ADJOURNED REGULAR MEETING HERMOSA BEACH CITY COUNCIL
Monday, April 14, 1997 - Council Chambers, City Hall
6:00 p.m.
MAYOR CITY CLERK
J. R. Reviczky Elaine Doerfling
MAYOR PRO TEM CITY TREASURER
Sam Y. Edgerton John M. Workman
COUNCIL MEMBERS CITY MANAGER
Robert Benz Stephen R. Burrell
John Bowler CITY ATTORNEY
Julie Oakes Michael Jenkins
All council meetings are open to the public. PLEASE ATTEND.
The Council receives a packet with detailed information and recommendations on nearly every agenda item.
Complete agenda packets are available for public inspection in the Police Department, Fire Department, Public
Library, the Office of the City Clerk, and the Chamber of Commerce. During the meeting, a packet is also
available in the Council foyer.
CALL TO ORDER
;ga
PLEDGE OF ALLEGIANCE
ROLL CALL
PUBLIC PARTICIPAT 1 N
1.
�ras
fl6�,zF—
LOWER PIER AVENUE STREETSCAPE PROJECT - PROPOSED CHANGE IN
CONSTRUCTION PHASING. Memorandum from Publ. Works Direct r Amy Amirani
dated April 2, 1997. cS 1
RECOMMENDATION: Approve Unispec Construction's proposed modifications tCIO
o the `A
existing project phasing for the Lower Pier Avenue Project and approve changes to time of
completion, phasing, incentives and liquidated damages. Gt1
4t4 AeisL
CITIZEN COMMENTS I? �s
Citizens wishing to address the Council on items within the
this time. Please limit comments to three minutes.
ADJOURNMENT q 0
cDs
r► �%' (A-,KAtd
a
e-Gy7dzelt
ouncil's jurisdiction may do so at
Ply
15
5sC IT 117,0-e ct
Iiiee Ai Ha'
3-7Usx*
w 7/'
i/-icex-"
CbsUv- 6"-4' &6°Aix- rte7L
iteuite_ 6 --eau / 6'6`o AA- fry'cack
S -00) 600
Ct- maxi f
�o is
1
/Ka() 1440 -e440 -e5
- :1474 de-6(44-ef 14e-661
irl
t/dAt-vitete
bsoJYCS i�.��csz
'464- 1,`(4'u2 e-eA-4(9-Q
-*1
Mcsii..412_1206.7k
" C I
a(K401101i$ Z5ttX•taa of # L,6-*(/1<fli°
CSS
8Z
LZ
9t 12 -e'54-5
5Z
t3
£Z
ZZ
TZ
03
61
8T
LT
91
5T
VT
£T
ZT
TT
01
6
8
L
9
5
j7
Z
T
442_
---- a ..\51
6c)(4q-iz--
aiLeciticL
V
2:s---3m,S1--7 4',_,_ cL –6T_e2.__
—7/-fddir4Kee–fiwarm
/ 0434-
4. L
0 13/J 0 `)-70
&() o c;frrit:
s 41.6
/0 7M/141
t (1,4,4 rei-
Jose (:)e)
4.14Avic et Cul te 604-
0,-?*
8Z
�• 41�s
LZ
9Z
9Z
173
£Z
ZZ
TZ
0Z
61
8T
Lt
91
trT
£T
pg ---5940-— • ZT
TT
Gr t 01
6
1 -If 1\ 14 1 J J 1 I.-) • 41 WI -1 I JUIN LIMING
1J OGO YJ YJ I'O r . YJ4
CHANGE ORDER NO. 19
LOWER PIER AVENUE STREETSCAPE (CIP 94-160)
CITY OF HERMOSA BEACH
Gentlemen:
You are hereby directed to perform the work in accordance with the herein described changes
from the plans and specifications relative to work sequence, time for completion, payment of
incentives and liquidated damages. All work shall be done in accordance with the applicable
provisions of the plans and specifications. NOTE: This change order is not effective until
approved by Owner.
