WHEREAS, members of the Boards and Commissions of the City of Hermosa Beach are
appointed by the Hermosa Beach City Council to four-year terms (with the exception of the Board
of Appeals, or unless otherwise specified); and
WHEREAS,the Hermosa Beach Municipal Code specifies the qualifications for each of
the City’s Boards and Commissions, including whether members must be qualified electors of the
City or bona fide residents, and appointees serve in a voluntary capacity, without compensation,
providing a valuable service to the entire community; and
WHEREAS, in accordance with established procedure, upcoming term expirations and
unscheduled vacancies are brought to the City Council’s attention by the City Clerk for direction
on advertising to fill the seats. Unless otherwise directed, a notice inviting applications is placed
on the City’s website, posted in various publicly-accessible Civic Center locations, sent to
residents who signed up for e-notifications, and published twice in the Easy Reader newspaper,
with a specified application filing deadline, after which the City Clerk reports back to the Council
for the scheduling of applicant interviews and appointment; and
WHEREAS,the City Council desires a consistent voting policy for making Board and
Commission appointments to eliminate the confusion created over the years by employing
different voting systems at different meetings (voice voting by consensus or formal motion, paper
voting with or without ranking).
555
Page 2 of 2 18-7111
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE
CITY OF HERMOSA BEACH DOES HEREBY RESOLVE AS FOLLOWS:
The following voting procedures for Board/Commission appointments are hereby adopted:
Section 1. Members of the City Council shall mark their selection(s), depending on the
number of seats, on a paper ballot provided by the City Clerk (conforming to the attached sample
voting sheet (Exhibit A).
Section 2. Councilmembers shall return their voted ballots to the City Clerk, who will
read their selection(s) aloud, tally the votes, and announce the appointee(s).
Section 3. Tie votes that occur with a full Council present shall be resolved by re-voting
until consensus is reached. In the event of a tie vote with less than a full Council, the appointment
shall be continued to the next meeting to allow for voting by all five members.
Section 4. the City Clerk shall certify to the passage and adoption of this Resolution, shall
enter the same in the book of original Resolutions of said city; and shall make minutes of the
passage and adoption thereof in the records of the proceedings of the City Council at which the
same is passed and adopted
PASSED, APPROVED and ADOPTED this 27th day of November, 2018.
______________________________________________________________________________________________
PRESIDENT of the City Council and MAYOR of the City of Hermosa Beach, California
ATTEST:APPROVED AS TO FORM:
_____________________________________________ ______________________________________________
City Clerk City Attorney
556
EXHIBIT A
Carolyn Petty Jeff Duclos
Public Works Comm. Appointments 11/02/16 Public Works Comm. Appointments 11/02/16
Three four-year terms Three four-year terms
Select Three (3) Applicants Select Three (3) Applicants
Janice Brittain- - - - - - - - - - - - - Janice Brittain- - - - - - - - - - - - -
Kent F. Brown- - - - - - - - - - - - - Kent F. Brown- - - - - - - - - - - - -
David Grethen- - - - - - - - - - - - - David Grethen- - - - - - - - - - - - -
Geoffrey Hirsch- - - - - - - - - - - - Geoffrey Hirsch- - - - - - - - - - - -
Jolisa Jones-Corey - - - - - - - - - Jolisa Jones-Corey - - - - - - - - -
Peter Tucker- - - - - - - - - - - - - - Peter Tucker- - - - - - - - - - - - - -
Justin Schnuelle - - - - - - - - - - - Justin Schnuelle - - - - - - - - - - -
Jonathan Wicks- - - - - - - - - - - - Jonathan Wicks- - - - - - - - - - - -
Hany Fangary Justin Massey
Public Works Comm. Appointments 11/02/16 Public Works Comm. Appointments 11/02/16
Three four-year terms Three four-year terms
Select Three (3) Applicants Select Three (3) Applicants
Janice Brittain- - - - - - - - - - - - - Janice Brittain- - - - - - - - - - - - -
Kent F. Brown- - - - - - - - - - - - - Kent F. Brown- - - - - - - - - - - - -
David Grethen- - - - - - - - - - - - - David Grethen- - - - - - - - - - - - -
Geoffrey Hirsch- - - - - - - - - - - - Geoffrey Hirsch- - - - - - - - - - - -
Jolisa Jones-Corey - - - - - - - - - Jolisa Jones-Corey - - - - - - - - -
Peter Tucker- - - - - - - - - - - - - - Peter Tucker- - - - - - - - - - - - - -
Justin Schnuelle - - - - - - - - - - - Justin Schnuelle - - - - - - - - - - -
Jonathan Wicks- - - - - - - - - - - - Jonathan Wicks- - - - - - - - - - - -
Stacey Armato City Clerk Tally
Public Works Comm. Appointments 11/02/16 Public Works Comm. Appointments 11/02/16
Three four-year terms Three four-year terms
Select Three (3) Applicants Select Three (3) Applicants
Janice Brittain- - - - - - - - - - - - - Janice Brittain- - - - - - - - - - - - -
Kent F. Brown- - - - - - - - - - - - - Kent F. Brown- - - - - - - - - - - - -
David Grethen- - - - - - - - - - - - - David Grethen- - - - - - - - - - - - -
Geoffrey Hirsch- - - - - - - - - - - - Geoffrey Hirsch- - - - - - - - - - - -
Jolisa Jones-Corey - - - - - - - - - Jolisa Jones-Corey - - - - - - - - -
Peter Tucker- - - - - - - - - - - - - - Peter Tucker- - - - - - - - - - - - - -
Justin Schnuelle - - - - - - - - - - - Justin Schnuelle - - - - - - - - - - -
Jonathan Wicks- - - - - - - - - - - - Jonathan Wicks- - - - - - - - - - - -
557
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0711
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
LIST OF REGULAR AND ONGOING CITY BOARD
AND COMMISSION APPOINTIVE TERMS THAT WILL
EXPIRE DURING THE 2019 CALENDAR YEAR
(City Clerk Elaine Doerfling)
Recommended Action:
City Clerk recommends that the City Council receive and file the attached list, prepared for posting by
the City Clerk pursuant to State law, of all regular and ongoing Hermosa Beach board, commission
and committee appointive terms which will expire during the 2019 calendar year.
Background:
Government Code Section 54972 requires the annual preparation and posting of a Local
Appointments List of regular and ongoing boards, commissions and committees whose members are
appointed by the City Council. The list must contain pertinent information on all appointive terms that
will expire during the calendar year, including the names of the incumbent appointees, their
appointment dates, the dates their terms expire, and the necessary qualifications for the position.
The list must also include information on any boards, commissions and committees whose members
serve strictly at the pleasure of the City Council, without set term limits (i.e., Board of Appeals).
Pursuant to State law, the City Clerk has prepared the attached list, which identifies:
§Emergency Preparedness Advisory Commission - three terms expire May 31, 2019 (vacancy
due to 07/16/2018 resignation of Matthew McCool);
§Parks, Recreation and Community Resources Commission - two terms expire June 30, 2019;
§Planning Commission - two terms expire June 30, 2019; and
§Civil Service Board - two terms expire July 15, 2019.
As required by State law, the list will be posted in the City Clerk’s office, the Library, and the City’s
website for public viewing purposes. It will also be posted at appropriate City departments (Planning,
Community Resources, Police) and in the outdoor display case at City Hall, where agendas and
other official notices are typically posted. In addition, it will be included in an upcoming City
newsletter and sent to residents who have requested e-notifications.
City of Hermosa Beach Printed on 4/3/2024Page 1 of 2
powered by Legistar™558
Staff Report
REPORT 18-0711
Attachments:
1. 2019 Appointment List
Submitted by: Elaine Doerfling, City Clerk
Concur: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 2 of 2
powered by Legistar™559
CITY OF HERMOSA BEACH LOCAL APPOINTMENTS LIST
In accordance with Government Code Section 54972 (Maddy Act) dealing with open lists of
local appointive positions, the following is:
1. A list of all appointive terms which will expire during the 2019 calendar year, with the names
of the incumbent appointees, their dates of appointment, the date each term expires, and the
necessary qualifications for each position; and
2. A list of all boards, commissions and committees whose members serve at the pleasure of the
legislative body, and the necessary qualifications for each position.
INCUMBENT APPT.TERM
COMMISSION APPOINTEES DATE EXPIRES QUALIFICATIONS
EMERGENCY Dave Buckland 07-17-17 05-31-19 Bona fide Resident of
PREPAREDNESS William Hallett 05-22-15 05-31-19 the City
COMMISSION Vacant 05-31-19 (see HBMC 2.38)
[4-year terms, no term limit]
PARKS AND Barbara Ellman 04-24-18 06-30-19 Bona fide Resident of
RECREATION Robert Rosenfeld 06-23-15 06-30-19 the City
COMMISSION (see HBMC 2.28)
[4-year terms, no term limit]
PLANNING Peter R. Hoffman 07-14-15 06-30-19 Qualified Elector of
COMMISSION Rob Saemann 07-14-15 06-30-19 the City
[4-year terms, no term limit](see HBMC 2.32)
CIVIL SERVICE E. Thomas Moroney 07-16-15 07-15-19 Qualified Elector of
BOARD Barry Warner 07-16-15 07-15-19 the City
[4-year terms, no term limit](see HBMC 2.76)
----------------------------------------------------------------------------------------------------------------------
BOARD OF APPEALS (members serve at the pleasure of the Council, without terms – must be
qualified to act on building construction matters - U.B.C. - See HBMC 15.04.020)
Bruce Cook, David Garrett, Mike Ludwig, Larry Peha, Veronica Torres
----------------------------------------------------------------------------------------------------------------------
ELAINE DOERFLING
Hermosa Beach City Clerk
Dated: 11-27-18
560
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0707
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
ADOPTION OF A RESOLUTION AUTHORIZING
THE SUBMISSION OF A GRANT APPLICATION TO
CALTRANS ADAPTATION PLANNING GRANT PROGRAM
(Environmental Analyst Leeanne Singleton)
Recommended Action:
Staff recommends that the City Council adopt a resolution approving submittal of a grant application
(for up to $250,000)to Caltrans for the Adaptation Planning Grant Program to conduct
preliminary/conceptual design and community outreach for multi-benefit adaptation and
transportation projects at Hermosa Beach entry corridors along Hermosa Avenue and the Strand.
Executive Summary:
For the 2019-20 Fiscal Year,Caltrans has released a call for grant applications and made $6 million
in grant funding available to local and regional agencies,at amounts ranging from $100,000 up to
$1,000,000,in support of transportation-related adaptation planning efforts.Staff has identified a
series of proposed infrastructure projects involving entry corridors to the City on the Strand and
Hermosa Avenue that could be packaged to create a competitive grant application that meets
Caltrans objectives to improve multi-modal connections and resilience to coastal flood hazards.If
awarded,the grant would fund planning/conceptual design and community engagement,but is not
intended to fund full engineering design documents or the construction of capital projects.In order to
receive funding,Caltrans requires each applicant to submit a resolution from the elected body
indicating its support for the efforts planned under the application.
Background:
In October 2018,the California Department of Transportation (Caltrans)released a call for
applications and an FY 2019-20 Grant Application Guide for Adaptation Planning Grants (
Attachment 1).This grant funding,available to local agencies,authorized under Senate Bill 1,the
Road Repair and Accountability Act of 2017,allocated $20 million over three fiscal years to support
climate change adaptation planning to make California’s transportation infrastructure,including
roads,railways,bikeways,trails,bridges,ports,and airports more resilient to the impacts of natural
hazards and climate change.This grant opportunity is focused on planning and conceptual design
City of Hermosa Beach Printed on 4/3/2024Page 1 of 5
powered by Legistar™561
Staff Report
REPORT 18-0707
and is not intended to fund full engineering design documents or the construction of capital projects.
For the 2019-20 Fiscal Year,Caltrans has $6 million in grant funding available to award to local and
regional agencies in amounts ranging from $100,000 up to $1,000,000.Applications are due to
Caltrans on November 30,2018 and require applicants to provide a minimum local match of 11.47%
of the grant amount requested,which can be provided through a cash match or in-kind contribution of
staff time.
Per the Grant Application Guide, projects that will be considered for funding include:
·Climate vulnerability assessments
·Extreme weather event evacuation planning
·Resilience planning
·Transportation infrastructure adaptation plans
·Natural and green infrastructure planning
·Integration of transportation adaptation planning considerations into existing plans
·Evaluation of or planning for other adaptation strategies
Successful past applications by jurisdictions throughout California are provided in Attachment 2.The
Grant Application Guide also includes a set of grant program objectives to assist applicants in
developing and aligning projects that best meet Caltrans funding objectives.
·Competitive applications include one or more of the following:
o Identify benefit to disadvantaged and/or vulnerable communities, including transit-
dependent populations (when applicable).
o Demonstrate collaboration and partnerships with diverse external stakeholders such as
businesses, non-governmental agencies, community-based organizations, and
community residents.
·Applicants must demonstrate how the proposed effort will accomplish the following:
o Demonstrate on-going collaboration and partnerships between sectors and
jurisdictions, across levels of government at a regional scale.
o Identify co-benefits of the adaptation work, such as benefits to public health, natural
ecosystems, air quality, social equity, the economy, or reductions in GHG.
·Applicants should demonstrate how the proposed effort will accomplish one or more of the
following:
o Identify climate change impact risks to multimodal transportation infrastructure in the
project area.
o Identify specific transportation infrastructure vulnerabilities to climate change impacts.
o Identify adaptation strategies and specific actions to remedy identified climate related
vulnerabilities.
City of Hermosa Beach Printed on 4/3/2024Page 2 of 5
powered by Legistar™562
Staff Report
REPORT 18-0707
o Advance the planning of specific climate adaptation projects, such as developing a cost
estimate or conceptual design.
o Include economic analysis and/or cost-benefit analysis of identified adaptation strategy
or strategies.
Discussion:
In reviewing the grant application guide, previous successful applications, and the City’s capital
project planning needs, staff has identified that conceptual planning and community outreach work on
several previously identified projects, involving entry corridors to the City on the Strand and Hermosa
Avenue, could be packaged to create a competitive grant application that meets Caltrans objectives
to improve multi-modal connections and resilience to coastal flood hazards.
More specifically,staff proposes,under this grant application,to conduct conceptual design and
community engagement efforts on the following projects,which consider improvements that serve
multiple modes of travel;are vulnerable to the effects of coastal flooding and sea level rise;and
include opportunities to provide co-benefits such as stormwater capture,dune restoration,and
improved safety for pedestrians and cyclists:
·Hermosa Avenue Green Street Project (Component of CIP(s): 15-162/17-417)
·Strand Bikeway and Walkway Improvements at 35th Street (Current CIP: 17-188)
·Hermosa Avenue Cycle Track and Greenwich Village Intersection Re-Design (New project
need identified following Hermosa Avenue Repavement Project)
City staff is in the process of preparing an application to submit to Caltrans and is soliciting letters of
support for the application from local residents and businesses in the vicinity,organizations,and
regional representatives including the Beach Cities Health District,South Bay Cities Council of
Governments,and the South Bay Bicycle Coalition.The application describes the interest and need
for the project as well as a proposed scope of work,schedule,and budget.The project will include
opportunities for the community to participate early on in the conceptual design process of these
projects to better inform the engineering design phase (following this grant)to include or exclude
design components that have been vetted and reviewed by the community.
In order to receive funding,Caltrans requires each applicant to submit a resolution from the elected
body indicating its support for the efforts planned under the application.While this resolution is not
required at the time of submission,the grant application identifies a project that is not listed in the
Capital Improvement Program (CIP)and may alter the schedule of one of the existing projects;
therefore,staff felt it prudent to provide a brief description of the proposal and the resolution to
Council for consideration prior to submitting the application to Caltrans.A draft resolution for City
Council consideration is provided as Attachment 3.
City of Hermosa Beach Printed on 4/3/2024Page 3 of 5
powered by Legistar™563
Staff Report
REPORT 18-0707
General Plan Consistency:
PLAN Hermosa,the City’s long-range planning document,was adopted by the City Council in August
2017,and envisions a future where “Hermosa Beach is the small town others aspire to be;a place
where our beach culture, strong sense of community, and commitment to sustainability intersect.”
PLAN Hermosa contains a suite of goals,policies,and implementation actions to achieve the City’s
long-term vision that speaks to prioritizing investing in its infrastructure,improving the accessibility of
public amenities,and pursuing grant funding to achieve community objectives.Goal 2 of the
Governance Element speaks specifically to the importance of having the community active and
engaged in the decision-making process through diverse outreach methods.Finally,PLAN Hermosa
calls for improving the range of safe and convenient transportation choices available,opportunities to
improve beach habitat,and a desire for infrastructure that is more resilient to coastal hazards and
sea level rise. The most relevant policies are listed below.
Governance Element
·2.1 Multiple outreach methods. Consistently engage in community outreach through
neighborhood forums, social media, the latest technologies, personal interaction, and other
methods on a regular basis.
·2.7 Major planning efforts. Require major planning efforts, policies, or projects to include a
public engagement effort.
Mobility Element
·2.1 Prioritize public right-of-ways. Prioritize improvements of public right-of-ways that provide
heightened levels of safe, comfortable and attractive public spaces for all non-motorized
travelers while balancing the needs of efficient vehicular circulation.
Sustainability Element
·2.3 Grants and incentives. Seek additional sources of funding to support implementation of
greenhouse gas reduction projects for the City, as well as residents and businesses.
Parks + Open Space Element
·6.3 Safe and accessible connections. Ensure public access points provide safe and accessible
connections to The Strand and shoreline, including access for persons with disabilities.
·9.2 Beach maintenance. Consider species and habitat impacts and potential improvements
when implementing beach maintenance activities.
·10.3 Green space co-benefits. Recognize the many positive qualities provided by landscaping,
trees, and green space including reduced heat gain, controlled stormwater runoff, absorbed
noise, reduced soil erosion, improved aesthetic character, and absorption of air pollution.
City of Hermosa Beach Printed on 4/3/2024Page 4 of 5
powered by Legistar™564
Staff Report
REPORT 18-0707
Public Safety Element
·1.5 Minimize coastal flooding. Natural interventions, green infrastructure, and infiltration
systems will be utilized to minimize damage from coastal flooding.
·2.1 Integrate resilience. Integrate resilience to anticipated sea level rise impacts into project
designs when repairing and replacing aging infrastructure within the coastal zone.
Infrastructure Element
·1.2 Priority investments. Use City Council established priorities and the Capital Improvement
Program (CIP) to identify and allocate funding for projects identified in the infrastructure plan.
·1.5 New technologies. When feasible, utilize emerging technologies and funding strategies
that improve infrastructure efficiency, sustainability, and resiliency.
·5.1 Integration of stormwater best practices. Integrate stormwater infiltration best practices
when initiating streetscape redevelopment or public facility improvement projects.
Fiscal Impact:
If authorized to proceed by City Council and awarded by Caltrans,staff anticipates the grant
application to include a requested amount not to exceed $250,000,requiring a minimum local match
commitment, in the form of staff time or a cash match, of approximately $28,675.
The Capital Improvement Program includes a design budget for CIP 15-162 ($15,000)and CIP 17-
188 ($115,000)of which a portion can be identified as leveraged funds to improve the ratio of the
City’s contribution or match to the grant amount requested,providing a more favorable application
from the City.
Attachments:
1. Caltrans Adaptation Planning Grant Program Guidelines
2. Caltrans FY 2018-19 Adaptation Planning Grants Award List
3. City Council Resolution Approving Submission of Caltrans Grant
Respectfully Submitted by: Leeanne Singleton, Environmental Analyst
Concur: Kristy Morris, Environmental Analyst
Concur: Glen W.C. Kau, Public Works Director
Concur: Ken Robertson, Community Development Director
Noted for Fiscal Impact: Viki Copeland, Finance Director
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 5 of 5
powered by Legistar™565
Page 1 of 2 17-____
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
C.C. RESOLUTION NO. 18-XX
A RESOLUTION OF THE CITY COUNCIL OF HERMOSA BEACH,
CALIFORNIA, AUTHORIZING THE SUBMISSION OF AND, IF
AWARDED, THE CITY MANAGER TO EXECUTE AGREEMENTS
WITH THE CALIFORNIA DEPARTMENT OF TRANSPORTATION
FOR THE HERMOSA BEACH ENTRY CORRIDORS MULTI-BENEFIT
ADAPTATION AND TRANSPORTATION PLANNING PROJECT FOR
THE CITY OF HERMOSA BEACH
THE CITY COUNCIL OF THE CITY OF HERMOSA BEACH, CALIFORNIA,
DOES HEREBY RESOLVE AND ORDER AS FOLLOWS:
Section 1. The City of Hermosa Beach is eligible to receive federal and/or State funding for
certain transportation planning related plans through the California Department of Transportation.
Section 2. The City of Hermosa Beach is interested in studying, testing, and evaluating
various multi-modal improvements and adaptation-focused infrastructure enhancements at entry
corridors along Hermosa Avenue and the Strand. The focus of this project is to conduct community
engagement and identify conceptual designs that are embraced by the community and can be
successfully implemented to enhance active transportation choices and safety along the corridor for
all users of the street while upgrading infrastructure to reduce coastal hazards and vulnerabilities that
may become more severe with the impacts of climate change.
Section 3. Community engagement and conceptual design in these areas will support local
mobility, safety, public health, resilience, and public participation initiatives, and will additionally
implement various aspects of Caltrans 2015-2020 Strategic Management Plan for making long-
lasting, smart mobility decisions that improve the environment, support a vibrant economy, and build
communities, not sprawl.
Section 4. The City of Hermosa Beach is committed to the success of this project and has
identified in-kind resources in the form of staff time and potential sources of future funding to
implement the demonstration project on a permanent basis to contribute to the success of this project.
566
Page 2 of 2 17-____
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
Section 5. A Restricted Grant Agreement is needed to be executed with the California
Department of Transportation before such funds can be claimed through the Transportation Planning
Grant Programs.
Section 6. The City Council of the City of Hermosa Beach wishes to delegate authorization to
execute these agreements, and any amendments thereto.
NOW, THEREFORE, BE IT RESOLVED, DETERMINED, AND ORDERED that the City
Council of the City of Hermosa Beach hereby:
1. Directs staff to submit the grant application package attached and any other supporting
material necessary for evaluation of the application to the California Department of
Transportation Adaptation Planning Grant Program for conceptual design and outreach for
multi-modal and adaptation planning projects at Hermosa Beach entry corridors.
2. Authorizes the City Manager of the City of Hermosa Beach to execute all necessary
applications, agreements, grant reports, and amendments thereto to implement and carry out
the grant application package attached hereto.
VOTE: AYES:
NOES:
ABSTAIN:
ABSENT:
PASSED, APPROVED and ADOPTED this 27th day of November, 2018.
______________________________________________________________________________________________
PRESIDENT of the City Council and MAYOR of the City of Hermosa Beach, California
ATTEST: APPROVED AS TO FORM:
City Clerk City Attorney
567
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0713
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
CONSIDERATION OF AN ORDINANCE TO ALLOW
AND REGULATE WIRELESS COMMUNICATION FACILITIES
IN THE PUBLIC RIGHT-OF-WAY, AND UPDATE ON AT&T’S
PROPOSAL FOR MULTIPLE INSTALLATIONS OF SMALLER
WIRELESS COMMUNICATION FACILITIES TO PROVIDE
REPLACEMENT COVERAGE TO EXISTING SITES
LOCATED AT 20TH AND 29TH COURT
(Continued from meetings of
September 25, 2018 and October 23, 2018)
(Community Development Director Ken Robertson)
Recommended Action:
Staff recommends that the City Council continue the public hearing to consider an ordinance to allow
and regulate wireless communication facilities in the public right-of-way, and, provide an update on
AT&T's proposal for multiple installations of smaller wireless communication facilities to provide
replacement coverage to existing sites located at 20th and 29th Court to an unspecified date for staff
to complete the draft ordinance for installation of wireless communication facilities in the public right-
of-way.
Background :
Since November of 2017, AT&T, has been working on preparing applications to the City for 16 small
cell sites within the City’s right-of-way (ROW) to provide replacement coverage for the removal and
replacement of the existing 20th and 29th Court facilities. AT&T expects to submit its applications;
however, applications require an adopted ordinance from the City prior to submittal, which includes
design standard and permitting procedures, in order to ensure that they are complete. This
ordinance is required for any wireless carrier that anticipates installing small cell sites within the
ROW. The public hearing for this ordinance previously scheduled on September 25 was continued to
October 23, 2018 in anticipation of the Federal Communications Commission’s (FCC) new wireless
infrastructure order.
Discussion:
Working closely with the City Attorney’s office, staff prepared a draft ordinance to allow and regulate
wireless communication facilities in the ROW. The City Attorney since advised that on Wednesday,
September 26, 2018, the FCC approved an extensive 116-page wireless infrastructure order. Given
the length and complexity of the order, the City Attorney’s general response to its municipal clients
City of Hermosa Beach Printed on 4/3/2024Page 1 of 2
powered by Legistar™568
Staff Report
REPORT 18-0713
took longer to complete, leaving limited time to coordinate a staff report and ordinance tailored to
Hermosa Beach prior to the November 27 Council meeting.
Staff anticipates that a report and ordinance, as well as initial direction on fees and lease rates, can
be completed in time for one of Council’s January 2019 meetings. However, rather than continuing
the hearing to a specific date, staff recommends that City Council continue the public hearing to an
unspecified date to ensure completion of this report before it is scheduled. Staff would fully re-notice
the public hearing given these multiple continuances.
Respectfully Submitted by:Nicole Ellis, Associate Planner
Concur:Ken Robertson, Community Development Director
Approved:Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 2 of 2
powered by Legistar™569
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0716
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
REINSTATEMENT OF A PROFESSIONAL SERVICES AGREEMENT
WITH ACCELA INC. TO COMPLETE THE IMPLEMENTATION OF
THE “ACCELA AUTOMATION” SOFTWARE UPGRADE
(Community Development Director Ken Robertson)
Recommended Action:
Staff recommends that the City Council reinstate the expired Professional Services Agreement with
Accela Inc. for a three-year term.
Executive Summary:
The City entered into a Professional Services Agreement with Accela Inc. (Accela) in 2014 to
implement “Accela Automation.” Accela Automation is an integrated software solution to improve
service delivery that includes modules for managing assets and service requests in the Public Works
Department, and for managing development and permitting processes in both the Community
Development and Public Works Departments. Reinstatement of the agreement is necessary to
extend the time required to complete the implementation.
Background:
At its June 24, 2014 <http://hermosabeach.granicus.com/MetaViewer.php?
view_id=6&clip_id=3149&meta_id=153057> meeting, City Council approved the current professional
service agreement with Accela and funding to implement this technology upgrade to automate City
service delivery.The products include two distinct modules that integrate with GIS (Geographic
Information Systems):
·Asset Management - Public Works Department management of physical assets and work
orders linked to the “Go Hermosa!” App
·Land Management - upgrade to existing Community Development and Public Works
Department plan check, permit and enforcement tracking system -currently a legacy Accela
product called “Permits Plus”.
The professional services agreement anticipated an implementation of these two modules in two
succeeding phases that would take eighteen (18) months with an expiration of June 24, 2016.
City of Hermosa Beach Printed on 4/3/2024Page 1 of 3
powered by Legistar™570
Staff Report
REPORT 18-0716
The Public Works Department experienced serious challenges and difficulties in implementing the
Asset Management portion of the Accela implementation. This caused extensive delays, well beyond
the anticipated timelines. Since the project was in progress and work was proceeding, the expiration
date was not discussed or considered an issue at the time. Asset Management and the Go
Hermosa! application have only recently gone “live.” When it came to the attention of management
staff that the agreement had expired, it was decided to put implementation of the “Land
Management” component on hold in order to further research and to more closely evaluate and verify
whether it was prudent to go ahead with implementation of “Land Management”.
Discussion
Community Development staff visited Culver City and the City of Torrance and spoke directly with
staff who was involved with their implementation process from beginning to end. While both cities
had challenges with the “out-of-the-box” product, they are satisfied with the finished product and
using it as part of their daily operations. Staff also spoke with the City of Anaheim, whose staff shared
a similar experience, and have maintained a long relationship with staff at the City of Santa Monica,
another Accela customer that is satisfied with the Accela Automation product. Staff was able to
experience firsthand these cities’ use of the Land Management system, and all four cities have made
themselves available to Hermosa Beach as continued resources.
Based on this outreach, as well as internal review of the scope of work, staff is confident that
continuing the City’s relationship with Accela would lead to a successful implementation with a
reasonably achievable timeline as set forth in the agreement (Attachment 3). The first step would be
department preparation for the implementation, which would formally begin in February of 2019.
Staff strongly believes implementation of this upgrade is essential to meeting the City’s goals of
offering first class service to all customers, keeping up with changes in technology and the rising
expectations of the City’s diverse customer base.
General Plan Consistency:
Completing the implementation of this new technology is consistent with Goal 3 of the Governance
Element:Excellent Customer Service Through the Use of Emerging Technologies and help the city
make progress towards achieving the following policies under Goal 3:
Governance 3.1 - Increased access to services. Strive to provide access to facilities, programs, and
services at times and locations that are convenient for residents and businesses.
Governance 3.2 - Social media technology. Make use of social networking, streaming video, photo-
sharing, and other technologies as they evolve to provide greater avenues of communication with
constituents and community members.
City of Hermosa Beach Printed on 4/3/2024Page 2 of 3
powered by Legistar™571
Staff Report
REPORT 18-0716
Governance 3.3 - Online materials. As feasible, continue to expand the City’s website with data and
materials for residents and people doing business with the City, including City Council and
Commission agenda packets, permit application forms, web-based geographic information systems
(GIS), and use of new technologies as appropriate.
Governance 3.4 - Virtual public counter. As feasible, establish a “virtual” public counter through an
online permitting system.
Fiscal Impact:
There is no fiscal impact associated with the recommended action since there has been no change in
the financial terms of the original agreement, and $354,669 has been reappropriated into the FY
2018-19 budget.
Attachments:
1.Link to June 24, 2014 Staff Report and Attachments
2.Reinstatement Agreement
3.Original Agreement
Respectfully Submitted by: Ken Robertson, Community Development Director
Concur: Glen W. C. Kau, P.E., Public Works Director/City Engineer
Noted for Fiscal Impact: Viki Copeland, Finance Director
Legal Review: Mike Jenkins, City Attorney
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 3 of 3
powered by Legistar™572
REINSTATEMENT OF AGREEMENT FOR ACCELA AUTOMATION SERVICES
This Reinstatement Agreement for Accela Automation Services (“Reinstatement
Agreement”) is entered into by and between the CITY OF HERMOSA BEACH, a municipal
corporation (“City”) and ACCELA, INC. (“Consultant”) as of November __, 2018.
RECITALS
A. City and Consultant entered into an Agreement for Professional Services to Implement
Accela Automation (“Agreement”) as of June 24, 2014, by the terms of which Consultant
was engaged as an independent contractor to provide City with information systems for
managing permitting, inspections and enforcement, integration with GIS, asset
management (service and maintenance requests) and citizen access to services and
information.
B. The Agreement expired on its own terms on June 30, 2016 and the parties now mutually
desire to reinstate the Agreement and extend the term in order that Consultant complete
implementation of the Land Management.
C. City does not have on its staff employees who possess the expertise or qualifications to
perform these services.
D. Consultant is fully qualified to perform the services for the City as an independent
contractor.
NOW, THEREFORE, in consideration of the foregoing:
1. The Agreement is hereby reinstated as of the date this Reinstatement
Agreement is fully executed.
2. Section 7 entitled “Term” is amended to read as follows:
The term of the Agreement shall resume upon execution by both parties of the
Reinstatement Agreement and shall expire on December 31, 2021, unless
earlier terminated under Section 11 or extended in writing in advance by both
parties.
573
3. The City Manager is authorized to execute this Reinstatement Agreement on
behalf of the City.
Except as above modified, in all other respects the Agreement is hereby reaffirmed in full
force and effect.
ACCELA, INC.
By
CITY OF HERMOSA BEACH
By _______
SUJA LOWENTHAL, CITY MANAGER
ATTEST:
CITY CLERK
574
575
576
577
578
579
580
581
582
583
584
585
586
587
Statement of Work
2012 Accela Inc. Page 1 of 40
Statement of Work
City of Hermosa Beach, CA
Version 7.0
June 16, 2014
THE LEADING PROVIDER OF
GOVERNMENT ENTERPRISE MANAGEMENT SOLUTIONS
588
Statement of Work
2012 Accela Inc. Page 2 of 40
TABLE OF CONTENTS
TABLE OF CONTENTS ............................................................................................................................................................................. 2
OVERVIEW ................................................................................................................................................................................................ 5
SERVICES DESCRIPTION ........................................................................................................................................................................ 5
PURPOSE ............................................................................................................................................................................................. 5
PROJECT TIMELINE ............................................................................................................................................................................... 5
PROJECT MANAGEMENT ........................................................................................................................................................................ 5
CRITICAL SUCCESS FACTORS ................................................................................................................................................................ 6
PROJECT ASSUMPTIONS ........................................................................................................................................................................ 7
WORK DESCRIPTION ............................................................................................................................................................................. 7
STAGE 1 - INITITATION ..................................................................................................................................................................... 7
DELIVERABLE 1: PROJECT INITIATION ..................................................................................................................................................... 7
DELIVERABLE 2: ACCELA AUTOMATION SETUP – DEV AND TEST ............................................................................................................... 8
STAGE 2 – TO-BE ANALYSIS ............................................................................................................................................................. 9
DELIVERABLE 3: TO-BE ANALYSIS SESSIONS ........................................................................................................................................ 10
DELIVERABLE 4: TO-BE ANALYSIS DOCUMENT(S) ................................................................................................................................. 11
STAGE 3 – SOLUTION FOUNDATION .................................................................................................................................................... 11
DELIVERABLE 5: ACCELA AUTOMATION SOLUTION FOUNDATION ............................................................................................................. 11
STAGE 4 – BUILD ............................................................................................................................................................................. 12
DELIVERABLE 6: HISTORICAL DATA CONVERSION ANALYSIS .................................................................................................................. 13
DELIVERABLE 7: STANDARD ADDRESS, PARCEL AND OWNERSHIP (APO) DATA CONVERSION ................................................................... 13
DELIVERABLE 8: STANDARD LICENSED PROFESSIONAL DATA CONVERSION ............................................................................................ 14
DELIVERABLE 9: HISTORICAL DATA CONVERSION DEVELOPMENT ............................................................................................................ 15
SYSTEM INTERFACES .......................................................................................................................................................................... 15
DELIVERABLE 10: EVENT MANAGEMENT SCRIPTING............................................................................................................................... 15
DELIVERABLE 11: REPORT SPECIFICATIONS ......................................................................................................................................... 17
DELIVERABLE 12: REPORT DEVELOPMENT............................................................................................................................................ 18
DELIVERABLE 13: ACCELA GIS CONFIGURATION ................................................................................................................................... 18
DELIVERABLE 14: ACCELA CITIZEN ACCESS CONFIGURATION ................................................................................................................ 19
DELIVERABLE 15: ACCELA MOBILE OFFICE CONFIGURATION ................................................................................................................. 20
DELIVERABLE 16: V360 USER EXPERIENCE.......................................................................................................................................... 20
STAGE 5 – READINESS .................................................................................................................................................................. 22
DELIVERABLE 17: ACCELA AUTOMATION SETUP – PRODUCTION ............................................................................................................ 22
DELIVERABLE 18: ADMINISTRATIVE AND TECHNICAL TRAINING ............................................................................................................... 22
DELIVERABLE 19: DAILY USER TRAINING .............................................................................................................................................. 23
DELIVERABLE 20: USER ACCEPTANCE TESTING (UAT) ......................................................................................................................... 24
STAGE 6 - DEPLOY ......................................................................................................................................................................... 25
DELIVERABLE 21: PRODUCTION SUPPORT ............................................................................................................................................ 25
DELIVERABLE 22: POST DEPLOYMENT SUPPORT AND TRANSITION TO CRC ........................................................................................... 25
PROJECT RESOURCES AND LOCATION OF WORK .................................................................................................................................. 27
WORK LOCATION ................................................................................................................................................................................ 27
AGENCY RESOURCES .......................................................................................................................................................................... 27
ACCELA RESOURCES .......................................................................................................................................................................... 28
PAYMENT SCHEDULE ........................................................................................................................................................................... 30
EXPENSES .......................................................................................................................................................................................... 31
ACCEPTANCE ...................................................................................................................................................................................... 31
TERMS ............................................................................................................................................................................................... 31
589
Statement of Work
2012 Accela Inc. Page 3 of 40
APPENDIX A - ACCELA IMPLEMENTATION METHODOLOGY ........................................................................................................... 32
IMPLEMENTATION LIFE CYCLE .............................................................................................................................................................. 32
INITIATION ........................................................................................................................................................................................... 32
TO-BE ANALYSIS................................................................................................................................................................................. 32
SOLUTION FOUNDATION ...................................................................................................................................................................... 33
BUILD ................................................................................................................................................................................................. 33
READINESS ......................................................................................................................................................................................... 33
DEPLOY .............................................................................................................................................................................................. 33
APPENDIX B – STANDARD PROJECT ASSUMPTIONS ...................................................................................................................... 34
PROJECT MANAGEMENT AND ADMINISTRATION ..................................................................................................................................... 34
PROJECT SCHEDULE ........................................................................................................................................................................... 35
TECHNOLOGY–INFRASTRUCTURE ......................................................................................................................................................... 35
TRAINING ............................................................................................................................................................................................ 36
CONVERSION AND INTERFACES ............................................................................................................................................................ 36
STANDARD DOCUMENT MIGRATION ...................................................................................................................................................... 38
TESTING ............................................................................................................................................................................................. 38
PRICING ASSUMPTIONS ....................................................................................................................................................................... 38
APPENDIX C – DELIVERABLES ACCEPTANCE FORM....................................................................................................................... 40
590
Statement of Work
2012 Accela Inc. Page 4 of 40
DOCUMENT CONTROL
Date Author Version Change Reference
03/20/2013 IK Consulting, LLC 1.0
04/04/13 IK Consulting, LLC 2.0 Modifications during conference call
04/15/13 Woolpert 3.0 Additions of Asset Management Language
04/25/13 IK Consulting, LLC
& Accela, Inc
4.0 Additional modifications to incorporate Land with Asset
Management
1/28/14 IK Consulting, LLC 5.0 Removal of Asset Management, Separately
03/30/14 IK Consulting, LLC 6.0 Fire Modification to 70/30 implementation percentage
6/16/14 Cindy Sullivan 7.0 Pricing Review
591
Statement of Work
2012 Accela Inc. Page 5 of 40
OVERVIEW
Congratulations on your selection of Accela, Inc. and their enterprise suite of industry leading software. The
implementation of Accela products is designed specifically to meet the specific requirements and budget defined by
Hermosa Beach, CA (“Agency”). Accela will utilize a best practice Implementation Methodology, based on previous
client interactions and industry knowledge, to promote a successful project that will meet the Agency’s objectives. The
following Statement of Work will detail how Accela Services will implement the software you have purchased, including
the major milestones and deliverables that will ensure your success.
Accela is committed to providing a superior software solution, and deployment of the software, for the current and
future needs of the Agency. Accela will work with Agency staff to optimize Accela’s portfolio of software, best
practices, and customer experience to enable the Agency to successfully deploy its Accela Automation software and
meet its functionality, timing and cost requirements. This Statement of Work (“SOW”) dated January 28, 2014 sets
forth a scope and definition of the consulting/professional services, work and/or project (collectively, the “Services”) to
be provided by Accela (“Accela”) to Agency.
SERVICES DESCRIPTION
PURPOSE
The purpose of this document is to detail the specific activities, deliverables, roles and responsibilities, and
acceptance criteria that comprise the implementation of Accela Automation Land Management, Accela GIS, Accela
Mobile Office and Accela Citizen Access, for the Agency. Accela will provide professional services for implementation
of the above modules and will add services per the Work Description section below. The following Agency
departments comprise the organization scope of the Land Management implementation described herein:
Community Development (functional areas include: Building and Planning)
Public Works Department (specifically those items currently in Permits Plus).
Fire Department.
PROJECT TIMELINE
The term of this project is eighteen (18) months and one phase.
Any delays (eg, Change in staff level/availability, missed deadlines) in the Project Timeline which by mutual
agreement were created by the Agency will result in an increase in the duration of the project will require a Change
Order to reimburse Accela for the additional costs associated with the delay, including but not limited to additional
hours for project management, deliverable development and review.
Upon execution of this SOW, the parties will collaborate to determine a start date for Services to be rendered. Upon
initiation of these Services, the Accela Project Manager will work with the Agency to collaboratively define a baseline
project schedule. Given the fact that project schedules are working documents that change over the course of the
project, the Accela Project Manager will work closely with Agency to update, monitor, agree, and communicate any
modifications.
PROJECT MANAGEMENT
Accela will provide a full time project manager for services throughout the implementation in order to plan and monitor
execution of the project in accordance with deliverables outlined in the Statement of Work. To support the
implementation of the Accela Automation software at the Agency, Accela will provide Project Management services
throughout the project. Generally these services include the following:
Project plan management using Microsoft Project,
Project document management using Microsoft SharePoint,
592
Statement of Work
2012 Accela Inc. Page 6 of 40
Issue log management and escalation,
Status reporting,
Change order management,
Project workspace management,
Resource management,
Executive project oversight and quality assurance.
By mutual agreement, some project management tasks may be shared between the Accela Project Manager and the
Agency Project Manager.
CRITICAL SUCCESS FACTORS
In order to successfully execute the services described herein, there are several critical success factors for the project
that must be closely monitored and managed by the stakeholders. These factors are critical in setting expectations
between the Agency and Accela, identifying and monitoring project risks, and promoting strong project
communication.
Knowledge Transfer – While Accela cannot guarantee specific expertise for Agency staff as a result of
participating in the project, Accela will make all reasonable efforts to transfer knowledge to the Agency. It is
critical that Agency personnel participate in the analysis, configuration and deployment of Accela Automation
in order to transfer knowledge to the Agency. Once Post Production assistance tasks are completed by
Accela Services, the Agency assumes all day-to-day operations of Accela Automation outside of the Support
and Maintenance Agreement. The Service and Maintenance Agreement do not cover any Agency
manipulation of implemented scripts, reports, interfaces and adapters. Key knowledge transfer areas include:
Configuration
Scripting
Batch scripts
Interfaces
Event Management Scripts
Reports and Forms
Dedicated Agency Participation – Accela fully understands that Agency staff members have daily
responsibilities that will compete with the amount of time that can be dedicated to the Accela Automation
implementation project. However, it is critical that the Agency acknowledges that its staff must be actively
involved throughout the entire duration of Services as defined in the Project Plan. Accela will communicate
insufficient participation of Agency and Accela resources through Project Status Reports with real and
potential impacts to the project timeline. Accela will work the project sponsors and department leaders to
determine appropriate team member involvement. This could run from full-time during early analysis
meetings to part-time during the technical implementation phase.
Deliverable Acceptance Process - Implementation services for the above products are formalized through
the deliverables defined in this document. Upon completion of each deliverable according to the acceptance
criteria defined herein, Accela will provide the Agency with a Deliverable Acceptance Form to formalize
acceptance and completion. The Deliverable Acceptance Form is subsequently signed by the appropriate
Agency contact, as defined in the Project Charter, and faxed/scanned/emailed or hand delivered to Accela.
Please refer to Appendix C to view a sample Deliverable Acceptance Form. Accela respectfully requests
prompt attention to the processing of all Deliverable Acceptance Forms, as adherence to this timely process
directly impacts the ability to complete the project in the desired timeframe. In order to prevent delays in the
project schedule, for all Deliverables where no response time is specifically identified in the SOW, a three (3)
business day acceptance period is assumed.
593
Statement of Work
2012 Accela Inc. Page 7 of 40
Accela Implementation Methodology – Accela’s successful, proven, implementation methodology is crucial
to the projects success. Accela’s Automation software and customer base is a niche market and as such the
implementation methodology may differ from other consulting firms and software packages. It is imperative
to project success that the Agency is willing to adhere/adopt to the Accela Implementation Methodology.
PROJECT ASSUMPTIONS
Accela understands the importance of the timely and successful implementation of the Agency project. We have
extensive experience working collaboratively with clients to achieve their objectives on systems integration projects,
both within Agency and around the country.
One of the major contributors to our mutual success is to clearly define and agree upon the responsibilities, scope and
assumptions of the project from the start, a number of which are included within your request or have been mutually
discussed. Within this section, we have reiterated some of these key points as well as identified additional
clarifications that we believe are critical to a successful, on-time project. The Project timeline and associated pricing
are based and dependent upon these assumptions.
Accela is committed to promptly devoting senior resources to any discussions regarding our assumptions such that
they may be concluded in an expeditious manner consistent with the anticipated project timeline. We have a proven
track record of creatively and efficiently working with our clients to achieve mutually acceptable terms for complex
projects such as this and we are confident that, if given the opportunity, we would be able to do so here. PLEASE
REFER TO APPENDIX B FOR SPECIFIC PARAMETERS RELATED TO ACCELA’S STANDARD PROJECT
ASSUMPTIONS.
WORK DESCRIPTION
The following section describes the specific activities and tasks that will be executed to meet the business objectives
and business requirements of the Agency. In support of the implementation effort as described above, Accela will
provide the following detailed implementation services. For each deliverable, a description is provided as well as
criteria for acceptance of the deliverable.
STAGE 1 - INITITATION
DELIVERABLE 1: PROJECT INITIATION
Project initiation is an opportunity to ensure the project starts in a well-organized, structured fashion while re-
confirming the Agency and Accela expectations regarding the implementation. This Deliverable is comprised of
project planning activities, core project management documents and templates and the first on-site meeting conducted
between the Agency and Accela after the signing of the Statement of Work.
In conjunction with the Agency representatives, Accela will perform the following tasks:
Finalize staffing for the project teams. Guidelines and recommendations for the Agency project staffing are
addressed in the Project Staffing section of this document.
Conduct a formal onsite Kickoff meeting. The objective of this meeting is to review the purpose of the project
and discuss the project scope, roles and responsibilities, deliverables, and timeline.
Establish Communication Plan and project logistics including escalation, status reporting, issue/risk
management, work locations, etc.
Establish schedule of Steering Committee meetings.
Review and agree on Project Status Report Template format.
Finalize and document formal deliverable signoff procedures, identify team members that will be responsible
for signoff from the Agency and Accela.
Review infrastructure requirements and preparation (with designated Agency technical staff).
594
Statement of Work
2012 Accela Inc. Page 8 of 40
Finalize an integrated project plan that includes resource allocation for all tasks (in cooperation with the
Agency Project Manager).
Develop a Project Charter that defines how the project will be governed, including a detailed escalation plan.
Create a project Sharepoint site and load all standard, current documentation.
The Project Kickoff Meeting includes a formal presentation by the project team to review project objectives,
methodology, timeline, roles and responsibilities, risks, and other key project elements with project stakeholders.
In terms of specific output, the following will be executed for this deliverable:
Project Charter (MS Word).
Baseline Project Plan (MS Project).
Project Status Report Template (MS Word).
Project Kickoff Presentation (MS PowerPoint).
Project Sharepoint Site.
Project Kickoff Meeting.
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s request for information.
Coordinate project planning activities.
Communicate the Accela Implementation Methodology that will be used by Accela to deliver Services.
Complete Baseline Project Plan, Project Status Report Template, and Project Kickoff Presentation
deliverables with input from appropriate Agency resources.
Agency Responsibilities:
Identify and set expectations with key resources and subject matter experts for ongoing participation in the
project.
Provide timely and appropriate responses to Accela’s requests for project planning input and meeting
logistics requests.
Provide meeting facilities for Project Kickoff and other onsite activities.
Include Project Sponsor in Project Kickoff Meeting.
Acceptance Criteria:
Review and acceptance of the Project Status Report Template
Review and acceptance of the Baseline Project Plan
Review and acceptance of the Project Charter
Completion of the Project Kickoff Meeting
DELIVERABLE 2: ACCELA AUTOMATION SETUP – DEV AND TEST
During the System Setup step of this project, Accela’s technical staff will work with the Agency IT staff to ensure that
the components for hardware, software, database, network, and Internet are in place for the development and testing
environments. Accela technical staff will validate the proper installation and configuration of the Accela Automation
environment.
In terms of specific output, the following will be executed for this deliverable:
Installation of the Accela Automation software, development and test environments.
Demonstration of an operational Accela Automation computing environment.
Installation documentation (Adobe PDF).
595
Statement of Work
2012 Accela Inc. Page 9 of 40
Specifically, Accela will perform the following tasks within the support environment:
Perform a remote system check of the installation.
Install Accela software.
Demonstrate that the Accela Automation applications are operational.
Provide documentation of the Agency installation.
Configure Accela Automation to use SQL Server Reporting Services.
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s request for information.
Consult with Agency resources to provide technical input and answer technical questions related to the
installation requirements for Accela Automation.
Deliver and install the Accela Automation software.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s requests for information.
Prepare the hardware, software, and network in accordance with the specifications provided by Accela.
Make available the appropriate Agency key IT users to participate in any hardware, software, environment,
and infrastructure meetings.
Arrange for the availability of appropriate people for the system installation, setup, testing, and quality
assurance throughout the setup process.
Acceptance Criteria:
Confirmation of ability to log into the Accela Automation software that has been installed on Agency
hardware.
STAGE 2 – TO-BE ANALYSIS
To-Be Analysis is comprised of the activities required to define the Accela Automation Solution Foundation for the
Agency. The key output of this deliverable is To-Be Analysis Document(s), which serve as a ‘blueprint’ for design and
the baseline configuration efforts throughout the implementation project and establishes the benchmarks for testing
and acceptance at the conclusion of the project.
The To-Be Analysis Document(s) include detailed information on the Agency’s business processes to be configured in
the Accela Automation Solution Foundation, including the following topics:
Organization and departments Standard Comments
Record Types Workflow
Inspections Email Notification
Status Values Intake Forms
User Defined Fields Dropdown List Values
Fees Conditions
596
Statement of Work
2012 Accela Inc. Page 10 of 40
The To-Be Analysis Sessions and To-Be Analysis Document(s) do not include detailed information related to the
following deliverables as they are dependent on the completion of the Solution Foundation milestone.
Deliverable 10: Event Management Scripting Assistance
Deliverable 11: Report Specifications
Deliverable 12: Report Development
Deliverable 16: V360 User Experience
The Project Team, consisting of representatives from both Accela and the Agency, will conduct a formal review of the
To-Be Analysis Documents for the purpose of approval and sign-off on the deliverable. Accela will build prototypes of
one Building process, which will be used during the review sessions to demonstrate the proposed functionality.
Prototyping is intended to demonstrate selected aspects of Accela Automation functionality to assist in understanding
how it will operate for the Agency.
DELIVERABLE 3: TO-BE ANALYSIS SESSIONS
In order to develop the content for the To-Be Analysis Document(s), Accela will work closely with designated Agency
personnel and will conduct analysis sessions to capture the “to-be” required business processes.
In conjunction with the Agency representatives, Accela will perform the following tasks:
Review and understand existing business processes intended for migration into Accela Automation.
Review the developed business process as a basis for configuration in Accela Automation’s workflow tool.
Assist the Agency in streamlining existing business processes for fit into Accela Automation.
Collect employee names and associated roles and identify user group setups.
Review the collected document intake requirements, forms, and data fields for each process.
Review the collected document output requirements (documents/letters/reports).
Review the collected document fees, fee schedules, and collection procedures for each process.
Review the collected document all required inspections and inspection result options for each type.
Accela’s Project Manager will coordinate and schedule the Analysis Sessions in conjunction with the Agency Project
Manager and according to the agreed upon Project Plan. In terms of specific output, the following will be executed for
this deliverable:
To-Be Analysis data gathering activities, including workshops, interviews, and web conferencing
sessions for up to 23 Record types.
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s request for information.
Interview staff in order to understand existing business processes.
Conduct to-be analysis sessions to capture the required business processes to be automated within the
system.
Conduct meetings via email, web conference, phone, and in person to gather and validate analysis input.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s requests for information.
Make available the appropriate Agency key users and content experts to provide required information,
participate in the configuration analysis and verify the accuracy of the documented workflows, input/output
formats, and data elements.
Provide any existing business process documentation, including process flows; fee schedules; commonly
used applications, reports and forms; and other relevant information.