DESCRIPTION OF CHANGE
A. This Change Order approves modifications to the Work Sequence Section 01010 §1.08B of the Project
Specifications to allow Phases IV, V, VI and VII to commence before the previous phase is substantially
complete.
B. This Change Order modifies the Time of Completion Section 01010 §1.10A, B and C of the Project
Specifications as follows:
Paragraph A: Final Completion Date will now be June 9, 1997.
Paragraph B: Incentives, will be paid as follows:
If Phases IV & V, Sidewalk areas on the north and south sides of Pier Avenue, are both
completed on or before May 9, 1997 the contractor shall receive a one time lump sum incentive of $20,000_
If Phase VI, The Hermosa/Pier Avenue Intersection, is complete on or before May 17, 1997
the contractor shall receive a one time lump sum incentive of $20,000.
Paragraph C: Liquidated damages alleged by City to have accrued to date are hereby waived;
all requests for extensions of time and damages alleged by Contractor due to delay are hereby waived.
Liquidated damages, if assessed, will be as follows:
Phase IV & V, Sidewalk areas on the north and south sides of Pier Avenue to be complete
by May 17, 1997 or the contractor shall incur liquidated damages of $4,000/day.
Phase VI, The Hermosa /Pier Avenue Intersection, to be complete
contractor shall incur liquidated damages of $10,000/day from May 24 to May 31, 19 • an • 0,000/day
thereafter.
May 23, 199
or the
Phase VII Final Completion including all fabricated items and palm trees shall be complete
by June 9, 1997 or the contractor shall incur liquidated damages of $4,000/day from June 10, 1997 through
June 20, 1997 and $10,000/day thereafter.
PW#8/chngord_doc
I,
rirr\ i i i.JJ1
1J • '-11 R 1 l.I 1r1r\LJ f WI -I I JUI'I LI -1 -
1J OGD YJYJ f r .!'J.)/U•4
For purposes of assessment of liquidated damages pursuant to the above schedule, the word
"complete" shall mean that items called for in the plans and specifications have been
constructed/erectedfinstalled in a substantially complete manner and in accordance with the plans and
specifications. Liquidated damages will not be assessed if minor corrections are not performed by the above
specified dates, as long as those minor corrections are made by July 3, 1997: after July 3, 1997, liquidated
damages will accrue for noncompletion of those items at the highest to set forth above for the releva t
phase. 34
REASON FOR CHANGE
Delays and extra work have extended the time to complete the contract New phasing, completion and
milestone dates reflect all delays, extra work, weather days and time -related change orders signed or
unsigned, submitted or not, experienced up to the date of acceptance endorsed below.
COST OF CHANGE No cost
CONTRACT TIME ADJUSTMENT
Contract extended per above agreed upon changes
This change order contains an agreed upon change in the schedule and sequencing in the
performance of the work, an adjustment of incentives and liquidated damages to be applied
hereafter, and a mutual waiver of time, sequencing and delay -related damages accrued to
both Owner and Contractor to the date hereof. With regard to the waiver, this change
order constitutes a release by both the Owner and the Contractor of any time, sequencing
or delay -related claims of any kind or nature in existence to date, is entered knowingly and
voluntarily with advice of counsel, and with knowledge of the provisions of California Civil
Code Section 1542, which provides as follows:
"A general release does not extend to
claims which the creditor does not know
or suspect to exist in his favor at the •
time of executing the release, which if
known by him must have materially affected
his settlement with the debtor."
This change order is not effective unless approved by Hermosa Beach City Council and the
contractor's surety.
RECOMMENDED BY:
DATE
ACCEPTED BY: DATE
.P. Engineer Contractor
PW#8/chngord.doc
HI'K-14-1'J'i f 15.41
K1LrIHKUb, WH I SUN LHF4G GLi bGb UOYd t -'. U4/04
Director of Public Works Contractors Surety
Mayor, Hermosa Beach City Council
PW#8/chngord.doc
TOTAL P.04