597
Statement of Work
2012 Accela Inc. Page 11 of 40
Schedule participants and meeting locations for analysis activities.
Acceptance Criteria:
Completion of To-Be Analysis Session for the Building and Planning processes.
DELIVERABLE 4: TO-BE ANALYSIS DOCUMENT(S)
To-Be Analysis Document(s) will be developed by Accela based on the information gathered in Deliverable 3: To-Be
Analysis Sessions. This document(s) will serve as the ‘blueprint’ for the Building, Planning, Public Works and Fire
processes throughout the implementation project. Upon completion of the document(s), Accela will conduct a formal
review with Agency for the purpose of approval and sign-off on the deliverable. To facilitate the approval process,
Accela will configure prototypes of the solution for 1 mutually agreed upon To-Be process, which will be used during
the review sessions to demonstrate the proposed functionality. Prototyping is intended to demonstrate selected
aspects of Accela Automation functionality to assist in understanding how it will operate for the Agency.
In terms of specific output, the following will be executed for this deliverable:
To-Be Analysis Document(s) (Adobe PDF) for up to 23 Record types.
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s request for information.
Interview staff as necessary in order to understand existing business processes.
Build selected prototypes to demonstrate proposed functionality.
Conduct meetings via email, web conference, phone, and in person to gather and validate analysis input.
Prepare and complete To-Be Analysis Document(s) capturing the Agency’s business processes to be
included in the Solution Foundation.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s request for information.
Schedule participants and meeting locations for To-Be Analysis Document(s) review activities.
Review and provide feedback on To-Be Analysis Document(s).
Acceptance Criteria:
Review To-Be Analysis Document(s) and validate that the content accurately reflects the business processes
data that will be included in the Accela Automation Solution Foundation.
Agency will have 15 business days to conduct initial review of the To-Be Analysis Document(s). If no
changes or comments are requested within the 15 days, the To-Be Analysis Document(s) is considered
approved by the Agency. Upon delivery of initial feedback, Accela will complete the necessary changes and
updates. The second and final review will have 7 business days for acceptance.
STAGE 3 – SOLUTION FOUNDATION
Accela will provide professional services to develop the Accela Automation Solution Foundation in accordance with
requirements established and agreed upon during the execution of the tasks that comprise Stage 2 – To-Be Analysis.
Accela will produce a detailed, technical Solution Foundation Document(s) that represents the entire foundation of the
system, for each module. This document will be delivered for review with the completed solution.
DELIVERABLE 5: ACCELA AUTOMATION SOLUTION FOUNDATION
598
Statement of Work
2012 Accela Inc. Page 12 of 40
Accela will provide professional services to develop the Solution Foundation of the Accela Automation product in
accordance with requirements established and documented in Deliverable 4: To-Be Analysis Document(s).
In terms of specific output, the following will be executed for this deliverable:
Completed Foundation of Accela Automation Solution to support the To-Be Business Processes for up
to 23 (Twenty-Three) Record types
Accela Automation Solution Foundation Document
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s request for information.
Configure the foundational components as defined in the To-Be Analysis Document(s).
Agency Responsibilities
Provide timely and appropriate responses to Accela’s request for information.
Make available the appropriate Agency key users and content experts to participate in creating the system in
an effort to learn about the system (knowledge transfer).
Work with Accela to verify that the system meets the foundational requirements documented in the To-Be
Analysis Document(s).
The Agency will test the system for purposes of validating the configuration.
Acceptance Criteria:
Review and approve that the Accela Automation Solution Foundation meets the requirements documented in
the approved To-Be Analysis Document(s).
Agency will have 15 business days to conduct initial review of the Solution Foundation. If no changes or
comments are requested within the 15 days, the milestone is considered approved by the Agency. Upon
delivery of initial feedback, Accela will complete the necessary changes and updates. The second and final
review will have 7 business days for acceptance.
STAGE 4 – BUILD
The Build stage includes data conversions, development of interfaces, development of Accela Event Manager Scripts
and custom report development. It comprises all of the additional critical activities outside of solution foundation that
has been configured for the Agency. Similar to the Configuration Stage, it is critical that appropriate agency
representatives are involved in each step of the process to ensure success.
Data conversion of historic/legacy data from Agency systems is a critical activity for the success of this project. The
Accela team is highly experienced in planning for and executing these activities and will work closely with Agency staff
to ensure a successful transition of data. Specifically, the Accela team will work with Agency to understand the data
sources, how they are used, where their data will be stored in Accela Automation and the quality of that data. Often
multiple sources store and manage similar information and decisions need to be made about the authoritative source.
It is also common to find that data sources have not had strong controls and the accuracy is questionable or there is
missing data. There are techniques and tools that Accela may recommend to understand the current state of Agency
data so that decisions can be made about data quality and what to convert. Upon completion of the data analysis,
mapping of historical/legacy data sources may begin with Accela’s mapping tool and conversion iterations performed
as outlined in the Project Plan. Accela provides release notes during these conversion tests to verify data is being
transferred correctly (e.g., number of records and expected values in fields).
Accela will lead the conversion effort and specifically assist in the following areas: data mapping, script development
for conversion, assistance in data testing and validation, and with the planning and execution of the final data
599
Statement of Work
2012 Accela Inc. Page 13 of 40
conversion. For conversions, it is expected and anticipated that the Agency will provide resources knowledgeable
with the historical data to facilitate in the data migration/conversion effort.
The required data mapping effort will be a conducted by Agency personnel with assistance from the Accela. Once the
data mapping has been defined, Accela will ask that a representative of the Agency sign off on the data maps.
Accela will be responsible for the data conversion programs to load data from the staging tables to the Accela
Automation database. PLEASE REFER TO APPENDIX B FOR SPECIFIC ASSUMPTIONS AND PARAMETERS
RELATED TO ACCELA ’S CONVERSION APPROACH.
DELIVERABLE 6: HISTORICAL DATA CONVERSION ANALYSIS
Upon receipt of Agency’s Permits Plus data, Accela will create a Data Conversion Mapping Document detailing the
data conversion process, mutually agreed upon requirements and mapping of Agency’s historical data into Accela
Automation Land Management.
In terms of specific output, the following will be executed for this deliverable:
Land Management Historical Data Conversion Specifications Document
Accela Responsibilities:
Work with the Agency to define and document historical data elements that are required for the conversion.
Assist Agency to complete data mapping.
Complete the Data Conversion Specifications Document.
Agency Responsibilities:
Provide historical data in acceptable formats.
Work with Accela in data mapping for conversion.
Review and sign-off on completed Data Conversion Mapping document.
Acceptance Criteria:
The Historical Data Conversion Specifications document identifies historical data elements that will be
converted into Accela Automation as well as document special consideration (ex. merging data sources,
phasing, etc.)
Acceptance Review Period:
Ten (10) business days total.
DELIVERABLE 7: STANDARD ADDRESS, PARCEL AND OWNERSHIP (APO) DATA
CONVERSION
This Deliverable includes conversion of Agency Address, Parcel, and Ownership (APO) data to Accela Automation.
Accela leverages a standardized data conversion process for APO data sets and will deliver the standard APO
specifications and file templates to be used by the Agency in preparing the data for conversion. The Agency will
identify a source for data to update the address, parcel and owner information within the Agency. Data must be
provided in Accela’s standard format, and Accela and Agency business and technical experts will work together to
map the source data to the Accela database. After Agency staff signs off on the conversion specification document,
the Accela conversion team will develop the conversion program that will populate the Accela system with the
appropriate data.
In terms of specific output, the following will be executed for this deliverable:
600
Statement of Work
2012 Accela Inc. Page 14 of 40
APO Data Conversion Specifications Document (MS Word/MS Excel).
Migrated APO data into Accela Automation testing database environment.
Accela Responsibilities:
Provide standard APO conversion documentation and support.
Migrate data provided by the Agency into the Agency’s AA testing database environment.
Agency Responsibilities:
Identify data accuracy / quality issues and resolve them (data scrubbing).
Provide APO data in the format(s) specified by the standard APO documentation.
Allocate the time for qualified business and technical experts for the Accela-led data-mapping sessions that
are critical to the project success.
Assist in the data-mapping process.
Load data from original source(s) into the Accela standard staging tables.
Allocate the time for qualified personnel to test the conversion for acceptance to ensure that the data is
converted successfully according to the data-mapping document.
Acceptance Criteria:
Review and acceptance of the APO Data Conversion Specifications document.
Confirmation that APO data has been converted to Accela Automation testing environment according to the
standard APO data specifications.
Acceptance Review Period:
Fifteen (15) business days total
DELIVERABLE 8: STANDARD LICENSED PROFESSIONAL DATA CONVERSION
Accela will provide a program to convert licensed professional data from the Agencies existing Permits Plus CAED
File to the Accela Automation licensed professional tables. Data will be provided in Accela’s standard format. After
Agency staff signs off on the conversion specification document, the Accela conversion team will configure the
conversion that will populate the Accela system with the appropriate data.
In terms of specific output, the following will be executed for this deliverable:
Licensed Professional Data Conversion Specifications Document (MS Word/MS Excel).
Migrated Licensed Professional data into Accela Automation testing database environment.
Accela Responsibilities:
Provide standard Licensed Professional conversion documentation and support.
Migrate data provided by the Agency into the Agency’s AA testing database environment.
Agency Responsibilities:
Identify data accuracy / quality issues and resolve them (data scrubbing).
Provide Licensed Professional data in the format(s) specified by the standard Licensed Professional
documentation.
Allocate the time for qualified business and technical experts for the Accela-led data-mapping sessions that
are critical to the project success.
Assist in the data-mapping process.
Load data from original source(s) into the Accela standard staging tables.
601
Statement of Work
2012 Accela Inc. Page 15 of 40
Allocate the time for qualified personnel to test the conversion for acceptance to ensure that the data is
converted successfully according to the data-mapping document.
Acceptance Criteria:
Review and acceptance of the Licensed Professional Data Conversion Specifications document.
Confirmation that Licensed Professional data has been converted to Accela Automation testing environment
according to the standard Licensed Professional data specifications.
Acceptance Review Period:
Fifteen (15) business days total.
DELIVERABLE 9: HISTORICAL DATA CONVERSION DEVELOPMENT
Upon Agency approval of the Historical Data Conversion Specifications document, (Deliverable 6), Accela will provide
a program(s) to migrate appropriate historical data into Accela Automation. Upon receipt of the conversion from
Accela, the Agency DBA will load the data into the Test environment for validation. A maximum of 120 hours have
been allocated for deliverables 6 and 9. As part of deliverable 9, Accela will provide the Agency with training on the
Data Mapping Tool and assist the Agency in using the tool in support of the conversion effort.
In terms of specific output, the following will be executed for this deliverable:
Migrated historical data into Accela Automation Land Management testing database environment.
Accela Responsibilities:
Provide a program to migrate historical data into the Agency’s AA test database environment.
Each data conversion will include up to three (3) conversion loads for client testing
Validate the successful completion of the migration of historical data into the Agency’s test environment.
Agency Responsibilities:
Providing the legacy data source in an accepted format
Assist in the execution of the data conversion program and provide access to environments as needed
Provide resources to validate the conversion statistics and the quality of the data converted into Accela
Automation
Acceptance Criteria:
Historical data has been converted to Accela Automation testing environment according to the Data
Conversion Mapping document.
Acceptance Review Period:
Ten (10) business days total.
SYSTEM INTERFACES
No system interfaces are defined or in scope for this project.
DELIVERABLE 10: EVENT MANAGEMENT SCRIPTING
During the configuration analysis phase of the implementation project, Accela will identify opportunities to supplement
the Accela Automation base functionality via Event Manager Script Engine (EMSE) script development. Accela will
work with key Agency project stakeholders to identify the business rules/processes to be automated. A maximum of
602
Statement of Work
2012 Accela Inc. Page 16 of 40
fifty-eight (58) services hours will be devoted to EMSE script requirement specification for Land Management,
EMSE script development, and EMSE script development consultation and knowledge transfer. Accela will work with
Agency to identify desired EMSE functionality, and subsequently will help prioritize the scripting needs to determine
which scripts will be developed by Accela, and which scripts can be developed by the Agency. The scripts developed
by Accela can be used as models whereby agency staff can develop and modify additional EMSE scripts as needed.
Representative examples of business processes that could be automated by a script listed below. Note that the below
list is an example list only and not a list of the actual script(s) that will be developed for the project.
Cancel application submittal based on proximity alert (Accela GIS)
o Use Case: Do not allow a casino to be located within 1 mile of a school;
Closing workflows based on inspection results
o Use Case: Final Inspection is complete, update workflow;
Automatic assessment of complex fee calculations
o Use Case: Auto fee calculation, assessment, and invoicing upon application submittal;
Increment a date based on workflow status change
o Use Case: Expiration on Permit is made current every time a workflow is updated;
Preventing inspections based on various criteria
o Use Case: Depending on workflow / application status, do not allow an inspection to take place.
Prior to the development of a script, the Agency will approve a design specification document that will be created
jointly by the Agency and Accela. The approved document will be used as a basis for determining completion and
approval of the deliverable.
In terms of specific output, the following will be executed for this deliverable:
Prioritized list of desired Land Management EMSE scripts (MS Excel/Word).
EMSE script specifications for scripts to be developed by Accela (MS Excel/Word).
Demonstrated operability of scripts in staging/test environment per the design document specifications.
Accela Responsibilities:
Work with Agency staff to identify potential uses of EMSE scripting.
Assist with development of list of desired EMSE functionality.
Aid the Agency in prioritizing which scripts will be developed by Accela.
Develop EMSE scripts based on the specifications.
Demonstrate functionality of scripts per specifications.
Agency Responsibilities:
Allocate the time for qualified business and technical experts for the script requirements sessions that are
critical to the project success.
Identify resources that will learn EMSE scripting tolls and approaches for ongoing maintenance.
Prioritize desired EMSE functionality to determine which scripts Accela will develop.
Provide timely and appropriate responses to Accela’s request for information.
Verify the Event Script Specification meets the intended business requirement.
Allocate the time for qualified personnel to test the script for acceptance.
Ensure that the data populates successfully according to the script requirements document.
Acceptance Criteria:
Review and acceptance of design document with written sign-off from the Agency.
Demonstrate a developed script within the system.
603
Statement of Work
2012 Accela Inc. Page 17 of 40
Reports
Reports are defined as anything that can be printed from the system, including but not limited to, reports, forms,
documents, notices, and letters that the Agency wishes to print as identified during configuration analysis. The
Configuration Document will define the reports and documents that are required by the Agency to effectively use
Accela Automation. These reports will be broken down by level of effort and identified in the configuration document. It
is expected that, after the appropriate training on the database and the selected report writing tool is completed,
Agency personnel will be able to handle additional and future report requirements. Reports are classified by level of
effort: high, medium, and low. High is defined as a report containing significant calculation and/or extensive detail and
number of fields – for example a financial statistical report or complex permit. The majority of reports require a
‘medium’ level of effort, which is defined as a report displaying non-calculated and minimal calculated data fields.
Reports with a low level of effort are typically letters or notices that contain contact information and basic application
data.
These reports can be developed using the integral Accela Report Writer included with Accela Automation, Microsoft
Report Service (SRS) or Crystal Reports XI Server at the Agency’s discretion. These custom reports, whether
developed with Accela AdHoc Report Writer, SRS or Crystal Reports, will be deployed in the Report Manager for use
within Accela Automation.
DELIVERABLE 11: REPORT SPECIFICATIONS
Accela will develop documents/letters/reports from those identified by the Agency as required for the new Land
Management system.
Accela and Agency have agreed that Accela will develop Land Management reports based on the following
breakdown:
Two (2) of High Complexity
Seventeen (17) of Medium Complexity
Seven (7) of Low Complexity
Prior to the development of a report the Agency will approve report design specification documents that will be created
jointly by the Agency and Accela. The approved documents will be used as a basis for determining completion and
approval of the reports. Development of each report cannot begin until agreement on each specification is complete.
A proven strategy that combines the use of the Accela Automation Quick Queries, custom reports developed by
Accela that include run-time parameters to allow similar reports to be combined, and the development of other reports
by the Agency after training, can ensure that all required reporting requirements are met.
In terms of specific output, the following will be executed for this deliverable:
List of identified Land Management reports that Accela will develop
Report Specifications Documents for each of the identified Land Management reports
Accela Responsibilities:
Assist in determining level of effort for reports to assist with prioritization.
Develop report specifications.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s request for information.
Make available the appropriate key users and content experts to participate in the report specification.
604
Statement of Work
2012 Accela Inc. Page 18 of 40
Provide information and data in the formats specified by Accela that will be needed for agreement on the
Deliverable.
Acceptance Criteria:
Agreement on prioritized list of reports that will be developed by Accela.
Review and approval of individual Report Specifications documents. The Agency will not unreasonably
withhold acceptance if the Agency requests changes to the reports specifications after the initial signoff of the
specification by the Agency.
Agency will have 10 business days to review the Report Specification Documents. If no changes or
comments are requested within the 10 days, the Report Specification Documents are considered approved
by the Agency.
DELIVERABLE 12: REPORT DEVELOPMENT
Accela will develop custom documents/letters/reports per the specifications developed and approved in Deliverable
11, Report Specifications. Changes to the report specifications after approval can negatively impact project progress
and the overall schedule. Therefore, changes to the report specifications after approval requires an analysis by
Accela to determine the level of effort required, and if a change order would be required to complete the work.
In terms of specific output, the following will be executed for this deliverable:
A total of twenty-six (26) Land Management documents/letters/custom reports per the Report
Specification Documents
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s request for information.
Develop reports per specifications.
Assist in the validation of the reports in test environment.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s request for information.
Make available the appropriate key users and content experts to participate in the report development and
validation activities.
Request change order if changes to specifications are required.
Acceptance Criteria:
Confirmation of report accuracy in test environment per Report Specifications.
DELIVERABLE 13: ACCELA GIS CONFIGURATION
Accela will install and configure Accela GIS to link and leverage existing Agency GIS information, including assistance
with establishing the map service to be used in conjunction with Accela GIS. The following are the main objectives
being pursued through the implementation of the Accela GIS:
Look up permit information and parcel information from the Permitting system.
View selection, location, and associated GIS information.
Select one or more parcels and add new applications to the permit system.
During GIS installation, Accela’s technical staff will work with Agency IT staff to ensure that the components for
hardware, software, database, network, and Internet are in place for the Accela GIS dev and production environments.
Accela technical staff will validate the proper installation and configuration of the Accela GIS environment.
In terms of specific output, the following will be executed for this deliverable:
605
Statement of Work
2012 Accela Inc. Page 19 of 40
Accela GIS installed on Agency server(s).
Demonstration of operational system.
Accela Responsibilities:
Install Accela software and perform quality assurance checks on the configuration and performance based on
acceptance criteria mutually developed by Accela and the Agency.
Demonstrate that the Accela GIS applications are operational in the Agency computing environment thus
communicating with the Accela Automation system.
Agency Responsibilities:
Arrange for the availability of appropriate staff for the system installation, setup, testing, and quality
assurance throughout the setup process.
Order and procure necessary hardware, non-Accela systems software, and networking infrastructure as
specified by Accela.
Provide people and physical resources based on the dates outlined in the project schedule.
Prepare the hardware, software, and network in accordance with the specifications provided by Accela.
Provide Accela with network access for remote installation and testing.
Provide information and data in the formats specified by Accela that will be needed for the GIS
implementation.
Acceptance Criteria:
Demonstration of operating Accela GIS in test environment.
DELIVERABLE 14: ACCELA CITIZEN ACCESS CONFIGURATION
This deliverable includes installation, setup, analysis, configuration and online merchant account setup assistance for
the Accela Citizen Access (ACA) software on the Test site for Building business processes. Subsequently, Accela will
work with the Agency representatives to assess and implement Accela Citizen Access to extend certain aspects of the
internal Accela Automation configuration for use by the general public.
Features available for configuration include:
Permit Research
Permit Application and Issuance
Inspection Request Entry
Inspection Results Research
Status tracking
In terms of specific output, the following will be executed for this deliverable:
Accela Citizen Access Configuration Specifications Document (MS Word)
Configuration of three (3) unique processes for online submittal
Accela Responsibilities:
Setup Accela Citizen Access in Dev and Prod environments.
Work with the Agency to determine which services to expose to the public via Accela Citizen Access.
Create configuration specification for Accela Citizen Access based on analysis with the Agency.
Configure the Online Record types defined in the System Configuration Document in Accela Citizen Access.
606
Statement of Work
2012 Accela Inc. Page 20 of 40
Agency Responsibilities:
Obtain a merchant account, and deploy an internet-enabled payment engine.
Validate that the configuration specification for Accela Citizen Access meets Agency requirements based on
details from the Configuration phase of the project.
Perform testing of all Online Record types for purposes of validating the configuration.
Acceptance Criteria:
Accela Citizen Access Configuration Analysis Document provides details of all configuration elements based
on Accela Automation back office configuration.
The base configuration of Accela Citizen Access is configured as documented in the approved Accela Citizen
Access Configuration Specification Document.
Demonstration of the operational Accela Citizen Access functionality per the specification document(s).
Acceptance Review Period:
Ten (10) business days.
DELIVERABLE 15: ACCELA MOBILE OFFICE CONFIGURATION
Accela will install setup and configure the Accela Mobile Office application. As part of this deliverable Accela will
perform the configuration tasks required to ensure Accela Mobile Office interfaces with Accela Automation in both a
dev and production environment. Using Accela Mobile Office, an Agency inspector can perform activities such as:
Result inspections/investigations in either store/forward or wireless mode
Lookup addresses and parcels and view corresponding activities
Analysis activities with the Agency will result in a Mobile Office Configuration Specifications Document. Subsequently,
Accela’s staff will extend base configuration of Accela Mobile Office per the Mobile Office Configuration Specifications
Document.
In terms of specific output, the following will be executed for this deliverable:
Accela Mobile Office Configuration Specifications Document (MS Word)
Demonstration of operational system per Accela Mobile Office Configuration Specifications document
Accela Responsibilities:
Create configuration specifications for Accela Mobile Office based on analysis with the Agency.
Configure Accela Mobile Office based on approved specifications document.
Acceptance Criteria:
The base configuration of Accela Mobile Office in the Test environment is configured as documented in the
Accela Mobile Office Configuration Specifications document.
Acceptance Review Period:
Ten (10) business days total.
DELIVERABLE 16: V360 USER EXPERIENCE
V360 User Experience is comprised of the fine-tuning of the User Interface (“look and feel”) of the system, usability
and security. This portion is completed prior to User Acceptance Testing to provide a more refined view of the system
and assistance with system acceptance for new users. Accela will use the completed configuration and standard,
607
Statement of Work
2012 Accela Inc. Page 21 of 40
best practice V360 User Interface as a starting point for analysis and documentation of desired look and feel of Accela
Automation V360 user interface.
In conjunction with the Agency representatives, Accela will perform the following tasks:
Review and update the required portlets for each major user group.
Review and update the required fields, field order and field names of each major portlet.
Provide recommendations and seek input on required Quick Queries in order to define a default list.
Provide recommendations and seek input on required Smart Charts (Dashboards) in order to define a default
list.
Accela will use the V360 User Console configuration document template, and the appropriate content within that
document to capture the Agency’s desired V360 User Experience to be configured, utilizing up to seventy (70) hours
of assistance. Accela’s Project Manager will coordinate the compilation of the information collected during the
Analysis into the document, including detailed settings related to the following topics:
User Consoles Form Filters
ASI Form Layout APO Template Form Layout
Quick Queries Smart Charts
My Navigation Go To Menu’s
The Project Team, consisting of representatives from both Accela and the Agency, will conduct a formal review of the
document for the purpose of approval and sign-off on the deliverable. Accela will configure the application to meet the
requirements of the document upon approval.
In terms of specific output, the following will be executed for this deliverable:
Analysis activities, including a workshop, interviews, and web conferencing sessions.
V360 User Console Configuration Document(s) (MS Word).
Up to 100 Hours of Configuration of V360 User Experience per the V360 User Console Configuration
Document
Accela Responsibilities:
Conduct sessions to capture the required look and feel functionality of the Accela Automation system.
Conduct meetings via email, web conferencing, phone, and in person to gather and validate analysis input.
Prepare and complete V360 User Console Configuration Document.
Build the user experience components as documented in the V360 User Console Configuration Document.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s request for information.
Make available the appropriate Agency key users and content experts to participate in the user experience
analysis and verify the accuracy of the documented user experience elements.
Schedule participants and meeting locations for analysis activities.
Acceptance Criteria:
V360 User Console configuration document.
Demonstration of the configured V360 experience.
Agency will have 10 business days to review the V360 User Console configuration document. If no changes
or comments are requested within the 10 days, the V360 User Console configuration document and
milestone is considered approved by the Agency.
608
Statement of Work
2012 Accela Inc. Page 22 of 40
STAGE 5 – READINESS
DELIVERABLE 17: ACCELA AUTOMATION SETUP – PRODUCTION
Accela’s technical staff will work with the Agency IT staff to ensure that the components for hardware, software,
database, network, and Internet are in place for the production environment. Accela technical staff will validate the
proper installation and configuration of the Accela Automation environment.
In terms of specific output, the following will be executed for this deliverable:
Installation of the Production Accela Automation environment.
Demonstration of an operational Accela Automation computing environment.
Updated Installation documentation (MS Word and Adobe pdf).
Specifically, Accela will perform the following tasks within the support environment:
Perform a remote system check of the installation.
Install Accela software.
Demonstrate that the Accela Automation applications are operational in the Agency computing environment.
Provide documentation of the Agency installation.
Configure Accela Automation to use Crystal Reports.
Accela Responsibilities:
Consult with Agency resources to provide technical input and answer technical questions related to the
installation requirements for Accela Automation.
Deliver and install the Accela Automation software on the Agency server.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s requests for information.
Prepare the hardware, software, and network in accordance with the specifications provided by Accela.
Acceptance Criteria:
Confirmation of ability to log into the Accela Automation software that has been installed on Agency computer
systems.
Demonstrate core Accela Automation system is operational in the Agency environment.
DELIVERABLE 18: ADMINISTRATIVE AND TECHNICAL TRAINING
Accela will provide training for Agency staff that focuses on the administration, maintenance, and augmentation of its
Accela Automation configuration. Our aim at Accela is to educate Agency resources on all aspects of Accela
Automation in an effort to ensure the Agency is self-sufficient. This allows the Agency to best react to changing
requirements and ongoing maintenance, which can allow the Agency to be proactive and significantly reduce system
maintenance costs over time.
In addition to a comprehensive administrator training course that spans three days, Accela will also train Agency users
on the administration and use of the system. Specifically, the following courses will be provided to the Agency.
Accela Automation Core Team Overview,
Accela Automation Administrator & V360Training
Accela Data Mapping Tool
Reports Schema and Training,
Accela Mobile Office Admin Training,
Accela Citizen Access Admin and User Training,
609
Statement of Work
2012 Accela Inc. Page 23 of 40
Accela GIS Admin and User Training.
In terms of specific output, the following will be executed for this deliverable:
Two-day Accela Overview Core Training course,
Accela Data Mapping Tool – ½ day training and advisement
Three-day Accela Automation Administrator Training course,
Two-day V360 Training
Two-day Reports Schema and Training course,
Half-day (4 hours) Mobile Office Administrator Training course,
One-day Accela Citizen Access Technical Training course,
Half-day (4 hours) Accela GIS Technical Training course
Accela Responsibilities:
Coordinate with the Agency to define training schedule and logistics.
Deliver training per the specific requirements listed above.
Agency Responsibilities:
Select and prepare the power-users who will be participating in the training and subsequently training end
users.
Arrange the time and qualified people for the training who are critical to the project success.
Provide suitable Agency facilities to accommodate various training classes.
Ensure that users are proficient in using PC’s in a Windows environment as a prerequisite for the course.
Ensure that users are familiar with use of standard Internet browsers as a prerequisite for the course.
Acceptance Criteria:
Execution of listed training courses
DELIVERABLE 19: DAILY USER TRAINING
This Deliverable includes the Delivery by Accela to Agency of either two (2) of the 4 day of Daily User Train the
Trainer Training course or four (4) of the 1.5 Day Daily User Training; to be determined at time of training schedules
based on current customer need at that time. Accela best practices have proven that class sizes no larger than 12
participants are more successful with students who meet the pre-requisites of the course. The Accela Trainer has the
right to modify the class size to ensure successful instruction with Agency agreement.
End User Training should be coupled with the Agency delivering supplementary user training to its staff using the core
Use Cases documented in each System Configuration Document. Accela recommends that Agency adopt the “80/20
rule” for training, focusing the majority of their training on the 80% of what the Agency normally does operationally.
The recommended supplementary training conducted by the Agency can utilize business experts from each area to
train on all aspects of their configuration. Accela will deliver current training documentation in a format that can b e
used to customize the documentation. Documents delivered by Accela to the Agency will be valid for the release that
the Agency is trained. Documents delivered by Accela may not be shared with any other agency or Company per the
Non-Disclosure Agreement.
In terms of specific output, the following will be executed for this deliverable:
Either Two (2) Four-day Daily User Train the Trainer Training Class OR
Four (4) One and a half-day Daily User Training Classes.
Accela Responsibilities:
Coordinate with the Agency to define training schedule and logistics.
610
Statement of Work
2012 Accela Inc. Page 24 of 40
Provide 4 Days of Daily User Train the Trainer Training.
Agency Responsibilities:
Select and prepare the power-users who will be participating in the training and subsequently training end
users.
Arrange the time and qualified people for the training who are critical to the project success.
Provide suitable Agency facilities to accommodate various training classes.
Ensure that users are proficient in using PC’s in a Windows environment as a prerequisite for the course.
Ensure that users are familiar with use of standard Internet browsers as a prerequisite for the course.
Acceptance Criteria:
Execution of listed training courses.
DELIVERABLE 20: USER ACCEPTANCE TESTING (UAT)
This deliverable is comprised of the assistance Accela will provide to allow the Agency to accept that the Land
Management solution meets the requirements as documented in all the deliverables. Accela will assist the Agency in
the testing and validation of the solution and its readiness to be migrated to production for active use and will assist in
transferring the solution and any required data from Support to Production.
Accela will provide support for training, oversight, answering questions and addressing issues discovered in User
Acceptance Testing. It should be noted that it is critical that the Agency devote ample time and resources to his effort
to ensure that the system is operating per signed specifications and ready for the move to production. The testing
effort will require a significant time investment by the Agency, and coordination of resources is critical. At this point in
the implementation process, the Agency should test individual components of functionality of the solution (i.e.,
functional and/or unit testing), and also test to ensure that the interrelated parts of the Accela Automation solution are
operating properly (i.e., integration testing).
Accela will provide assistance to the Agency as needed by providing User Acceptance Testing (UAT) support and
facilitating completion of UAT. Accela will address and rectify issues discovered during the UAT process as Agency
staff executes testing activities. Accela will work with the Agency to develop a test plan and deliver sample test
scripts, as well as an issue log to track the progress of testing. It should be noted that Accela will plan for a total of 2
months to complete this deliverable.
If the Agency does not devote adequate time and staffing to UAT in order to completely test the solution, Accela may
opt to postpone go-live at the Agency’s expense. Accela will work diligently with Agency to ensure this does not occur
and provide several opportunities for the Agency to add additional staff and time to this effort before recommending a
postponement or delay.
In terms of specific output, the following will be executed for this deliverable:
Resolution of configuration issues resulting from Agency End User Testing.
Fully-tested Land Management system that is ready to move to a production environment.
Accela Responsibilities:
Provide recommendations on testing strategy and best practices.
Lead the Agency in up to 2 months of User Acceptance testing effort and the validation of the system
configuration and its readiness to be migrated to production for active use.
Resolution of issues as a result of User Acceptance Testing activities.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s request for information.
611
Statement of Work
2012 Accela Inc. Page 25 of 40
Make available the appropriate Agency key users and content experts to participate in user acceptance
testing as defined and managed by Agency.
Develop the User Acceptance test scripts.
Utilize the use cases documented in each Configuration Document Deliverable as the basis for the
acceptance of this Deliverable.
Acceptance Criteria:
Completion of up to 6 weeks of UAT.
STAGE 6 - DEPLOY
DELIVERABLE 21: PRODUCTION SUPPORT
Production date is defined as the official date in which Accela Automation moves from the test environment to
production for daily Agency usage. This date will be agreed to by both Accela and the Agency at project inception. It
may be altered only by change order agreed to by both parties. In the weeks prior to moving to Production, Accela will
assist in final data conversions, system validation, staff preparation assistance and training, and coordination of
deployment.
In terms of specific output, the following will be executed for this deliverable:
Deployment support prior to moving to Production.
Accela Automation used in production environment for Agency daily use.
Accela Responsibilities:
Provide on-site resources to support the move to Production effort.
With assistance from the Agency, lead the effort to transfer the system configuration and any required data
from Support to Production.
Assist in the development of a Pre-Production checklist that details the critical tasks that must be
accomplished prior to moving to Production.
Agency Responsibilities:
Provide technical and functional user support for pre and post Production Planning, execution, and
monitoring.
Provide timely and appropriate responses to Accela’s request for information.
Assist in the development of a Pre-Production checklist that details the critical tasks that must be
accomplished prior to moving to Production.
Make available the appropriate Agency key users and content experts to participate in user acceptance
testing as defined and managed by Agency.
Acceptance Criteria:
Deployment support prior to moving to Production.
Production system is first used by the Agency for daily use.
DELIVERABLE 22: POST DEPLOYMENT SUPPORT AND TRANSITION TO CRC
This deliverable is comprised of the post- Production support assistance that Accela will provide to address issues and
provide consultative advice immediately following the move to Production for daily use. Accela will provide support for
one (1) month immediately following deployment (go-live). At the end of the support period, a formal meeting will be
scheduled with the Agency, Accela Services Team, and Accela CRC for the purpose of transitioning support of the
Agency to Accela CRC.
612
Statement of Work
2012 Accela Inc. Page 26 of 40
Accela will work with the Agency to identify and address issues identified during this period using a Post Production
Issues List. This list will be comprised of issues related to the defined deliverables listed in this SOW, which will be
addressed by Accela, as well as any other issues which will be addressed by the Agency. Examples of issues the
Agency is responsible for include training issues, functional changes beyond the scope of this Statement of Work,
cosmetic changes, and procedures related to the use of Accela Automation. Specifically, Accela will not be
developing or creating additional reports, conversions, record types and workflow processes that were not included in
the scope of this project.
In terms of specific output, the following will be executed for this deliverable:
One (1) month of Post Deployment Support.
Finalized Post Production Issues List.
Transition of Agency from Services team to Customer Resource Center for ongoing support.
Accela Responsibilities:
Provide post-production support for Accela developed configuration and components.
Assist with the identification of issues for the Post Production Issues List.
Assist with issues that may arise related to the deliverables in this SOW.
Transfer ongoing support of the client to the CRC to address any post Production issues that require
remediation.
Agency Responsibilities:
Provide technical and functional user support for post-production support and monitoring.
Develop and maintain a Post Production Issues List.
Provide timely and appropriate responses to Accela’s request for information.
Make available the appropriate Agency key users and content experts to participate in user acceptance
testing as defined and managed by Agency.
Acceptance Criteria:
Execution of one (1) month post-Production support.
Official transfer from the Accela Services project team to the Customer Resource Center (CRC).
613
Statement of Work
2012 Accela Inc. Page 27 of 40
PROJECT RESOURCES AND LOCATION OF WORK
WORK LOCATION
Services contracted under this SOW may be performed remotely and/or at the Agency’s on-site facilities as deemed
appropriate and reasonable for the successful completion of the Services detailed herein.
AGENCY RESOURCES
Agency must fill the appropriate roles with the appropriate personnel to work together with the Accela Engagement
Team for these Services and that Agency will make available additional resources as needed for the Services to be
successful. Agency roles can be filled by the same person. In addition, Agency will provide all necessary technical
resources to make appropriate modifications within any Agency systems wishing to integrate with any Accela systems.
These resources must be proficient in Agency coding/development environment and tools, to make the required
changes to their software to enable integration and must be available during the timeframe of these Services.
Agency roles include Sponsor, Project Manager, Technology Manager, and Business Lead(s) for each
Division/department being implemented, Super User trainers, and others as appropriate.
Agency Resources Description
Project Sponsor
Responsibilities include:
Ultimate responsibility for the success of the project,
Creating an environment that promotes project buy-in,
Driving the project through all levels of the agency,
High-level oversight throughout the duration of the project,
Serving as the primary escalation point to address project issues in a timely
manner.
Project Manager
Responsibilities include:
Overall administration, coordination, communication, and decision- making
associated with the implementation;
Planning, scheduling, coordinating and tracking the implementation with
Accela and across departments within the agency;
Ensuring that the project team stays focused, tasks are completed on
schedule, and that the project stays on track.
Division/Departmental
Business Leads
A user representative for each affected department must be appointed to facilitate
analysis and configuration and serve as a decision-making entity for that group.
These critical appointments may well determine the success of the implementation for
their respective areas. Responsibilities include:
Attending requirements workshop sessions;
Willing and able to gather data and make decisions about business
processes;
Assist in the creation of specifications for reports, interfaces & conversions
Review and test the system configuration;
Participating in the implementation of the Accela Automation solution.
614
Statement of Work
2012 Accela Inc. Page 28 of 40
Division/Departmental
Subject Matter Expert
(SME)
Responsibilities include:
Being trained on the Accela Automation system at a System Administration
level;
Being fully engaged in the Business Analysis and system configuration
activities;
Assist internal efforts towards the creation of reports, interfaces &
conversions;
Assist in the review and testing of the system configuration;
Actively participate in the full implementation of the Accela Automation
solution.
Technical Lead
Responsibilities include:
Primary responsibility for the technical environment during the software
implementation;
Ensure that servers, databases, network, desktops, printers, are available for
system implementation and meet minimum standards;
Work with Accela technical personnel during implementation;
Maintain test and production databases;
Perform day-to-day maintenance of the system and install maintenance
releases;
Act as the primary technical resource for troubleshooting problems;
·Establish and maintain backup, archival, and other customary maintenance
and housekeeping activities.
ACCELA RESOURCES
Accela will assign key Professional Services resources for this engagement with Agency. These individuals are well
versed in the Accela Automation application, and are well qualified to lead this effort. Accela’s Project Manager shall
assume full responsibility for the coordination of this team and its interaction with key Agency resources assigned to
the effort. The main roles are as follows:
Accela Resources Description
Project Executive
The Project Executive oversees the project’s progress/direction and works with the
Project Manager to ensure efficiency, consistency and quality in delivery of Accela
implementations. The Project Executive actively participates in a project
director/executive role. The Project Executive will meet with Agency Executives
monthly or upon request throughout the duration of the project.
Project Manager
The Accela Project Manager is responsible for the overall project management and
works directly with the client throughout all aspects of Accela implementations: from
the initial scoping, planning, staffing to delivery. The Project Manager undertakes the
project administration tasks including:
Project plan management,
Change order management,
Issue log management and escalation,
615
Statement of Work
2012 Accela Inc. Page 29 of 40
Status reporting,
Project workspace management,
Resources management,
Work plan management,
Meetings management,
Project review with Project Executive.
In addition, the Project Manager will actively participate in leading the System
Configuration Analysis sessions and will be responsible for the creation of the System
Configuration Document.
Senior Implementation
Consultant
The Senior Implementation Consultant assigned to the project will have major
experience in the business process as well as the product functionality and is
responsible for:
Business analysis activities: Mapping the client’s business processes and
requirements to the functionality of Accela’s products and the creation of
solution design,
Leading system configuration activities,
Providing training/mentoring to agency staff,
Recommend industry best practices to agency to enhance business
processes,
Guide agency on how best to configure the system based on past
experiences and software expertise.
Implementation Consultant
Implementation Consultant resources support the project and typically focus on the
following tasks.
The configuration of the system to match the System Configuration
document.
Build activities within the project, such as conversion data mapping, creation
of reports and interface specification.
Technical Consultant
Accela Technical Consultants are involved in all areas that require knowledge of
server-side considerations and Accela add-on products such as:
Application installation and setup (Accela Automation, Accela GIS, Accela
Mobile Office, and Accela Citizen Access),
Report definition and creation,
Event Manager Script definition and programming,
Database Conversions and data mapping assistance,
Interface specifications and development.
Training Consultant Training Consultants are responsible for Accela Training classes with assistance from
Implementation consultants, depending on the nature of the specific project.
616
Statement of Work
2012 Accela Inc. Page 30 of 40
PAYMENT SCHEDULE
The table below represents the Services payments to be made during the project. Progress Payments will commence
30 days after on site kick-off meeting, and occur monthly.
Progress Payment Schedule
Description Payment Amount Payment Date
Progress Payment 1 $29,792.00 Upon Contract Signing
Progress Payment 2 $14,896.00 1 Month after kickoff
Progress Payment 3 $14,896.00 2 Months after kick-off
Progress Payment 4 $14,896.00 3 Months after kick-off
Progress Payment 5 $14,896.00 4 Months after kick-off
Progress Payment 6 $14,896.00 5 Months after kick-off
Progress Payment 7 $14,896.00 6 Months after kick-off
Progress Payment 8 $14,896.00 7 Months after kick-off
Progress Payment 9 $14,896.00 8 Months after kick-off
Progress Payment 10 $14,896.00 9 Months after kick-off
Progress Payment 11 $14,896.00 10 Months after kick-off
Progress Payment 12 $14,896.00 11 Months after kick-off
Progress Payment 13 $14,896.00 12 Months after kick-off
Progress Payment 14 $14,896.00 13 Months after kick-off
Progress Payment 15 $14,896.00 14 Months after kick-off
Progress Payment 16 $14,896.00 15 Months after kick-off
Progress Payment 17 $14,896.00 16 Months after kick-off
Progress Payment 18 $29,792.00 Final Acceptance
Total $297,920.00
617
Statement of Work
2012 Accela Inc. Page 31 of 40
Monthly Project Management Payment Schedule
Description Payment Amount Payment Date
Project Management Payment 1 $1,813.39 1 Month after kickoff
Project Management Payment 2 $1,813.33 2 Months after kickoff
Project Management Payment 3 $1,813.33 3 Months after kick-off
Project Management Payment 4 $1,813.33 4 Months after kick-off
Project Management Payment 5 $1,813.33 5 Months after kick-off
Project Management Payment 6 $1,813.33 6 Months after kick-off
Project Management Payment 7 $1,813.33 7 Months after kick-off
Project Management Payment 8 $1,813.33 8 Months after kick-off
Project Management Payment 9 $1,813.33 9 Months after kick-off
Project Management Payment 10 $1,813.33 10 Months after kick-off
Project Management Payment 11 $1,813.33 11 Months after kick-off
Project Management Payment 12 $1,813.33 12 Months after kick-off
Project Management Payment 13 $1,813.33 13 Months after kick-off
Project Management Payment 14 $1,813.33 14 Months after kick-off
Project Management Payment 15 $1,813.33 15 Months after kick-off
Project Management Payment 16 $1,813.33 16 Months after kick-off
Project Management Payment 17 $1,813.33 17 Months after kick-off
Project Management Payment 18 $1,813.33 18 Months after kick-off
Sub-Total $32,640.00
Total
Project Sub-total $330,560.00
Travel Expenses Estimate $36,000.00
Total $366,560.00
EXPENSES
Out-of-pocket travel and lodging expenses incurred by Accela resources in the performance of this Statement of Work
will be reimbursed by Agency as incurred, in accordance with the Services Agreement between Accela and the
Agency. Out-of-pocket travel and living expenses include but are not limited to all travel, airfare, transportation,
lodging, parking, wireless internet connectivity, and meals.
ACCEPTANCE
The Services contracted for in this Statement of Work will be considered Accepted when all Deliverables defined in the
Work Description Section have been accepted by Agency as defined for each Deliverable. Additionally, transition to
Accela’s Customer Service Center, CRC has been completed. The live system has been handed over to the CRC
and the transfer of knowledge from the Project Team to the CRC has also been completed. All training has concluded
and project documentation has been handed over to the CRC.
TERMS
The pricing and terms of this proposal are valid until June 30, 2014. If this Statement of Work is accepted after this
date all pricing and terms may not be valid.
618
Statement of Work
2012 Accela Inc. Page 32 of 40
APPENDIX A - ACCELA IMPLEMENTATION METHODOLOGY
Accela will deliver its Services to the Agency by employing the methodology detailed in this section. This is a proven
methodology that guides the project from inception to deployment, thereby increasing the chances of successfully
implementing Accela software products. Project delivery through execution of this Implementation Life Cycle is
described below.
IMPLEMENTATION LIFE CYCLE
Thorough execution of these six stages ensures that Accela customers receive high-quality services throughout the
project engagement.
As illustrated in the figure above, the stages of project delivery flow in linear direction, although many tasks run in
parallel as appropriate to avoid unnecessary project delays. Each stage has pre-defined objectives, tasks and
associated deliverables. Depending on the exact scope of the project, a full complement or subset of all available
deliverables will be delivered through the services defined for the project. Employing this deliverables-based
approach ensures that Accela and the Agency understand the composition and ‘downstream’ impact of each project
deliverable to ensure the project is delivered with quality and in a timely manner.
INITIATION
Initiation represents the first stage in the lifecycle. During the Initiation stage, project contracts and the SOW
are finalized, project scope and objectives are reviewed, and project planning activities and deliverables are
completed. In terms of specific deliverables, common output from the Initiation Phase is as follows:
Project Charter,
Baseline Project Plan,
Project Status Report Template,
Project Sharepoint Site pre-loaded with baseline documentation,
Project Initiation Meeting.
TO-BE ANALYSIS
Analysis is the second stage in the lifecycle. During the Analysis stage, Accela reviews existing agency
documentation, interviews agency staff, and conducts workshops to understand the “To-Be” vision of the
Agency that can be executed with the aid of Accela Automation. It is during this Phase that Accela gains a
deeper understanding of Agency processes and business rules; simultaneously, the Agency begins to gain a
deeper understanding of the methodology and Accela Automation capabilities. A key output of this Phase is
the To-Be Analysis Document(s) which serve as the ‘foundation’ for configuration of Accela Automation to
support germane elements of the Agency “To-Be” vision. Supplementing the To-Be Analysis Document(s)
are all other configuration specifications documents related to data conversion, interfaces, reports, and event
scripts.
619
Statement of Work
2012 Accela Inc. Page 33 of 40
SOLUTION FOUNDATION
Solution Foundation is the third stage in the lifecycle. It begins upon completion of Stage 2 and should be
completed prior to the next stage, Build. During the Solution Foundation stage, Accela Automation will be
built to match the to-be processes agreed to in the Analysis stage. Essential to this effort is the configuration
of the Record (Case, Application, and Permit types) that were agreed to during the Analysis phase.
Configuration of in-scope record types is comprised of, but not limited to:
User-defined fields (Application-Specific Information and Task-Specific Information),
Workflows and statuses,
Fee structures and rules,
Inspection data.
BUILD
Build serves as the fourth stage in the lifecycle, and execution of this stage overlaps Configuration, but ends
after Configuration is complete. During the Build stage, all defined elements during the Analysis stage
beyond the Solution Foundation will be implemented. This includes conversions, event scripts, interfaces
and reports. In terms of specific deliverables, common output from the Build Phase is as follows:
Event Script Development,
Report Specifications and Development,
Data Conversion Specifications and Development,
Interface Specifications and Development.
READINESS
Readiness is the fifth stage in the lifecycle. During the Readiness stage Accela Automation is fully tested,
errors are identified, documented and corrected. Additionally, the solution is prepared for deployment. In
addition, system administrators and end users are trained so that all appropriate agency staff members are
prepared to use and maintain the software once the move to production occurs. In terms of specific
deliverables, common output from the Readiness Phase is as follows:
User Acceptance Testing,
End-User Training.
DEPLOY
Deploy is the sixth and final stage in the lifecycle. During the Deploy stage the applications are moved to
production; all requisite pre-production activities are identified, tracked and completed, and post-production
analysis and review is completed. Upon moving to production, the Accela Automation applications are
transitioned to the Accela Customer Resource Center (‘CRC”) for ongoing support. A formal transition will
occur between the Services team and the CRC that instructs the agency on available communication
channels (telephone, email, and online tracking system) and use of the Accela knowledge base. Lastly, all
documented issues or enhancement requests will be transitioned from the Services team to the Customer
Resource Center. In terms of specific deliverables, common output from the Deploy Phase is as follows:
Pre-Production Checklist Development, Tracking and Execution,
Move to Production,
Post Production Analysis,
Formal Transition to the CRC for Ongoing Support
620
Statement of Work
2012 Accela Inc. Page 34 of 40
APPENDIX B – STANDARD PROJECT ASSUMPTIONS
Following the assumptions is a summary of the anticipated project risks, impacts and mitigation strategies that we
documented based on our understanding of the project and our prior experience on similar initiatives.
The information in this section is organized into the following categories:
Project Management and Administration
Project Schedule
Technology – Infrastructure
Training
Conversion and Interfaces
Testing
Pricing
PROJECT MANAGEMENT AND ADMINISTRATION
1. Accela will be utilizing IK Consulting, LLC, as the main services partner for work related to this SOW, as specified
within the Deliverables section of this document.
2. Agency and Accela will review their responsibilities before work begins to ensure that Services can be
satisfactorily completed.
3. Agency shall provide the necessary tools, accounts, and permissions that will enable Accela to access the
Agency’s internal network for the purpose of remote installation and testing. This access must be provided
through industry standard tools such as Virtual Private Network (VPN). Failure to provide this access in a timely
fashion will result in a project delay. Such a delay will result in a Change Order.
4. Agency will be responsible for all coordination, scheduling, meeting minute documentation and management and
resolution of action items. Accela will provide Agency information and data required for all meetings for follow up
with Agency.
5. Agency agrees during the Initiation Phase of the project to assign a single designated approver for each major
project deliverable. The designated approver will be responsible for overseeing and/or directly participating in the
design and development, as well as the approval, of the deliverable. Agency may make changes to designated
approvers with written notification to Accela a minimum of one month before a deliverable is due.
6. Accela may perform work off-site.
7. When the project team works on-site at an Agency facility, suitable workspace will be provided and equipped with
appropriately functional and usable desktop workstations, phones, network access to and connectivity with all
systems, networks, and data as necessary to perform the project.
8. All decisions regarding project change orders and other project issues will be documented in writing using an
issue management process mutually agreed upon by the Agency and Accela. For each issue, the project team in
conjunction will describe the issue, various options and a proposed recommendation in writing for consideration.
Work will not commence until approved through the established changed control process for the project.
9. Accela personnel will attend Agency executive steering committee meetings as needed.
10. Agency will respond to requests for information, data, and clarifications and make Project related decisions within
3 working days in order to prevent excessive delays or repeated delays that may impact the project schedule.
11. Accela will need access to (Agency/Department) subject matter experts to assist in identifying business rules,
resolving process discrepancies, and answering questions. These subject matter experts will, in turn, solicit input
from appropriate Agency management on any areas where policy or procedure is undefined.
12. Agency has committed to the involvement of key resources and subject matter experts for ongoing participation
in all project activities as defined in the project plan associated with this SOW.
13. Accela will provide the Agency with a Weekly Status Report that outlines the tasks completed during the prior
week, the upcoming tasks that need to be completed during the following week, the resources needed to
621
Statement of Work
2012 Accela Inc. Page 35 of 40
complete the tasks, a current version of the project plan, and a listing of any issues that may be placing the
project at risk (e.g., issues that may delay the project or jeopardize one or more of the production dates).
PROJECT SCHEDULE
1. Schedule changes resulting from Agency business decisions and/or Agency staff availability that adjust t he
delivery of Project Team services beyond the agreed upon Project scope and timeline will likely impact the overall
Project schedule and related fees. Such issues will be managed through the established change control
procedure, as necessary.
2. Accela's project schedule and task estimates account for staff as per its proposal response and its understanding
of the scope. As part of requirements validations, scope may be clarified, increased or reduced which may result
in staff and associated schedule and cost changes.
3. Agency will maintain primary responsibility for the scheduling of Agency employees and facilities in support of
project activities.
4. The project schedule is managed using Microsoft Project. Should any tasks slip behind schedule ten (10)
business days, Accela and Agency will escalate according to the Communication Plan in the Project Charter.
TECHNOLOGY–INFRASTRUCTURE
1. Agency will provide Accela with access to its equipment, systems, and personnel to the extent needed to
complete the defined Services.
2. Accela will implement the most current version of Accela Automation at the time of the installation. New versions
of Accela software released during the implementation are considered out of scope.
3. Agency will provide Accela with access to its equipment, systems, and personnel to the extent needed to
complete the defined Services, including, but not limited to, internet access, access to Accela servers, VPN
access to the Agency network, and admin rights to all Accela servers (as needed).
4. Agency will provide/purchase/acquire the appropriate hardware, software and infrastructure assets to support all
required Accela software products in both support/testing and production environments as defined in the project
schedule.
5. Agency is responsible for proper site preparation, hardware, software, and network configuration in accordance
with Accela specifications.
6. The Agency will host and operate the system environment. This includes all necessary system and database
backup and recovery services.
7. The Agency will be responsible to ensure and certify that the new application will not adversely affect any existing
systems in a shared environment (if applicable).
8. The Agency will be responsible for performing all necessary activities related to the current Agency applica tions,
data, network and infrastructure, including PCs and associated peripheral devices, hardware, operating software,
database management systems, network, and system security, to support the Project. These activities include
infrastructure installation, support and enhancement necessary to support the project, legacy system shutdown,
legacy system modification, and interface development in the legacy system, legacy data extraction and cleansing
and legacy system support.
9. The Agency or any concerned agency will be responsible for making the necessary modifications to Agency or
3rd Party systems to make an interface available to Accela.
10. The Agency will provide the acquisition, installation, configuration, upgrading and other related hardware/software
component related activities of all relevant user workstations, laptops and mobile computing devices.
11. The Agency will be responsible for confirming that any proposed hardware and software meet agency and other
Agency standards (if applicable).
12. The Agency will provide necessary network support, communications, modifications, and administration including
but not limited to:
a. The Agency will ensure that the system environments (to include electrical, network, HVAC, floor space)
are available to support the Project, as needed to maintain the Project schedule. Delays attributable to
the environments not being available that have a scope or schedule impact will be managed through the
established change process.
622
Statement of Work
2012 Accela Inc. Page 36 of 40
13. The Agency will certify through approval of deliverables that all systems and components comply with any
applicable laws, regulations, standards, and statute, including Security Certification and Accreditation (C&A) and
ADA compliance.
14. The Agency will provide Accela with necessary access to the associated Agency systems to meet requirements
including, but not limited to interfaces, subject matter experts and relevant documentation.
15. Agency will provide necessary network support, communications, modifications, and administration.
16. Accela software will be installed on Customer provided backend Server Platforms specifically Windows Servers,
and Microsoft SQL Server Database, in two separate environments (Test and Production).
17. For use with Accela Citizen Access, Agency will provide/purchase/acquire an online merchant account and all
related hardware required by the merchant account provider for the handling of credit cards and/or checks.
TRAINING
1. In support of the training effort, the Agency will:
a. Identify all trainers and engage them with the project team as early as possible in the schedule in order
to develop their knowledge of the system.
b. Be responsible for the costs associated with any recommended external training as identified and
confirmed in the Training Plan.
2. Our proposed project price is based on Train-the-Trainer (TTT) delivery.
3. Accela will train up to 14 people per training class provided.
4. The Agency will help plan, prepare for and assist in delivering the train-the-trainer sessions. As necessary, the
Agency will provide the setup of individual training user IDs and appropriate role-based responsibilities. The
Agency will provide test scripts, processes and policies to the project team in a timeframe that supports the
training content development schedule. The Agency will provide and/or otherwise enter training environment data
and will be responsible for maintaining the training environment, including refreshing the training database per a
refresh master schedule.
5. The Agency is solely responsible for making designated trainees (trainers) available for training per the project
schedule. If any designated trainee is not available to participate in scheduled training, Accela is not responsible
for making alternative arrangements for missed training.
6. The Agency will provide all hardware, software and supporting equipment required for delivery all training. The
Agency will provide appropriate classroom facilities and training environments when required.
7. The Agency will be responsible for all end user training including training logistics, training scheduling, and the
printing of training materials. The Agency will confirm the total number of training rooms needed for the project
duration after the approval by the Agency of the draft training strategy.
CONVERSION AND INTERFACES
1. The proposed project plan includes data conversion/migration activities as part of the project scope. To facilitate
the completion of these tasks, the Agency will provide access to the legacy systems and databases and
appropriate subject matter experts or system owners to aid in the conversion process.
2. For the data conversion/migration effort, the Agency is responsible for the business data quality assessment
and/or data cleansing as well as extraction of the data from legacy systems in a format to be specified by the
project team. The Agency will provide resources to accurately assess the quality of data in legacy systems and
databases to be converted and take mutually acceptable measures to improve the quality of that data to meet
project requirements. If the quality of the data shifts the delivery of project team services beyond the agreed upon
project scope and timeline, it may affect the overall project schedule and related fees. Such impacts would be
managed through the established change control procedure.
3. Accela understands the complexity and level of detail inherent in conversion activities and provides this
information in an effort to address common questions and misconceptions. Any conversion activities not included
in this Standard Project Assumptions section are considered out of scope, and can be addressed through a
change order for Accela services, or can potentially be executed by the Agency, depending on the nature of the
tasks and the skills required.
623
Statement of Work
2012 Accela Inc. Page 37 of 40
4. The standard historical data conversion includes converting transactional tables, current APO and Professional
License data.
5. Extensive quality assurance of historical data by the Agency is recommended to verify accurate transfer of data.
Accela will perform unit testing of the conversion program and perform spot checks of the data within AA to rule
out data corruption.
6. A complete core configuration must be completed prior to data conversion as it is heavily dependent upon
configuration. In particular:
a. Record types must be configured and work flow must be established for each Record type prior to
conversion,
b. Configuration of application specific information must exist,
c. Agency sign off on data maps is required prior to executing the first conversion run.
7. The Agency and Accela will jointly develop specifications for required interfaces to legacy Agency and external
systems. Agency will certify all interfaces prior to the start of User Acceptance Testing. The Agency staff will
develop the legacy portion of the interface, create test data, perform tests on each interface, and approve the final
version for moving into production. Other Agency interface responsibilities include:
a. Data transformation, as necessary, to meet the requirements defined in the project solution design
documents.
b. Stabilization of the target legacy interface applications.
c. Coordinating development of any external interfaces per the baseline project schedule.
d. Developing/maintaining a test environment for target legacy interface applications.
e. Taking corrective action based on test results for legacy environment within two business days.
8. Conversion of transactional tables, Address/Parcel/Owner (APO) data, Professional License data is executed “As-
is” into Accela Automation. “As-is” means no data transformation (unless the Accela Data Mapping tool enables
the data transformation) and also means the mapping will be field-to-field, such that a single field is mapped to a
single field. “As-is” means the data will look in AA as it appears in the legacy system.
9. Database Formats for historical conversions that utilize the data mapping tool, data must be provided in either an
MS SQL Server or Oracle database. Accela will lead the effort to supply the historical data in the appropriate
format. (Note that APO and Licensed Professional data can be provided in Oracle, MS-SQL Server, MS Access,
or pipe delimited flat file because these two conversions do not utilize the data mapping tool).
10. Conditions of approvals can be mapped to workflow using the Data Mapping Tool and are standard provided they
correlate and are configured to a work flow item in AA. Conditions of lock/hold/notice are standard.
11. The data conversion includes converting documents to ADS in AA provided the client provides the documents in a
structure Accela requires. The documents will be converted to ADS and written/stored in a file system, not a
database. See Standard Document Migration for additional details.
12. The following are the standard data concatenation/translation rules:
a. Record level concatenation (e.g. Fielda & “ and “ & Fieldb),
b. Type casting with defaulting (e.g. convert a string to a date or number if translation is possible,
c. Null checked on required fields,
d. Add two numbers (e.g. NumberA + NumberB),
e. Translate legacy items that fit into the predefined translation tables,
f. Eliminate duplicated records.
13. The Agency requires an interface to Accela Automation Inspection scheduling and status features will be
leveraged to the public through an interface to Selectron IVR. While Accela has an existing relationship with
Selectron that allows Selectron IVR to be integrated with Accela Automation for inspection scheduling and
tracking purposes, the responsibility for the maintenance of the interface becomes the responsibility of Selectron
and the Agency.
14. Accela will train Agency staff to map data as needed. Data can be mapped using the Accela Data Mapping tool,
an Accela implementation tool used to map legacy data into Accela Automation. The standard allows for certain
types of mappings. For example, a legacy ‘yes/no’ field that would map to an AA yes/no field is allowed for within
the standard. Another example the tool allows is mapping a legacy ‘1 or 0’ to a checkbox field in AA.
15. The Agency or any concerned agency will be responsible for making the necessary modifications to their systems
to make an interface available to Accela.
624
Statement of Work
2012 Accela Inc. Page 38 of 40
16. The purpose of all interfaces will be strictly limited to an exchange of data.
STANDARD DOCUMENT MIGRATION
The standard document migration is for clients who will be utilizing the Accela Document Service (ADS). The ADS
system can store files associated to an application and/or parcel. In order for the file to be associated to an
application or Parcel record the data must be loaded prior to running the standard migration tool. All files must be in
the pre-defined format as described below and on a windows based machine.
To use the Document Migration Tool the files that need to be loaded into ADS must be in a pre-defined format. To
create the required structure follow the below steps:
Create the root repository on the server/computer where you want to store the files that need migrated. For
purposes of this document, it is assumed that the repository is at C:\AccelaDocuments\
Under the C:\AccelaDocuments folder there will be a folder for each application/parcel record that has a file
that needs to be associated to it. The name of the folder must be either the application or parcel number.
All files to be associated to the application or parcel record will be placed in the folder. For example, for the
application number of BLDG07-00001 There will be a folder created at “C:\AccelaDocuments\BLDG07-
00001” located in this folder will be all files that need to be linked to the application number of BLDG07-
00001.
The Standard Document Migration tool will load the appropriate table in Accela Automation and ADS
databases.
TESTING
1. Accela will be responsible for unit test and support the remaining testing processes and phases, correcting any
defects based upon expected functionality captured in the approved Design.
2. Agency will develop the Acceptance Test Plan in collaboration with their staff/departments. The Agency will be
responsible for executing the Test Scripts and validating and loading all required test data into the Test
Environment necessary for test execution.
3. The Agency is responsible for developing, within the framework of the agreed upon Test Plan and Scripts, all test
datasets and related database content to support Integration, System and User Acceptance Testing.
4. Accela will provide a sample User Acceptance Test Plan.
PRICING ASSUMPTIONS
Our fixed-fee price is based on the scope, approach, resource estimates, deliverables and assumptions defined in this
task order. The level of effort included in our pricing was estimated based on the information available and discussion
with Agency on roles and responsibilities. As the project detailed design progresses, Accela will work with Agency to
further define and estimate at a detailed level customizations/extensions and other custom coded components as well
as prioritize work in these areas. Should Agency require customizations/extensions and other custom coded
components, revised resource and cost estimates will be made. Any resulting scope changes will be managed
through the established change control procedure for the project.
1. Agency accepts best practices templates as basis for system configuration (workflow process, workflow tasks,
workflow task statuses, smart-choices, renewal info, application statuses, Accela Citizen Access record types,
and inspections) with some modifications allowed to address customer-specific nomenclature, application specific
information, fee schedules, conditions, and Accela Citizen Access text.
2. Twenty-Three(23) unique Land Management business processes (this includes distinct combinations of workflow
processes, inspections, fee schedules, and application intake process) are included for the record type
configuration. Additional need for more business processes configuration will be the responsibility of the
Customer. Accela will train Customer resources adequately so this can be accomplished by the Customer.
3. Up to Fifty-Eight (58) hours of custom Land Management Event Manager Scripts will be designed and
configured. Event Manager Scripts are useful when a solution via base configuration cannot be achieved, as
custom scripts extend the base functional capabilities of Accela Automation software.
625
Statement of Work
2012 Accela Inc. Page 39 of 40
4. Accela will train Agency Staff to understand the Accela Database structure so the Agency can develop reports
beyond the proposed Twenty-Six (26). The Agency resource should already possess a working skill and
proficiency with ANSI SQL and T-SQL, Microsoft SQL Server Reporting Services reporting tools and report
develop techniques. Accela does not provide training in either of these noted areas of proficiency.
626
Statement of Work
2012 Accela Inc. Page 40 of 40
APPENDIX C – DELIVERABLES ACCEPTANCE FORM
Date:
Agency Name:
Approving Agency Manager:
Accela Manager:
Project Name / Code:
Contract / Agreement #:
Agency agrees that Accela has successfully completed the following Deliverables:
Deliverable #
Source /
Reference
Details
Service
Agreement
Agency agrees that Accela has successfully completed the Deliverables described above in accordance with the
terms of the related Contract/Agreement.
Agency Name
Signature
Title
Date
Sign and fax this document to:
Accela, Inc.
Connie Ingram
IK Consulting, LLC
Tel: (520) 891-5319
Fax: (520) 721-8634
Email this document as an
attachment to:
connie.ingram@ikcpartners.com OR
Please acknowledge acceptance by:
A B
APPROVALS:
627
Statement of Work
2013 Accela Inc. Page 1
Statement of Work
City of Hermosa Beach
Asset Management
Version 1.3
6/14/2014
THE LEADING PROVIDER OF
GOVERNMENT ENTERPRISE MANAGEMENT SOLUTIONS
628
Statement of Work
2013 Accela Inc. Page 2
TABLE OF CONTENTS
TABLE OF CONTENTS ............................................................................................................................................................................. 2
DOCUMENT CONTROL ............................................................................................................................................................................ 4
OVERVIEW ................................................................................................................................................................................................ 5
SERVICES DESCRIPTION ........................................................................................................................................................................ 5
PURPOSE ............................................................................................................................................................................................. 5
PROJECT TIMELINE ............................................................................................................................................................................... 5
PROJECT MANAGEMENT ........................................................................................................................................................................ 5
CRITICAL SUCCESS FACTORS ................................................................................................................................................................ 6
PROJECT ASSUMPTIONS ........................................................................................................................................................................ 7
WORK DESCRIPTION ............................................................................................................................................................................. 8
STAGE 1 - INITIATION ........................................................................................................................................................................... 8
DELIVERABLE 1: PROJECT INITIATION ..................................................................................................................................................... 8
DELIVERABLE 2: ACCELA AUTOMATION SETUP – CLOUD SUPPORT ......................................................................................................... 10
STAGE 2 – TO-BE ANALYSIS .............................................................................................................................................................. 10
DELIVERABLE 3: ENTERPRISE-WIDE WORKSHOP............................................................................................................................... 12
DELIVERABLE 4: TO-BE ANALYSIS SESSIONS – ASSETS AND SERVICE REQUEST ................................................................................ 13
DELIVERABLE 5: TO-BE ANALYSIS DOCUMENT(S) – ASSETS AND SERVICE REQUEST .............................................................................. 14
STAGE 3 – SOLUTION FOUNDATION .................................................................................................................................................... 15
DELIVERABLE 6: ACCELA AUTOMATION SOLUTION FOUNDATION – ASSETS AND SERVICE REQUEST .......................................................... 15
STAGE 4 – BUILD .............................................................................................................................................................................. 16
DELIVERABLE 7: HISTORICAL DATA CONVERSION ANALYSIS .................................................................................................................. 16
DELIVERABLE 8: HISTORICAL DATA CONVERSION DEVELOPMENT ............................................................................................................ 17
DELIVERABLE 9: EVENT MANAGEMENT SCRIPTING ASSISTANCE............................................................................................................. 18
DELIVERABLE 10: REPORT SPECIFICATIONS ......................................................................................................................................... 19
DELIVERABLE 11: REPORT DEVELOPMENT ............................................................................................................................................ 20
DELIVERABLE 12: ACCELA GIS CONFIGURATION ................................................................................................................................... 20
DELIVERABLE 13: ACCELA MOBILE OFFICE CONFIGURATION ................................................................................................................. 21
DELIVERABLE 14: V360 USER EXPERIENCE.......................................................................................................................................... 22
STAGE 5 – READINESS .................................................................................................................................................................. 23
DELIVERABLE 15: ADMINISTRATIVE AND TECHNICAL TRAINING ............................................................................................................... 23
DELIVERABLE 16: USER ACCEPTANCE TESTING (UAT) ASSETS ............................................................................................................. 24
DELIVERABLE 17: DAILY USER TRAINING .............................................................................................................................................. 25
STAGE 6 - DEPLOY ......................................................................................................................................................................... 25
DELIVERABLE 18: PRODUCTION SUPPORT – ASSETS ............................................................................................................................. 25
DELIVERABLE 19: POST DEPLOYMENT SUPPORT AND TRANSITION TO CRC ........................................................................................... 26
PROJECT RESOURCES AND LOCATION OF WORK .................................................................................................................................. 27
WORK LOCATION ................................................................................................................................................................................ 27
AGENCY RESOURCES .......................................................................................................................................................................... 27
ACCELA RESOURCES .......................................................................................................................................................................... 29
PAYMENT TERMS ................................................................................................................................................................................... 31
PAYMENT SCHEDULE: .................................................................................................................................................................. 31
EXPENSES: ..................................................................................................................................................................................... 31
CONTRACT SUM: ................................................................................................................................................................................ 32
ACCEPTANCE ...................................................................................................................................................................................... 32
629
Statement of Work
2013 Accela Inc. Page 3
TERMS ............................................................................................................................................................................................... 32
APPENDIX A - ACCELA IMPLEMENTATION METHODOLOGY ........................................................................................................... 33
IMPLEMENTATION LIFE CYCLE .............................................................................................................................................................. 33
INITIATION ........................................................................................................................................................................................... 33
ANALYSIS ........................................................................................................................................................................................... 33
SOLUTION FOUNDATION ...................................................................................................................................................................... 33
BUILD ................................................................................................................................................................................................. 34
READINESS ......................................................................................................................................................................................... 34
DEPLOY .............................................................................................................................................................................................. 34
APPENDIX B – DATA CONVERSION ASSUMPTIONS ......................................................................................................................... 35
GENERAL INFORMATION AND REQUIREMENTS FOR HISTORICAL CONVERSIONS ..................................................................................... 35
DATA CONVERSION ASSUMPTIONS ....................................................................................................................................................... 35
APPENDIX C – DELIVERABLES ACCEPTANCE FORM....................................................................................................................... 36
630
Statement of Work
2013 Accela Inc. Page 4
DOCUMENT CONTROL
Date Author Version Change Reference
3/28/2014 Dave Feuer 1.0 1st Versión
5/23/2014 Dave Feuer 1.1 Comment Review and Edits based on Inquiries
5/25/2014 Cindy Sullivan 1.2 Review and Acceptance of Edits
6/14/2014 Cindy Sullivan 1.3 Updated Pricing
631
Statement of Work
2013 Accela Inc. Page 5
OVERVIEW
Congratulations on your selection of Accela, Inc., and their enterprise suite of industry leading software. The
implementation of Accela products is designed specifically to meet the specific requirements and budget defined by
City of Hermosa Beach (“Agency”). Accela will utilize a best practice Implementation Methodology, based on previous
client interactions and industry knowledge, to promote a successful project that will meet the Agency’s objectives. The
following Statement of Work will detail how Accela Services will implement the software you have purchased, including
the major milestones and deliverables that will ensure your success.
Accela is committed to providing a superior software solution, and deployment of the software, for the current and
future needs of the Agency. Accela will work with Agency staff to optimize Accela’s portfolio of software, best
practices, and customer experience to enable the Agency to successfully deploy its Accela Automation software and
meet its functionality, timing and cost requirements. This Statement of Work (“SOW”) dated September 04, 2013 sets
forth a scope and definition of the consulting/professional services, work and/or project (collectively, the “Services”) to
be provided by Accela (“Accela”) to Agency.
SERVICES DESCRIPTION
PURPOSE
The purpose of this document is to detail the specific activities, deliverables, roles and responsibilities, and
acceptance criteria that comprise the implementation of Accela Automation, Accela GIS, and Accela Mobile Office for
the Agency. Accela will provide professional services for implementation of the above modules and products per the
Work Description section detailed henceforth. The following Agency departments comprise the organization scope of
the implementation described herein:
Public Works Admin and Yard
PROJECT TIMELINE
The term of this project is 8 months and 1 phase for the Asset Management Implementation. The 18 month Land
Management may supersede this project and is proposed under a separate SOW.
Any delays (eg, Change in staff level/availability, missed deadlines) in the Project Timeline which by mutual
agreement were created by the Agency will result in an increase in the duration of the project will require a Change
Order to reimburse Accela for the additional costs associated with the delay, including but not limited to additional
hours for project management, deliverable development and review.
Upon execution of this SOW, the parties will collaborate to determine a start date for Services to be rendered. Upon
initiation of these Services, the Accela Project Manager will work with the Agency to collaboratively define a baseline
project schedule. Given the fact that project schedules are working documents that change over the course of the
project, the Accela Project Manager will work closely with Agency to update, monitor, agree, and communicate any
modifications.
PROJECT MANAGEMENT
Accela will provide a full time project manager for services throughout the implementation in order to plan and monitor
execution of the project in accordance with deliverables outlined in the Statement of Work. To support the
implementation of the Accela Automation software at the Agency, Accela will provide Project Management services
throughout the project. Generally these services include the following:
Project plan management using Microsoft Project 2010,
Project document management using Microsoft SharePoint,
632
Statement of Work
2013 Accela Inc. Page 6
Issue log management and escalation,
Status reporting,
Change order management,
Project workspace management,
Resource management,
Executive project oversight and quality assurance.
By mutual agreement, some project management tasks may be shared between the Accela Project Manager and the
Agency Project Manager.
CRITICAL SUCCESS FACTORS
In order to successfully execute the services described herein, there are several critical success factors for the project
that must be closely monitored and managed by the stakeholders. These factors are critical in setting expectations
between the Agency and Accela, identifying and monitoring project risks, and promoting strong project
communication.
Knowledge Transfer – While Accela cannot guarantee specific expertise for Agency staff as a result of
participating in the project, Accela will make all reasonable efforts to transfer knowledge to the Agency. It is
critical that Agency personnel participate in the analysis, configuration and deployment of Accela Automation
in order to transfer knowledge to the Agency. Once Post Production assistance tasks are completed by
Accela Services, the Agency assumes all day-to-day operations of Accela Automation outside of the Support
and Maintenance Agreement. The Service and Maintenance Agreement does not cover any Agency
manipulation of implemented scripts, reports, interfaces and adapters. Key knowledge transfer areas include:
Configuration
Scripting
Batch scripts
Interfaces
Event Management Scripts
Reports and Forms
Dedicated Agency Participation – Accela fully understands that Agency staff members have daily
responsibilities that will compete with the amount of time that can be dedicated to the Accela Automation
implementation project. However, it is critical that the Agency acknowledges that its staff must be actively
involved throughout the entire duration of Services as defined in the Project Plan. Accela will communicate
insufficient participation of Agency and Accela resources through Project Status Reports with real and
potential impacts to the project timeline. Accela will work the project sponsors and department leaders to
determine appropriate team member involvement. This could rand range from full-time during early analysis
meetings to part-time during the technical implementation phase.
Deliverable Acceptance Process - Implementation services for the above products are formalized through
the deliverables defined in this document. Upon completion of each deliverable according to the acceptance
criteria defined herein, Accela will provide the Agency with a Deliverable Acceptance Form to formalize
acceptance and completion. The Deliverable Acceptance Form is subsequently signed by the appropriate
Agency contact, as defined in the Project Charter, and faxed/scanned/emailed or hand delivered to Accela.
Please refer to Appendix C to view a sample Deliverable Acceptance Form. Accela respectfully requests
prompt attention to the processing of all Deliverable Acceptance Forms, as adherence to this timely process
directly impacts the ability to complete the project in the desired timeframe. In order to prevent delays in the
project schedule, for all Deliverables where no response time is specifically identified I the SOW, a three (3)
business day acceptance period is assumed.
633
Statement of Work
2013 Accela Inc. Page 7
Accela Implementation Methodology – Accela’s successful, proven, implementation methodology is crucial
to the project success. Accela’s Automation software and customer base is a niche market and as such the
implementation methodology may differ from other consulting firms and software packages. It is imperative
to project success that the Agency is willing to adhere/adopt to the Accela Implementation Methodology.
PROJECT ASSUMPTIONS
Agency and Accela will review their responsibilities before work begins to ensure that Services can be
satisfactorily completed.
Agency shall provide the necessary tools, accounts, and permissions that will enable Accela to access the
Agency’s internal network for the purpose of remote installation and testing. This access must be provided
through industry standard tools such as Virtual Private Network (VPN). Failure to provide this access in a
timely fashion will result in a project delay. Such a delay will result in a Change Order.
Agency agrees during the Initiation Phase of the project to assign a single designated approver for each
major project deliverable. The designated approver will be responsible for overseeing and/or directly
participating in the design and development, as well as the approval, of the deliverable. Agency may make
changes to designated approvers with written notification to Accela a minimum of one month before a
deliverable is due.
Agency will provide work space for Accela Services for work completed on Agency premises.
Accela will implement the most current version of Accela Automation at the time of the contract signing.
Agency will maintain primary responsibility for the scheduling of Agency employees and facilities in support of
project activities.
Agency will ensure that Accela resources have access to a Dev or Test version of the 3rd party system for
interface development. All interfaces will be developed against 1 (one), agreed upon version of the 3rd party
system.
Agency will provide/purchase/acquire the appropriate hardware, software and infrastructure assets to support
all required Accela software products in both support/testing and production environments as defined in the
project schedule.
For use with Accela Citizen Access, Agency will provide/purchase/acquire an online merchant account and
all related hardware required by the merchant account provider for the handling of credit cards and/or checks.
Agency is responsible for proper site preparation, hardware, software, and network configuration in
accordance with Accela specifications.
Accela will be responsible for implementing a functioning version of the application software at the Agency
(assuming the Agency has installed the proper hardware, software, and networking devices).
Accela will provide the Agency with a Weekly Status Report that outlines the tasks completed during the prior
week, the upcoming tasks that need to be completed during the following week, the resources needed to
complete the tasks, a current version of the project plan, and a listing of any issues that may be placing the
project at risk (e.g., issues that may delay the project or jeopardize one or more of the production dates).
Agency will provide Accela with access to test and development environments for each Agency system that
requires integration with Accela Automation.
Accela personnel will attend Agency executive steering committee meetings as needed.
Agency is committed to the involvement of key resources and subject matter experts for ongoing
participation in all project activities as defined in the project plan associated with this SOW.
The project schedule is managed using Microsoft Project. Should any tasks slip behind schedule ten (10)
business days, Accela and Agency will escalate according to the Communication Plan in the Project Charter.
The following Assumptions are specific to deliverables as noted below:
o 30 Asset Types
o 80 Work Order Template with 80 record types (record types match work order template names.
Group = AMS; Type = Department; Subtype = Asset type; Category = WO activity.
634
Statement of Work
2013 Accela Inc. Page 8
o 50 Tasks will be created that can be manually selected by end users at any time but will not be pre-
defined with templates
o 15 Service Request Record types
o 5 asset feature classes setup with up to five attributes per asset with GIS sync - focus is on key
utility assets first with GIS. Work will be done remotely.
o Provide one key script that associates service requests to work orders.
o One week of end user training with 2 days of administrator training.
o Up to 20 end users.
o Test and acceptance plan will focus on unique test scenarios (eg: service request or work order, not
unique work orders or service requests.). Testing support is off-site.
o Lead analyst will support Go-live on-site plus off-site prep time. Go-live will be up to 4 consecutive
days on-site.
o Accela training documentation will be used.
o Two users groups assumed with along with an admin user role.
o Consoles will focus on providing view to service requests and work order lists.
o Report hours will be agreed to with City in how they will best be utilized based on best practice
recommendations from Woolpert.
o Checklists will be provided prior to install and go-live tasks that City will need to run-through and
validate prior to performing on-site work.
o Up to 15 days or less assumed on-site for project.
o All assets are in the GIS.
o
o No inventory management assumed.
o Landport migration will to bring over both service requests and work order history with six fields. .
o Two workflows assumed - a work order standard and a service request standard.
o Up to 5 statuses.
o Up to 4 inspections assumed with up to ten observations.
o Up to 5 PM schedules for up to five assets types.
o Cost groups will be used for accessing labor, material and equipment from WO.
o Quick queries include Open work orders, reactive work orders, work orders assign to individual,
approved work orders.
WORK DESCRIPTION
The following section describes the specific activities and tasks that will be executed to meet the business objectives
and business requirements of the Agency. In support of the implementation effort as described above, Accela will
provide the following detailed implementation services. For each deliverable, a description is provided as well as
criteria for acceptance of the deliverable.
STAGE 1 - INITIATION
DELIVERABLE 1: PROJECT INITIATION
Project initiation is an opportunity to ensure the project starts in a well-organized, structured fashion while re-
confirming the Agency and Accela expectations regarding the implementation. This Deliverable is comprised of
project planning activities, core project management documents and templates and the first on-site meeting conducted
between the Agency and Accela after the signing of the Statement of Work.
In conjunction with the Agency representatives, Accela will perform the following tasks:
Prepare a project plan that addresses the following:
635
Statement of Work
2013 Accela Inc. Page 9
o Finalize staffing for the project teams. Guidelines and recommendations for the Agency project
staffing are addressed in the Project Staffing section of this document.
o Conduct a formal onsite Kickoff meeting. The objective of this meeting is to review the purpose of
the project and discuss the project scope, roles and responsibilities, deliverables, and timeline.
o Establish Communication Plan and project logistics including escalation, status reporting, issue/risk
management, work locations, etc.
o Establish schedule of Steering Committee meetings.
o Review and agree on Project Status Report Template format.
o Finalize and document formal deliverable signoff procedures, identify team members that will be
responsible for signoff from the Agency and Accela.
o Review infrastructure requirements and preparation (with designated Agency technical staff).
o Finalize an integrated project plan that includes resource allocation for all tasks (in cooperation with
the Agency Project Manager).
o Create a project SharePoint site and load all standard, current documentation.
o Submit a request for information of existing asset and maintenance management practices.
The Project Kickoff Meeting includes a formal presentation by the project team to review project objectives,
methodology, timeline, roles and responsibilities, risks, and other key project elements with project stakeholders.
In terms of specific output, the following will be executed for this deliverable:
Baseline Project Plan (MS Project).
Project Status Report Template (MS Word).
Project Kickoff Presentation (MS PowerPoint).
Project SharePoint Site.
Project Kickoff Meeting.
Accela Deliverables:
Pre-kickoff stakeholder phone calls
Steering committee conference call
Draft and final project plan
On-site kickoff meeting
Request for Information
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s request for information.
Coordinate project planning activities.
Communicate the Accela Implementation Methodology that will be used by Accela to deliver Services.
Complete Baseline Project Plan, Project Status Report Template, and Project Kickoff Presentation
deliverables with input from appropriate Agency resources.
Agency Responsibilities:
Identify and set expectations with key resources and subject matter experts for ongoing participation in the
project.
Provide timely and appropriate responses to Accela’s requests for project planning input and meeting
logistics requests.
Provide meeting facilities for Project Kickoff and other onsite activities.
Include Project Sponsor in Project Kickoff Meeting.
636
Statement of Work
2013 Accela Inc. Page 10
Acceptance Criteria:
Review and acceptance of the Project Status Report Template
Review and acceptance of the Baseline Project Plan
Review and acceptance of the Project Charter
Completion of the Project Kickoff Meeting
DELIVERABLE 2: ACCELA AUTOMATION SETUP – CLOUD SUPPORT
During the Setup of the Accela Cloud Support step of this project, Accela’s technical staff will work with the Agency IT
staff to ensure that the components for hardware, software, database, network, and Internet are in place for Cloud
Support Site. Accela technical staff will validate the proper installation and configuration of the Accela Automation
environment. This Deliverable is defined as the agency setup in the Cloud environment of the Accela Automation
software, such that Agency can log into the system and verify that the software was setup
In terms of specific output, the following will be executed for this deliverable:
Setup of Cloud Support of the Accela Automation software.
Demonstration of an operational Accela Automation computing environment.
Specifically, Accela will perform the following tasks within the support environment:
Perform a remote system check of the setup.
Demonstrate that the Accela Automation applications are operational in the Agency computing environment.
Configure Accela Automation to use the reporting technology Crystal Reports.
Accela Deliverables:
Setup of Cloud Support of the Accela Automation software.
Demonstration of an operational Accela Automation computing environment.
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s request for information.
Consult with Agency resources to provide technical input and answer technical questions related to the
support setup for Accela Automation.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s requests for information.
Procure and configure necessary hardware, non-Accela systems software, and networking infrastructure as
specified by Accela.
Make available the appropriate Agency key IT users to participate in any hardware, software, environment,
and infrastructure meetings.
Acceptance Criteria:
Confirmation of ability to log into the Accela Automation software that has been setup in the Support Accela
Cloud.
STAGE 2 – TO-BE ANALYSIS
To-Be Analysis is comprised of the activities required to define the Accela Automation Solution Foundation for the
Agency. The key output of the process are To-Be Analysis Document(s), which serves as a ‘blueprint’ for design and
baseline configuration efforts throughout the implementation project and establishes the benchmarks for testing and
acceptance at the conclusion of the project.
637
Statement of Work
2013 Accela Inc. Page 11
The To-Be Analysis Document(s) include detailed information on the Agency’s business processes to be configured in
the Accela Automation Solution Foundation, including the following topics:
Organization and departments Standard Comments
Record Types Workflow
Inspections Email Notification
Status Values Intake Forms
User Defined Fields Dropdown List Values
Fees Conditions
The To-Be Analysis Sessions and To-Be Analysis Document(s) do not include detailed information related to the
following deliverables as they are dependent on the completion of the Solution Foundation milestone.
Deliverable 9: Event Management Scripting Assistance
Deliverable 10: Report Specifications
Deliverable 11: Report development
Deliverable 14: V360 User Experience
The Project Team, consisting of representatives from both Accela and the Agency, will conduct a formal review of the
To-Be Analysis Documents for the purpose of approval and sign-off on the deliverable. Accela will build prototypes of,
which will be used during the review sessions to demonstrate the proposed functionality. Prototyping is intended to
demonstrate selected aspects of Accela Automation functionality to assist in understanding how it will operate for the
Agency.
Accela Deliverables:
Setup of Cloud Support of the Accela Automation software.
Demonstration of an operational Accela Automation computing environment.
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s request for information.
Consult with Agency resources to provide technical input and answer technical questions related to the
support setup for Accela Automation.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s requests for information.
Procure and configure necessary hardware, non-Accela systems software, and networking infrastructure as
specified by Accela.
Make available the appropriate Agency key IT users to participate in any hardware, software, environment,
and infrastructure meetings.
Reviewing specific business processes such as the standard procedures for repairing a specific asset is not
considered – Accela’s focus is on use of Accela System and asset management best practices, not
operational procedures for specific assets.
All workshop preparation activities will be performed remotely
Actual workshops will be administered on-site at City facilities
Acceptance Criteria:
Completion of Metrics workshop
Completion of organization-wide workshop
Common service request and work order workflows
638
Statement of Work
2013 Accela Inc. Page 12
DELIVERABLE 3: ENTERPRISE-WIDE WORKSHOP
Metrics Workshop Review
Prior to discuss details around the asset configuration, in order to develop the To-Be Analysis Document, Accela will
review the City’s existing metrics and discuss organization-wide standards.
Accela understands that an organization may, or may not, have defined a ‘Current baseline’ of performance
measures. Accela recognizes that most entities implementing, or enhancing, a CMMS or EAM are creating or seeking
enhanced methods to measure and monitor performance. We understand the importance to align business
objectives with what gets done day-to-day, realize asset performance and financial success all while satisfying
stakeholder expectations—such as safety assurance, brand reputation, and environmental responsibility. With this in
mind, Accela expects a set of new or enhanced ‘Target Measures’ to be established through a ‘Gap Analysis’
process with a focus on defining those that can be monitored within the EAM or CMMS system.
By building off of the City’s current asset management approach and developing the above items, the core
project team will reach agreement on concrete items that drive the asset management program and the
supporting software solution.
With senior level management in place for the primary discussions above, Accela may move directly into the
Organization-Wide Standards Workshop.
Accela will document the results of these workshops within the To-Be Analysis Document(s).
Organization-Wide Workshop
This task will begin with an organization-wide standards workshop to review and address the following business areas:
Key Enterprise Business Decisions
Approaches to managing unique asset IDs.
Standard maintenance types to be used Client-wide (eg: preventative, reactive, corrective and predictive
maintenance).
Asset failure codes – where and how they will be used.
Tracking contractor costs.
Tracking work by project.
Managing asset warranties.
Tracking financial account codes.
Discuss and agree on the assets part of the project that work orders
Common Enterprise Business Strategies
Work order lifecycle statuses and priorities.
Review key service requests
Expected roles and responsibilities of a maintenance technician (eg: as an organization, we expect our
maintenance personnel to log into a computer and record their work electronically, book their labor etc.).
Expected roles and responsibilities of a supervisor (eg: as an organization, we expect the supervisors to
review each and every work order each day before closing).
Expected roles and responsibilities for asset data maintenance (eg: asset additions, updates and/or deletions
will be managed in the following way).
639
Statement of Work
2013 Accela Inc. Page 13
Managing asset removals and replacements.
Common Service Request and Work Order Workflows
Accela has found that organizations have both a combination of unique business processes and routine / common
workflows. The concept behind this approach involves the 80/20 Rule (or Pareto Principle) that suggests 80% of
resources are consumed performing 20% of tasks. This principle indicates that defining 20% of tasks will narrow the
focus on the configuration analysis.
The standard work order system workflow (standard service request and work orders) will be provided.
Accela Deliverables:
Metrics review workshop
Organization-wide workshop
Common workflows
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s requests for information.
Interview staff in order to understand existing business processes.
Conduct workshops to capture the key decisions.
Conduct meetings via email, web conference, phone, and in person to gather and validate analysis input.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s requests for information.
Make available the appropriate Agency key users and content experts to provide required information,
participate in the configuration analysis and verify the accuracy of the documented workflows, input/output
formats, and data elements.
Provide any existing business process documentation, including process flows; fee schedules; commonly
used applications, reports and forms; and other relevant information.
Schedule participants and meeting locations for analysis activities.
Acceptance Criteria:
Completion of workshops and provided common workflows.
DELIVERABLE 4: TO-BE ANALYSIS SESSIONS – ASSETS AND SERVICE REQUEST
In order to develop the content for the To-Be Analysis Document(s), Accela will work closely with designated Agency
personnel and will conduct analysis sessions to capture the “to-be” required business processes.
In conjunction with the Agency representatives, Accela will perform the following tasks:
Review and understand existing business processes intended for migration into Accela Automation (Accela
Asset Management and Accela Service Request modules).
Assist the Agency in streamlining existing business processes for fit into Accela Automation.
Collect employee names and associated roles and identify user group setups.
Review the collected document intake requirements, forms, and data fields for each process.
Review the collected document output requirements (documents/letters/reports).
Review required preventative maintenance and/or condition assessment s for potential assets.
640
Statement of Work
2013 Accela Inc. Page 14
Accela’s Project Manager will coordinate and schedule the Analysis Sessions in conjunction with the Agency Project
Manager and according to the agreed upon Project Plan. In terms of specific output, the following will be executed for
this deliverable:
To-Be Analysis data gathering activities, including workshops, interviews, and web conferencing sessions.
Accela Deliverables:
To-Be Analysis data gathering activities, including workshops, interviews, and web conferencing sessions
o Two trips anticipated on-site for up to 8 days of analysis and configuration review.
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s requests for information.
Interview staff in order to understand existing business processes.
Conduct to-be analysis sessions to capture the required business processes to be automated within the
system.
Conduct meetings via email, web conference, phone, and in person to gather and validate analysis input.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s requests for information.
Make available the appropriate Agency key users and content experts to provide required information,
participate in the configuration analysis and verify the accuracy of the documented workflows, input/output
formats, and data elements.
Provide any existing business process documentation, including process flows; fee schedules; commonly
used applications, reports and forms; and other relevant information.
Schedule participants and meeting locations for analysis activities.
Acceptance Criteria:
Completion of To-Be Analysis Sessions for the Assets.
DELIVERABLE 5: TO-BE ANALYSIS DOCUMENT(S) – ASSETS AND SERVICE REQUEST
To-Be Analysis Document(s) will be developed by Accela based on the information gathered in Deliverable 4: To-Be
Analysis Sessions – Assets. This document(s) will serve as the ‘blueprint’ for Department processes throughout the
implementation project. Upon completion of the document(s), Accela will conduct a formal review with Agency for the
purpose of approval and sign-off on the deliverable.
In terms of specific output, the following will be executed for this deliverable:
To-Be Analysis Document(s) (Adobe PDF).
Accela Deliverables:
To-Be Analysis Document
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s requests for information.
Interview staff as necessary in order to understand existing business processes.
Build selected prototypes to demonstrate proposed functionality.
Conduct meetings via email, web conference, phone, and in person to gather and validate analysis input.
641
Statement of Work
2013 Accela Inc. Page 15
Prepare and complete To-Be Analysis Document(s) capturing the Agency’s business processes to be
included in the Solution Foundation.
Completion and successful demonstration of 2 prototypes to demonstrate proposed process functionality
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s requests for information.
Schedule participants and meeting locations for To-Be Analysis Document(s) review activities.
Review and provide feedback on To-Be Analysis Document(s).
Acceptance Criteria:
Successful demonstration of prototypes.
Review To-Be Analysis Document(s) and validate that the content accurately reflects the business processes
data that will be included in the Accela Automation Solution Foundation.
STAGE 3 – SOLUTION FOUNDATION
Accela will provide professional services to develop the Accela Automation Solution Foundation in accordance with
requirements established and agreed upon during the execution of the tasks that comprise Stage 2 – To-Be Analysis.
Accela will produce a detailed, technical Solution Foundation Document(s) that represents the entire foundation of the
system, for each module. This document will be delivered for review with the completed solution.
DELIVERABLE 6: ACCELA AUTOMATION SOLUTION FOUNDATION – ASSETS AND SERVICE
REQUEST
Accela will provide professional services to develop the Solution Foundation of the Accela Automation product in
accordance with requirements established and documented in Deliverable 05: To-Be Analysis Document(s).
In terms of specific output, the following will be executed for this deliverable:
Completed Configuration to support the To-Be Business Processes
Accela Deliverables:
Completed Configuration
Webex to review results of configuration
Accela Responsibilities:
Provide timely and appropriate responses to Agency’s requests for information.
Configure the foundational components as defined in the To-Be Analysis Document(s).
Agency Responsibilities
Provide timely and appropriate responses to Accela’s requests for information.
Make available the appropriate Agency key users and content experts to participate in creating the system in
an effort to learn about the system.
Work with Accela to verify that the system meets the foundational requirements documented in the To-Be
Analysis Document(s).
The Agency will test the system for purposes of validating the configuration.
Acceptance Criteria:
Review and approve that the Accela Automation Solution Foundation meets the requirements documented in the
approved To-Be Analysis Document(s).
642
Statement of Work
2013 Accela Inc. Page 16
STAGE 4 – BUILD
The Build stage includes data conversions, development of interfaces, development of Accela Event Manager Scripts
and custom report development. It comprises all of the additional critical activities outside of solution foundation that
has been configured for the Agency. Similar to the Configuration Stage, it is critical that appropriate agency
representatives are involved in each step of the process to ensure success.
Data conversion of historic/legacy data from Agency systems is a critical activity for the success of this project. The
Accela team is highly experienced in planning for and executing these activities and will work closely with Agency staff
to ensure a successful transition of data. Specifically, the Accela team will work with Agency to understand the data
sources, how they are used, where their data will be stored in Accela Automation and the quality of that data. Often
multiple sources store and manage similar information and decisions need to be made about the authoritative source.
It is also common to find that data sources have not had strong controls and the accuracy is questionable or there is
missing data. There are techniques and tools that Accela may recommend to understand the current state of Agency
data so that decisions can be made about data quality and what to convert. Upon completion of the data analysis,
mapping of historical/legacy data sources may begin with Accela’s mapping tool and conversion iterations performed
as outlined in the Project Plan. Accela provides release notes during these conversion tests to verify data is being
transferred correctly (e.g., number of records and expected values in fields).
Accela will lead the conversion effort and specifically assist in the following areas: data mapping, script development
for conversion, assistance in data testing and validation, and with the planning and execution of the final data
conversion. For conversions, it is expected and anticipated that the Agency will provide resources knowledgeable
with the historical data to assist in the data migration/conversion effort.
The required data mapping effort will be a conducted by Accela personnel with assistance from the Agency. Once the
data mapping has been defined, Accela will ask that a representative of the Agency sign off on the data maps.
Accela will be responsible for the data conversion programs to load data from the staging tables to the Accela
Automation database. PLEASE REFER TO APPENDIX B FOR SPECIFIC ASSUMPTIONS AND PARAMETERS
RELATED TO ACCELA ’S CONVERSION APPROACH.
DELIVERABLE 7: HISTORICAL DATA CONVERSION ANALYSIS
Upon receipt of Agency’s Landport data, Accela will create a Data Conversion Mapping Document detailing the data
conversion process, mutually agreed upon requirements and mapping of Agency’s historical data into Accela
Automation.
In terms of specific output, the following will be executed for this deliverable:
Landport Historical Data Conversion Specifications
Accela Deliverables:
Data conversion specification
Accela Responsibilities:
Work with the Agency to define and document historical data elements that are required for the conversion.
Facilitate the data analysis and mapping process
Complete the Data Conversion Specifications Document.
Agency Responsibilities:
Provide historical data in acceptable formats.
643
Statement of Work
2013 Accela Inc. Page 17
Provide subject matter experts on the data source to aid Accela in identifying key components of the
historical data
Provide subject matter experts on the historical configuration to aid in the data mapping process
Review and sign-off on completed Data Conversion Specifications document.
Acceptance Criteria:
The Historical Data Conversion Specifications document identifies historical data elements that will be
converted into Accela Automation as well as document special consideration (ex. merging data sources,
phasing, etc.)
Acceptance Review Period:
Ten (5) business days total
DELIVERABLE 8: HISTORICAL DATA CONVERSION DEVELOPMENT
Upon Agency approval of the Historical Data Conversion Specifications document, (Deliverable 7), Accela will provide
a program(s) to migrate appropriate historical data into Accela Automation. Upon receipt of the conversion from
Accela, the Agency DBA will load the data into the Support Cloud environment for validation.
In terms of specific output, the following will be executed for this deliverable:
Migrated historical data into Accela Automation Support Cloud database environment.
Accela Deliverables:
Data conversion
Accela Responsibilities:
Provide a program to migrate historical data into the Agency’s AA test database environment.
Each data conversion will include up to three (3) conversion loads for client testing
o Load 1 will include Composition to Record Type Mappings, Addresses, Work Description, Summary
Costs, Status, and Inspections
o Load 2 will include Screen Data Mapped to ASI or ASIT and all other data in Load 1.
o Load 3 will include all data in Load 2 plus any mapping adjustments.
Validate the successful completion of the migration of historical data into the Accela Support Cloud.
Agency Responsibilities:
Providing the legacy data source in an accepted format
Assist in the execution of the data conversion program and provide access to environments as needed
Provide resources to validate the conversion statistics and the quality of the data converted into Accela
Automation
Acceptance Criteria:
Historical data has been converted to Accela Automation testing environment according to the Data
Conversion Mapping document.
Acceptance Review Period:
Ten (5) business days total
644
Statement of Work
2013 Accela Inc. Page 18
DELIVERABLE 9: EVENT MANAGEMENT SCRIPTING ASSISTANCE
During the configuration analysis phase of the implementation project, Accela will identify opportunities to supplement
the Accela Automation base functionality via Event Manager Script Engine (EMSE) script development. Accela will
work with key Agency project stakeholders to identify the business rules/processes to be automated. Accela will work
with Agency to identify desired EMSE functionality, and subsequently will help prioritize the scripting needs to
determine which scripts will be developed by Accela, and which scripts can be developed by the Agency. The scripts
developed by Accela can be used as models whereby agency staff can develop and modify additional EMSE scripts
as needed. Accela will provide up to 16 hours of scripting assistance.
Representative examples of business processes that could be automated by a script listed below. Note that the below
list is an example list only and not a list of the actual script(s) that will be developed for the project.
Service request to work order script
Prior to the development of a script, the Agency will approve a design specification document that will be created
jointly by the Agency and Accela. The approved document will be used as a basis for determining completion and
approval of the deliverable.
In terms of specific output, the following will be executed for this deliverable:
EMSE script specifications for scripts to be developed by Accela (MS Excel/Word).
Demonstrated operability of scripts in staging/test environment per the design document specifications.
Accela Deliverables:
EMSE script specifications for scripts to be developed by Accela (MS Excel/Word).
Demonstrated operability of scripts in staging/test environment per the design document specifications.
Accela Responsibilities:
Work with Agency staff to identify potential uses of EMSE scripting.
Assist with development of list of desired EMSE functionality.
Aid the Agency in prioritizing which scripts will be developed by Accela.
Develop EMSE scripts based on the specifications.
Demonstrate functionality of scripts per specifications.
Provide 16 hours of Scripting Assistance.
Agency Responsibilities:
Allocate the time for qualified business and technical experts for the script requirements sessions that are
critical to the project success.
Identify resources that will learn EMSE scripting tolls and approaches for ongoing maintenance.
Prioritize desired EMSE functionality to determine which scripts Accela will develop.
Provide timely and appropriate responses to Accela’s request for information.
Verify the Event Script Specification meets the intended business requirement.
Allocate the time for qualified personnel to test the script for acceptance.
Ensure that the data populates successfully according to the script requirements document.
Acceptance Criteria:
Review and acceptance of design document with written sign-off from the Agency.
Demonstrate a developed script within the system.
645
Statement of Work
2013 Accela Inc. Page 19
Reports
Reports are defined as anything that can be printed from the system, including but not limited to, reports, forms,
documents, notices, and letters that the Agency wishes to print as identified during configuration analysis. The
Configuration Document will define the reports and documents that are required by the Agency to effectively use
Accela Automation. These reports will be broken down by level of effort and identified in the configuration document. It
is expected that, after the appropriate training on the database and the selected report writing tool is completed,
Agency personnel will be able to handle additional and future report requirements. Reports are classified by level of
effort: high, medium, and low. High is defined as a report containing significant calculation and/or extensive detail and
number of fields – for example a financial statistical report or complex permit. The majority of reports require a
‘medium’ level of effort, which is defined as a report displaying non-calculated and minimal calculated data fields.
Reports with a low level of effort are typically letters or notices that contain contact information and basic application
data.
These reports can be developed using the integral Accela Report Writer included with Accela Automation or Crystal
Reports XI Server at the Agency’s discretion. These custom reports, whether developed with Accela Report Writer or
Crystal Reports, will be deployed in the Report Manager for use within Accela Automation.
DELIVERABLE 10: REPORT SPECIFICATIONS
Accela will develop documents/letters/reports from those identified by the Agency as required for the new system.
Accela and Agency have agreed that Accela will develop reports based on the following breakdown:
5 of Medium Complexity
5 of Low Complexity
Prior to the development of a report the Agency will approve report design specification documents that will be created
jointly by the Agency and Accela. The approved documents will be used as a basis for determining completion and
approval of the reports. Development of each report cannot begin until agreement on each specification is complete.
A proven strategy that combines the use of the Accela Automation Quick Queries, custom reports developed by
Accela that include run-time parameters to allow similar reports to be combined, and the development of other reports
by the Agency after training, can ensure that all required reporting requirements are met.
In terms of specific output, the following will be executed for this deliverable:
List of identified reports that Accela will develop
Report Specifications Documents for each of the identified reports
Accela Deliverables:
List of identified reports that Accela will develop
Report Specifications Documents for each of the identified reports
Accela Responsibilities:
Assist in determining level of effort for reports to assist with prioritization.
Develop report specifications.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s request for information.
Make available the appropriate key users and content experts to participate in the report specification.
646
Statement of Work
2013 Accela Inc. Page 20
Provide information and data in the formats specified by Accela that will be needed for agreement on the
Deliverable.
Acceptance Criteria:
Agreement on prioritized list of reports that will be developed by Accela.
Review and approval of individual Report Specifications documents. The Agency will not unreasonably
withhold acceptance if the Agency requests changes to the reports specifications after the initial signoff of the
specification by the Agency.
Agency will have 5 business days to review the Report Specification Documents. If no changes or comments
are requested within the 10 days, the Report Specification Documents are considered approved by the
Agency.
DELIVERABLE 11: REPORT DEVELOPMENT
Accela will develop custom documents/letters/reports per the specifications developed and approved in Deliverable
10, Report Development. Changes to the report specifications after approval can negatively impact project progress
and the overall schedule. Therefore, changes to the report specifications after approval requires an analysis by
Accela to determine the level of effort required, and if a change order would be required to complete the work.
In terms of specific output, the following will be executed for this deliverable:
A total of 10 documents/letters/custom reports per the Report Specification Documents
Accela Deliverables:
A total of 10 documents/letters/custom reports per the Report Specification Documents
Accela Responsibilities:
A total of 10 documents/letters/custom reports per the Report Specification Documents
Provide timely and appropriate responses to Agency’s request for information.
Develop reports per specifications.
Assist in the validation of the reports in test environment.
Acceptance Criteria:
Confirmation of report accuracy in test environment per Report Specifications.
DELIVERABLE 12: ACCELA GIS CONFIGURATION
Accela will install and configure Accela GIS to link and leverage existing Agency GIS information, including assistance
with establishing the map service to be used in conjunction with Accela GIS. The following are the main objectives
being pursued through the implementation of the Accela GIS:
Auto-populate spatial attributes for a property in forms up to 20 fields from GIS to Automation for 5 assets.
During GIS installation, Accela’s technical staff will work with Agency IT staff to ensure that the components for
hardware, software, database, network, and Internet are in place for the Accela GIS test and production environments.
Accela technical staff will validate the proper installation and configuration of the Accela GIS environment.
In terms of specific output, the following will be executed for this deliverable:
Accela GIS installed on Agency server(s).
Demonstration of operational system.
647
Statement of Work
2013 Accela Inc. Page 21
Up to 20 field Attribute Mapping(s)
5 assets
Accela Deliverables:
Accela GIS installed on Agency server(s).
Demonstration of operational system.
Up to 20 field Attribute Mapping(s) for 5 assets
Accela Responsibilities:
Install Accela software and perform quality assurance checks on the configuration and performance based on
acceptance criteria mutually developed by Accela and the Agency.
Demonstrate that the Accela GIS applications are operational in the Agency computing environment thus
communicating with the Accela Automation system.
Agency Responsibilities:
Arrange for the availability of appropriate staff for the system installation, setup, testing, and quality
assurance throughout the setup process.
Order and procure necessary hardware, non-Accela systems software, and networking infrastructure as
specified by Accela.
Provide people and physical resources based on the dates outlined in the project schedule.
Prepare the hardware, software, and network in accordance with the specifications provided by Accela.
Provide Accela with network access for remote installation and testing.
Provide information and data in the formats specified by Accela that will be needed for the GIS
implementation.
Acceptance Criteria:
Demonstration of operating Accela GIS in test environment.
DELIVERABLE 13: ACCELA MOBILE OFFICE CONFIGURATION
Accela will configure the Accela Mobile Office application. As part of this deliverable Accela will perform the
configuration tasks required to ensure Accela Mobile Office interfaces with Accela Automation in both a test and
production environment. Using Accela Mobile Office, work orders can be executed in the field:
Analysis activities with the Agency will result in a Mobile Office Configuration Specifications Document. Subsequently,
Accela’s staff will extend base configuration of Accela Mobile Office per the Mobile Office Configuration Specifications
Document.
In terms of specific output, the following will be executed for this deliverable:
Accela Mobile Office Configuration Specifications Document (MS Word)
Demonstration of operational system per Accela Mobile Office Configuration Specifications document
Accela Deliverable:
Accela Mobile Office Configuration Specifications Document (MS Word)
Demonstration of operational system per Accela Mobile Office Configuration Specifications document
Accela Responsibilities:
Create configuration specifications for Accela Mobile Office based on analysis with the Agency.
648
Statement of Work
2013 Accela Inc. Page 22
Configure Accela Mobile Office based on approved specifications document off-site.
Acceptance Criteria:
The base configuration of Accela Mobile Office in the Test environment is configured as documented in the
Accela Mobile Office Configuration Specifications document.
Acceptance Review Period:
Ten (5) business days total
DELIVERABLE 14: V360 USER EXPERIENCE
V360 User Experience is comprised of the fine-tuning of the User Interface (“look and feel”) of the system, usability
and security. This portion is completed prior to User Acceptance Testing to provide a more refined view of the system
and assistance with system acceptance for new users. Accela will use the completed configuration and standard,
best practice V360 User Interface as a starting point for analysis and documentation of desired look and feel of Accela
Automation V360 user interface.
In conjunction with the Agency representatives, Accela will perform the following tasks:
Review and update the required portlets for each major user group.
Review and update the required fields, field order and field names of each major portlet.
Provide recommendations and seek input on required Quick Queries in order to define a default list.
Provide recommendations and seek input on required Smart Charts (Dashboards) in order to define a default
list.
Accela will use the V360 User Console configuration document template, and the appropriate content within that
document to capture the Agency’s desired V360 User Experience to be configured. Accela’s Project Manager will
coordinate the compilation of the information collected during the Analysis into the document, including detailed
settings related to the following topics:
User Consoles Form Filters
ASI Form Layout APO Template Form Layout
Quick Queries Smart Charts
My Navigation Go To Menu’s
Data Filters Security
The Project Team, consisting of representatives from both Accela and the Agency, will conduct a formal review of the
document for the purpose of approval and sign-off on the deliverable. Accela will configure the application to meet the
requirements of the document upon approval
In terms of specific output, the following will be executed for this deliverable:
Provide 2 days of Workshops and assistance in the setup of V360 User Interface
Accela Responsibilities:
Provide 2 days of Workshops and assistance to the Agency.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s request for information.
Make available the appropriate Agency key users and content experts to participate in the user experience
analysis and verify the accuracy of the documented user experience elements.
649
Statement of Work
2013 Accela Inc. Page 23
Schedule participants and meeting locations for analysis activities.
Acceptance Criteria:
Provide 2 days of Workshops and assistance to the Agency.
STAGE 5 – READINESS
DELIVERABLE 15: ADMINISTRATIVE AND TECHNICAL TRAINING
Accela will provide training for Agency staff that focuses on the administration, maintenance, and augmentation of its
Accela Automation configuration. Our aim at Accela is to educate Agency resources on all aspects of Accela
Automation in an effort to ensure the Agency is self-sufficient. This allows the Agency to best react to changing
requirements and ongoing maintenance, which can allow the Agency to be reactive and significantly reduce system
maintenance costs over time.
In addition to a comprehensive administrator training course that spans three days, Accela will also train Agency users
on the administration and use of the system. Specifically, the following courses can be selected from the twenty-three
days of training being provided to the agency to the Agency. (NOTE – This is a list of all Administrative Training and
the agency can choose at their discretion which training is required). At a Minimum the follow training sessions must
be delivered to the agency Three-Day Accela Automation Administrator, One-day EMSE, and One-day Report
Workshop. The total of required Administrative training courses is 5 days.
Accela Automation Administrator Training,
Accela Mobile Office Training,
Accela GIS Training.
In terms of specific output, the following will be executed for this deliverable:
One-day Accela Overview Training course,
Three-day Accela Automation Administrator Training course,
Half-day (4 hours) Mobile Office Administrator Training course,
Half-day (4 hours) Accela GIS Technical Training course
Accela Responsibilities:
Coordinate with the Agency to define training schedule and logistics.
Deliver training per the specific requirements listed above.
Agency Responsibilities:
Select and prepare the power-users who will be participating in the training and subsequently training end
users.
Arrange the time and qualified people for the training who are critical to the project success.
Provide suitable Agency facilities to accommodate various training classes.
Ensure that users are proficient in using PC’s in a Windows environment as a prerequisite for the course.
Ensure that users are familiar with use of standard Internet browsers as a prerequisite for the course.
Acceptance Criteria:
Execution of 6 days of listed training courses, the agency has 5 required days and 1 floating day that can be
used at the discretion of the agency.
650
Statement of Work
2013 Accela Inc. Page 24
DELIVERABLE 16: USER ACCEPTANCE TESTING (UAT) ASSETS
This deliverable is comprised of the assistance Accela will provide to allow the Agency to accept that the solution
meets the requirements as documented in all the deliverables. Accela will assist the Agency in the testing and
validation of the solution and its readiness to be migrated to production for active use and will assist in transferring the
solution and any required data from Support to Production.
Accela will provide of support for training, oversight, answering questions and addressing issues discovered in User
Acceptance Testing. It should be noted that it is critical that the Agency devote ample time and resources to his effort
to ensure that the system is operating per signed specifications and ready for the move to production. The testing
effort will require a significant time investment by the Agency, and coordination of resources is critical. At this point in
the implementation process, the Agency should test individual components of functionality of the solution (i.e.,
functional and/or unit testing), and also test to ensure that the interrelated parts of the Accela Automation solution are
operating properly (i.e., integration testing).
Accela will provide assistance to the Agency as needed by providing User Acceptance Testing (UAT) support and
facilitating completion of UAT. Accela will address and rectify issues discovered during the UAT process as Agency
staff executes testing activities. Accela will work with the Agency to develop a test plan and deliver sample test
scripts, as well as an issue log to track the progress of testing. It should be noted that Accela will plan for a total of 1
month to complete this deliverable.
If the Agency does not devote adequate time and staffing to UAT in order to completely test the solution, Accela may
opt to postpone go-live at the Agency’s expense. Accela will work diligently with Agency to ensure this does not occur
and provide several opportunities for the Agency to add additional staff and time to this effort before recommending a
postponement or delay.
In terms of specific output, the following will be executed for this deliverable:
Resolution of configuration issues resulting from Agency End User Testing.
Fully-tested system that is ready to move to a production environment.
Accela Deliverables:
Resolution of configuration issues resulting from Agency End User Testing.
Fully-tested system that is ready to move to a production environment.
Accela Responsibilities:
Provide recommendations on testing strategy and best practices.
Lead the Agency in up to 1 month of User Acceptance testing effort and the validation of the system
configuration and its readiness to be migrated to production for active use.
Resolution of issues as a result of User Acceptance Testing activities.
Agency Responsibilities:
Provide timely and appropriate responses to Accela’s request for information.
Make available the appropriate Agency key users and content experts to participate in user acceptance
testing as defined and managed by Agency.
Develop the User Acceptance test scripts.
Utilize the use cases documented in each Configuration Document Deliverable as the basis for the
acceptance of this Deliverable.
651
Statement of Work
2013 Accela Inc. Page 25
Acceptance Criteria:
Completion of up to 1.5 weeks of UAT Support or 60 hours
DELIVERABLE 17: DAILY USER TRAINING
This Deliverable includes the Delivery by Accela to Agency of 6 Days of the Daily User Training course (3 days
onsite). Accela best practices have proven that class sizes no larger than 14 participants are more successful with
students who meet the pre-requisites of the course. The Accela Trainer has the right to modify the class size to
ensure successful instruction with Agency agreement.
End User Training should be coupled with the Agency delivering supplementary user training to its staff using the core
Use Cases documented in each System Configuration Document. Accela recommends that Agency adopt the “80/20
rule” for training, focusing the majority of their training on the 80% of what the Agency normally does operationally.
The recommended supplementary training conducted by the Agency can utilize business experts from each area to
train on all aspects of their configuration. Accela will deliver current training documentation in a format that can be
used to customize the documentation. Documents delivered by Accela to the Agency will be valid for the release that
the Agency is trained. Documents delivered by Accela may not be shared with any other agency or Company per the
Non-Disclosure Agreement.
In terms of specific output, the following will be executed for this deliverable:
5 Days of Daily User Training.
Accela Deliverables:
Up to one week of training
Accela Responsibilities:
Coordinate with the Agency to define training schedule and logistics.
Provide 5 days of Daily User Training.
Agency Responsibilities:
Select and prepare the power-users who will be participating in the training and subsequently training end
users.
Arrange the time and qualified people for the training who are critical to the project success.
Provide suitable Agency facilities to accommodate various training classes.
Ensure that users are proficient in using PC’s in a Windows environment as a prerequisite for the course.
Ensure that users are familiar with use of standard Internet browsers as a prerequisite for the course.
Develop any specific custom training material to support unique workflows.
Acceptance Criteria:
Execution of 6 days of the End User Training course to the Agency.
STAGE 6 - DEPLOY
DELIVERABLE 18: PRODUCTION SUPPORT – ASSETS
Production date is defined as the official date in which Accela Automation moves from the test environment to
production for daily Agency usage. This date will be agreed to by both Accela and the Agency at project inception. It
may be altered only by change order agreed to by both parties. In the weeks prior to moving to Production, Accela will
652
Statement of Work
2013 Accela Inc. Page 26
assist in final data conversions, system validation, staff preparation assistance and training, and coordination of
deployment.
In terms of specific output, the following will be executed for this deliverable:
Deployment support prior to moving to Production.
Accela Automation used in production environment for Agency daily use.
Accela Deliverables:
Deployment support prior to moving to Production.
Accela Automation used in production environment for Agency daily use.
Accela Responsibilities:
Provide on-site resources to support the move to Production effort.
With assistance from the Agency, lead the effort to transfer the system configuration and any required data
from Support to Production.
Assist in the development of a Pre-Production checklist that details the critical tasks that must be
accomplished prior to moving to Production.
Agency Responsibilities:
Provide technical and functional user support for pre and post Production Planning, execution, and
monitoring.
Provide timely and appropriate responses to Accela’s request for information.
Assist in the development of a Pre-Production checklist that details the critical tasks that must be
accomplished prior to moving to Production.
Make available the appropriate Agency key users and content experts to participate in user acceptance
testing as defined and managed by Agency.
Acceptance Criteria:
Deployment support prior to moving to Production.
Production system is first used by the Agency for daily use.
DELIVERABLE 19: POST DEPLOYMENT SUPPORT AND TRANSITION TO CRC
This deliverable is comprised of the post- Production support assistance that Accela will provide to address issues and
provide consultative advice immediately following the move to Production for daily use. Accela will provide support for
1 week immediately following deployment (go-live) of phase 1. At the end of the support period, a formal meeting will
be scheduled with the Agency, Accela Services Team, and Accela CRC for the purpose of transitioning support of the
Agency to Accela CRC.
Accela will work with the Agency to identify and address issues identified during this period using a Post Production
Issues List. This list will be comprised of issues related to the defined deliverables listed in this SOW, which will be
addressed by Accela, as well as any other issues which will be addressed by the Agency. Examples of issues the
Agency is responsible for include training issues, functional changes beyond the scope of this Statement of Work,
cosmetic changes, and procedures related to the use of Accela Automation. Specifically, Accela will not be
developing or creating additional reports, conversions, records types and workflow processes that were not included in
the scope of this project.
In terms of specific output, the following will be executed for this deliverable:
653
Statement of Work
2013 Accela Inc. Page 27
Transition of Agency from Services team to Customer Resource Center for ongoing support.
Accela Deliverables:
Transition of Agency from Services team to Customer Resource Center for ongoing support.
Accela Responsibilities:
Provide post-production support for Accela developed configuration and components.
Assist with the identification of issues for the Post Production Issues List.
Assist with issues that may arise related to the deliverables in this SOW.
Transfer ongoing support of the client and to the CRC to address any post Production issues that require
remediation.
Agency Responsibilities:
Provide technical and functional user support for post-production support and monitoring.
Develop and maintain a Post Production Issues List.
Provide timely and appropriate responses to Accela’s request for information.
Make available the appropriate Agency key users and content experts to participate in user acceptance
testing as defined and managed by Agency.
Acceptance Criteria:
Execution of 1 weeks of post-Production support phase 1.
Official transfer from the Accela Services project team to the Customer Resource Center (CRC).
PROJECT RESOURCES AND LOCATION OF WORK
WORK LOCATION
Services contracted under this SOW may be performed remotely and/or at the Agency’s on-site facilities as deemed
appropriate and reasonable for the successful completion of the Services detailed herein.
AGENCY RESOURCES
Agency must fill the appropriate roles with the appropriate personnel to work together with the Accela Engagement
Team for these Services and that Agency will make available additional resources as needed for the Services to be
successful. Agency roles can be filled by the same person. In addition, Agency will provide all necessary technical
resources to make appropriate modifications within any Agency systems wishing to integrate with any Accela systems.
These resources must be proficient in Agency coding/development environment and tools, to make the required
changes to their software to enable integration and must be available during the timeframe of these
Services. Agency roles include Sponsor, Project Manager, Technology Manager, and Business Lead(s) for each
Division/department being implemented, Super User trainers, and others as appropriate.
Agency Resources Description
Project Sponsor
Responsibilities include:
Ultimate responsibility for the success of the project,
Creating an environment that promotes project buy-in,
Driving the project through all levels of the agency,
654
Statement of Work
2013 Accela Inc. Page 28
High-level oversight throughout the duration of the project,
Serving as the primary escalation point to address project issues in a
timely manner.
Project Manager
Responsibilities include:
Overall administration, coordination, communication, and decision- making
associated with the implementation;
Planning, scheduling, coordinating and tracking the implementation with
Accela and across departments within the agency;
Ensuring that the project team stays focused, tasks are completed on
schedule, and that the project stays on track.
Division/Departmental Busines
s Leads
A user representative for each affected department must be appointed to facilitate
analysis and configuration and serve as a decision-making entity for that
group. These critical appointments may well determine the success of the
implementation for their respective areas. Responsibilities include:
Attending requirements workshop sessions;
Willing and able to gather data and make decisions about business
processes;
Assist in the creation of specifications for reports, interfaces & conversions
Review and test the system configuration;
Participating in the implementation of the Accela Automation solution.
Division/Departmental Subject
Matter Expert (SME)
Responsibilities include:
Being trained on the Accela Automation system at a System
Administration level;
Being fully engaged in the Business Analysis and system configuration
activities;
Assist internal efforts towards the creation of reports, interfaces &
conversions;
Assist in the review and testing of the system configuration;
Actively participate in the full implementation of the Accela Automation
solution.
Technical Lead
Responsibilities include:
Primary responsibility for the technical environment during the software
implementation;
Ensure that servers, databases, network, desktops, printers, are available
for system implementation and meet minimum standards;
Work with Accela technical personnel during implementation;
Maintain test and production databases;
Perform day-to-day maintenance of the system and install maintenance
releases;
655
Statement of Work
2013 Accela Inc. Page 29
Act as the primary technical resource for troubleshooting problems;
·Establish and maintain backup, archival, and other customary
maintenance and housekeeping activities.
ACCELA RESOURCES
Accela will assign key Professional Services resources for this engagement with Agency. These individuals are well
versed in the Accela Automation application, and are well qualified to lead this effort. Accela’s Project Manager shall
assume full responsibility for the coordination of this team and its interaction with key Agency resources assigned to
the effort. The main roles are as follows:
Accela Resources Description
Project Executive
The Project Executive oversees the project’s progress/direction and works with the
Project Manager to ensure efficiency, consistency and quality in delivery of Accela
implementations. The Project Executive actively participates in a project
director/executive role. The Project Executive will meet with Agency Executives
monthly or upon request throughout the duration of the project.
Project Manager
The Accela Project Manager is responsible for the overall project management and
works directly with the client throughout all aspects of Accela implementations: from
the initial scoping, planning, staffing to delivery. The Project Manager undertakes the
project administration tasks including:
Project plan management,
Change order management,
Issue log management and escalation,
Status reporting,
Project workspace management,
Resources management,
Work plan management,
Meetings management,
Project review with Project Executive.
In addition, the Project Manager will actively participate in leading the System
Configuration Analysis sessions and will be responsible for the creation of the System
Configuration Document.
Senior Implementation
Consultant
The Senior Implementation Consultant assigned to the project will have major
experience in the business process as well as the product functionality and is
responsible for:
Business analysis activities: Mapping the client’s business processes and
requirements to the functionality of Accela’s products and the creation of
solution design,
Leading system configuration activities,
Providing training/mentoring to agency staff,
656
Statement of Work
2013 Accela Inc. Page 30
Recommend industry best practices to agency to enhance business
processes,
Guide agency on how best to configure the system based on past
experiences and software expertise.
Implementation Consultant
Implementation Consultant resources support the project and typically focus on the
flowing tasks.
The configuration of the system to match the System Configuration
document.
Build activities within the project, such as conversion data mapping, creation
of reports and interface specification.
Technical Consultant
Accela Technical Consultants are involved in all areas that require knowledge of
server-side considerations and Accela add-on products such as:
Application installation and setup (Accela Automation, Accela GIS, Accela
Wireless, and Accela Citizen Access),
Report definition and creation,
Event Manager Script definition and programming,
Database Conversions and data mapping assistance,
Interface specifications and development.
Training Consultant Training Consultants are responsible for Accela Training classes with assistance
from Implementation consultants, depending on the nature of the specific project.
657
Statement of Work
2013 Accela Inc. Page 31
PAYMENT TERMS
PAYMENT SCHEDULE:
Accela will perform the Services on a monthly payment basis based on: the nature and scope of the Services and
associated Deliverables outlined herein, the expected staffing requirements, project schedule, Accela’s and
Customer’s roles and responsibilities and the other assumptions set forth in this SOW. Accela’s total price to perform
the Services and provide the Deliverables described is $158,400.00 exclusive of taxes and expenses. The pricing is
based on the information available at the time of signing and the assumptions, dependencies and constraints, and
roles and responsibilities of the Parties, as stated in this SOW. Invoices will be sent on the monthly anniversary of the
contract signing until the contracted amount has been met.
EXPENSES:
Actual amounts of any reasonable and customary travel expenses incurred during the performance of services under
this SOW will be billed to Agency, according to Accela expense policy. Accela will bill Customer for actual expenses
incurred for travel and lodging/living, as well as other approved out-of-pocket expenses (such as mileage, parking,
tolls and telecommunications charges). Accela will work with Customer to manage and control its expenses in
Payment Amount Payment Date
Progress Payment 1 $12,320.00 Upon Contract Signing
Progress Payment 2 $14,080.00 1 Month after kickoff
Progress Payment 3 $14,080.00 2 Months after kick-off
Progress Payment 4 $14,080.00 3 Months after kick-off
Progress Payment 5 $14,080.00 4 Months after kick-off
Progress Payment 6 $14,080.00 5 Months after kick-off
Progress Payment 7 $14,080.00 6 Months after kick-off
Progress Payment 8 $14,080.00 7 Months after kick-off
Progress Payment 9 $12,320.00 Upon Project Completion
Sub-Total Services $123,200.00
Payment Amount Payment Date
Project Management Payment 1 $3,911.12 1 Month after kickoff
Project Management Payment 2 $3,911.11 2 Month after kickoff
Project Management Payment 3 $3,911.11 3 Months after kick-off
Project Management Payment 4 $3,911.11 4 Months after kick-off
Project Management Payment 5 $3,911.11 5 Months after kick-off
Project Management Payment 6 $3,911.11 6 Months after kick-off
Project Management Payment 7 $3,911.11 7 Months after kick-off
Project Management Payment 8 $3,911.11 8 Months after kick-off
Project Management Payment 9 $3,911.11 Upon Project Completion
Sub-Total Project Management $35,200.00
TOTAL $158,400.00
658
Statement of Work
2013 Accela Inc. Page 32
accordance with Accela’s global travel policy guidelines and will not incur expenses in excess of the initial contracted
budget below without Customer’s prior written consent. Expense receipts will accompany invoices. Total estimated
expenses are based on past Accela engagement experience. The assumption is that there will only need to be 10
onsite trips at an estimated travel expense budget not to exceed $20,000.00. Should the customer require more onsite
trips than the assumption above, a Change Order will be required prior to additional travel commencing to cover the
cost of those additional trips.
CONTRACT SUM:
The total amount payable under this Agreement is therefore up to a maximum of $178,400.00 including travel
expenses. The estimated fees for this SOW are predicated on the timely completion of project milestones. However,
should completion of milestones slip due to actions of Agency, and should this slippage result in material effort to
Accela in excess of the hours provided for in this document, Accela will produce a change order at a rate of $158/hr.
for additional hours in support of the scope and deliverables contained herein. Any change order will need to be
approved by both Agency and Accela.
ACCEPTANCE
The Services contracted for in this Statement of Work will be considered Accepted when all Deliverables defined in the
Work Description Section have been accepted by Agency as defined for each Deliverable. Additionally, transition to
Accela’s Customer Service Center, CRC has been completed. The live system has been handed over to the CRC
and the transfer of knowledge from the Project Team to the CRC has also been completed. All training has concluded
and project documentation has been handed over to the CRC.
TERMS
The pricing and terms of this proposal are valid until June 30, 2014. If this Statement of Work is accepted after this
date all pricing and terms may not be valid.
659
Statement of Work
2013 Accela Inc. Page 33
APPENDIX A - ACCELA IMPLEMENTATION METHODOLOGY
Accela will deliver its Services to the Agency by employing the methodology detailed in this section. This is a proven
methodology that guides the project from inception to deployment, thereby increasing the chances of successfully
implementing Accela software products. Project delivery through execution of this Implementation Life Cycle is
described below.
IMPLEMENTATION LIFE CYCLE
Thorough execution of these six stages ensures that Accela customers receive high-quality services throughout the
project engagement.
Figure 1 - Accela Methodology
As illustrated in the figure above, the stages of project delivery flow in linear direction, although many tasks run in
parallel as appropriate to avoid unnecessary project delays. Each stage has pre-defined objectives, tasks and
associated deliverables. Depending on the exact scope of the project, a full complement or subset of all available
deliverables will be delivered through the services defined for the project. Employing this deliverables-based
approach ensures that Accela and the Agency understand the composition and ‘downstream’ impact of each project
deliverable to ensure the project is delivered with quality and in a timely manner.
INITIATION
Initiation represents the first stage in the lifecycle. During the Initiation stage, project contracts and the SOW
are finalized, project scope and objectives are reviewed, and project planning activities and deliverables are
completed. In terms of specific deliverables, common output from the Initiation Phase is as follows:
Project Charter,
Baseline Project Plan,
Project Status Report Template,
Project Sharepoint Site pre-loaded with baseline documentation,
Project Initiation Meeting.
ANALYSIS
Analysis is the second stage in the lifecycle. During the Analysis stage, Accela reviews existing agency
documentation, interviews agency staff, and conducts workshops to understand the “To-Be” vision of the
Agency that can be executed with the aid of Accela Automation. It is during this Phase that Accela gains a
deeper understanding of Agency processes and business rules; simultaneously, the Agency begins to gain a
deeper understanding of the methodology and Accela Automation capabilities. A key output of this Phase is
the To-Be Analysis Document(s) which serve as the ‘foundation’ for configuration of Accela Automation to
support germane elements of the Agency “To-Be” vision. Supplementing the To-Be Analysis Document(s)
are all other configuration specifications documents related to data conversion, interfaces, reports, and event
scripts.
SOLUTION FOUNDATION
Solution Foundation is the third stage in the lifecycle. It begins upon completion of Stage 2 and should be
completed prior to the next stage, Build. During the Solution Foundation stage, Accela Automation will be
660
Statement of Work
2013 Accela Inc. Page 34
built to match the to-be processes agreed to in the Analysis stage. Essential to this effort is the configuration
of the Record (Case, Application, Permit, Work Order, etc) types that were agreed to during the Analysis
phase. Configuration of in-scope record types is comprised of, but not limited to:
User-defined fields (Application-Specific Information and Task-Specific Information),
Workflows and statuses,
Fee structures and rules,
Inspection data.
BUILD
Build serves as the fourth stage in the lifecycle, and execution of this stage overlaps Configuration, but ends
after Configuration is complete. During the Build stage, all defined elements during the Analysis stage
beyond the Solution Foundation will be implemented. This includes conversions, event scripts, interfaces
and reports. In terms of specific deliverables, common output from the Build Phase is as follows:
Event Script Development,
Report Specifications and Development,
Data Conversion Specifications and Development,
Interface Specifications and Development.
READINESS
Readiness is the fifth stage in the lifecycle. During the Readiness stage Accela Automation is fully tested,
errors are identified, documented and corrected. Additionally, the solution is prepared for deployment. In
addition, system administrators and end users are trained so that all appropriate agency staff members are
prepared to use and maintain the software once the move to production occurs. In terms of specific
deliverables, common output from the Readiness Phase is as follows:
User Acceptance Testing,
End-User Training.
DEPLOY
Deploy is the sixth and final stage in the lifecycle. During the Deploy stage the applications are moved to
production; all requisite pre-production activities are identified, tracked and completed, and post-production
analysis and review is completed. Upon moving to production, the Accela Automation applications are
transitioned to the Accela Customer Resource Center (‘CRC”) for ongoing support. A formal transition will
occur between the Services team and the CRC that instructs the agency on available communication
channels (telephone, email, and online tracking system) and use of the Accela knowledge base. Lastly, all
documented issues or enhancement requests will be transitioned from the Services team to the Customer
Resource Center. In terms of specific deliverables, common output from the Deploy Phase is as follows:
Pre-Production Checklist Development, Tracking and Execution,
Move to Production,
Post Production Analysis,
Formal Transition to the CRC for Ongoing Support
661
Statement of Work
2013 Accela Inc. Page 35
APPENDIX B – DATA CONVERSION ASSUMPTIONS
The following information provides detail related to the scope of Accela’s data conversion offerings. Due to the
inherent complexity of conversion activities, it is critical to address and understand common questions and
misconceptions. Any conversion activity or requirement not included in this section is considered out of scope, and
may be addressed through a change order for Accela services.
GENERAL INFORMATION AND REQUIREMENTS FOR HISTORICAL CONVERSIONS
- The standard data conversion includes the conversion of transactional data to the Accela Automation
database when a configured destination exists. In the event there is no destination for legacy transactional
data then it will be required to be converted as best fits into another area of the configuration or excluded
from the conversion effort.
- Accela will perform unit testing of the conversion program including spot checks of the data within Accela
Automation in order to identify if data corruption issues exist. Extensive quality assurance of legacy/historical
data by the agency is required in order to ensure accurate transfer of data.
- A completed, signed off, Solution Foundation must be available before Accela will begin the data conversion
mapping effort.
DATA CONVERSION ASSUMPTIONS
- “As-Is” Approach: Conversion of transactional tables, Address/Parcel/Owner (APO) data, Professional
License data is executed “As-is” into Accela Automation. “As-is” means that the data will be transformed as
mapped to existing configuration elements in Accela Automation. The conversion process will not create
configuration data or alter the mapped data when processed into Accela Automation. Additionally this means
if invalid, inaccurate, or incomplete data is provided, it will be loaded into Accela Automation “As-Is”. All data
cleanup must occur prior to execution into Accela Automation.
- Accela Data Conversion Tools: Data will be mapped and converted utilizing Accela’s Extract Translate and
Load (“ETL”) toolset. This will assist to ensure the accuracy of the mapping. The data mapping tool ensures
that the legacy source to Accela Automation solution is accurate and prevents data from failing to convert,
while the execution tool can be used to consistently run conversion process and track statistics.
- Acceptable Data Formats For Historical Conversion: It is expected that the Conversion Source Data be
provided in an Oracle 10g/11g or Microsoft SQL Server 2000/2005/2008 database format. In the event that
the source is not in an acceptable format, Accela will provide recommendations for transposing the data in
the proper format.
- Acceptable Data Formats For Reference Conversion: It is expected that the Conversion Source Data be
provided in Oracle 10g/11g, Microsoft SQL Server 2000/2005/2008, or pipe delimited flat file format. In the
event that the source is not in an acceptable format, Accela will provide recommendations for transposing the
data in the proper format.
- Documents: Historical/Legacy data conversion DOES NOT include the conversion of attached documents
into Accela Document Services (“ADS”) in Accela Automation.
662
Statement of Work
2013 Accela Inc. Page 36
APPENDIX C – DELIVERABLES ACCEPTANCE FORM
Date:
Agency Name:
Approving Agency Manager:
Accela Manager:
Project Name / Code:
Contract / Agreement #:
Agency agrees that Accela has successfully completed the following Deliverables:
Deliverable #
Source /
Reference
Details
Service
Agreement
Agency agrees that Accela has successfully completed the Deliverables described above in accordance with the
terms of the related Contract/Agreement.
Agency Name
Signature
Title
Date
Sign and fax this document to:
Accela, Inc.
YOUR NAME
YOUR TITLE
Tel:
Fax:
Email this document as an
attachment to:
YOUR EMAIL OR
Please acknowledge acceptance by:
A B
APPROVALS:
663
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
REPORT 18-0717
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
REQUEST TO REMOVE DOWNTOWN HERMOSA AVENUE
CROSSWALK TREATMENTS FROM CURRENT CONTRACT
WITH ALL AMERICAN ASPHALT AND AUTHORIZE STAFF TO
RE-ISSUE SEPARATE BID FOR CROSSWALKS UNDER CAPITAL
IMPROVEMENT PROJECT (CIP) 16-174 STREET IMPROVEMENTS
(Public Works Director Glen W.C. Kau)
Recommended Action:
Staff recommends that the City Council:
1.Authorize staff to issue a change order for the deletion of the Duratherm and Decomark line
items from the contract with All American Asphalt for CIP 16-174 Hermosa Avenue Resurfacing
Improvements Contract;
2.Authorize staff to re-solicit bids to supply and install the Decomark and Duratherm crosswalks
for Hermosa Avenue under a separate contract; and
3.Reaffirm the previously selected color palette or select an alternate combination of colors
based on the availability of chip samples of the Duratherm material.
Executive Summary:
This item recommends the deletion of the crosswalk treatment bid items from the contract with All
American Asphalt and to re-issue these items as a separate bid item for supply and installation.The
recommendation comes after changes to the design were approved by Council in June 2018 and
staff subsequently received a quote from the current contractor,under a non-competitive bid
scenario,that is significantly higher than originally anticipated.Since this work is to be performed by
a sub-contractor,staff believes that re-issuing the bid under a competitive scenario will likely result in
lower costs.
Background:
At the October 10,2017 City Council Meeting,Council provided direction to agendize a discussion of
the pedestrian scramble located at the intersection of Hermosa Avenue and Pier Avenue and the
synchronization of signals along Hermosa Avenue between 11th Street and 14th Street.
On January 23,2018,Staff provided a briefing to City Council for the potential concerns regarding
City of Hermosa Beach Printed on 4/3/2024Page 1 of 5
powered by Legistar™664
Staff Report
REPORT 18-0717
On January 23,2018,Staff provided a briefing to City Council for the potential concerns regarding
pedestrian crossing/safety issues,where the Duratherm product was recommended to enhance
delineation of the crosswalks on Hermosa Avenue between 10th Street and 14th Street.
On February 13,2018,Council recommended retaining the all way walk/diagonal crossing at the Pier
Avenue -Hermosa Avenue intersection,but to add a creative/artistic design to the intersection
pavement that also marks the all way walk/diagonal crossing (and other downtown intersections)and
warns drivers to proceed with caution as they proceed through the intersection.
The Downtown subcommittee provided guidance to staff during the April meeting for the patterns and
colors to present to City Council.Additionally,the installation of a Decomark City seal in the center of
the Pier Avenue and Hermosa Avenue Intersection was considered.
On May 22,2018,staff recommended that Council select patterns and colors for the Duratherm
Crosswalks from options presented at the meeting,but Council opted to continue this item to a later
date determined by staff for a presentation of additional Duratherm designs.At the same meeting,
Council awarded the construction agreement to All American Asphalt for the construction of CIP 16-
174 - Street Improvements at Various Locations - Hermosa Avenue.
At the June 12,2018 Council meeting,Council selected the Winds of Change Duratherm option for
the Hermosa Avenue Pier Avenue intersection which incorporates a modified version of the current
Hb logo across the entire intersection in the Ashlar pattern (Attachment 1)in a sand and yellow color
palette.The decorative crosswalks at 10th,11th,Pier,13th,and 14th would also have the same pattern
to create a cohesive design along Hermosa Avenue through downtown.
Discussion:
The Construction phase of CIP 16-174 began on September 17,2018 with construction of the ADA
ramps,prior to the repaving of Hermosa Avenue.The Duratherm/Decomark applications are not
planned for installation until after the new pavement has been applied and cured in early 2019.
The bid amount from All American Asphalt for the Duratherm/Decomark treatments,based on the
original design,which only included the diagonal portions of the intersection,was $175,727.50
(Attachment 2;bid items 31 and 33).Based on the Council-selected colors and pattern,staff
obtained an informal quote from the authorized Duratherm/Decomark representative,Ennis-Flint for
the revised pattern and colors.The estimated material cost provided by the Ennis-Flint for the new
pattern and colors would have increased the item costs (and the project costs)by approximately
$20,000.
During the submittal process of the items included in the CIP project,the Duratherm/Decomark sub-
contractor (installer)provided a quote for the new patterns and colors in the amount of $327,842
(Attachment 3).The quote did not include the costs for the prime contractor’s markup (estimated atCity of Hermosa Beach Printed on 4/3/2024Page 2 of 5
powered by Legistar™665
Staff Report
REPORT 18-0717
(Attachment 3).The quote did not include the costs for the prime contractor’s markup (estimated at
10%)as permitted by the Standard Specifications for Public Works Construction (Greenbook),for an
estimated total cost of $360,300.
The Duratherm/Decomark subcontractor explains that the cost increase is a result of a custom
design that requires manufacturing of additional non-reusable templates.However,staff attributes the
cost increase in part due to the fact that the subcontractor is not competing with other installers when
providing an updated cost for the Duratherm item to afford the City competitive pricing.
The subcontractor also provided an alternate option for the Duratherm/Decomark for an approximate
cost of $208,030 (plus estimated 10%prime contractor markup)which includes a solid color for the
sun rays that are a glue-on application at the intersection of Hermosa Avenue and Pier Avenue.Since
this option lacks the Council-selected pattern,staff is not familiar with the method/durability of
installation,and unsure that it would achieve the final product as originally presented,staff does not
recommend pursuit of this option at this time.
In light of the above detailed considerations,staff recommends that the Duratherm/Decomark items,
line items 31 and 33 on the Bid Documents be removed under a change order process from the
current contract and that Council authorize staff to release a stand-alone formal bid for the supply
and installation of Duratherm/Decomark crosswalks along Hermosa Avenue based on the Council-
approved designs.The supply and installation of the newly-bid Duratherm item would take place
shortly after the completion of the pavement resurfacing of Hermosa Avenue in February 2019.
The removal of the two above mentioned bid items from the project is permitted under the general
provisions that govern public works construction projects,Greenbook Standard Specifications for
Public Works Construction,as long as the cost of the items removed do not exceed 25 percent of the
value of the overall contract.The value of the removed items is approximately 8.2 percent of the
contract amount.
Finally,following Council approval of the design and color palette at the June 12,2018 meeting,staff
obtained chip samples of the Duratherm materials in the selected and alternate colors and is seeking
Council affirmation of the colors for use in the final design.The colors previously approved by
Council,based on the brochure,were a ‘sand’color for the majority of the pattern design and the
standard ‘yellow’color for Hb mark in the center of the intersection.Based upon the sample chips
(Attachment 4),which did not appear exactly as presented in the brochure,staff recommends that
Council affirm one of the following options:
1.Use the ‘lemon yellow’ color for the Hb mark, keep ‘sand’ color for pattern - this would most
closely resemble the approved design.
2.Use the ‘white’ color for the Hb mark and use ‘khaki’ color for pattern.
City of Hermosa Beach Printed on 4/3/2024Page 3 of 5
powered by Legistar™666
Staff Report
REPORT 18-0717
3.Select a single ‘sand’ color for the pattern and Hb mark.
4.Direct staff to return with additional color samples and combinations for consideration.
General Plan Consistency:
The broader project associated with these recommendations has been evaluated for its consistency
with the City’s General Plan. Relevant policies are listed below:
Land Use and Design Element:
4.5 Corridor Connectivity. Recognize corridors as important cross-town thoroughfares that connect
Hermosa Beach, serve as transitions between neighborhoods, provide opportunities for local-serving
retail and balance the needs of multiple transport modes.
4.9 Streetscape Enhancements. Facilitate streetscape improvements, add pedestrian amenities that
attract new uses, and revitalize the corridors.
5.4 Unique Brand and Identity. Promote city-wide identity with the addition of gateway signs,
monuments, or other features to key entrances (especially to the east and north) that display the
City’s name and identifies the area as a distinct place.
Mobility Element:
2.1 Prioritize Public Right-of-ways. Prioritize improvements of public right-of-ways that provide
heightened levels of safe, comfortable and attractive public spaces for all non-motorized travelers
while balancing the needs of efficient vehicular circulation.
2.4 Sustainable Landscape. Use consistent and sustainable landscape and streetscape designs that
reflect the city’s community identity; showcase local assets and the community’s unique and vibrant
culture.
Fiscal Implications:
Removing Duratherm and Decomark from All American Asphalt’s contract will reduce the contract
amount by $175,627.50.These funds would be used at a later time for the same purpose when the
items are re-bid.Staff will return to Council at a future meeting with a recommended award for
construction following the bid process with a construction bid cost for Council consideration.
Attachments:
1.Council Selected Duratherm Design
2.All American Asphalt bid documents
3.Quote for new Duratherm/Decomark design
4.Duratherm Chip Sample Colors
Submitted by: Lucho Rodriguez, P.E., Deputy City Engineer
Concur: Glen W. C. Kau, P.E., Public Works Director/City Engineer
City of Hermosa Beach Printed on 4/3/2024Page 4 of 5
powered by Legistar™667
Staff Report
REPORT 18-0717
Noted for Fiscal Impact: Viki Copeland, Finance Director
Legal Review: Michael Jenkins, City Attorney
Approved: Suja Lowenthal, City Manager
City of Hermosa Beach Printed on 4/3/2024Page 5 of 5
powered by Legistar™668
Pattern Detail 3D View Pier + Hermosa4. Bright Winds of Change
669
ATTACHMENT 2
670
671
672
673
674
675
676
677
678
ATTACHMENT 3
679
680
681
682
683
684
From: noreply@granicusideas.com <noreply@granicusideas.com>
Sent: Monday, November 26, 2018 3:00 PM
To: Ann Yang <anny@hermosabch.org>
Subject: New eComment for City Council Meeting (Closed Session - 6:00 P.M. and Regular Meeting -
7:00 P.M.)
New eComment for City Council Meeting (Closed
Session - 6:00 P.M. and Regular Meeting - 7:00
P.M.)
Claudia Berman submitted a new eComment.
Meeting: City Council Meeting (Closed Session - 6:00 P.M. and Regular Meeting - 7:00 P.M.)
Item: 6b) REPORT 18-0717 REQUEST TO REMOVE DOWNTOWN HERMOSA AVENUE
CROSSWALK TREATMENTS FROM CURRENT CONTRACT WITH ALL AMERICAN
ASPHALT AND AUTHORIZE STAFF TO RE-ISSUE SEPARATE BID FOR CROSSWALKS
UNDER CAPITAL IMPROVEMENT PROJECT (CIP) 16-174 STREET IMPROVEMENTS (Public
Works Director Glen W.C. Kau)
eComment: I agree that the Duratherm should go to bid, due to the high increase in cost. Now
that there are actual samples for the Duratherm, I think that the "sand" and the "lemon yellow"
(option 1) combination clashes. So does the "lemon yellow" and the "Khaki". If you want to stick
to 2 colors in the provided samples, I suggest white with any of the other colors (e.g. option 2). It
may be good to select white for the patterned rays and crosswalk design, since that will be
consistent with the other white "painted" crosswalks on Hermosa Ave. that are not getting
Duratherm. Time permitting, it also may be good to see samples of other colors too, since the
brochure colors are very different than the samples.
View and Analyze eComments
685
City of Hermosa Beach
Staff Report
City Hall
1315 Valley Drive
Hermosa Beach, CA 90254
Staff Report
18-0722
Honorable Mayor and Members of the Hermosa Beach City Council
Regular Meeting of November 27, 2018
TENTATIVE FUTURE AGENDA ITEMS
Recommended Action:
Staff recommends that the City Council receive and file the tentative future agenda items.
Attachments:
Tentative Future Agenda
City of Hermosa Beach Printed on 4/3/2024Page 1 of 1
powered by Legistar™686
November 19, 2018
Honorable Mayor and Members Regular Meeting of
of the Hermosa Beach City Council November 27, 2018
TENTATIVE FUTURE AGENDA ITEMS
THURSDAY, NOVEMBER 29, 2018 @ 6:00 PM
APPOINTMENT OF MAYOR AND MAYOR PRO TEMPORE
DECEMBER 11, 2018 @ 6:00 PM INITIAL
DATE CLOSED SESSION: LABOR NEGOTIATIONS
DECEMBER 11, 2018 @ 7:00 PM
PRESENTATIONS
LOCAL CONTEST WINNERS OF THE COUNTY OF LOS ANGELES
PUBLIC LIBRARY 2018 CHILDREN’S BOOKMARK CONTEST
ANNOUNCEMENT OF THE WINNER OF THE 9TH ANNUAL PARKING PERMIT ART CONTEST
CONSENT CALENDAR
City Council Minutes City Clerk Ongoing
Check Registers Finance Director Ongoing
Recommendation to receive and file the action minutes of the Parks,
Recreation and Community Resources Advisory Commission meeting of
November 6, 2018
Community Resources Manager Ongoing
Purchase and installation of Pier Avenue Bus Stop Shelters & Furniture Environmental Analyst New Item
Recommendation to receive and file the action minutes of the Public Works
Commission meeting of May 16, 2018, July 18, 2018 and September 19,
2018
Public Works Director Ongoing
PUBLIC HEARINGS – 7:30 PM
Consideration of an Ordinance regulating Sidewalk Vending in compliance
with Senate Bill 946
Community Development Director Staff Request
Nov. 2018
Consider amendment of the Municipal Code adding Chapter 5.78 to the
Hermosa Beach Municipal Code (Tobacco Retailers) requiring licensure of
Tobacco Retailers and limiting sale of electronic smoking devices and
flavored tobacco products to reduce the illegal sale of tobacco to youth and
amending Section 1.10.040 to make violations of Chapter 5.78 subject to
administrative penalty procedures (Continued from meeting of August 25,
2015)
Community Development Director Aug 2015
MUNICIPAL MATTERS
Parking Lot D (Manhattan Ave and 14th Street) Final Designs Environmental Analyst Staff Request
Aug. 2018
MISCELLANEOUS ITEMS AND MEETING ATTENDANCE REPORTS - CITY COUNCIL
Schedule interviews for City Representative to the Los Angeles County West
Vector and Vector-Borne Control District Board
City Clerk New Item
Approval of City Council 2019 Meeting Schedule City Manager Annaul
OTHER MATTERS - CITY COUNCIL
Tentative Future Agenda City Manager Ongoing
687
2
DECEMBER 25, 2018 @ 6:00 PM
NO MEETING
JANUARY 8, 2019 @ 6:00 PM INITIAL
DATE CLOSED SESSION
JANUARY 8, 2019 @ 7:00 PM
CONSENT CALENDAR
City Council Minutes City Clerk Ongoing
Check Registers Finance Director Ongoing
Recommendation to receive and file the action minutes of the Planning
Commission meeting of December 10, 2018
Community Development Director Ongoing
Recommendation to receive and file the action minutes of the Parks,
Recreation and Community Resources Advisory Commission meeting of
December 4, 2018
Community Resources Manager Ongoing
CONSENT ORDINANCES
Ordinance regulating Sidewalk Vending in compliance with Senate Bill 946 City Clerk Council Direction
Dec 11, 2018
Amendment of the Municipal Code adding Chapter 5.78 to the Hermosa
Beach Municipal Code (Tobacco Retailers) requiring licensure of Tobacco
Retailers and limiting sale of electronic smoking devices and flavored
tobacco products to reduce the illegal sale of tobacco to youth and amending
Section 1.10.040 to make violations of Chapter 5.78 subject to administrative
penalty procedures
City Clerk Council Direction
Dec 11, 2018
PUBLIC HEARINGS – 7:30 PM
Consideration of an ordinance to allow and regulate wireless communication
facilities in the public right-of-way, and update on AT&T’s proposal for
multiple installation of smaller wireless communication facilities to provide
replacement coverage to existing sites located at 20th and 29th Court
(Continued from meeting of September 25, 2018)
Community Development Director Council Direction
Nov 28, 2017
MUNICIPAL MATTERS
Parking Lot D (Manhattan Ave and 14th Street) Final Designs Environmental Analyst Staff Request
Aug. 2018
Update on South Bay Guidelines for a Shared Mobility (bikeshare and e -
scooters) Pilot Program
Environmental Analyst Council Direction
Aug. 28, 2018
OTHER MATTERS - CITY COUNCIL
Tentative Future Agenda City Manager Ongoing
MONDAY, JANUARY 14, 2019 @ 6:00 PM
JOINT STUDY SESSION WITH EPAC
688
3
JANUARY 22, 2019 @ 6:00 PM INITIAL
DATE CLOSED SESSION
JANUARY 22, 2019 @ 7:00 PM
PRESENTATIONS
LOS ANGELES COUNTY FIRE SERVICES AND MCCORMICK AMBULANCE QUARTERLY UPDATE
CONSENT CALENDAR
City Council Minutes City Clerk Ongoing
Check Registers Finance Director Ongoing
Revenue and Expenditure Reports Finance Director Ongoing
City Treasurer’s and Cash Balance Report City Treasurer Ongoing
Public Works Project Status Report Public Works Director Ongoing
Recommendation to receive and file the action minutes of the Public Works
Commission meeting of November 28, 2018
Public Works Director Ongoing
Planning Commission Tentative Future Agenda Community Development Director Ongoing
Recommendation to receive and file the action minutes of the Planning
Commission meeting of January 15, 2019
Community Development Director Ongoing
Recommendation to receive and file the action minutes of the Emergency
Preparedness Advisory Commission meeting of November 5, 2018
Emergency Management
Coordinator
Ongoing
CONSENT ORDINANCES
Ordinance to allow and regulate wireless communication facilities in the
public right-of-way, and update on AT&T’s proposal for multiple installation
of smaller wireless communication facilities to provide replacement coverage
to existing sites located at 20th and 29th Court
City Clerk Council Direction
Dec 11, 2018
MUNICIPAL MATTERS
Adoption of Resolution Authorizing City Clerk Salary Adjustment and Direct
Staff to Draft a Ballot Measure for the November 2019 Election
City Clerk / City Manager’s Office Staff Request
Nov 5, 2018
OTHER MATTERS - CITY COUNCIL
Tentative Future Agenda City Manager Ongoing
689
4
PENDING STRATEGIC PLAN ITEMS INITIAL
COMPLETION
DATE
Update Personnel Policies Human Resources Manager
Beach Policy/Regulations (Continued from meeting of October 27, 2016) Community Resources Manager Sept-2016
Alternative Fuel Transportation Report Environmental Analyst Nov-2016
Encroachment Direction City Attorney Nov-2016
CCA Direction Environmental Analyst Dec-2016
Phase 3 Parking Meter Purchase Police Chief / Assistant to the City
Manager
Jul-2017
PENDING NEW ITEMS INITIAL
REQUEST
Initial Report on Options and Strategies for Installing a Permanent Carousel
or other Family Friendly Features at the Entry Point to Pier Plaza. In
Cooperation with the Chamber of Commerce, this would include a
Preliminary Cost Benefit Analysis and Implementation of the City Decision
Making Tool (supported by Duclos and Fangary)
Public Works Director Other Matters
Tree ordinance with respect to tree removal Public Works Director Staff Request
Consideration of re-establishing, on an as needed basis, both funding and
discretion for the director of Public Works to contract services to pump major
beach storm outfalls drains prior to anticipated major storm events (supported
by Duclos, Armato and Petty)
Public Works Director Other Matters
Policy discussion regarding city responsibilities and expectations when
donations are made to city
Finance Director Council Direction
Update on Visual Identity and Brand for the City of Hermosa Beach Environmental Analyst / Assistant to
the City Manager
Council Direction
Consideration of a position letter on federal gun control legislation
(supported by Fangary, Armato and Massey)
Assistant to the City Manager Other Matters
Report on Phase II of Library Assessment including Location Alternatives Community Resources Manager Staff Request
Strand Bikeway and Walkway Improvements at 35th Street Public Works Director Staff Request
Award of Contract for On-Call Traffic Engineering Services Public Works Director Staff Request
Special Event Policy Update and Subcommittee Direction Community Resources Manager
Update on bicycle infrastructure implementation & consideration of
designating a route in honor of Julian Katz
Environmental Analyst New Item
Consideration of proposed changes to the city right of way and public
facilities in the area of the proposed North School Project
Environmental Analyst Staff Request
Farmers Market Contract Renewal Community Resources Manager Staff Request
690